This is a set of civil and landscaping construction plans and specifications for the Ocean Park Parking-Phase 1 project prepared for the City of Dania Beach, Florida. The project involves the design and construction of parking improvements at Ocean Park to enhance public access and parking capacity. The scope of work encompasses demolition and erosion control, pavement markings and signage, paving and grading, drainage infrastructure, tree disposition and planting, and irrigation system installation. The plans include detailed sheets covering general notes, existing conditions, demolition and erosion control plans and details, pavement markings and signage plans, paving and grading plans with cross-sections and drainage plans, and comprehensive landscaping and irrigation plans with installation details. The project is being designed by civil engineer George Balaban (Florida PE No. 74543) with Kimley-Horn and Associates, Inc. serving as the civil engineer and landscape architect, and Stoner & Associates, Inc. as the surveyor. The City of Dania Beach is soliciting bids through its e-Procurement Portal at https://procurement.opengov.com/portal/daniabeachfl with a bid submission deadline of 10:00 a.m. on Monday, August 24, 2026.
The construction plans require the contractor to complete all work within the existing right-of-way and comply with applicable federal, state, county, and local codes including FDOT standards, ADA accessibility requirements, and environmental protection regulations. Key construction requirements include clearing and grubbing of the site, removal of unsuitable subgrade materials to three feet below finished grade, installation of twelve-inch limerock base material compacted to 98% maximum density, placement of asphaltic concrete pavement with proper prime and tack coats, construction of drainage infrastructure including exfiltration trenches and storm drainage structures, installation of permanent irrigation systems with automatic controls, and comprehensive sodding and landscaping with one-year plant warranties. The contractor must obtain all necessary construction permits including NPDES permits prior to starting work, maintain detailed erosion and sediment control measures throughout construction, coordinate with existing utility providers, submit shop drawings and as-built plans certified by a Florida licensed professional surveyor, and provide landscape maintenance services for 90 days following acceptance. The project specifications indicate that contractor costs for signed and sealed as-builts, landscape and irrigation maintenance, traffic maintenance, erosion control measures, and utility coordination are to be included as part of the overall bid price.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| OCEAN_PARK_PARKING-PHASE_1_(Addendum_#2_Revision).pdf | ||
| OCEAN_PARK_PARKING-PHASE_1.pdf | ||
| DRAFT_Construction_Agreement_052026.pdf | ||
| Survey.pdf | ||
| Ocean_Park_Parking_Technical_Specifications.pdf | ||
| Subsurface_Utility_Report.pdf | ||
| PERFORMANCE_BOND.pdf | ||
| PAYMENT_BOND.pdf | ||
| Laredo_Street_Sidewalks.pdf | ||
| Laredo_Street_Sidewalks.pdf | ||
| Laredo_Street_Sidewalks.pdf | ||
| Laredo_Street_Sidewalks.pdf | ||
| 26-019_Draft_Contract.pdf | ||
| 26-019_Draft_Contract.pdf | ||
| 26-019_Draft_Contract.pdf | ||
| 26-019_Draft_Contract.pdf | ||
| Laredo_Street_Sidewalks_100%.pdf | ||
| Laredo_Street_Sidewalks_100%.pdf | ||
| Laredo_Street_Sidewalks_100%.pdf | ||
| Laredo_Street_Sidewalks_100%.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O C
EA
N
P
AR
K
PA
R
KI
N G
PH
AS
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F D
AN
IA
B
EA
C H
C O
VE
R
S H
EE
T
C0.00
GEOR
G
E
B A
L A
B A N
L
IC
E N
S E
F
LO
R
ID
A
PROFESS
IO
NA
L
E
NG
INEER
N o
ST
AT
E O
F
OWNER
CITY OF DANIA BEACH
100 WEST DANIA BEACH BOULEVARD
DANIA BEACH, FL 33004
PHONE: (954) 924-6808
CONTACT: OSCAR VASQUEZ
SURVEYOR
STONER & ASSOCIATES. INC.
4341 S.W. 62ND AVENUE
DAVIE, FL 33314
PHONE: (954) 585-0997
CONTACT: WALTER DE LA ROCHA, P.S.M.
CIVIL ENGINEER
KIMLEY-HORN AND ASSOCIATES, INC.
8201 PETERS RD, SUITE 2200
PLANTATION, FL 33324
PHONE: (954) 535-5100
CONTACT: GEORGE BALABAN, P.E.
CITY OF DANIA BEACH
OCEAN PARK PARKING - PHASE 1
SOURCE: NEARMAP
LOCATION MAP
1" = 250'
© 2026 KIMLEY-HORN AND ASSOCIATES, INC.
8201 PETERS ROAD, SUITE 2200, PLANTATION, FL 33324
PHONE: 954-535-5100 FAX: 561-863-8175
WWW.KIMLEY-HORN.COM CA 00000696
PREPARED BY
DANIA BEACH CITY COMMISION
JOYCE L. DAVIS
MARCO A. SALVINO, SR.
LORI LEWELLEN
LUIS RIMOLI
A.J. RYAN IV
CANDIDO SOSA-CRUZ
CONSTRUCTION SET
DATE OF ISSUE: 06/25/2026
SECTION 36, TOWNSHIP 50S, RANGE 42E
DEPARTMENT OF PUBLIC SERVICES
CITY OF DANIA BEACH
100 WEST DANIA BEACH BOULEVARD
DANIA BEACH, FLORIDA 33004
PHONE: 954-924-6800
MAYOR
VICE MAYOR
COMMISSIONER
COMMISSIONER
COMMISSIONER
CITY MANAGER
PROJECT LOCATION
NORTHPROJECT TEAM
CAMBRIDGE ST
N B
EA
C
H R
D
N
BE
AC
H
RD
N O
C
EA
N D
R
N E
4T H
T
ER
N B
EA
C
H R
D
JIMMY BUFFET MEMORIAL HWY
LANDSCAPE ARCHITECT:
KIMLEY-HORN & ASSOCIATES, INC.
TOM HARGRETT, PSA, ASLA
1920 WEKIVA WAY, SUITE 200
WEST PALM BEACH, FL 33411
PHONE: (561) 840-0812
TOM.HARGRETT@KIMLEY-HORN.COM
Sheet List Table Sheet Number Sheet Title
C0.00 COVER SHEET
C0.10 GENERAL NOTES
C0.20 EXISTING CONDITIONS PLAN
C1.00 DEMOLITION & EROSION CONTROL NOTES
C1.01 DEMOLITION & EROSION CONTROL PLAN
C1.10 DEMOLITION & EROSION CONTROL DETAILS
C2.00 PAVEMENT MARKINGS & SIGNAGE PLAN
C3.00 PAVING & GRADING PLAN
C3.10 DRAINAGE PLAN
C3.20 CROSS SECTIONS
C3.30 PAVING, GRADING & DRAINAGE DETAILS
C3.31 PAVING, GRADING & DRAINAGE DETAILS
L5.00 TREE DISPOSITION AND PLANTING PLAN
L5.10 PLANTING DETAILS
L5.20 PLANTING NOTES
L6.00 IRRIGATION PLAN
L6.10 IRRIGATION DETAILS
L6.11 IRRIGATION DETAILS
L6.20 IRRIGATION NOTES
L6.30 IRRIGATION NOTES
EA
N
P
AR
K
PA
R
KI
N G
PH
AS
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F D
AN
IA
B
EA
C H
G
EN
ER
AL
N O
TE
S
C0.10
GENERAL NOTES
I. APPLICABLE CODES
A. GENERAL
1. ALL WORK FOR THIS PROJECT SHALL BE COMPLETED WITHIN AND FROM EXISTING RIGHT OF WAY.
2. COUNTY IN THESE NOTES REFERS TO THE BROWARD COUNTY, CITY IN THESE NOTES REFERS TO THE CITY OF DANIA
BEACH. STATE IN THESE NOTES REFERS TO THE STATE OF FLORIDA.
3. THE FDOT INDICES REFERRED TO IN THE DRAWINGS AND NOTES REFERS TO FLORIDA DEPARTMENT OF
TRANSPORTATION (FDOT) STANDARD PLANS FOR ROAD AND BRIDGE CONSTRUCTION AND FDOT DESIGN STANDARDS
LATEST EDITION.
4. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST STANDARDS, CODES, REGULATIONS AND SPECIFICATIONS
OF THE CITY, COUNTY, STATE, AND FEDERAL CODES WHERE APPLICABLE.
