About this file

This is a draft construction agreement template from the City of Dania Beach, Florida, establishing the contractual framework for construction services associated with the Ocean Park Parking-Phase 1 project. The agreement outlines the City's standard terms and conditions for construction work, with services to be performed in accordance with an Invitation to Bid (ITB) and the contractor's response to that solicitation, both incorporated as exhibits. The contractor must achieve substantial completion within 120 calendar days and final completion within 150 calendar days from the Notice to Proceed. The agreement requires the contractor to provide all labor, materials, supplies, and equipment necessary for the work, maintain daily site security and cleanliness, comply with all applicable governmental requirements and codes, and coordinate with other contractors operating at the site. Key administrative requirements include submission of a construction schedule using Critical Path Method within 10 calendar days of the Notice to Proceed, monthly progress reports, daily logs for various administrative items, and adherence to a detailed schedule of values for payment applications.

The contract price is subject to unit pricing or lump sum arrangements as specified in the bid documents, with the contractor bearing all costs including permits, licenses, business tax receipts, and utilities except for NPDES dewatering permits which the County will reimburse. Progress payments will be made monthly at 95 percent of completed work with five percent retainage held until final completion and acceptance, with potential reductions in retainage after 50 and 90 percent completion if no pending claims exist. The contractor must provide performance and payment bonds each equal to 100 percent of the contract price within 14 days of award and prior to issuance of the Notice to Proceed. Liquidated damages are assessed at $500.00 per calendar day for failure to achieve substantial or final completion by the specified dates, which the parties acknowledge as a reasonable pre-estimate of damages rather than a penalty. The agreement is funded in whole or in part with federal and state grant funds administered by the Florida Division of Emergency Management, requiring compliance with 2 C.F.R. Part 200 and all grant conditions, with payment expressly conditioned upon the contractor's compliance with all documentation, procurement, and reporting requirements.

View the file

Other files for this state and local contract opportunity

Other files attached to OCEAN PARK PARKING-PHASE 1, newest first.
File Type Posted
OCEAN_PARK_PARKING-PHASE_1_(Addendum_#2_Revision).pdf PDF
OCEAN_PARK_PARKING-PHASE_1.pdf PDF
Ocean_Park_Parking_Technical_Specifications.pdf PDF
Civil_and_Landscaping_Plans_(1).pdf PDF
Survey.pdf PDF
Subsurface_Utility_Report.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Laredo_Street_Sidewalks.pdf PDF
Laredo_Street_Sidewalks.pdf PDF
Laredo_Street_Sidewalks.pdf PDF
Laredo_Street_Sidewalks.pdf PDF
26-019_Draft_Contract.pdf PDF
26-019_Draft_Contract.pdf PDF
26-019_Draft_Contract.pdf PDF
26-019_Draft_Contract.pdf PDF
Laredo_Street_Sidewalks_100%.pdf PDF
Laredo_Street_Sidewalks_100%.pdf PDF
Laredo_Street_Sidewalks_100%.pdf PDF
Laredo_Street_Sidewalks_100%.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGREEMENT

THIS IS AN AGREEMENT (“Agreement”) dated _________________, 20___, between the City of Dania Beach, Florida, a Florida municipal corporation (“City”), with its principal place of business located at 100 West Dania Beach Boulevard, Dania Beach, Florida 33004 and ________________________(“Contractor”), with a mailing address of ___________________.

In consideration of the mutual covenants, terms and conditions contained in this

Agreement, and for other good and valuable consideration, the adequacy and receipt of which are acknowledged and agreed upon, the parties agree as follows:

1. Definitions.

City. The City of Dania Beach, Florida.

City Code. The City of Dania Beach Code of Ordinances.

Force Majeure: Any event which results in the prevention or delay of performance by a party of its obligations under this Agreement and which is beyond the reasonable control of such party including, but is not limited to fire, earthquakes, hurricanes, tornadoes, storms, lightning, epidemic, pandemic, war, riot, civil disturbance, sabotage, and governmental actions. “Force majeure” does not include where the City’s actions or inactions or lack of compliance with the Agreement delay the Contractor.

Governmental Approvals: All governmental and quasi-governmental approvals from applicable city, county and other agencies and authorities required to develop the Property, including, but not limited to, development of regional impact approvals, site plan approvals, comprehensive land use plan approvals, plat approvals and recordation, public dedications, environmental approvals, zoning approvals, building permits and all other governmental approvals required in connection with the development of any Improvements at the Property (and the expiration of all appeal periods with respect thereto), modification or vacation of easements or both, and other matters pertaining to the Property.

Governmental Authority. Any federal, state, county, municipal or other governmental department, entity, authority, commission board, bureau, court, agency, or any instrumentality of any of them now existing or hereafter created, having jurisdiction over the Property or any portion thereof.

Governmental Requirement. Any law, enactment, statute, code, ordinance, rule, regulation, judgment, decree, writ, injunction, order, permit, certificate, license, authorization, agreement, or other direction or requirement of any Governmental Authority now existing or hereafter enacted, adopted, promulgated, entered, or issued.

