Drawing.pdf
PDF 4 MB Posted
- Solicitation number
- W90VN924R0076
About this file
This document appears to be an Operation and Maintenance Manual for a granular activated carbon (GAC) water treatment system at Camp Walker, South Korea. The manual provides detailed step-by-step procedures for charging new carbon into the vessels, performing initial and normal backwashing, normal operation, removing spent carbon, and short-term and long-term system shutdown. It also includes performance monitoring requirements, with guidance to replace the GAC in a vessel if PFOA and PFOS levels exceed 150 ng/L. The related federal contract opportunity is a solicitation to replace the activated carbon filters at B344, Camp Walker. The solicitation provides additional details on the required services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN924R0076.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNIT #15746, APO AP 96218-5746
DATE:
NOT TO SCALE
ESTIMATION Br.
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION Br.
ENCLOSURE
TRASH
RACK
BICYCLE
ENCLOSURE
TRASHFUEL TANK
GENERATOR/
FUEL TANK
GENERATOR/
RACK
BICYCLE
P S
X
PS
X
R A
C K
B I
C Y
C L
E
RACK
BICYCLE
BLDG #800
TOWER-1
PARKING STRUCTURE
ENCLOSURE
TRASH
RACK
BICYCLE
ENCLOSURE
TRASH
FUEL TANK
GENERATOR/
FUEL TANK
GENERATOR/
RACK
BICYCLE
P S
X
PS
X
RACK
BI
CYCLE
RACK
BI
CYCLE
PROJECT LOCATION PLAN
610611
KELLY FIELD
Golf Course
Tennis Court
DRIVING
RANGE
Golf Course
Golf Course
Golf Course
PENNSYLVANIA AVENUE
W I S
C O
N S I N
S
T R
E E
T
IN
DI
ANA
AVENUE
W
IS
C O
N S
IN
S T
R E E T
U T
A H
S T
R E E T
GEORGIA STREET
T E
X A S
S T
R E E T
R H
O D E
IS
L A
N D
S T
R E E T
T E
X A S
S T
R E E T
WASHINGTON STREET
C A L
IF
O R
N
IA
S T
R E E T
GEORGI
A
STREET
N E
B R
A S
K A
S
T R
E E
T
C A L
IF
O R
N
IA
S T
R E E T
R H
O D
E
IS
L A
N D
S
T R
E E
T
P E N N S Y L V A N
IA
A V E N U E
T E
X A S
S T
R E E T
Substation
351 423
PARK
SKATE
BLDG #810
TOWER-2
BLDG #820
TOWER-3
PARKING STRUCTURE
PARKING STRUCTURE
BLDG #830
TOWER-4
PARKING STRUCTURE
Daemyeong-dong, Nam-gu, Daegu, South Korea
CAMP WALKER
J1-00063-3J
B344, CAMP WALKER
AT WATER TREATMENT PLANT(WTP)
REPLACE ACTIVATED CARBON FILTERS
GATE #4
GATE #6
PROJECT LOCATION PLAN
B344, Camp Walker
LOCATION: Water Treatment Plant(WTP)
FEWR # J1-00063-3J
THIS PROJECT
A B C D E F
IT] IT]
00 0
10'-(S- 10·-0· � 10'-0" J
� w w
GAC SYSTEM FLOOR PLAN
G
�t
Fl@@ir ID1rairr11
SYMBOL ZONE
H
0 IT]
12° � 12°
R@llrJ� ID@@
IPtra� W /Clearr11@rJt
2 J@rr11 M@rr11@1r�!I 400 IP C ID1rairr11 lirr11e t@Sa imry Seweir
9•�2·' w
DESCRIPTION
REVISIONS
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
l@ StmmSewe
DATE BY CHK. APVD.
BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION 8.-.
REVIEWED BY
0 & M
FES
FORCE PROTECTION
HOUSING DIV.
SAFETY REP
UNIT •t5746, APO AP 96218-5746
DESIGNED BY
CHECKED BY
SUBMITTED BY
APPROVED BY
CHIEF,
ESTIMATION
DATE:
USING AGENCY
SIGNAL REP
Br.
REPLACE ACTIVATED CARBON FILTERS
AT WATER TREATMENT PLANT(WTP)
B344, CAMP WALKER
GAC SYSTEM FLOOR PLAN
•�trr 'TO SCALE
DRAWING NO.