5. THE CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH FEDERAL, STATE, COUNTY, AND CITY LAWS, CODES, ORDINANCES AND REGULATIONS.
6. IN THE EVENT OF A CONFLICT BETWEEN THE GENERAL NOTES AND CONSTRUCTION SPECIFICATIONS IN THESE PLANS AND THE CONTRACT DOCUMENTS AND SPECIFICATIONS IN THE SPECIFICATIONS BOOKLET THE CONTRACTOR SHALL
SUBMIT WRITTEN REQUEST FOR CLARIFICATION TO THE ENGINEER.
7. ALL HANDICAP ACCESSIBLE ACCESS TO CONFORM WITH THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES
ACT AND LOCAL, STATE, AND FEDERAL CODES, LATEST EDITIONS.
8. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL APPLICABLE CONSTRUCTION PERMITS PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL APPLY FOR AND PROCURE ALL PERMITS AND LICENSES, PAY ALL APPLICABLE CHARGES, TAXES, ROYALTIES & FEES, AND GIVE ALL NOTICES NECESSARY TO COMPLETE THIS PROJECT.
9. RADII DIMENSIONS AND ELEVATIONS ARE TO BE EDGE OF PAVEMENT AND FINISH GRADE UNLESS NOTED OTHERWISE.
10. IF ABANDONED GAS, WATER, AND SEWER SERVICE LATERALS ARE ENCOUNTERED DURING EXCAVATION, THE SECTION IN
THE EXCAVATED ENVELOPE WILL BE REMOVED AND THE STUB ON THE SIDE CONNECTED TO THE MAIN WILL BE CAPPED, PLUGGED OR OTHERWISE SEALED.
11. CONTRACTOR TO MAINTAIN ACCESS TO BUSINESS AND RESIDENTIAL LOCATIONS BY NORMAL MEANS AND METHODS, I.E.
TEMPORARY STEEL PLATES, LIMEROCK, ETC. ALL ASSOCIATED COST TO BE INCLUDED IN M.O.T. PAY ITEM.
12. CONTRACTOR SHALL NOTIFY BROWARD COUNTY TRAFFIC ENGINEERING DIVISION 72 HOURS PRIOR TO WORK WITHIN
COUNTY RIGHT-OF-WAY.
13. CONTRACTOR SHALL NOTIFY THE FLORIDA DEPARTMENT OF TRANSPORTATION 72 HOURS PRIOR TO WORK WITHIN
STATE RIGHT-OF-WAY.
14. ITEMS IN CONFLICT WITH DESIGN SUCH AS EXISTING CURBS AND GUTTERS, SIDEWALKS, DRAINAGE STRUCTURES PAVEMENT AND BASE AND EXCESS EXCAVATIONS ARE TO BE REMOVED BY CONTRACTOR AND DISPOSED OF IN A LEGAL AND PROPER MANNER AWAY FROM THE JOB SITE AT THE CONTRACTOR'S EXPENSE UNLESS THE ITEMS ARE TO BE
REUSED ON THE PROJECT
15. EXCESS MATERIAL REMOVED BY THE CONTRACTOR WILL BE DISPOSED OF IN AREAS PROVIDED BY THE CONTRACTOR.
16. THE INFORMATION PROVIDED IN THESE PLANS IS TO ASSIST THE CONTRACTOR IN ASSESSING THE NATURE AND EXTENT
OF THE CONDITIONS WHICH MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. ALL CONTRACTORS ARE DIRECTED, PRIOR TO BIDDING, TO CONDUCT ANY INVESTIGATIONS THEY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS REGARDING THE ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED AND UPON WHICH THEIR BIDS WILL BE BASED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INVESTIGATE SITE CONDITIONS OF THE PROJECT AND FULLY SATISFY THEMSELVES OF BOTH THE SURFACE AND SUBSURFACE CONDITIONS AND BASE THEIR PRICING ACCORDINGLY.
GEOTECHNICAL REPORT IS INCLUDED IN THE CONTRACT DOCUMENTS.
17. CONTRACTOR SHALL PRESERVE ALL STREET SIGNS, BENCHES, TRAFFIC CONTROL SIGNS, LANDSCAPING, ETC. WHEN DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL REINSTALL OR DELIVER SAID PUBLIC PROPERTY TO THE
COUNTY OR CITY AS APPLICABLE.
18. THE CONTRACTOR SHALL TAKE SPECIAL NOTE OF ANY SPECIAL EQUIPMENT SHORING, SHEETING OR OTHER PROCEDURES NECESSARY TO PROTECT ADJACENT PROPERTY, EITHER PUBLIC OR PRIVATE, DURING EXCAVATION OF SUBSOIL MATERIAL OR DURING THE FILLING OF ANY AREA, OR FOR ANY AREA, OR FOR ANY OPERATION DURING CONSTRUCTION SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND PROVIDED AT NO ADDITIONAL COST TO
THE OWNER.
19. APPARENT ERRORS, DISCREPANCIES, OR OMISSIONS ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF
THE ENGINEER OF RECORD IMMEDIATELY.
20. THE AMOUNT OF EACH OF THE MATERIALS PROVIDED IS THE ESTIMATED AMOUNT REQUIRED TO COMPLETE THE JOB.
THESE QUANTITIES ARE ESTIMATED ONLY AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLETE THE JOB IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SHOULD ADDITIONAL MATERIALS BE REQUIRED THEY WILL BE PAID
FOR AT THE CONTRACT UNIT PRICES AS DESCRIBED IN THE BID DOCUMENTS.
21. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES THAT REMAIN IN PLACE.
22. ALL ROAD CROSSINGS ARE OPEN CUT UNLESS OTHERWISE NOTED ON THE DRAWINGS.
23. THE CONTRACTOR SHALL REPLACE ALL PAVING, STABILIZING EARTH, DRIVEWAYS, SIDEWALKS, ETC. WITH THE SAME
TYPE OF MATERIAL THAT WAS REMOVED DURING CONSTRUCTION OF AS DIRECTED BY THE ENGINEER.
24. THE CONTRACTOR SHALL NOT ENCROACH INTO PRIVATE PROPERTY WITH PERSONNEL, MATERIAL OR EQUIPMENT
WITHOUT OBTAINING WRITTEN PERMISSION FROM THE OWNER.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE, REMOVAL OR MODIFICATION ACCIDENTALLY OR PURPOSELY, CAUSED TO ANY IRRIGATION SYSTEMS, PRIVATE OR PUBLIC WITHIN THE PROJECT LIMITS. THE COSTS TO REPLACE, REMOVE OR MODIFY IRRIGATION PIPES, SPRINKLER HEADS OR OTHER PERTINENT APPURTENANCES SHALL BE CONSIDERED INCIDENTAL TO AND SHALL BE INCLUDED IN THE OTHER ITEMS OF RELATED WORK. ALL COSTS DUE TO
DAMAGE SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF AND MAKING THE REPAIRS OF EXISTING PAVEMENT, PIPES, CONDUITS, CURBS, CABLES, TREES, SOD, LANDSCAPE ITEMS, ETC. WHETHER OR NOT SHOWN ON THE PLANS DAMAGED AS A RESULT OF THE CONTRACTORS OPERATIONS AND/OR THOSE OF THEIR SUBCONTRACTORS. CONTRACTOR SHALL REPORT ANY DAMAGE TO SIDEWALK, DRIVEWAY, ETC., PRIOR TO BEGINNING
WORK IN ANY AREA.
27. CONTRACTOR IS RESPONSIBLE TO REMOVE AND REINSTALL ALL BRICK OR PAVER DRIVEWAYS IMPACTED BY CONSTRUCTION, REPAIR OR REPLACE ALL ASPHALT, CONCRETE, OR STAMPED CONCRETE DRIVEWAYS IMPACTED BY CONSTRUCTION. ALL COSTS ASSOCIATED WITH THIS WORK SHALL BE INCLUDED AS PART OF THE OVERALL BID.
28. THE CONTRACTOR SHALL RESTORE OR REPLACE, WHEN AND AS DIRECTED BY THE ENGINEER, ANY PUBLIC OR PRIVATE PROPERTY DAMAGED BY HIS/HER WORK, EQUIPMENT, EMPLOYEES OR THOSE OF HIS SUBCONTRACTORS TO A CONDITION AT LEAST EQUAL (DETERMINED BY THE ENGINEER OF RECORD) TO THAT EXISTING IMMEDIATELY PRIOR TO
THE BEGINNING OF OPERATIONS.