Contractor shall comply with all Governmental Requirements applicable to the operations and Property, including, without limitation, those prohibiting discrimination by reason of race, color, religion, sex, marital status, sexual orientation, gender identity, national origin, or handicap in the development, construction, management, Agreement, use, occupancy of the operation and Property or any portion thereof.

Work. The labor and materials required to complete the construction of the Improvements on the Property, and any related buildings or structures not located on the Property, in a good and workmanlike manner in accordance with the Plans and all applicable Governmental Requirements.

2. Scope of Services. The Contractor agrees to provide construction services (“Services” or “Work”) associated with the City’s ITB (Invitation to Bid) No. _______ entitled___________________________________________________________, which ITB is incorporated by this reference into this Agreement as Exhibit “A”. This Agreement encompasses the Contractor’s response; provided, however that if there is any conflict between the terms of the Agreement and the Contractor’s response to City, the Agreement is controlling. The Services are identified and described in the Contractor’s response as Exhibit “B” which exhibit is incorporated by reference into this Agreement.

3. Subcontracts. It is expressly agreed to by the parties that the City shall approve in advance in writing any Subcontractors and the fees to be paid them by Contractor, prior to any such Subcontractor proceeding with any such work. Contractors shall only designate employees who are sufficiently skilled to provide the required services specified in this Agreement. Any person employed to provide the services who fails, refuses or neglects to obey the instructions of the City's representative in anything relating to these services, or who appears to be disorderly, insubordinate, or incompetent shall upon the order of City's representative, be immediately relieved by the Contractor from the Project Work. Any interference with, or any abusive or threatening conduct toward any City representative, its assistants or inspectors by the Contractor, its employees or agents, or any member of the public shall be grounds for the City to terminate the agreement and re-let the work. The Contractor shall furnish all labor, materials, supplies and equipment necessary to properly maintain all Project Work areas in an acceptable and safe condition. It is expressly agreed to by the parties that the City shall approve in advance in writing any subcontractors and the fees to be paid them by Contractor, prior to any such subcontractor proceeding with any such work.

4. Contractor agrees that it and its officers shall be held fully responsible, except as otherwise prohibited by law, for all acts of their employees while in their employ.

4.1 Code Related Inspections. The Contractor recognizes that the City of Dania Beach, Development Services Department, is a department within the City of Dania Beach, separate and apart from the City of Dania Beach’s Engineering Department, that is charged with the inspection of improvements to real property for code compliance. The Contractor agrees that it will not assert, as a City caused delay, or as a defense of any delay on the part of the Contractor, any good-faith action or series of actions on the part of the Development Services Department, including, but not limited to, the Development Services Department’s refusal to accept any portion of the Contractor's Work. If it is ultimately determined by the Architect and City that such delay was not the result of Contractor's failure to comply with the Agreement Documents, the Contractor may be entitled to make a claim for extension of Agreement Time only as its exclusive remedy, in accordance with the terms of the Agreement.

4.2 Commercial Activities. Contractor shall not establish any commercial activity or issue concessions or permits of any kind to third parties for establishing commercial activities on lands owned or controlled by City. Contractor shall not allow its employees to engage in any commercial activities on the site.

4.3 Cooperation With Others. City and other contractors may be working at the site during the performance of this Agreement. Contractor shall fully cooperate with the City, City's designated Representative, and other separate contractors to avoid any delay or hindrance of their work.

City may require that certain facilities be used concurrently by Contractor and other parties, and Contractor shall comply with such requirements. The City shall provide for coordination of the activities of the City's own forces, and of each separate contractor, with the Work of the Contractor, who shall cooperate and participate with other separate contractors and the City in reviewing their construction schedules.

4.3 The below listed documents are to be used by the Contractor and City during the administration of this Agreement. Additional administrative forms may supplement this list upon written notice by the City (or City's Project representative). City reserves the right to modify these forms as it deems necessary. Contractor shall maintain logs for Items A-K and provide to City monthly.

A. Request for Information B. Field Instruction C. Field Bulletin D. Construction Change Proposal E. Change Order F. Construction Change Directive G. Submittal Transmittal H. Deficiency Report I. Non-Conformance Report J. Contractor's Daily Report K. Substitution Report

4.4 Contractor shall provide and maintain all utilities in work areas to meet the requirements of the Agreement. Such utilities shall be furnished by the Contractor and shall include, but not be limited to, the following:

A. Public telephone service for the Contractor's use.

B. Construction power as required at each point of construction.

C. Water as required throughout the construction.

4.5 Prior to final acceptance of the Work, the Contractor shall, at its expense, satisfactorily remove and dispose of all temporary utilities developed to meet the requirements of the Agreement. The City will assume the utility costs directly related to its usage of areas in which the Work has been certified as Substantially Complete.

4.6 Coordination And Correlation Of Drawings And Specifications. The Contractor represents that the Contractor, its Subcontractors, material and equipment suppliers have carefully and diligently compared Phasing, Demolition, Landscaping, Architectural, Structural, Electrical, Underground, Civil and Site Drawings and Specifications, and have compared and reviewed all general and specific details on the Drawings. Contractor shall not be liable to the City for damages or costs resulting from errors, omissions, or inconsistencies in the Agreement Documents, or for differences between field conditions and the Agreement Documents, unless the Contractor recognized, or in the exercise of its due diligence, should have recognized the issue and knowingly failed to report it to the City. Contractor shall have the right to rely on the completeness and accuracy of information, Drawings, Specifications, and other Agreement Documents provided by the City or Design Consultants.