SHEET OF
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNIT #15746, APO AP 96218-5746
DATE:
NOT TO SCALE
ESTIMATION Br.
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION Br.
J1-00063-3J
B344, CAMP WALKER
AT WATER TREATMENT PLANT(WTP)
REPLACE ACTIVATED CARBON FILTERS
GAC SYSTEM SECTION VIEW A - A"
GAC SYSTEM BUILDING LAYOUT
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNIT #15746, APO AP 96218-5746
DATE:
NOT TO SCALE
ESTIMATION Br.
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION Br.
J1-00063-3J
B344, CAMP WALKER
AT WATER TREATMENT PLANT(WTP)
REPLACE ACTIVATED CARBON FILTERS
GAC SYSTEM SECTION VIEW B - B"
GAC SYSTEM BUILDING LAYOUT
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNIT #15746, APO AP 96218-5746
DATE:
NOT TO SCALE
ESTIMATION Br.
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION Br.
J1-00063-3J
B344, CAMP WALKER
AT WATER TREATMENT PLANT(WTP)
REPLACE ACTIVATED CARBON FILTERS
PIPE & INSTRUCTION DIAGRAM
PIPE & INSTRUCTION DIAGRAM
Perfluorinated Compounds Sampling and Mitigation, Republic of Korea Revision 1 APTIM Project No. 500889 September 2018 Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-1
1.0 Charging Carbon to Vessel (탱크에 활성탄 충전)
1. Inspect vessel internals, remove all foreign debris.
활성탄 충전전 탱크내부 검사를 하며, 이물질발견시 제거함
2. Verify all manways and valves are closed.
모든 밸브가 잠기고 탱크내출입뚜껑이 완전히 밀봉돼었는지 확인한다
3. Fill vessel with potable water using backwash supply line. (백 워쉬 공급수로 탱크내부에
물채우기)
A. Open vessel 2-inch manual vent valve.
탱크위에서 내려오는 2 인치 공기배출구 밸브를 연다
B. Open backwash supply line’s, backwash shutoff valve (BWSV).
백워쉬 공급수 밸브 (BWSV) 를 연다
C. Slowly open the vessel backwash valve (A-V12, A-V11, B-V12, or B-V11/ Vessel #1, #2, #3, or #4, respectively) until the backwash water flow rate is approximately 100 gallons per minute (GPM).
백워시의 공급배관의 유량계를 보며 순간유량이 100 (GPM) 정도되도록 백워쉬 밸브 (A-
V12, A-V11, B-V12, B-V11) 를 개방한다.
D. Continue to fill until water is discharged from the vessel’s manual vent line. Close manual vent valve and allow vessel to pressurize to normal base water pressure (55 to 65 pounds per square inch gauge [psig]).
탱크위에서 내려오는 2 인치 공기배출구에서 물이 나올때까지 물을채우며, 물이 나오기
시작하면 2 인치 공기배출구밸브를 닫고, 평상시의 가동압력인 55 ~65 PSI 정도까지
탱크에 물을 채운다
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-2
E. Close all valves.
C 항목에 열었던 모든 밸브를 잠근다
4. Check for leaks.
육안으로 탱크 및 주변 파이프와 밸브등에서 누수가있는지 점검한다
5. Add chlorine to disinfect vessel internals.
탱크내부 살균을위헤 정해진량의 염소를 투입한다
6. Conduct bacteria testing, per American Water Works Association C653-03 to meet applicable requirements.
AWWA C-653-03 의 정해진 요건에 합당하는 박테리아 테스트 시행
7. Drain vessel to discharge chlorinated water. (탱크살균에 사용한 물 방류)
A. Open manual vent valve.
탱크위에서 내려오는 2 인치 공기배출구밸브를 개방한다
B. Open backwash effluent valve (A-V10, A-V9, B-V10, or B-V9/ Vessels #1, #2, #3, or #4, respectively) until flow stops.
백워쉬방출밸브 (A-V10, A-V9, B-V10, B-V9) 을 개방한다
C. Drain remaining water with 2-inch vessel drain valve.
탱크하부에있는 2” 배수밸브를 이용하여 탱크내 남아있는잔류물을 방류한다
D. Close drain valve and backwash effluent valve.
탱크하부 2 인치 배수 밸브와 백워쉬 방출밸브를 (A-V10, A-V9, B-V10, B-V9) 잠근다
8. Open the top manway to allow carbon to be placed in the vessel using dry filling methods.
활성탄 투입을 위해 탱크위의 투입구 뚜껑을 연다 (뚜껑 개봉시 뚜껑과 조임장치가
탱크내로 빠질염려가 있으니 주의하여야 함)
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-3
9. Fill GAC vessel with potable water to approximately 1 to 2 feet above underdrains. This can be verified by opening the lower ¼ inch granular activated carbon (GAC) sample bed valve and filling water into the vessel until water flows out of the sample valve.