29. CONTRACTOR SHALL ADJUST ALL EXISTING SURFACE FEATURES SUCH AS EXISTING FRAMES, GRATES, MANHOLE
COVERS, UTILITY VALVE BOXES, MONITORING WELLS, ECT. TO MATCH FINISHED GRADES.
30. ALL INSTALLATIONS WITHIN BROWARD COUNTY JURISDICTION RIGHTS OF WAY SHALL BE IN CONFORMITY WITH THE
BROWARD COUNTY HIGHWAY CONSTRUCTION & ENGINEERING DIVISION "MINIMUM STANDARDS."
31. THE CITY OF DANIA BEACH SHALL RECEIVE A COPY OF ALL REQUIRED DENSITY REPORTS, AS-BUILTS, AND SHOP
DRAWINGS OF THE PROJECT.
32. IRRIGATION LOCATIONS ON THE PLANS ARE KNOWN. CONTRACTOR IS TO COORDINATE WITH CITY'S LANDSCAPE/IRRIGATION CONTRACTOR, BRIGHTVIEW, LAURA GROTH AT 305-345-7906 TO BE PROPERTLY INFORMED OF
EXISING IRRIGATION SYSTEM LOCATION.
B. CONSTRUCTION SAFETY
1. ALL CONSTRUCTION SHALL BE DONE IN A SAFE MANNER SPECIFICALLY, THE RULES AND REGULATIONS OF THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) AND THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD) SHALL BE STRICTLY OBSERVED.
C. TRENCH SAFETY ACT
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE STATE OF FLORIDA TRENCH SAFETY ACT.
2. WHERE EXCAVATIONS TO A DEPTH IN EXCESS OF FIVE FEET (5') ARE REQUIRED, THE CONTRACTOR SHALL INCLUDE THE
FOLLOWING INFORMATION IN THE BID:
2.1. A REFERENCE TO THE TRENCH SAFETY STANDARDS THAT WILL BE IN EFFECT DURING THE PERIOD OF
CONSTRUCTION OF THE PROJECT.
2.2. WRITTEN ASSURANCES BY THE CONTRACTOR PERFORMING THE TRENCH EXCAVATION THAT SUCH CONTRACTOR
WILL COMPLY WITH THE APPLICABLE TRENCH SAFETY STANDARDS.
2.3. A SEPARATE ITEM IDENTIFYING THE COST OF COMPLIANCE WITH THE APPLICABLE TRENCH SAFETY STANDARDS.
WHEN A BID IS NOT SUBMITTED, THE CONTRACTOR SHALL SUBMIT THE INFORMATION LISTED IN ITEM 2 ITO THE
ENGINEER PRIOR TO STARTING WORK.
D. SURVEY DATA
1. ALL EXISTING CONTROL POINTS AND/OR REFERENCE MARKERS SHALL BE RAISED TO FINAL GRADE. THESE POINTS AND
REFERENCE MARKERS SHALL BE LOCATED AND NOTED ON THE AS-BUILTS.
2. ANY NGVD - 1929 MONUMENT WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF IN DANGER OF DAMAGE, NOTIFY:
GEODETIC INFORMATION CENTER
ATTN: MARK MAINTANENCE SECTION N/CG-162
6001 EXECUTIVE BLVD.
ROCKVILLE, MARYLAND 20852
PHONE: 301-443-8319
II. PRECONSTRUCTION RESPONSIBILITIES
A. GENERAL
1. UPON RECEIPT OF THE "NOTICE OF AWARD", THE CONTRACTOR SHALL CONTACT THE ENGINEER OF RECORD AND
ARRANGE A PRE-CONSTRUCTION CONFERENCE TO INCLUDE THE ALL INVOLVED GOVERNMENTAL AGENCIES, UTILITY OWNERS, AND THE ENGINEER OF RECORD, AND HOLD THE MANDATORY PRE-CONSTRUCTION CONFERENCE AFTER ISSUANCE OF THE CONTRACT'S "NOTICE OF AWARD" BUT BEFORE THE ACTUAL CONSTRUCTION DATE. CONTRACTOR
MAY NOT BEGIN WORK BEFORE ACTUAL CONSTRUCTION DATE.
2. THE CONTRACTOR SHALL OBTAIN A SUNSHINE CERTIFICATION NUMBER AT LEAST 48 HOURS PRIOR TO BEGINNING ANY
EXCAVATION.
3. PRIOR TO BEGINNING CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE SIZE, LOCATION ELEVATION, AND MATERIAL
OF ALL EXISTING UTILITIES WITHIN THE AREA OF CONSTRUCTION.
4. EXISTING UTILITY LOCATION SHOWN ON THESE PLANS ARE APPROXIMATE. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF EXISTING UTILITIES SHOWN OR FOR ANY EXISTING UTILITIES NOT SHOWN.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ANY EXISTING UTILITIES FOR WHICH IT FAILS TO REQUEST LOCATIONS FROM THE UTILITY OWNER. THE CONTRACTOR IS RESPONSIBLE AS WELL FOR DAMAGE TO ANY EXISTING
UTILITIES WHICH ARE PROPERLY LOCATED.
6. IF UPON EXCAVATION, AN EXISTING UTILITY IS FOUND TO BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION OR TO BE OF A SIZE OR MATERIAL DIFFERENT FROM THAT SHOWN ON THE PLANS, THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE ENGINEER.
7. EXISTING UTILITIES SHALL BE MAINTAINED IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE APPROVED BY THE
UTILITY OWNER.
8. THE CONTRACTOR SHALL COORDINATE WITH UTILITIES TO ARRANGE RELOCATION AND TEMPORARY SUPPORT OF
UTILITY FEATURE ETC. AS NECESSARY TO COMPLETE THE WORK.
9. THE UTILITY COMPANIES SHALL BE NOTIFIED BY THE CONTRACTOR TWO (2) BUSINESS DAYS IN ADVANCE OF ANY
EXCAVATION INVOLVING THEIR UTILITIES SO THAT A COMPANY REPRESENTATIVE CAN BE PRESENT.
10. THE CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD TRANSMISSION LINES OR
UNDERGROUND UTILITIES.
11. It SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO TAKE THE NECESSARY PRECAUTIONS TO ENSURE PROPER
SAFETY AND WORKMANSHIP WHEN WORKING IN THE VICITINITY OF EXISTING UTILITY LINES.
III. INSPECTIONS
A. GENERAL
1. THE CONTRACTOR SHALL GIVE THE ENGINEER OF RECORD A MINIMUM OF TWO (2) BUSINESS DAYS ADVANCE NOTICE
PRIOR TO BACKFILLING OR COMPLETING THE INSPECTION OF THE FOLLOWING ITEMS SO THE ENGINEER OF RECORD
CAN PERFORM FIELD OBSERVATIONS OF THE FOLLOWING ITEMS:
1.1. STORM DRAINAGE
1.2. WATER MAIN
1.3. SUBGRADE; SUBMIT AND HAVE APPROVED DENSITIES PRIOR TO PLACEMENT OF ROCK
1.4. LIMEROCK BASE; SUBMIT AND HAVE APPROVED DENSITIES AND AS-BUILTS PRIOR TO THE
1.5. PLACEMENT OF ANY ASPHALT.
1.6. ASPHALTIC CONCRETE
1.7. FINAL
2. ALL INSPECTIONS WILL BE MADE BY THE COUNTY AND THE CITY OF DANIA BEACH. THE ENGINEER OF RECORD WILL
PROVIDE CONSTRUCTION OBSERVATION SERVICE.
3. IF THE CONTRACTOR FAILS TO NOTIFY THE ENGINEER OF RECORD PRIOR TO COMPLETING THE ABOVE, THE ENGINEER
RESERVES THE RIGHT NOT TO ISSUE ANY CERTIFICATIONS OR FINAL INSPECTIONS.