4.7 Agreement Interpretation. All claims of Contractor, and all questions the Contractor may have relating to interpretation or clarification of this Agreement or its acceptable fulfillment shall be submitted immediately, in writing, to City for resolution. City, or its representatives, will render its determination concerning such resolution within an appropriate period, not to exceed five (5) calendar days, unless additional time is needed due to the novelty or complexity of the interpretation or clarification requested, which determination shall be considered final and conclusive unless Contractor files a timely written protest pursuant, as a Dispute. The Contractor's written protest shall state clearly and in detail the basis thereof, and the relief it seeks, if any. City will consider Contractor's protest and render its decision thereon within five (5) calendar days If Contractor does not agree with the City's decision, the Contractor shall immediately deliver written notice to that effect to the City. If questions of interpretation are not responded to by the Architect or City within the time frame above, and in a manner so as not to impede the natural progress of the Work as scheduled, and such delay impacts the critical path of the Work, Contractor shall be entitled to adjustment in the performance time as its exclusive remedy. Contractor is solely responsible for requesting instructions or interpretations and is solely liable for any cost and/or expenses arising from its failure to do so. Contractor's failure to protest City's determinations, instructions, clarifications or decisions within five (5) calendar days after receipt thereof shall constitute a waiver by Contractor of all its rights to further protest, judicially or otherwise. Contractor shall not rely on oral interpretations of the Contract Documents. Any clarification or interpretation provided by the City or its representatives shall not constitute a modification of the Contract Documents unless issued by written Addendum prior to award or by written Change Order executed by the City after award.

5. Date Of Commencement And Substantial Completion

5.1 The Date of Commencement is the date from which the Agreement Time is measured and shall be the date set forth in the Notice to Proceed as issued by the City. Should the Contractor incur costs prior to the issuance of the Notice to Proceed, any such costs shall be incurred at the Contractor’s risk, and the City shall not reimburse the Contractor for any such costs under any circumstances. Notwithstanding the foregoing, City may reimburse Contractor for actual costs incurred relating to performance and payment bonds and insurance, with submittal of invoices, in the event that City terminates this Agreement for convenience, as provided in the General Conditions. If Contractor fails to commence the Work within thirty (30) days of the date set forth in the Notice to Proceed, City may terminate the Agreement immediately, without providing an opportunity to cure.

5.2 The Contractor shall achieve Substantial Completion withinone hundred twenty (120) calendar days and Final Completion of the entire Work within _ one hundred fifty (150_______________________________ calendar days from the issuance of the Notice to

Proceed. Contractor shall prosecute the Work diligently and continuously to completion within the Contract Time.

5.3 Liquidated Damages

Time is of the essence. If Contractor fails to achieve Substantial Completion or Final Completion within the Contract Time, Contractor shall pay the City liquidated damages in the amount of One Thousand Dollars ($500.00) per calendar day for each day beyond the Contract Time.

The parties acknowledge that the damages to the City resulting from delayed completion would be difficult to ascertain and that the foregoing amount represents a reasonable estimate of such damages and is not a penalty.

Liquidated damages shall be in addition to, and not in lieu of, any other rights or remedies available to the City under the Contract Documents or applicable law.

Contractor acknowledges that delays may impact the City’s operations and compliance with applicable grant requirements, which factors were considered in establishing the liquidated damages amount.

5.4 Delays; Extensions of Time

“Contractor shall not be entitled to any increase in the Agreement Sum for delays, impacts, disruptions, or inefficiencies, regardless of cause, except to the extent expressly authorized by a written Change Order executed by the City.

If Contractor is delayed in the progress of the Work, Contractor may be entitled to an extension of the Agreement Time, provided such delay is not caused by Contractor, its subcontractors, or suppliers, and Contractor complies with all notice and documentation requirements of the Agreement Documents. Any extension of time granted by the City shall be Contractor’s sole and exclusive remedy for delay.

Delays caused by weather, material shortages, labor issues, supply chain disruptions, or other conditions reasonably foreseeable or within Contractor’s control shall not entitle Contractor to additional compensation.”

5.5 Term. The term of this Agreement shall be through and including _________________, or completion of the Services, whichever date is sooner.

6. Payment for Services.

6.1 City agrees to pay Contractor a not-to-exceed fee of

___________________________________ based on the tasks and associated fees attached as Exhibit “B” and incorporated into the Agreement by this reference

6.2 No travel and meal costs will be reimbursable unless incurred outside of Miami-Dade, Broward and Palm Beach Counties, which costs shall be approved in writing in advance by the City. Any such costs are payable at the City reimbursement rate.

6.3. The Agreement Sum is based upon the cost agreed upon by the parties, for the satisfactory performance of the Work in accordance with the Agreement Documents.

