This request for information seeks information from potential sources for the procurement of two knuckle boom or telescoping knuckle boom marine cranes. Responses are requested by April 6, 2021 to provide details on capability to meet requirements, including lift capacities of 22,000 pounds at 70 feet in port, 10,000 pounds at 70 feet offshore in sea state 4, and 15,000 pounds at 30 feet for partially submerged objects. The cranes must meet API 2C standards and be designed for the marine environment with stainless steel and corrosion resistant components. Delivery is required by April 2022 to Joint Expeditionary Base in Little Creek, Virginia. The document outlines additional technical requirements for the cranes and requests pricing, drawings, component data, and maintenance plans from potential sources.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Items to be provided:
1) Two knuckle boom or telescoping knuckle boom marine cranes in accordance with requirements in this document.
a. Vessel 1 will have the HPU mounted remotely from the crane and will be water cooled.
b. Vessel 2 will have the HPU mounted on the crane and will be air cooled. (Refer to
Option 2 below.)
2) Certification Test Plan for each crane configuration.
3) Operations and maintenance documentation with parts lists and unlimited rights to reproduce for the purposes of maintaining the purchased hardware in the following form:
a. Two hard copies
b. Digital copy (pdf)
4) Technical Data Package with unlimited rights to reproduce for the purposes of maintaining the purchased hardware:
a. Engineering analyses demonstrating conformance to API 2C requirements.
b. Detailed assembly drawings identifying and dimensioning interface connections in PDF and AutoCAD compatible formats for both crane configurations:
i. Front, right, rear, left, and top views
ii. Electrical schematics
iii. Hydraulic schematics
iv. Foundation interface drawings
c. Pertinent requirements or restrictions at component interfaces, such as piping system weight restrictions.
d. Crane load charts for various boom lengths and angles in all operational sea states.
e. Fluid type, volume, and cooling requirements
f. Comprehensive list of safety interlocks
g. Comprehensive list of critical components
h. HPU pump performance curves
i. Wire rope certificate of test
j. Recommended maintenance schedule
5) Commissioning/installation support, to include:
a. Certification of correct installation of hardware, components, and services.
b. Grooming of control/safety systems
c. Participation in load testing
d. Crew familiarization training covering operation, routine maintenance, and electronic control module (ECM) trouble code recovery and interpretation (up to four people)
6) Technical support of integration design effort (phone support to answer questions as needed)
7) Component Warranty
Options:
1) Crane delivered treated for long term storage of six months to a year. Warranty not to begin until crane is installed and crew training has completed, if installed inside of the terms of the treatment.
2) The Government is willing to consider not mounting the HPU on the crane for Vessel 2 if it is to the Government’s advantage.
3) The required reach for both cranes is 70 feet. Cranes with a reach of up to 100 feet which meet the load requirements at 70 feet will be considered for Vessel 2.
Government Responsibilities and Points for Collaboration:
The Government will integrate the selected crane package with the boat’s systems, ensuring the systems provide the performance necessary for the crane to operate to its full potential. The
Government may find it necessary to collaborate with the supplier at interface points to achieve an optimum design solution. The Government will identify such points and consult initially with the supplier within two weeks of receipt of the technical data package. Periodic correspondence with the supplier may be necessary as the design integration process matures.
Crane System Definition:
The crane system to be supplied includes the crane, hydraulic system, controls, motor controllers, boom crutch, and other ancillary components necessary for proper functioning of the crane. The crane system as defined herein does not include the boat foundation or the power feed to the system.
Objectives:
To minimize life cycle costs, commonality of controls, parts, and maintenance plans is strongly desired by the Government.
Requirements:
1) The cranes shall be designed to the requirements of API 2C. Certification testing shall be in accordance with NSTM 589.
2) Lift capacity (in‐port or sheltered harbor): minimum 22,000 lbs @ 70 feet.
3) Lift capacity (off‐shore, sea state 4 Hsig=8.2 feet): minimum 10,000 lbs @ 70 feet.
4) Lift capacity (partially submerged object): minimum 15,000 lbs @ 30 feet.
5) Lift a 10,000 lb load with hook up point 12 feet above the main deck, with a lateral separation of
30 feet from the crane axis, and with a maximum of 3 feet of wire beyond the anti‐two block device.
6) Man‐lift capacity: minimum 7500 lbs @ 30 feet.
Note: It is highly desirable that the crane meet the lift requirements with a single part lifting wire.
7) Dedicated HPU ‐ The HPU shall have the capable of being mounted either onto the crane assembly or be mounted onto structural members of the craft apart from the crane assembly.