IV. SHOP DRAWINGS
A. GENERAL
1. PRIOR TO THEIR CONSTRUCTION OR INSTALLATION, SHOP DRAWINGS SHALL BE SUBMITTED TO AND REVIEWED BY THE
ENGINEER OF RECORD FOR STORM MANHOLES, AND OTHER ACCESSORIES. CATALOGUE LITERATURE SHALL BE SUBMITTED FOR STORM PIPES. PRIOR TO SUBMITTING SHOP DRAWINGS TO THE ENGINEER, THE CONTRACTOR SHALL REVIEW AND APPROVE THE DRAWINGS, AND SHALL NOTE IN RED ANY DEVIATIONS FROM THE ENGINEER'S PLANS OR SPECIFICATIONS. INDIVIDUAL SHOP DRAWINGS FOR ALL PRECAST STRUCTURES ARE REQUIRED. CATALOGUE
LITERATURE WILL NOT BE ACCEPTABLE FOR PRECAST STRUCTURES.
V. TEMPORARY FACILITIES
A. TEMPORARY UTILITIES
1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ARRANGE OR SUPPLY TEMPORARY WATER SERVICE, SANITARY
FACILITIES, AND ELECTRICITY TO ITS EMPLOYEES AND SUBCONTRACTORS FOR THEIR USE DURING CONSTRUCTION.
B. TRAFFIC REGULATION
1. MAINTENANCE OF TRAFFIC IN THE PUBLIC RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE MUTCD. A MAINTENANCE
OF TRAFFIC PLAN MUST BE APPROVED BY THE GOVERNMENTAL ENGINEERING DIVISION HAVING JURISDICTION FOR THE
SECTION OF ROADWAY BEFORE STARTING WORK IN THE PUBLIC RIGHT-OF-WAY.
2. ALL OPEN TRENCHES AND HOLES ADJACENT TO ROADWAYS OR WALKWAYS SHALL BE PROPERLY MARKED AND
BARRICADED TO ASSURE THE SAFETY OF BOTH VEHICULAR AND PEDESTRIAN TRAFFIC.
3. NO TRENCHES OR HOLES NEAR WALKWAYS OR IN ROADWAYS OR THEIR SHOULDERS ARE TO BE LEFT OPEN DURING
NIGHTTIME HOURS WITHOUT EXPRESS PERMISSION OF THE CITY.
C. TEMPORARY FACILITIES
1. THE CONTRACTORS ON-SITE EQUIPMENT, STOCK PILED MATERIAL, AND SUPPLIES SHALL BE KEPT IN A SECURE, FENCED
AND LOCKED LOCATION WHEN CONTRACTOR IS NOT SUPERVISING THE STAGING OR LAY DOWN AREA.
2. STAGING AND MATERIAL STORAGE SHALL NOT BE CONDUCTED ON ABUTTING PRIVATE PROPERTY OR PUBLIC
RIGHT-OF-WAY WITHOUT APPROVAL FROM THE CITY OF DANIA BEACH.
3. CONTRACTOR SHALL CONSTRUCT AND MAINTAIN TEMPORARY STREET LIGHTING AS REQUIRED TO LIGHT THE
CONSTRUCTION PROJECT LIMITS AT ALL TIMES TO AT LEAST THE SAME LIGHTING INTENSITY LEVELS AS WAS EXISTING PRIOR TO THE START OF CONSTRUCTION. ALL COSTS ASSOCIATED WITH THE CONSTRUCTION AND MAINTAINING
LIGHTING TO BE INCLUDED IN M.O.T. PAY ITEM.
4. THE CONTRACTOR SHALL COORDINATE SELECTION AND REVIEW OF ANY PROPOSED STAGING AREAS ASSOCIATED WITH
THIS PROJECT WITH THE CITY OF DANIA BEACH.
VI. PROJECT CLOSEOUT
A. CLEANING UP
1. DURING CONSTRUCTION, THE PROJECT SITE AND ALL ADJACENT AREAS SHALL BE MAINTAINED IN A NEAT AND CLEAN
MANNER. UPON FINAL CLEAN UP, THE PROJECT SITE SHALL BE LEFT CLEAR OF ALL SURPLUS MATERIAL OR TRASH, THE
PAVED AREAS SHALL BE SWEPT BROOM CLEAN.
2. THE CONTRACTOR SHALL RESTORE OR REPLACE, WHEN AND AS DIRECTED BY THE ENGINEER OR THOSE OF ITS SUBCONTRACTORS TO A CONDITION AT LEAST EQUAL OR BETTER TO THE EXISTING CONDITION IMMEDIATELY PRIOR TO THE BEGINNING OF OPERATIONS. TO THIS END, THE CONTRACTOR SHALL DO ALL NECESSARY HIGHWAY OR DRIVEWAY, WALK AND LANDSCAPING WORK, SUITABLE MATERIALS AND METHODS SHALL BE USED FOR SUCH RESTORATION.
3. WHERE MATERIAL OR DEBRIS HAS WASHED OR FLOWED INTO OR BEEN PLACED IN WATER COURSES, DITCHES, DRAINS, CATCH BASINS, OR ELSEWHERE AS A RESULT OF THE CONTRACTOR'S OPERATIONS, SUCH MATERIAL OR DEBRIS SHALL BE REMOVED AND SATISFACTORILY DISPOSED OF DURING PROGRESS OF THE WORK, AND THE AREA KEPT IN A CLEAN
AND NEAT CONDITION.
4. UPON COMPLETION OF THE PROPOSED DRAINAGE WORK, THE CONTRACTOR SHALL CLEAN THE NEW SYSTEM, REMOVE ALL POLLUTION CONTROL DEVICES FROM THE NEW AND EXISTING SYSTEM, AND CLEAN THE EXISTING STRUCTURES AND
DRAINAGE SYSTEM AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING OF ALL OF THE EXISTING DRAINAGE SYSTEM AFFECTED BY THE
CONSTRUCTION WITHIN THE RIGHT-OF-WAY UPON COMPLETION OF THE PROJECT.
B. PROJECT RECORD DOCUMENTS
1. THE CONTRACTOR SHALL MAINTAIN ACCURATE AND COMPLETE RECORDS OF WORK ITEMS COMPLETED.
2. PRIOR TO THE PLACEMENT OF ANY ASPHALT OR CONCRETE PAVEMENT, THE CONTRACTOR SHALL SUBMIT TO THE
ENGINEER "AS-BUILT" PLANS (SIGNED AND SEALED BY A FLORIDA CERTIFIED PROFESSIONAL LAND SURVEYOR) SHOWING LIMEROCK BASE GRADES, ALL DRAINAGE AND WATER IMPROVEMENTS. PAVING OPERATIONS SHALL NOT COMMENCE
UNTIL THE ENGINEER HAS REVIEWED THE "AS-BUILTS."
3. ALL REQUIRED DENSITY AND LBR TEST RESULTS FOR SUB-GRADE SHALL BE PROVIDED TO THE ENGINEER PRIOR TO
PLACING BASE MATERIAL.
4. ALL REQUIRED DENSITY AND LBR TEST RESULTS FOR LIMEROCK SHALL BE PROVIDED TO THE ENGINEER PRIOR TO
PLACING ASPHALT.
5. ALL "AS-BUILT" INFORMATION SUBMITTED TO THE ENGINEER SHALL BE SUFFICIENTLY ACCURATE, CLEAR AND LEGIBLE TO SATISFY THE ENGINEER THAT THE INFORMATION PROVIDES A TRUE REPRESENTATION OF THE IMPROVEMENTS
CONSTRUCTED.
6. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER OF RECORD COMPLETE SETS OF "AS-BUILT" CONSTRUCTION DRAWINGS (SIGNED AND SEALED BY A FLORIDA CERTIFIED PROFESSIONAL LAND SURVEYOR) AS REQUIRED FOR SUBMITTAL AND APPROVAL. THESE DRAWINGS SHALL BE MARKED TO SHOW "AS-BUILT" CONSTRUCTION CHANGES AND DIMENSIONED LOCATIONS AND ELEVATIONS OF ALL IMPROVEMENTS AND SHALL BE
SIGNED AND SEALED BY A REGISTERED LAND SURVEYOR.
7. ALL "AS-BUILT" INFORMATION ON ELEVATIONS OF WATER, SEWER, PAVING, AND DRAINAGE SHALL BE CERTIFIED BY A
REGISTERED LAND SURVEYOR.
8. AS-BUILT INFORMATION ON THE WATER SYSTEM SHALL INCLUDE LOCATIONS OF ALL VALVES, FITTINGS, FIRE HYDRANTS, WATER SERVICES AND TOP OF PIPE ELEVATIONS AT ALL FITTINGS AND AT A MINIMUM OF 100' SPACING.