6.4 The value of any construction Work covered by a Change Order or of any claim for an increase or decrease in the Agreement Sum shall be determined in one of the following ways at the City's option:

(A) Where the Work involved is covered by unit prices contained in the Agreement Documents, by application of unit prices to the quantities of items involved without additional fees.

(B) By mutual acceptance of a lump sum price.

6.5 Contractor may expend funds only for allowable costs resulting from obligations incurred during the specified Agreement period.

6.6 Any balance of unobligated funds which have been advanced or paid must be refunded to the City.

6.7 Any funds paid in excess of the amount to which the Contractor or sub-contractor is entitled under the terms of the Agreement must be refunded to the City.

6.8 Any additional information as required in Section 215.97, Florida Statutes.

6.9 Any necessary additional work, as determined by City, which is not covered by the approved written proposal, shall not be undertaken without a written amendment to this Agreement executed by both parties in advance of any work.

6.10 Contractor shall submit its invoices in the format and with supporting documentation as may be required by City.

6.11 Each application for payment shall include complete and accurate supporting documentation sufficient to satisfy applicable audit and grant reimbursement requirements. The City may withhold payment for incomplete or non-compliant submissions.

6.12 Contractor acknowledges that this Project is funded in whole or in part with federal and state grant funds administered by the Florida Division of Emergency Management. Contractor agrees to comply with all applicable requirements of 2 C.F.R. Part 200 and all grant conditions incorporated into the Contract Documents. Payment to Contractor is expressly conditioned upon Contractor’s compliance with all documentation, procurement, and reporting requirements.

Failure to comply may result in withholding or denial of payment.

7. Billing Procedure.

7.1 The preferred method for invoices is to send via email to ap@daniabeachfl.gov. A copy may also be mailed to City Hall.

City of Dania Beach Finance Department Attn: Accounts Payable 100 West Dania Beach Boulevard Dania Beach, Florida 33004 with a copy to:

City of Dania Beach __________________ Department Attn: (Director) 100 West Dania Beach Boulevard Dania Beach, Florida 33004

7.2 The City will pay to the Contractor for the faithful performance of the Agreement, in lawful money of the United States, and subject to adjustments as provided in the Agreement Documents, the amounts equal to the sum of the unit, lump sum price or both established for each separately identified work item, times the estimated quantity of that item, as indicated in the Schedule of Prices.

7.2.1 Taxes: The City is exempt from any taxes related to the requested services, which may otherwise be imposed by the state or federal government. This exemption does not transmit to suppliers in their purchases of goods or services, used in work or goods supplied to the City. The Contractor shall pay all applicable sales, consumer, use and other similar taxes required by law. The Contractor is responsible for reviewing the pertinent state statutes involving the sales tax and complying with all requirements..

7.3 As provided in the Bid, the quantities entered in the Schedule of Prices for each item of work is an estimate only and the final Agreement amount and the total payment made to the Contractor will be based on the actual number of units of each work item incorporated in the Work of the Agreement. It is understood that the unit prices quoted or established for work items will be used for computing the amount to be paid to the Contractor, based on the quantities actually constructed as determined by the applicable measurement and payment portion of the Specifications.

7.4 Based upon Applications for Payment submitted to the City by the Contractor and Certifications of Payment issued by the City, the City shall make progress payments on account of the Agreement Sum to the Contractor as provided below, elsewhere in the Agreement Documents and in accordance with Part VII of Chapter 218, Florida Statutes, as it may be amended from time to time, entitled the “Local Government Prompt Payment Act.”

7.5 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:

(A) Each Application for Payment shall be based upon the Schedule of Values mailto:ap@daniabeachfl.gov submitted by the Contractor in accordance with the Agreement Documents. The Schedule of Values shall allocate the entire Agreement Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the City may require. This Schedule, unless objected to by the City, shall be used as a basis for reviewing the Contractor's Applications for Payment.

(B) Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.

7.6 Subject to the provisions of the Agreement Documents, the amount of each progress payment shall be computed as follows:

(A) Payment for services performed may be made on a monthly basis upon approval of the Application for Payment by the designated official of the City. The Agreement may include phases of performance to be negotiated. There will be separate phases for design responsibilities and for construction responsibilities. Retainage will be withheld on all payments as authorized by state law until City acceptance of the Project and City has received evidence of satisfactory completion of the Agreement.

(B) Five percent (5 %) of monies earned by the Contractor shall be retained by City until Final Completion and acceptance by City, except for the following items: General Conditions and self-performed work performed on a cost reimbursement basis, if any. After fifty percent (50%) of the Work has been completed, Contractor may request that the Agreement Administrator reduce the retainage to five (5%) percent of all monies previously earned and all monies earned thereafter, and City shall grant such request, provided that there are no pending claims by the City for delay or otherwise, and provided further that there are no pending third party claims against the City as a result of the Work, including claims for non-payment by Contractor’s lower-tiered subcontractors and suppliers (“Claims”). At any time thereafter, Agreement Administrator may increase retainage back to ten percent (10%) of all monies previously earned and all monies earned thereafter, if in the sole discretion of the Agreement Administrator, such increase is necessary to protect the City from any Claims, and such retainage may be deducted from any monies then due or that is to become due the Contractor. After ninety (90%) percent of the Work has been completed, and provided that there are no pending Claims, the Agreement Administrator may reduce the retainage to two and one-half (2-1/2%) percent of all monies previously earned and all monies earned thereafter. Subsequent to Final Completion and prior to Final Payment, Agreement Administrator may reduce retainage to a nominal amount at the sole discretion of the Agreement Administrator. Any reduction in retainage shall be in the sole discretion of the Agreement Administrator, and Contractor shall have no entitlement to a reduction. City shall hold retainage in the amount of two and one-half percent (2-1/2%) or such reduced amount as applicable, until the expiration of any applicable warranty period(s) to ensure completion of Contractor’s warranty obligations and maintenance of all required insurance coverages during the warranty period(s). Any interest earned on retainage shall accrue solely to the benefit of City.