탱크를 정수된물 (백워쉬 공급수)로 하부배수 보다 30 ~ 60 쎈티정도 위로 채운다. 이 수면
높이는 탱크옆에설치된 0.25 인치 활성탄 샘플밸브를 열어놓고 탱크에 채우는 물이 이 밸브를
통해 나올때이다
10. Fill GAC vessel with 12,000 pounds of GAC.
각 탱크당 약 5.5 톤의 활성탄을 투입한다
11. Close and secure vessel’s top manway.
탱크위 활성탄 주입구주변을 청소하고 뚜껑을 닫는다
12. Refill the GAC vessel with potable water using the backwash supply line (see Section 1.0, “Charging Carbon to Vessel,” Step 3 above).
각 탱크를 백워시 공급수로 채운다 (위 항목 3 번 참조)
13. Allow the carbon to soak for 24 hours.
탱크를 물로 채운후 활성탄에 물이 스며들도록 24 시간동안 한다
14. Open the vessel’s top vent valve and fill additional water into the vessel until all air pockets are released from the vessel (this may also be necessary periodically during initial operation since the carbon has microscopic fines that continue to release air over a period of approximately 1 week).
탱크위에서 내려오는 2 인치 배출구밸브를 개방하고, 탱크내부의 잔류공기가 빠질때까지
물을 채운다 (활성탄의 미세공간내의 공기를 완전히 제거하기위해서는 약 1 주일간 같은
과정을 반복하여야 한다)
15. Carbon charging is complete (see Section 2.0, “Initial Carbon Backwashing” for next step).상
기 과정으로 활성탄 투입완료 (“초기 활성탄 백워쉬” 과정은, 2.0 항을 참조)
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-4
2.0 Initial Carbon Backwashing (초기 활성탄 백워쉬 )
1. Verify all valves are closed and that there are no leaks from the vessel.
모든밸브가 잠금상태이며, 탱크에서의 유수가 없는지를 확인한다
2. Notify the Department of Public Works Waste Water Treatment Plant of intended backwashing operation.
오수처리장에 백워쉬 계획과 일정을 통보한다
3. Open backwash supply valve BWSV.
백워쉬 공급수 밸브를 개방한다
4. Open GAC backwash influent valve (A-V12, A-V11, B-V12, or B-V11/Vessels #1, #2, #3, or #4, respectively) per Valve Charts A-3, A-4, B-3, and B-4.
밸브 도면 (A-3, A-4, B-3, B-4)에 묘사한대로, 백워쉬 입수밸브 A-V12 (탱크 #1), A-V11 (탱크
# 2), B-V12 (탱크 #3), B-V11 (탱크 # 4) 를 개방한다
5. Slowly open backwash effluent valve (A-V10, A-V9, B-V10, or B-V9/Vessels #1, #2, #3, or #4, respectively). Use the backwash effluent valve to backwash at the following flow rates and durations in Table below:
백워쉬 배수밸브를 밑에 기재된 유속과 개방에 맞추어 천천히 개방한다. 백워시는 한번에
한탱크씩 하며, 각탱크에 해당되는 밸브는, A-V10 (탱크 #1), A-V9 (탱크 # 2), B-V10 (탱크
#3), B-V9 (탱크 # 4) 이다
Initial Backwashing
Stage Rate GPM Duration (per minute) Total Gallons
1 500 10 5,000 2 750 10 7,500 3 950 5 4,760 4 500 5 2,500 Total 30 19,760
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-5
초기 백워쉬
단계 분당유량 (GPM) 백위쉬시간 (분) 총유량 (GPM)
1 500 10 5,000
2 750 10 7,500
3 950 5 4,760
4 500 5 2,500
합 계 30 19,760
6. Collect water samples from the vessel’s top vent valve to observe water quality of backwash water. (Note: if GAC product is in backwash water, slow the backwash flow rate. On the final step, make sure the water quality has cleared and only very light fines are present.)