9. THE COST OF SIGNED AND SEALED AS-BUILTS AND CADD FILES SHALL BE INCLUDED IN THE COST OF THE OVERALL BID.
VII. EARTHWORK
A. GENERAL
1. NONE OF THE EXISTING MATERIAL IS TO BE INCORPORATED IN THE LIMEROCK BASE.
2. ALL SUB-GRADE UNDER PAVED AREAS SHALL BE 12" THICK AND HAVE A MINIMUM LBR VALUE OF 40. AND SHALL BE
COMPACTED TO 98% OF THE MAXIMUM DENSITY AS DETERMINED BY AASHTO T-180.
3. ALL FILL MATERIAL IN AREAS NOT TO BE PAVED SHALL BE COMPACTED TO 95% OF THE MAXIMUM DENSITY AS
DETERMINED BY ASSHTO T-180.
4. WHEN WORKING IN AND AROUND EXISTING DRAINAGE CANALS OR LAKES, APPROPRIATE SILT BARRIERS SHALL BE
INSTALLED.
5. ALL ORGANIC AND OTHER UNSUITABLE MATERIAL UNDER THOSE AREAS TO BE PAVED SHALL BE REMOVED TO A DEPTH
OF THREE(3) FEET BELOW FINISHED GRADE AND FOR THREE(3) FEET BEYOND THE PERIMETER OF THE PAVING.
6. SUITABLE BACKFILL SHALL BE MINIMUM LBR 40 MATERIAL COMPACTED TO 98% OF THE MAXIMUM DENSITY AS
DETERMINED BY ASSHTO T-180 THREE (3) FEET BEYOND THE PERIMETER OF PAVING.
7. CONTRACTOR SHALL TIE TO EXISTING GRADE BY EVENLY SLOPING FROM CLOSEST PROPOSED GRADE PROVIDED TO
EXISTING GRADE AT LIMITS OF WORK UNLESS OTHERWISE NOTED ON PLANS. IF NO LIMIT OF WORK IS INDICATED, SLOPE
TO THE ADJACENT PROPERTY LINE OR RIGHT-OF-WAY LINE AS APPLICABLE.
8. SITE GRADING ELEVATIONS SHALL BE WITHIN 0.1 OF THE REQUIRED ELEVATION AS SHOWN ON THE PLANS AND ALL
AREAS SHALL BE GRADED TO DRAIN WITHOUT PONDING.
9. GROUND ADJACENT TO ROADWAY/PAVEMENT WHERE STORMWATER RUNOFF FLOWS FROM PAVEMENT TO GROUND SHALL BE GRADED TWO (2) INCHES LOWER THAN THE EDGE OF PAVEMENT TO ALLOW FOR THE PLACEMENT OF SOD.
10. WHEN ENCOUNTERED WITHIN PROPOSED DRAINAGE SWALES, HARDPAN SHALL BE REMOVED FOR A WIDTH OF FIVE (5)
FEET AT THE INVERT AND REPLACED WITH GRANULAR MATERIALS.
11. ALL AREAS TO BE CONSTRUCTED UPON WITH STRUCTURES, PAVEMENT, DRAINAGE, WATER, SEWER, CURBING, SIDEWALK, FENCING, ETC., SHALL BE CLEARED AND GRUBBED PRIOR TO CONSTRUCTION. THIS SHALL CONSIST OF THE COMPLETE REMOVAL OF AND DISPOSAL OF ALL TREES, BRUSH, STUMPS, ROOTS, GRASS, WEEDS, RUBBISH, AND ALL OTHER OBSTRUCTIONS RESTING ON OR PROTRUDING THROUGH THE SURFACE OF THE EXISTING GROUND TO A DEPTH OF 6 INCHES. ITEMS DESIGNATED TO OPERATION. ALL WORK SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS.
12. ALL PROPOSED GRADES SHOWN IN PLAN ARE FINISHED GRADES.
VIII. PAVING
A. GENERAL
1. ALL UNDERGROUND UTILITIES SHALL BE COMPLETED PRIOR TO THE CONSTRUCTION OF THE LIMEROCK BASE AND PRIOR TO THE PLACEMENT OF THE PAVEMENT. ALL REPAIRS TO EXISTING PAVEMENT SHALL RECEIVE SAW-CUT EDGES PRIOR TO RELAYING ASPHALT. ALL EXISTING PAVEMENT, LIMEROCK AND SUB-GRADE THAT IS AFFECTED AND NOT PART OF THE
CONSTRUCTION PROJECT SHALL BE PROPERLY RESTORED AT THE CONTRACTOR'S EXPENSE.
B. MATERIALS
1. LIMEROCK BASE MATERIAL SHALL HAVE A MINIMUM OF 70% CARBONATES (CALCIUM AND MAGNESIUM) WITH A MINIMUM
LBR OF 100.
2. PRIME COAT SHALL BE APPLIED AT THE RATE OF 0.25 GAL/YD SQ. AND TACK COAT SHALL MEET FLORIDA DEPARTMENT
OF TRANSPORTATION (FDOT) STANDARDS.
3. SURFACE COURSE SHALL BE EQUAL TO FDOT TYPE FC 12.5 & SP 9.5 ASPHALTIC CONCRETE.
C. INSTALLATION
1. LIMEROCK BASE MATERIAL SHALL BE 12" THICK AND COMPACTED TO 98% OF THE MAXIMUM DENSITY AS DETERMINED BY
AASHTO T-180.
2. LIMEROCK BASE MATERIAL SHALL BE PLACED IN MAXIMUM 6" LIFTS. BASES GREATER THAN 6" OF LIMEROCK SHALL BE
PLACED IN TWO OR MORE EQUAL LIFTS. LIMEROCK BASE SHALL BE COMPACTED TO 98% OF THE MAXIMUM DENSITY AS
DETERMINED BY AASHTO T-180.
3. NEW ASPHALTIC CONCRETE SHALL BE 1-1/2" FC 12.5 AND 1" SP 9.5 TOP LIFT. ASPHALTIC CONCRETE OVERLAY AND
RESURFACING TO BE 1" SP 9.5.
4. PRIME COAT SHALL BE PLACED ON ALL LIMEROCK BASES IN ACCORDANCE WITH FDOT STANDARDS.
5. TACK COAT SHALL BE PLACED AS REQUIRED IN ACCORDANCE WITH FDOT STANDARDS.
6. CARBONATES CONTENT MINIMUM 70% AND LBR MINIMUM OF 100.
7. BASE COURSE CONSTRUCTION SHALL NOT BE STARTED UNTIL ALL UNDERGROUND CONSTRUCTION IN THE VICINITY HAS
BEEN TESTED AND ACCEPTED.
8. WEARING COURSES SHALL NOT BE PLACED UNTIL:
8.1. A WALK THROUGH HAS BEEN CONDUCTED TO DETERMINE IF THERE IS ANY REMAINING WORK THAT MIGHT CAUSE
DAMAGE TO THE FINAL LIFT.
8.2. ALL LANDSCAPING WORK THAT MIGHT CAUSE DAMAGE TO THE FINAL LIFT IS COMPLETE.
8.3. ALL UNDERGROUND UTILITIES ARE INSTALLED AND ACCEPTED AND A FINISHED ROCK SURVEY HAS BEEN SUBMITTED
TO AND ACCEPTED BY THE HIGHWAY CONSTRUCTION & ENGINEERING DIVISION.
D. TESTING
1. ALL SUB-GRADE, LIMEROCK AND ASPHALT TESTS REQUIRED SHALL BE TAKEN AT THE DIRECTION OF THE ENGINEER AND
PER THE CITY OF DANIA BEACH REQUIREMENTS.
2. DENSITY TESTS SHALL BE CONDUCTED EVERY 200 FEET AND TWO FEET AWAY FROM ANY MANHOLE OR DRAINAGE
STRUCTURE INSTALLED IN PAVED AREAS.
IX. SIGNING AND MARKING
1. ALL PAVEMENT MARKING AND SIGNING SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, FDOT, AND CITY OF DANIA BEACH STANDARDS.
2. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PAINT
MARKINGS THEN AFTER 14 DAY CURING PERIOD PLACE THERMOPLASTIC PAVEMENT MARKINGS.
3. ONE BI-DIRECTIONAL YELLOW REFLECTIVE PAVEMENT MARKER SHALL BE PROVIDED AT 40' INTERVALS ON EACH SIDE OF
DOUBLE YELLOW STRIPES.