(C) City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of:

(1) Defective Contractor or Subcontractor Work not remedied.

(2) Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor.

(3) Failure of Contractor to make payments properly to subcontractors or for material or labor.

(4) Damage to another subcontractor not remedied.

(5) Failure of Contractor to provide any and all documents required by the Agreement

Documents.

7.7 Application for Payment after the first Application shall be accompanied by a Certification of Payment form, provided by the City, from the Contractor and each Supplier and Subcontractor, in amounts equal to those stated in the PRIOR Application for the Contractor and each Subcontractor and each Subcontractor, Material/Labor Supplier so due payment. The Application for Payment for Retainage shall be accompanied by a final Certification of Payment and Release of Claim form from the Contractor, each Supplier and Subcontractor in amounts equal to those stated in the Schedule of Values.

7.8 Contractor shall comply with the Public Records requirements set forth in Section 72.

8. Final Payment. Final payment, constituting the entire unpaid balance of the Agreement Sum, shall be made by the City to the Contractor when:

(A) the Agreement has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work, if any, which obligation survives final payment and continues thereafter;

(B) a final Certification of Payment has been issued by the City; such final payment shall be made by the City not more than thirty (30) days after the issuance of the Contractor's final Certification of Payment;

(C) final Certification of Payment has been furnished from the Contractor, Suppliers and Subcontractors; and

(D) a Consent of Surety, if any, for final payment.

9. Payment and Performance Bond. Contractor shall furnish Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price, in forms acceptable to the City and consistent with the bond forms attached to the ITB as Exhibit ‘A’ and incorporated herein, including without limitation the Performance Bond and Payment Bond forms included in the solicitation documents.

The required bonds shall be submitted to the City within fourteen (14) days of award and, in all events, prior to issuance of the Notice to Proceed. Furnishing of such bonds is a condition precedent to Contractor’s right to commence the Work.

The executed Performance and Payment Bonds shall be attached to this Agreement as Exhibit ‘C’ (or next available exhibit designation) and incorporated herein by this reference.

The bonds shall remain in full force and effect for the duration of the Work and through Final Completion, including all warranty obligations of the Contractor.

Failure to provide or maintain the required bonds shall constitute a material breach of this Agreement, entitling the City to terminate the Agreement, withhold payment, or pursue any other remedies available under the Contract Documents or applicable law.”

10. Protection Of Property. The Contractor shall at all times guard against damage or loss to City property or property of other persons, vendors or Contractors and shall be responsible for replacing or repairing any such damage or loss. The Contractor will be required to report any such damages immediately to the City’s representative in charge of the Project. The City reserves the right to repair any damages created by the Contractor and to deduct the appropriate amount from any payment due to the Contractor. In all cases, the decision of the City is final.

11. Florida Trench Safety Act. The Contractor shall include with its Bid, when applicable, all documentation required by the Florida "Trench Safety Act", Section 553.63, Florida Statutes.

The unit prices and total prices presented in the Bid, and those presented in any subsequent change orders shall include the Contractor's cost for compliance with the applicable trench safety standards.

12. Trash. Contractor shall be responsible for the daily removal of trash and debris from the Project work sites and upon completion of the Project Work.

13. Public Bid Disclosure Act. In accordance with the Public Bid Disclosure Act, Section 218.80, Florida Statutes, each license, permit, or fee a Contractor will have to pay the City before or during the work, items or services to be provided or the percentage method or unit method of all licenses, permits, and fees required by the City and payable to the City by virtue of the work, items, or services as part of the agreement are as follows:

(A) Contractor shall have and maintain during the term of the agreement any and all appropriate City licenses, fees (and business tax receipts, if applicable), which shall be paid in full in accordance with the City's fee structure for such items. THERE WILL

NOT BE ANY PERCENTAGE REDUCTION OR WAIVING OF CITY

LICENSES, FEES (OR BUSINESS TAX RECEIPTS, IF APPLICABLE).

(B) During the performance of the agreement, there may be times when the Contractor will be required to obtain a permit for such work, or in connection with the items or services.

It is the responsibility of the Contractor to ensure that it has the appropriate permits as may become necessary during the performance of the work. Any fees related to the required permits in connection with the agreement will be the sole responsibility of the Contractor.

(C) Licenses, permits, and fees may be required by Broward County, the state of Florida or the federal government.

(D) City will reimburse permit fee costs related to dewatering and National Pollutant Discharge Elimination System (NPDES).