탱크위의 2 인치 공기배출구로 물의 샘플받아서 백워쉬 하는동안 물의 상태를 관찰한다 (만일
활성탄이 물에 석여있으면, 백워쉬 분당유량을 줄여서 활성탄이 유출을 방지한다. 마지막
4 단계에서는 백워쉬하는물이 맑아야하며, 미세한입자의 활성탄만 관찰되어야 한다)
7. After backwashing is complete, close all valves including BWSV.
백워쉬완료후 백워쉬공급수 밸브를 비롯한 모든 밸브를 잠근다
8. Backwash each vessel that new GAC is placed in.
새로운 활성탄이 투입된 모든탱크는 백워시 하여야 한다
9. Backwashing is complete (see Section 3.0, “Normal Operation [Vessels #1, #3 lead/Vessels #2, #4 Lag”).
상기과정으로 백워시 완료 ( 지하수가 탱크 # 1 & 3 으로선도하여, # 2 & 4 로 넘어가는
정상정수에 대한 과정은 3.0 항목을 참조)
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-6
3.0 Normal Operation (Vessels #1, #3 Lead/Vessels #2, #4 Lag) 정상정수 (지하수가 탱크 # 1 & 3 으로선도하여, # 2 & 4 을 거치는 정수과정)
1. Open GAC valves (A-V2, A-V3, A-V6, and A-V7: B-V2, B-V3, B-V6, and B-V7) per valve charts A-1 and B-1.
밸브챠트에 묘사한대로 GAC 밸브 (A-V2, A-V3, A-V6, A-V7 / B-V2, B-V3, B-V6, B-V7) 를
개방한다
2. Open Stripper # 1 and #2 to GAC influent valves.
스트리퍼 타워 # 1 과 #2 에서 GAC 시스템으로오는 밸브를 개방한다
3. Open GAC flow control valves (CV-01 and CV-02) until fully open.
GAC 시스템으로 들어가는 밸브 CV-01 과 CV-02 를 완전 개방한다
4. Close Stripper #1 and #2 to clarifier influent valves.
스티리퍼 타워 # 1 과 #2 에서 클레어퍼이어로 가는 밸브를 잠근다
5. Use GAC flow control valves to regulate desired flow rate to Train A or Train B.
GAC 유량조절 밸브를 사용해 Train A 와 Train B 로 원하는 유량을 조절한다
6. Monitor and record pressure gauges (PI-01 to PI-06) daily.
압력계 (PI-01 ~ PI-06) 를 관찰하고, 기록한다
7. Monitor and record differential pressure meters (dP-01 and dP-02) daily (note if differential pressure exceeds 15 psig than conduct normal backwashing per Section 5, “Normal Backwash”).
차압계 (dP-01 과 dP-02) 를 관찰하고 기록한다. (차압이 15 PSIG 를 넘으면, 항목 5.0 “정상
백워쉬” 에 기술한대로 백워쉬를 실시한다.
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-7
8. Monitor and record flow rates and total flow volume from flow meters FE-01, FE-02, FE-03 daily.
유량계 (FE-01, FE-02, FE-03) 의 유속과 총유량 을 관찰하고, 기록한다
9. Conduct daily inspection for leaks or abnormal operating conditions.
매일 GAC 시스템의 유수나 비정상적인 작동이 없는지 검사한다
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-8
4.0 Normal Operation (Vessels #2, #4 Lead/ Vessels #1, #3 Lag 정상정수 (지하수가 탱크 # 2 & 4 으로선도하여, # 1 & 3 을 거치는 정수과정)
1. Open GAC valves (A-V1, A-V4, A-V5, and A-V8: B-V1, B-V4, B-V5, and B-V8) per valve charts A-2 and B-2.
밸브도면에 묘사한대로 GAC 밸브 (A-V1, A-V4, A-V5, A-V8 / B-V1, B-V4, B-V5, B-V8) 를
개방한다
2. Follow Steps 2 through 9 in Section 3.0, “Normal Operation (Vessels #1, #3 Lead/Vessels #2, #4 Lag)”.
항목 3.0 “정상정수” (지하수가 탱크 # 1 과 # 3 으로 선도하여, # 2 와 4 를 거치는 정수과정)