The HPU will be powered exclusively from the boat electrical systems. (Note: For Vessel 1, the
HPU may need a custom tank due to space restrictions.)
8) Operator Cab ‐ The crane shall have an enclosed cab for the operator. The cab should be located on the left side of the crane boom (both cranes). The enclosed cab shall have environmental controls.
9) Stainless steel cylinder rods ‐ All hydraulic cylinders must be equipped with stainless steel cylinder rods.
10) Hydraulic Hose Metallic Hardware ‐ All metallic hardware used on all hydraulic hoses shall be manufactured from alloy 316 corrosion resistant steel.
11) Lighting ‐ The crane and its boom shall be equipped with adequate lighting for night time operations.
12) Marine Grade Corrosion Protection – Paint scheme, fasteners, and other component shall be designed to withstand the marine environment.
13) Boom Crutch ‐ The contractor shall supply a Boom Crutch and make recommendations concerning the proper installation of the boom crutch onto the boat. The crutch shall provide support to the boom when the crane is stowed.
14) An Anti‐two block device will be provided with each crane.
15) A crane load sensing system or indicator should be included as an option for each crane.
Information to Include:
1) Cost and schedule for:
a. Purchasing two 70 foot reach crane systems via separate purchase orders.
b. Purchasing one 70 foot reach crane for Vessel 1 and one 70+ to 100 foot reach crane for
Vessel 2 (Option 3).
c. Invoking Option 1 for one and for both cranes with the understanding that this option would be invoked as circumstances dictate after award but before delivery of the cranes.
d. Cost to include all items identified in the “Items to be provided” section of this document. For engineering/technical support for the integration of the crane system on the boats, quote 40 man hours of phone support and the man hour rate for additional hours, if required.
2) Specific model cranes with operating profiles demonstrating compliance to the requirements of this technical specification.
3) Assessment of Option 2 against the “Objective” of this procurement
4) Outline dimensioned drawing of each crane (plan and profile) including ladder swing radius and platform swing radius in digital and PDF formats (both variants).
5) Outline dimensioned drawings of HPU with details of interfaces (hydraulic, cooling, electrical, etc)
6) Detailed dimensioned drawing of base footprint of crane
7) Component data (HPU, cab details with respect to ergonomics and observation range, controls information, heating/cooling, hook, safety components, etc)
8) Cooling and electrical requirements
9) Foundation loads
10) Referrals/references of similar, prior installations
11) Warranty
12) Preventative/Routine Maintenance Plan with man hours required to complete maintenance actions and current costs for tools/materials required other than general shop tools and supplies.
13) Explanation of the similarities/differences of the cranes being offered in light of the “Objectives” section of this document.
14) Available training opportunities beyond familiarization training (class room/shop)
NAVSUP FLCN is requesting information in order to make an informed determination regarding procurement strategy.
Responders should indicate whether they can provide a system meeting these desired characteristics, and the details as to how they would satisfy these requirements. If not, responders are encouraged to indicate what characteristics cannot be met and what the capabilities are regarding these characteristics.
SUBMISSION OF RESPONSES: Responses shall include specific details regarding the ability to provide the required crane capability to meet the needs of the Government. Responses shall discuss how your product will meet the requirements found above.
Responses are not to exceed 25 pages. Responses shall be in electronic format. A cover page for the response shall be included. The cover page shall include the company name, address, CAGE Code, Business Size Status for the North American Industry Classification System (NAICS) code of this RFI and points of contract (names, email, and telephone numbers) at a minimum. The cover page is not considered in the total page count.
NAVSUP FLCN will accept only electronic unclassified submission of responses. Responses shall be sent to Carnell Aurelio at carnell.p.aurelio@navy.mil, with the subject line "RFI_CRANE_001". All responses shall be unclassified and submitted by no later than 4:00 PM EST on 06 April2021.
This RFI is for market research purposes only and does NOT constitute a Request for Proposal (RFP). This notice shall not be construed as a contract, a promise to contract, or as a commitment of any kind by the Government. The Government is NOT seeking or accepting unsolicited proposals. This RFI Notice is issued solely for conducting market research in accordance with FAR Part 10 and gathering information for planning purposes.
Government WILL NOT PAY for any information received in response to this RFI, and the Government will not compensate the respondent for any cost incurred in developing the response to this RFI. The
Government will not release any information marked with a proprietary legend received in response to this RFI to any firms, agencies or individuals outside the Government without written permission in accordance with the legend. Please be advised that all submissions become Government property and will not be returned.