14. Safety. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Project Work. The Contractor shall comply with the rules and regulations of the Florida Department of Commerce regarding industrial safety (Florida Statutes, Section 440.56) and with the standards set forth in the federal Occupational Safety and Health Act of 1970 (OSHA), and its amendments. Contractor, by submitting a bid, certifies that all materials and equipment to be supplied for the Project will meet all federal and state requirements, including but not limited to, the Occupational Safety and Health Act (OSHA).

15. Warranty. The Contractor shall warrant to the City that materials and equipment furnished under the agreement will be of good quality and new unless otherwise required or permitted by the Agreement Documents; that the Work will be free from defects, and that the Work will conform to the terms and conditions of the agreement. Work not conforming to those terms and conditions, including substitutions not properly approved and authorized may be considered defective. The Contractor's warranty may exclude damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient City maintenance, improper operation, or normal wear and tear under normal usage. The Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All manufacturers’ product warranties shall be registered in the City’s name and for its sole benefit.

16. Construction Quality. Contractor agrees to perform all work (“Work”) required to complete the construction of the Improvements on the Property in a good and workmanlike manner.

16.1 Standards of Construction. Any and all construction of Improvements shall be performed in such a manner as to provide that the Improvements shall: (i) Substantially comply with the Permitted Plans; (ii) Comply with the terms and provisions of this Agreement; and (iii) Comply with all applicable laws, ordinances, rules, regulations and procedures of all applicable Governmental Authorities.

16.2 Comply with Applicable Law. All Improvements constructed or installed by the Contractor, its agents, or contractors, shall conform to all applicable state, federal, county, and local statutes, ordinances, building codes, fire codes, and rules and regulations, as amended.

16.3 Contractor’s Obligations During Construction. Prior to the Completion Date, Contractor shall:

(A) Provide scaffolding, hoists, temporary structures, light, heat, power, toilets, temporary utility connections, equipment, tools and materials and other requirements for the performance of the Work;

(B) Maintain the Property in a clean and orderly condition, at all times, taking into consideration the public beachfront nature of the Project, and remove all paper, cartons and other debris from the Property;

(C) Preserve all properties adjacent to or leading to the Property, and restore and repair any such properties damaged as a result of construction of the Work, whether such properties are publicly or privately owned;

(D) Implement and maintain at all times a comprehensive hurricane and flood plan for the Property and the Work, and provide a copy of same to the City, if requested;

(E) Provide construction fencing.

(F) As Builts. Within one hundred twenty (120) days after the date a CO is issued for

Improvements constructed by Contractor during the term of this Agreement, the Contractor shall at its expense, provide the City with a complete set of "as built" plans and specifications, including mylar reproducible "record" drawings, and, if available, one set of machine readable disks (or comparable) containing electronic data in an AUTOCAD format that meets the City's graphic standards of the "as-constructed" or "record" plans for such Improvements. The "as built" plans submitted by Contractor must show the square footage of each Improvement depicted in such plans.

(G) Use diligent effort to complete the Work in a commercially reasonable time under the circumstances and in accordance with this Agreement. At all times make diligent effort to have proper supervision of the general contractor or other employees or agents of the Contractor upon the Property site.

(i) Employees Of The Contractor. Contractors shall only designate employees who are sufficiently skilled to provide the required services specified in the ITB. Any person employed to provide the services who fails, refuses or neglects to obey the instructions of the City's representative in anything relating to these services, or who appears to be disorderly, insubordinate, or incompetent shall upon the order of City's representative, be immediately relieved by the Contractor from the Project Work. Any interference with, or any abusive or threatening conduct toward any City representative, its assistants or inspectors by the Contractor, its employees or agents, or any member of the public shall be grounds for the City to terminate the agreement and re-let the work. The Contractor shall furnish all labor, materials, supplies and equipment necessary to properly maintain all Project Work areas in an acceptable and safe condition. Contractor agrees that it and its officers shall be held fully responsible, except as otherwise prohibited by law, for all acts of their employees while in their employ.

(H) Contractor Progress Reports. At the request of City, Contractor will deliver written reports of the progress of construction to the City Manager or his or her designee.

(I) City’s Representative. The City may designate one or more employees or agents to be the City’s Representative for the Project so that he or she may, subject to site conditions and during normal business hours, visit and the Property.

(J) Certificates of Final Completion. After Contractor completes the Work, the City will deliver to Contractor, a recordable Certificate of Final Completion certifying that, to the best of the City’s knowledge, Contractor has satisfied all its obligations to the City for the construction of the specified Improvements.

16.4 Site Conditions Contractor has the sole responsibility of satisfying itself concerning the nature and location of the Work and the general and local conditions, and particularly, but without limitation, with respect to the following: those affecting transportation, access, staging, parking, disposal, handling and storage of materials; availability, quantity and quality of labor, water and electric power; availability and condition of roads; climatic conditions, location of underground utilities as depicted on Agreement documents, and through verification with local utility companies and the City, physical conditions of existing construction, topography and ground surface conditions; subsurface geology, and nature and quantity of surface and subsurface materials to be encountered; the nature of the ground water conditions; equipment and facilities needed preliminary to and during performance of the Agreement; and all other matters which would be reasonably known to a licensed general contractor with expertise in streetscape and related infrastructure construction as in any way affecting performance of the Agreement, or the cost associated with such performance. The failure of Contractor to acquaint itself with any applicable condition will not relieve it from the responsibility for properly estimating either the difficulties or the costs of successfully and timely performing the Agreement.