의 과정 2 번부터 9 번을 시행한다
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-9
5.0 Normal Backwash (Vessels #1, #2, #3, or #4) (정상 정수중 백워쉬)
1. Backwash only one vessel at a time.
정수중 정상 백워쉬는 탱크하나씩 실시하다
1. Close GAC train valves (A-V2, A-V3, A-V6, and A-V7 or B-V2, B-V3, B-V6, and B-V7).
GAC Train 의 다음밸브들을 잠근다 (A-V2, A-V3, A-V6, A-V7 / B-V2, B-V3, B-V6, B-V7)
2. Open backwash supply valve BWSV.
백워쉬 공급수 밸브 (BWSV) 를 개방한다
3. Open GAC vessel backwash influent valve (A-V12, A-V11, B-V12, or B-V11/Vessels #1, #2, #3, or #4, respectively) per Valve Charts A-3, A-4, B-3, and B-4.
밸브도면 (A-3, A-4, B-3, B-4) 에 묘사한대로, GAC 탱크의 백워쉬 공급수 밸브를 연다 (탱크#1:
A-V12, 탱크#2: A-V11, 탱크#3: B-V12, 탱크#4: B-V11)
4. Slowly open backwash effluent valve (A-V10, A-V9, B-V10, or B-V9/Vessels #1, #2, #3, or #4, respectively). Use the backwash effluent valve to backwash at the following flow rates and durations in table below:
백워쉬 배수밸브를 밑에 기재된 유속과 개방시간에 맞추어 천천히 개방한다. 백워시는 한번에
한탱크씩 하며, 각탱크에 해당되는 밸브는, A-V10 (탱크 #1), A-V9 (탱크 # 2), B-V10 (탱크
#3), B-V9 (탱크 # 4) 이다
Normal Backwashing
Stage Rate GPM Duration
(per minute) Total Gallons 1 300 5 1,500 2 500 10 5,000 3 300 5 1,500
Total 20 8,000
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-10
정상 정수중 백워쉬
단계 분당유량 (GPM) 백위쉬시간 (분) 총유량 (GPM)
1 300 5 1,500
2 500 10 5,000
3 300 5 1,500
합 계 20 8,000
5. Collect water samples from the vessel top vent valve to observe water quality of backwash water. (Note: if GAC product is in backwash water, slow the backwash flow rate. On the final step, make sure water quality has cleared and only very light fines are present.)
탱크위의 2 인치 공기배출구로 물의 샘플받아서 백워쉬 하는동안 물의 상태를 관찰한다 (만일
활성탄이 물에 석여있으면, 백워쉬 분당유량을 줄여서 활성탄이 유출을 방지한다. 마지막 3
단계에서는 백워쉬하는물이 맑아야하며, 미세한입자의 활성탄만 관찰되어야 한다)
6. After backwashing is completed, close all valves including BWSV.
백워쉬완료후 백워쉬공급수 밸브를 비롯한 모든 밸브를 잠군다
7. Vessel backwashing is complete (see Sections 3.0 or 4.0 for normal operation).
상기과정으로 백워시 완료 (정상정수에 대한 과정은 3.0 항목을 참조)
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-11
6.0 Removal of Spent Carbon from Vessel (탱크에서 활성탄 제거)
1. Close all GAC train valves (A-V1 to A-V12).
GAC Train 의 모든 밸브를 잠근다
2. Connect carbon receiving tanker truck via 4-inch 125 pounds per square inch (psi) pressure rated hose to truck.
활성탄을 적재할수있는 탱크트럭에 4 인치 호스를 연결한다 (호스의 압등급은 125 PSI
이상어야함)
3. Connect compressed air line to 3/4-inch ball valve in fill line.
활성탄 투입관의 ¾ 인치 밸브에 압축공기 공급호스를 연결한다
4. Open air line ball valve to pressurize vessel to 10 to 15 psi.
압축공기를 탱크압이 10 PSIG 에서 15 PSIG 까지 채운다
5. Leaving the air ball valve open, open the carbon slurry discharge valve and allow the entire contents of the vessel to transfer to the receiving tanker truck.
압축공기 밸브를 개방한 상태에서, 탱크하부의 활성탄 방출밸브를 열어서, 탱크내의 모든
활성탄이 탱크트럭으로 옮겨가도록 한다
6. Close carbon slurry valve and compressed air valves immediately upon the discharge of all water from the vessel.
탱크내부의 모든물이 빠지는 즉시, 압축공기 밸브와 활성탄 방출밸브를 잠근다
7. Additional washing of carbon may be accomplished if necessary by adding 1 to 3 feet of water into the vessel through the backwash supply valve (A-V11, A-V12, B-V11, or B-V12 [Vessels #1, #2, #3, or #4, respectively]) or through the vessel influent lines (A-V1, A-V2, B-V1, or B-V2 [Vessels #1, #2, #3, or #4, respectively]). Repeat the pressurization and carbon slurry transfer process to empty water from the vessel.
