Draft_SOW.pdf

PDF 179 KB Posted

Attached to
A49/108B Chilled Water Distribution Unit Upgrade with Piping
Solicitation number
N00173-23-RFI-JD22
Issued by

About this file

This document outlines a Statement of Work (SOW) for a federal contract to upgrade two Coolant Distribution Units (CDUs) and associated piping at a Naval Research Laboratory facility. The scope of work includes removing four existing Liebert CDUs and secondary piping under a raised floor, and installing two new CDUs rated at 1350 kilowatts each with compatible primary and secondary connections. The contractor must also install a new secondary piping system with manifold, branch mains, and 48 taps to supply existing and future in-row cooling units. Additional requirements include installing electrical components, glycol mix, strainers, and providing training, drawings, start-up services, leak testing, and a one-year warranty. The related federal contract opportunity is a pre-solicitation notice from the Department of the Navy seeking proposals to perform the CDU and piping upgrade work outlined in the SOW.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

A49/108B COOLANT DISTRIBUTION UNIT UPGRADE

1. Introduction

The Cyber Operations Division at the Naval Research Laboratory (NRL) located at 4555 Overlook Ave SW, Washington DC, has a requirement to upgrade its cooling infrastructure with two new High-Density Coolant Distribution Units (CDUs) and associated piping for 24 APC in-row cooling (IRC) units. The existing CDUs and piping are aging and incapable of meeting the increasing demand for cooling. The new CDUs will enhance efficiency, reliability, and ensure that the overall cooling infrastructure is better equipped to meet current and future cooling requirements at this NRL facility.

2. Scope

The Contractor shall furnish all parts, labor, transportation, materials and supplies required to remove four existing Liebert CDUs and all associated piping located under a raised floor. The Contractor shall be responsible for providing and installing two new Coolant Distribution Units and all related piping to 8 existing APC in-row cooling units and 16 future APC in-row cooling units. The Contractor must ensure that the new CDUs meet all necessary specifications, including compatibility with the current primary chilled water system, the existing IRC units, and any other relevant equipment. All components must be installed in accordance with industry standards and manufacturer specifications to ensure optimal performance and proper functioning of the new CDUs.

3. Requirements

The Contractor shall remove 4 existing Liebert CDUs and all associated secondary piping under a 16.5-inch raised floor to include the removal of all electrical power feeds, mechanical connections, external pumps and controls, and dispose of all fluid from each of the existing units and associated piping. The Contractor shall place the 4 existing CDUs in the NRL A49 warehouse to be repurposed for future use.

The Contractor shall provide and install two new CDUs with a minimum rating of 1350 kilowatts each. The CDUs must be installed on top of a raised floor inside NRL’s computer room and be compatible with both a 4-inch primary top connection and secondary bottom connection. Additionally, the CDUs must be equipped with network interface cards that enable real-time and historic remote monitoring, an automatic and manual backflush filter system to maintain optimal coolant quality, and configured in an N+1 setup to ensure redundancy.

The Contractor shall provide and install all necessary equipment, including piping, valves, fittings, pumps, and related components, to deploy a new secondary piping system under the raised floor (16.5-inches). This secondary piping system shall include an insulated 4-inch copper manifold with a main supply and return header, 3 branch mains, and a total of 48 taps to supply coolant from both CDUs to 8 existing and 16 future APC in-row cooling units with a combined maximum flow rate of 324 gallons per minute. The Contractor is required to install the necessary components to ensure that the secondary piping system can be extended into two adjacent rooms to support the installation of future APC in-row cooling units. Additionally, the Contractor shall connect the primary top connection of each CDU to an existing 4-inch chilled water supply and return isolation valve located directly above the location of the new CDUs. Furthermore, the Contractor shall provide and install a new insulated condensate drain line system routed to the nearest drain.

The Contractor shall provide and install new isolation valves, circuit setters, fittings, and all necessary parts to provision 48 supply and return taps on the new secondary piping system. These components must be compatible with Parker hydraulic quick couplings to support the new piping connections of the 24 in-row cooling units. Additionally, all new isolation valves, circuit setters, fittings, and related components must match the configuration, size, and manufacturer specifications of the existing components on the current secondary piping system. NRL will provide and complete all piping connections from both the existing and future in-row cooling units to the new secondary piping system.

The Contractor is required to supply and install a glycol mix to fill the secondary piping system, that must provide coolant to both existing and future in-row cooling units. Additionally, the Contractor is responsible for ensuring that the glycol mix is properly prepared and installed in accordance with design parameters and manufacturer specifications, including conducting all necessary testing and adjustments to ensure the mixture complies with the manufacturer’s requirements.

The Contractor is responsible for providing and installing new primary side bypass strainers. These strainers must be compatible with the current 4-inch primary top connection to the new CDUs. Additionally, the Contractor is responsible for ensuring that the bypass strainers meet all necessary specifications and are properly installed, tested, and adjusted to ensure optimal performance.

The Contractor shall provide and install all necessary electrical components, including electrical feeds, breakers, wiring, and associated materials, to connect each of the new CDUs to existing 480V generator-supported power distribution panels. The electrical connections must be installed in accordance with industry standards and manufacturer specifications. Additionally, the Contractor must conduct all required tests and inspections to verify that the electrical connections are functioning properly and that the units are operating within the required performance parameters.

4. Deliverables

• The Contractors shall install the CDUs and all related components in accordance with industry standards and manufacturer guidelines, and all necessary testing and commissioning must be carried out to ensure proper functionality of the new cooling system.

• The Contractor shall provide training to NRL on the operation and functionality of the new CDUs.

• The Contractor shall perform site observations to obtain existing conditions and architecture and perform necessary calculations to size infrastructure based on design loads that include the sizing of the secondary piping system, electrical power feeds, and structural support for the new CDUs.

• The Contractor shall develop and provide one-line drawings of existing and proposed architecture and engineering infrastructure.

• The Contractor shall provide start-up services with manufacturer representation to include testing, balancing, verification of newly installed equipment, and set appropriate set points, thresholds, and operating parameters.

• The Contractor shall perform a leak check for all piping prior to installation of the secondary coolant.

• The Contractor shall design metrics and points to be controlled and remotely monitored by NRL’s Data Center Infrastructure Management Software tool, StruxureWare.

• The Contractor shall provide a 1-year base warranty for all parts, materials, labor, and workmanship.

File details come from the government source that posted it. Updated .