16.5 The City shall not be responsible for any conclusions or interpretations made by the Contractor based on the information made available by the City. The City shall not be responsible for any understanding reached or representation made concerning conditions which can affect the Work by any of Contractor's officers, employees, agents, subcontractors, material men, or suppliers before execution of this Agreement, unless that understanding or representation is expressly stated in this Agreement.

16.6 The provisions of this Section 16 shall be deemed a complete waiver by the Contractor of claims for equitable adjustment in Agreement Time or Price, or both, unless due to (1) subsurface or concealed conditions which differ materially from those indicated on the Agreement Documents, or (2) unknown physical conditions of an unusual nature which differ materially from those ordinarily found to exist and generally recognized as inherent in construction of the character provided in the Agreement Documents; provided however, that claims under this Section 16 shall be denied in the event that the conditions were reasonably inferable from activities, testing and investigations performed in connection with the Pre-Con Agreement, and which would otherwise provide to Contractor an expectation that the conditions could be similar elsewhere in the Project.

16.7 Warranty. Unless otherwise provided elsewhere in the Agreement, all materials and equipment incorporated into any Work covered by the Agreement shall be new and, where not specified, of the highest grade and quality for their intended use, and all workmanship shall be in accordance with construction practices acceptable to City. Unless otherwise provided in the Agreement, Contractor warrants all equipment, materials, and labor furnished or performed under this Agreement, against defects in design, materials and workmanship, for a period of twelve (12) months (unless longer guarantees or warranties are provided for elsewhere in the Agreement in which case the longer periods of time shall prevail) from and after Substantial Completion of the Work under the Agreement, regardless of whether the same were furnished or performed by Contractor or by any of its subcontractors of any tier. Even in the event that the City assumes partial utilization of portions of the Work prior to completion of all Work, the Warranties for that portion shall also extend for twelve (12) months from Substantial Completion of the entire Work, so that all warranties are running concurrently upon Substantial Completion of the total Project.

16.8 Upon receipt of written notice from City of any defect in any such equipment, materials, or labor during the applicable warranty period due to defective design, materials or workmanship, the affected item or parts thereof shall be redesigned, repaired or replaced by Contractor at a time and in a manner acceptable to City in compliance with the Agreement Documents, at its expense.

16.9 Contractor warrants such redesigned, repaired or replaced Work against defective design, materials and workmanship for a period of twelve (12) months from and after the date of acceptance thereof. Should Contractor fail to promptly make the necessary redesign, repair, replacement and tests, after written notice from City specifying the defects, City may perform or cause to be performed the same, at Contractor's sole cost and expense.

16.10 Contractor shall perform such tests as City may require verifying that such redesign, repairs and replacements comply with the requirements of this Agreement. All costs incidental to such redesign, repair, replacement, and testing, including the removal, replacement, and reinstallation of equipment and materials necessary to gain access, shall be borne exclusively by Contractor. However, if such testing determines that the Work is not defective, than City shall compensate Contractor for such costs of testing and any effects on previously completed work.

16.11 Contractor and its Surety shall be liable for the satisfaction and full performance of the warranties as set forth herein, and any damage to other parts of the Work caused by the Contractor's failure to perform pursuant to this section 16.

16.12 The Contractor shall commence Work to remedy or replace the defective, deficient Work within five (5) calendar days after receiving written (including transmittals by email) notice from the City, subject to allowance for long-lead items. If the Contractor fails to remedy or remove or replace that Work or material which has been found to be defective, or reasonably commence corrective action, then the City may remedy or replace the defective or deficient Work at the Contractor's expense; provided, however, all repairs to natural gas, telephone, radio, computer security, water, electric, air conditioning services and all emergency services shall be commenced within twelve (12) hours of notification, or by 7:00 a.m. whichever is earlier, and Contractor shall complete the repairs in an expeditious manner befitting the nature of the deficiency. The Contractor shall immediately pay the expenses incurred by the City for remedying the defects. If the City is not paid within ten (10) calendar days, the City may pursue any and all legal remedies it may have against the Contractor and its Surety.

16.13 The Contractor is required to provide a designated telephone number for warranty related emergencies which occur outside the normal workday. The Contractor is solely responsible for ensuring that all warranty Work is completed in the manner described above. If the City agrees, in writing, a subcontractor may be the point of contact for notices regarding warranty items, but such agreement shall not absolve the Contractor of its responsibility.

16.14 Ingress/Egress. Contractor's access to the Work area will be permitted only through approaches that will be designated by City, and then only in such manner that Contractor's traffic will not interfere with City's operations and Merchants/Tenants adjacent to the activity area(s).

Contractor shall, at all times, maintain reasonably free unimpeded ingress and egress at the site.