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-12
탱크내의 잔여 활성탄을 방출하려면 백워쉬 공급수를 사용하거나, 탱크로 공급되는 물을, 탱크하부에서 30 쎈티에서 90 쎈티정도 채워서, 위에 기슬한 활성탄 방출과정을 반복한다.
백워쉬공급수로 채우기 위해서는 개방해야하는 밸브는 A-V11 (탱크 #1), A-V12 (탱크 #2), B-V11 (탱크 #3), B-V-12 (탱크 #4) 이며, 탱크 공급수로 채우려면 개방해야하는 밸브는 A-
V1 (탱크 #1), A-V2 (탱크 #2), B-V1 (탱크 #3), B-V2 (탱크 # 4) 이다
8. After transfer, depressurize vessel with top vent.
활성탄 방출이 완료후, 탱크내부의 압을뺀다
9. After venting, the top or side manways may be opened for vessel inspection or cleaning.
탱크내의 압을 뺀후, 내부의 검사나 청소를 위해, 탱크위 활성탄 투입구나, 탱크옆의 검사구를
활용할수 있다
7.0 Short Term Shutdown (Less than 48 Hours) 단기간 가동 중지 (48
시간이내)
1. Close all vessel valves, open vessel’s top vent valve to relieve thermal expansion pressure build-up.
탱크의 모든 밸브를 잠그고, 열팽창으로 인한 탱크내부의 압력상승을 막기위해 탱크위에서
내려오는 2 인치 공기 배출구 밸브를 개방한다
8.0 Long Term Shutdown (Great than 48 Hours) 장기간 가동 중지 (48 시간
이상)
1. Close all vessel valves, open vessel’s top vent valve and allow venting.
탱크의 모든 밸브를 잠그고, 위에서 내려오는 2 인치 공시 배출구를 개방한다
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
G-13
2. Open bottom drain valve to drain vessel.
탱크하부의 배수 밸브를 개방한다
3. Open low point pipe drains if necessary to drain stagnant water.
탱크내의 잔루 배수를위해서, 파이프 하부에설치된 배수플러그 개방한다
4. Refill vessel with water before starting operation.
정수를 다시 시작하기 전에 탱크에 물을 채운다
9.0 Performance Monitoring (정수과정 모니터링)
1. Collect water sample from lead GAC vessels (SV-02, SV-03, SV-05, or SV-06 [Vessels #1, #2, #3, or #4, respectively]), as appropriate every three months.
3 개월 주기로 선도 탱크의 정수된 물의 샘플을 채취한다. 각 탱크의 샘플밸브는 SV-02
(탱크#1), SV-03 (탱크#2), SV-05 (탱크#3), SV-06 (탱크#4) 이다
2. If lead GAC vessel perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) concentrations exceed 150 nanograms per liter of total PFOA and PFOS individually or combined, then schedule replacement of vessel GAC.
만일 선도탱크의 PFOA 와 PFOS 의 개별 함유량이 리터당 150 나노그램 (ng) 이상이거나, 혹은 PFOA 와 PFOS 의 합친 함유량이 150 나노그램 (ng) 이상일경우에는, 활성탄을 교체하여야 한다.
Operation and Maintenance Manual - Camp Carroll 500889-SE-MA-000001
USACE Contract W9128F-12-D-0003 Task Order 0036 Aptim Federal Services, LLC Appendix G
| Drawing |
| J1-00063-3J GAC 343-Default-0001 |
| J1-00063-3J GAC 343-Default-0002 |
| J1-00063-3J GAC 343-Default-0003 |
| J1-00063-3J GAC 343-Default-0004 |
| J1-00063-3J GAC 343-Default-0005 |
| Encl #6_HS-00051-3J_Drawing |
| Encl #6_HS-00051-3J_Drawing |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Camp Carroll O-M Step by Step procedures_Korean_Translation |
| HS-00051-3J Replace activated carbon with new at Water Trea-Default-0001 |
| HS-00051-3J Replace activated carbon with new at Water Trea-Default-0002 |
File details come from the government source that posted it. Updated .