4. BI-DIRECTIONAL AMBER/AMBER REFLECTIVE PAVEMENT MARKERS SHALL BE PROVIDED AT 1' INTERVALS AT ALL
BULLNOSES.
5. BI-DIRECTIONAL WHITE/RED REFLECTIVE PAVEMENT MARKERS SHALL BE PROVIDED AT 20' INTERVALS ALONG SOLID
WHITE LINES (NOT ON EDGE OF PAVEMENT OR BIKE LANE LINES).
6. REFLECTIVE PAVEMENT MARKERS SHALL BE CLASS B MARKERS MANUFACTURED IN ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS 706 AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED
PROCEDURES.
7. ALL SIGNING SHALL BE FABRICATED USING TYPE XI SHEETING, AS PER BROWARD COUNTY TRAFFIC ENGINEERING
DIVISION STANDARDS (CURRENT EDITION).
8. ALL PAVEMENT MARKINGS AND SIGNING DAMAGED DURING CONSTRUCTION. SHALL BE RESTORED TO BROWARD
COUNTY TRAFFIC ENGINEERING DIVISION.
9. EXISTING MARKINGS SHALL BE REMOVED BY WATER BLASTING ONLY.
10. SEE SIGNING AND MARKING DETAILS FOR ADDITIONAL INFORMATION.
11. ALL EXISTING SIGNALIZATION EQUIPMENT TO REMAIN IS ASSUMED TO BE IN GOOD WORKING ORDER UNLESS CITY IS
NOTIFIED IN WRITING PRIOR TO START OF CONSTRUCTION. ANY SUBSEQUENT DAMAGE TO THE SIGNAL EQUIPMENT
SHALL BE REPAIRED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
X. PLANTING & SODDING
1. A 2" BLANKET OF TOP SOIL SHALL BE PLACED OVER ALL AREAS TO BE SODDED.
2. SOD SHALL BE ST. AUGUSTINE, BITTER BLUE OR FLORATAM AND SHALL BE PLACED ON THE GRADED TOP SOIL AND
WATERED TO INSURE SATISFACTORY CONDITION UPON FINAL ACCEPTANCE OF THE PROJECT.
3. ALL NEW AND TRANSPLANTED PLANT MATERIAL SHALL BE IRRIGATED BY AN AUTOMATIC UNDERGROUND IRRIGATION
SYSTEM.
4. CONTRACTOR SHALL REMOVE ALL ROAD ROCK, CONCRETE, ASPHALT, AND OTHER NON NATURAL MATERIAL FROM
PLANTING AREAS AND REPLACE WITH PLANTING SOIL PRIOR TO LANDSCAPE INSTALLATION.
5. WORK SHALL INCLUDE MAINTENANCE AND WATERING OF ALL CONTRACT PLANTING AREAS UNTIL CERTIFICATION OF
ACCEPTABILITY BY THE OWNER.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNAUTHORIZED CUTTING OR DAMAGE TO TREES AND SHRUBS
EXISTING OR OTHERWISE, CAUSED BY CARELESS EQUIPMENT OPERATION, MATERIAL STOCKPILING, ETC. THIS SHALL INCLUDE COMPACTION BY DRIVING OR PARKING INSIDE THE DRIP-LINE AND SPILLING OIL, GASOLINE, OR OTHER DELETERIOUS MATERIALS WITHIN THE DRIP-LINE. NO MATERIALS SHALL BE BURNED WHERE HEAT WILL DAMAGE ANY PLANT. EXISTING TREES/LANDSCAPING KILLED OR DAMAGED SO THAT THEY ARE MISSHAPEN AND/ OR UNSIGHTLY SHALL
BE REPLACED AT THE COST TO THE CONTRACTOR.
7. SOIL MIXTURE (PLANTING MEDIUM FOR PLANT PITS) SHALL CONSIST OF 20% CLEAN FLORIDA MUCK AND 80% PARTS CLEAN SAND. IT SHALL CONTAIN THREE (3) TO FIVE (5) PERCENT DECOMPOSED ORGANIC MATTER AND A PH BETWEEN
5.5 AND 7.0.
8. MUCK (OR MUCKY PEAT) FOR USE IN PREPARING SOIL MIXTURE FOR BACKFILLING PLANT PITS SHALL BE FERTILE, AND OF A VERY HIGH ORGANIC CONTENT DERIVED FROM FLORIDA SOURCES; REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH WEEDS AND OTHER LITTER; FREE OF ROOTS, STUMPS, STONES LARGER THAN 2" IN ANY DIRECTION, AND OTHER
EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH.
9. WATER NECESSARY FOR PLANTING AND MAINTENANCE SHALL BE OF SATISFACTORY QUALITY TO SUSTAIN AN ADEQUATE PLANT GROWTH AND SHALL NOT CONTAIN HARMFUL, NATURAL OR MAN-MADE ELEMENTS DETRIMENTAL TO PLANTS. WATER MEETING THE ABOVE STANDARD SHALL BE OBTAINED ON THE SITE FROM THE OWNER, IF AVAILABLE, AND THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE ARRANGEMENTS FOR ITS USE BY HIS TANKS, HOSES, SPRINKLERS, ETC.. IF SUCH WATER IS NOT AVAILABLE AT THE SITE, THE CONTRACTOR SHALL PROVIDE SATISFACTORY
WATER FROM SOURCES OFF THE SITE AT NO ADDITIONAL COST TO THE OWNER.
10. WATERING/IRRIGATION RESTRICTIONS MAY APPLY - REFER TO PROPERTY'S JURISDICTIONAL AUTHORITY.
11. THE CONTRACTOR SHALL FINE GRADE THE LAWN AND PLANTING AREAS TO BRING THE ROUGH GRADE UP TO FINAL
FINISHED GRADE ALLOWING FOR THICKNESS OF SOD AND/OR MULCH DEPTH. THIS CONTRACTOR SHALL FINE GRADE BY HAND AND/OR WITH ALL EQUIPMENT NECESSARY INCLUDING A GRADING TRACTOR WITH FRONT-END LOADER FOR
TRANSPORTING SOIL WITHIN THE SITE.
12. ALL PLANTING AREAS SHALL BE GRADED AND MAINTAINED FOR POSITIVE DRAINAGE TO SURFACE/SUBSURFACE STORM
DRAIN SYSTEMS. AREAS ADJACENT TO BUILDINGS SHALL SLOPE AWAY FROM THE BUILDINGS.
13. CLEANING UP BEFORE COMMENCING WORK: THE CONTRACTOR SHALL CLEAN WORK AND SURROUNDING AREAS OF ALL RUBBISH OR OBJECTIONABLE MATTER. ALL MORTAR, CEMENT, AND TOXIC MATERIAL SHALL BE REMOVED FROM THE SURFACE OF ALL PLANT BEDS. THESE MATERIALS SHALL NOT BE MIXED WITH THE SOIL. SHOULD THE CONTRACTOR FIND SUCH SOIL CONDITIONS BENEATH THE SOIL WHICH WILL IN ANY WAY ADVERSELY AFFECT THE PLANT GROWTH, HE SHALL IMMEDIATELY CALL IT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. FAILURE TO DO SO BEFORE PLANTING SHALL MAKE THE CORRECTIVE MEASURES THE RESPONSIBILITY OF THE CONTRACTOR.
14. SUBGRADE EXCAVATION: CONTRACTOR IS RESPONSIBLE TO REMOVE ALL EXISTING AND IMPORTED LIMEROCK AND LIMEROCK SUB-BASE FROM ALL LANDSCAPE PLANTING AREAS TO A MINIMUM DEPTH OF 36". CONTRACTOR IS RESPONSIBLE TO BACKFILL THESE PLANTING AREAS TO ROUGH FINISHED GRADE WITH CLEAN TOPSOIL FROM AN ON-SITE SOURCE OR AN IMPORTED SOURCE. IF LIMEROCK OR OTHER ADVERSE CONDITIONS OCCUR IN PLANTED AREAS AFTER 36" DEEP EXCAVATION BY THE CONTRACTOR, AND ADEQUATE PERCOLATION CAN NOT BE ACHIEVED, CONTRACTOR SHALL UTILIZE PLANTING DETAIL THAT ADDRESSES POOR DRAINAGE.