Contractor personnel are not to enter into any areas of the jobsite other than Work areas and areas of designated access. Contractor shall safely maintain, at all times during the performance of the Work, both vehicular and pedestrian traffic in, around, and adjacent to the Project.

16.15 Preconstruction Conference. As soon as practicable after execution of this Agreement, and prior to commencing any Work, a pre-construction conference will be coordinated by the Contractor and the City. In attendance at said conference will be City, Architect, and any of their representatives as may be deemed advisable. The purpose of said conference is to determine procedures related to the smooth progress of the Project, review of any items requiring clarification, maintenance of traffic, merchant and pedestrian accessibility, related safety issues, and procedures for the processing and distribution of all documents and correspondence related to the Agreement, among other things.

16.16 Meetings. The Contractor shall, at its expense, as requested by City, attend any and all meetings called by City to discuss the Work under the Agreement. Such meetings shall be conducted and recorded by the City with typed minutes of each meeting distributed to all attendees.

16.17 Delivery, Unloading And Storage Contractor shall, at its expense, receive, unload, store in a secure place, and deliver from storage to the construction site all materials, plant and equipment required for the performance of the Agreement. The storage facilities, methods of storing and security provisions shall meet City's approval and manufacturer's recommendations.

Materials and equipment subject to degradation by outside exposure shall be stored in a weather tight enclosure.

16.18 Work Area. All Contractor's Work areas on the jobsite will be assigned by City.

Contractor shall confine its office, shops, storage, assembly and equipment and vehicle parking to the areas so assigned. Before commencing Work, the Contractor shall provide a temporary office on the site of the Work, which shall have a telephone where a representative of the Contractor may be reached at all times during normal working hours. Should Contractor find it necessary or advantageous to use any additional land outside the Project site for any purpose whatever, Contractor shall, provide and make its own arrangements for the use of such additional land.

16.19 Plant, Equipment And Facilities. Contractor shall provide and use on any Work only such construction plant and equipment as are capable of producing the quality and quantity of work and materials required by the Agreement and within the time or times specified in the Agreement. Before proceeding with any Agreement Work or with erection of any facilities, including, but not limited to, temporary structures, machinery, equipment, offices and warehouses, Contractor shall furnish City such information and drawings relative to such equipment, plant facilities as City may request.

16.20 Upon written order of City, Contractor shall discontinue operation of unsatisfactory plant and equipment or facilities and shall either modify or remove the unsatisfactory items from the site.

16.21 Contractor shall not remove construction plant or equipment from the site before the Work is finally accepted without City's written approval. Such approval shall not be unreasonably withheld.

16.22 Contractor-Furnished Materials, Equipment And Workmanship. Only new, unused items of recent manufacture, of designated quality, but in no event less than the standard quality for the improvements, free from defects, will be accepted. Rejected items shall be removed immediately from the Work and replaced with items of specified quality. Failure by City to order removal of rejected materials and equipment shall not relieve Contractor from responsibility for quality of the materials supplied nor from any other obligation under the Agreement Documents.

16.23 Contractor shall continuously check architectural and structural clearances for accessibility of equipment and mechanical and electrical systems. No allowance of any kind will be made for Contractor's negligence to foresee means of installing equipment into position inside structures.

16.24 No Work defective in construction or quality, or deficient in meeting any requirement of the Agreement Drawings and Specifications, will be acceptable regardless of City's failure to discover or to point out defects or deficiencies during construction; nor will the presence of field representatives at the Work or the satisfaction of the Work meeting applicable code requirements relieve Contractor from responsibility for the quality and securing progress of Work as required by the Agreement Documents. The City shall notify the Contractor of defective or unacceptable Work if the City discovers such. Defective Work revealed within the time required by warranties (whether expressed or implied) shall be remedied in accordance with Section 15, entitled, “Warranty.” No payment, whether partial or final, shall be construed as an acceptance of defective Work or improper materials.

16.25 Contractor shall waive "common practice" and "common usage" as construction criteria wherever details and specifications or governing codes and ordinances require greater quantity or better quality than common practices and common usage would require. Contractor shall order and schedule delivery of materials in reasonable time to avoid delays in construction. Delays in delivery of equipment or material purchased by the Contractor or its Trade Contractors shall not be considered as a cause for an adjustment of the Agreement Time or a basis for damages or compensation. The Contractor shall be fully responsible for the timely ordering, scheduling, expediting, delivery, and installation of all equipment and materials. If an item is found to be unavailable, Contractor shall notify City immediately of recommended substitute(s) to permit City's selection of a suitable substitute.

16.26 City will exercise sole authority for determining conformance of workmanship, materials, equipment and systems with the requirements of the Agreement. Review and approval of all items proposed by Contractor for incorporation into the Work will be by City. This function by City will apply both to approvals for the Agreement as initially signed, and to approvals for changes to Agreement by modifications during progress of the Work. Reference to manufacturers' names, brands and models is to establish the type and quality desired.

Substitutions may be permitted unless specifically noted otherwise in this Agreement.

16.27 When materials, equipment, or systems are specified by performance only, without reference to specific manufacturer's brands or models, Contractor shall submit its own choice for City's…

This is the start of the file's text. The full file is on GovTribe.