15. COMPLY WITH APPLICABLE FEDERAL, STATE, COUNTY, AND LOCAL REGULATIONS GOVERNING LANDSCAPE MATERIALS AND WORK. CONFORM TO ACCEPTED HORTICULTURAL PRACTICES AS USED IN THE TRADE. UPON ARRIVAL AT THE SITE , PLANTS SHALL BE THOROUGHLY WATERED AND PROPERLY MAINTAINED UNTIL PLANTED. PLANTS STORED ON-SITE SHALL NOT REMAIN UNPLANTED FOR A PERIOD EXCEEDING TWENTY-FOUR (24) HOURS. AT ALL TIMES, METHODS
CUSTOMARY IN GOOD HORTICULTURAL PRACTICES SHALL BE EXERCISED.
16. ALL AREAS THAT ARE TO BE SODDED SHALL BE CLEARED OF ANY ROUGH GRASS, WEEDS, AND DEBRIS, AND THE GROUND BROUGHT TO AN EVEN GRADE. THE ENTIRE SURFACE SHALL BE ROLLED WITH A ROLLER WEIGHING NOT MORE THAN ONE-HUNDRED (100) POUNDS PER FOOT OF WIDTH. DURING THE ROLLING, ALL DEPRESSIONS CAUSED BY SETTLEMENT SHALL BE FILLED WITH ADDITIONAL SOIL, AND THE SURFACE SHALL BE REGRADED AND ROLLED UNTIL
PRESENTING A SMOOTH AND EVEN FINISH TO THE REQUIRED GRADE.
17. SODING SOIL PREPARATION: PREPARE LOOSE BED FOUR (4) INCHES DEEP. HAND RAKE UNTIL ALL BUMPS AND
DEPRESSIONS ARE REMOVED. WET PREPARED AREA THOROUGHLY.
18. THE CONTRACTOR SHALL SOD ALL AREAS THAT ARE NOT PAVED OR PLANTED AS DESIGNATED ON THE DRAWINGS
WITHIN THE CONTRACT LIMITS, UNLESS SPECIFICALLY NOTED OTHERWISE.
19. THE SOD SHALL BE CERTIFIED TO MEET FLORIDA STATE PLANT BOARD SPECIFICATIONS, ABSOLUTELY TRUE TO
VARIETAL TYPE, AND FREE FROM WEEDS, FUNGUS, INSECTS AND DISEASE OF ANY KIND.
20. SOD PANELS SHALL BE LAID TIGHTLY TOGETHER SO AS TO MAKE A SOLID SODDED LAWN AREA. SOD SHALL BE LAID UNIFORMLY AGAINST THE EDGES OF ALL CURBS AND OTHER HARDSCAPE ELEMENTS, PAVED AND PLANTED AREAS.
ADJACENT TO BUILDINGS, A 24 INCH STONE MULCH STRIP SHALL BE PROVIDED - REFER TO DETAILS. IMMEDIATELY FOLLOWING SOD LAYING, THE LAWN AREAS SHALL BE ROLLED WITH A LAWN ROLLER CUSTOMARILY USED FOR SUCH PURPOSES, AND THEN THOROUGHLY IRRIGATED. IF, IN THE OPINION OF THE OWNER, TOP-DRESSING IS NECESSARY AFTER ROLLING TO FILL THE VOIDS BETWEEN THE SOD PANELS AND TO EVEN OUT INCONSISTENCIES IN THE SOD, CLEAN SAND, AS APPROVED BY THE OWNER'S REPRESENTATIVE, SHALL BE UNIFORMLY SPREAD OVER THE ENTIRE SURFACE OF THE SOD AND THOROUGHLY WATERED IN. FERTILIZE INSTALLED SOD AS ALLOWED BY PROPERTY'S JURISDICTIONAL
AUTHORITY.
21. DURING DELIVERY, PRIOR TO, AND DURING THE PLANTING OF THE LAWN AREAS, THE SOD PANELS SHALL AT ALL TIMES BE PROTECTED FROM EXCESSIVE DRYING AND UNNECESSARY EXPOSURE OF THE ROOTS TO THE SUN. ALL SOD SHALL
BE STACKED SO AS NOT TO BE DAMAGED BY SWEATING OR EXCESSIVE HEAT AND MOISTURE.
22. WITHIN THE CONTRACT LIMITS, THE CONTRACTOR SHALL PRODUCE A DENSE, WELL ESTABLISHED LAWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND RE-SODDING OF ALL ERODED, SUNKEN OR BARE SPOTS
(LARGER THAN 12"X12") UNTIL CERTIFICATION OF ACCEPTABILITY BY THE OWNER'S REPRESENTATIVE. REPAIRED SODDING SHALL BE ACCOMPLISHED AS IN THE ORIGINAL WORK (INCLUDING REGRADING IF NECESSARY).
23. UPON COMPLETION OF ALL PLANTING WORK AND BEFORE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL MATERIAL, EQUIPMENT, AND DEBRIS RESULTING FROM HIS WORK. ALL PAVED AREAS SHALL BE BROOM-CLEANED AND THE SITE LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE OWNER'S AUTHORIZED REPRESENTATIVE.
24. ALL PLANTS AND PLANTING INCLUDED UNDER THIS CONTRACT SHALL BE MAINTAINED BY WATERING, CULTIVATING, SPRAYING, AND ALL OTHER OPERATIONS (SUCH AS RE-STAKING OR REPAIRING GUY SUPPORTS) NECESSARY TO INSURE A HEALTHY PLANT CONDITION BY THE CONTRACTOR UNTIL CERTIFICATION OF ACCEPTABILITY BY THE OWNER'S REPRESENTATIVE. MAINTENANCE AFTER THE CERTIFICATION OF ACCEPTABILITY SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS IN THIS SECTION. CONTRACTORS ARE REQUESTED TO PROVIDE A BID ESTIMATE TO COVER LANDSCAPE AND IRRIGATION MAINTENANCE FOR A PERIOD OF 90 CALENDAR DAYS COMMENCING AFTER ACCEPTANCE.
25. THE LIFE AND SATISFACTORY CONDITION OF ALL 7 GALLON AND LARGER PLANT MATERIAL INSTALLED BY THE LANDSCAPE CONTRACTOR SHALL BE WARRANTED BY THE CONTRACTOR FOR A MINIMUM OF ONE (1) CALENDAR YEAR COMMENCING AT THE TIME OF CERTIFICATION OF ACCEPTABILITY BY THE OWNER'S REPRESENTATIVE.
26. THE LIFE AND SATISFACTORY CONDITION OF ALL OTHER PLANT MATERIAL (INCLUDING SOD) INSTALLED BY THE LANDSCAPE CONTRACTOR SHALL BE WARRANTED BY THE CONTRACTOR FOR A MINIMUM OF ONE (1) CALENDAR YEAR COMMENCING AT THE TIME OF CERTIFICATION OF ACCEPTABILITY BY THE OWNER'S REPRESENTATIVE.
27. REPLACEMENT: ANY PLANT NOT FOUND IN A HEALTHY GROWING CONDITION AT THE END OF THE WARRANTY PERIOD SHALL BE REMOVED FROM THE SITE AND REPLACED AS SOON AS WEATHER CONDITIONS PERMIT. ALL REPLACEMENTS SHALL BE PLANTS OF THE SAME KIND AND SIZE AS SPECIFIED IN THE PLANT LIST. THEY SHALL BE FURNISHED PLANTED
AND MULCHED AS SPECIFIED UNDER "PLANTING", AT NO ADDITIONAL COST TO THE OWNER.
28. IN THE EVENT THE OWNER DOES NOT CONTRACT WITH THE CONTRACTOR FOR LANDSCAPE (AND IRRIGATION) MAINTENANCE, THE CONTRACTOR IS ENCOURAGED TO VISIT THE PROJECT SITE PERIODICALLY DURING THE ONE YEAR WARRANTY PERIOD TO EVALUATE MAINTENANCE PROCEDURES BEING PERFORMED BY THE OWNER, AND SHALL NOTIFY THE OWNER IN WRITING OF MAINTENANCE PROCEDURES OR CONDITIONS WHICH THREATEN VIGOROUS AND HEALTHY PLANT GROWTH. IT IS SUGGESTED SUCH SITE VISITS SHALL BE CONDUCTED A MINIMUM OF ONCE PER MONTH FOR A
PERIOD OF TWELVE (12) MONTHS FROM THE DATE OF ACCEPTANCE.
XI. MAINTENANCE OF TRAFFIC
1. TRAFFIC CONTROLS SHALL BE IN ACCORDANCE WITH THE PROJECT TRAFFIC PLANS, THE CURRENT EDITION OF THE FDOT STANDARD PLANS FOR ROAD AND BRIDGE CONSTRUCTION. THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AS MINIMUM CRITERIA.
2. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL POTHOLES THAT DEVELOP WITHIN PROJECT LIMITS AND WILL MAINTAIN A SUPPLY OF COLD MIX ON THE PROJECT SITE TO EXPEDITE THOSE REPAIRS. ALL COSTS ASSOCIATED WITH
THIS WORK SHALL BE INCLUDED AS PART OF THE OVERALL BID.
3. REQUEST FOR PROPOSED LANE CLOSURES OR TEMPORARY DETOURS SHALL BE SUBMITTED FOR REVIEW AND
APPROVAL TO ROADWAY'S MAINTAINING AGENCY TO CLOSURE OR DETAIL.
4. AT THE DISCRETION OF THE ENGINEER, IF A LANE CLOSURE CAUSES EXTENDED CONGESTION OR DELAY, THE CONTRACTOR SHALL BE DIRECTED TO REOPEN THE CLOSED LANE(S) UNTIL SUCH TIME THAT TRAFFIC FLOW HAS
RETURNED TO AN ACCEPTABLE LEVEL.
5. THE TRAFFIC AND TRAVEL WAYS SHALL NOT BE ALTERED BY THE CONTRACTOR TO CREATE A WORK ZONE UNTIL ALL
LABOR AND MATERIAL ARE AVAILABLE FOR THE CONSTRUCTION IN THAT AREA.
6. THE CONTRACTOR SHALL REMOVE ANY EXISTING OR PROPOSED PAVEMENT MARKINGS THAT CONFLICT WITH THE TRAFFIC CONTROL. WHEN THE CONFLICT NO LONGER EXISTS THE CONTRACTOR SHALL RESTORE PAVEMENT MARKINGS TO THEIR ORIGINAL POSITION. REMOVAL OF EXISTING AND/OR TEMPORARY PAVEMENT MARKINGS SHALL BE ACCOMPLISHED BY FOLLOWING METHODS: BY MILLING AND ASPHALT OVERLAY, BY GRINDING AND ASPHALT OVERLAY, SAND OR WATER BLASTING, OR BY OTHER MEANS APPROVED BY THE ENGINEER. GRINDING (WITHOUT ASPHALT OVERLAY) SHALL ONLY BE PERMITTED IN NON-TRAFFIC AREAS AS DESIGNATED BY THE ENGINEER, ALL COSTS OF PAVEMENT MARKING REMOVAL, INCLUDING THE COST OF ASPHALT OVERLAY REQUIRED WHEN MILLING OR GRINDING IS USED IN TRAFFIC AREAS, SHALL BE INCLUDED. USE OF BLACK PAINT TO COVER EXISTING AND/OR TEMPORARY
PAVEMENT MARKINGS IS PROHIBITED.
7. CONTRACTOR SHALL REMOVE OR COVER ANY EXISTING OR PROPOSED SIGNS THAT CONFLICT WITH THE TRAFFIC CONTROL. WHEN THE CONFLICT NO LONGER EXISTS, CONTRACTOR SHALL RESTORE THE SIGNS TO THEIR ORIGINAL
POSITION, COST TO BE INCLUDED IN THE BID.
8. ALL EXISTING STREET NAMES AND STOP SIGNS AFFECTED BY CONSTRUCTION SHALL BE RELOCATED TO AND MAINTAINED IN A VISIBLE LOCATION FOR THE DURATION OF THE PROJECT. WHEN NO LONGER AFFECTED BY CONSTRUCTION THEY SHALL BE RESTORED TO THEIR FINAL POSITION. COST TO BE INCLUDED IN BID.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF STORMWATER FROM ROADWAYS UTILIZED FOR TRAFFIC MAINTENANCE IN A MANNER APPROVED BY THE ENGINEER. COST TO BE INCLUDED IN BID.
10. AT THE END OF EACH WORK PERIOD, ANY DROP-OFF IN THE AREA ADJACENT TO THE TRAVEL WAY SHALL BE BACKFILLED IN ACCORDANCE WITH STANDARD INDEX 102-600 OR SHALL BE OTHERWISE PROTECTED WITH TEMPORARY BARRIER AT
THE CONTRACTOR'S EXPENSE.
11. CONTRACTOR SHALL NOTIFY BROWARD COUNTY TRAFFIC ENGINEERING DIVISION 48 HOURS PRIOR TO ANY MODIFICATION AND/OR CHANGES OF AN EXISTING TRAFFIC SIGNAL (E.G TAKING THE SIGNALS OFF-LINE, REMOVING OR REPLACING LOOP ASSEMBLIES OR REARRANGING TRAFFIC SIGNAL HEADS). THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR THE NORMAL MAINTENANCE OF THE EXISTING TRAFFIC SIGNAL(S) WITHIN THE PROJECT LIMITS.
COST OF REARRANGING TRAFFIC SIGNAL HEADS AND MAINTAINING TRAFFIC SIGNALS TO BE INCLUDED IN THE BID.
12. CONTRACTOR TO MAINTAIN ACCESS TO RESIDENCES AND BUSINESSES ALONG THE PROJECT. CONTRACTOR IS TO SUBMIT A PROPOSED METHOD OF MAINTAINING ACCESS TO THESE PROPERTIES TO ENGINEER FOR REVIEW PRIOR TO
INSTALLATION. ALL COSTS WITH MAINTAINING ACCESS TO BE INCLUDED IN THE BID.
13. M.O.T TRANSITIONS AND TEMPORARY INTERSECTION CROSSOVERS WHERE CONSTRUCTION HAS CAUSED GRADE DIFFERENCES BETWEEN THE EXISTING AND NEW ROADWAYS SHALL BE CONSTRUCTED USING 1:20 SLOPE TO ACCOMMODATE VEHICULAR TRAFFIC FROM ANY DIRECTION. WORK SHALL BE DONE WITH ASPHALTIC CONCRETE TYPE "S" AND SHALL INCLUDE ASPHALT SLOPE REMOVAL WHEN NO LONGER NEEDED. ALL COST WITH MAINTAINING
CROSSOVER SLOPE GRADE AND REMOVAL TO BE INCLUDED IN THE BID.
14. CONTRACTOR SHALL MAINTAIN A CONTINUOUS PEDESTRIAN WAY ON ONE SIDE OF THE ROADWAY AT ALL TIMES.
PEDESTRIAN WAY SHALL HAVE SMOOTH SURFACE AND BE GRADED ON CONFORMANCE WITH THE AMERICAN
DISABILITIES ACT (ADA) REQUIREMENTS. ALL COSTS TO BE INCLUDED IN THE BID.
15. AT THE END OF EACH WORK DAY OR WHENEVER THE WORK ZONE BECOMES INACTIVE, ANY DROP-OFF ADJACENT TO THE PEDESTRIAN, BICYCLE OR WHEELCHAIR TRAVEL PATHS SHALL BE BACKFILLED FLUSH THE TRAVEL PATH OR SHALL BE PROTECTED WITH BARRICADES, TEMPORARY BARRIER WALL, OR APPROVED HANDRAIL COST TO BE INCLUDED IN THE
BID.
16. PEDESTRIAN, BICYCLE AND WHEELCHAIR TRAFFIC SHALL BE GUIDED AND MAINTAINED USING APPROVED WARNING LIGHTS, SIGNING AND CHANNELIZATION DEVICES. SUCH CONTROL DEVICES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH FDOT SPECIFICATIONS AND MUTCD SECTIONS ON WORK ZONE TRAFFIC CONTROL. COST TO BE
INSTALLED IN THE BID.
17. IF THERE ARE UNEVEN PAVEMENT SURFACES DURING CONSTRUCTION, THE VERTICAL "DROP OFF" DIFFERENCE SHALL
NOT BE MORE THAN 3 INCHES IN HEIGHT BETWEEN THE ADJACENT SURFACES.
18. CONTRACTOR SHALL MAINTAIN ACCESS TO RESIDENCES AND BUSINESSES FOR GARBAGE/SANITATION PICK-UP ALONG
THE PROJECT. ALL COSTS WITH MAINTAINING ACCESS TO BE INCLUDED IN THE BID.
19. CONTRACTOR SHALL MAINTAIN CURRENT LEVELS OF ROADWAY LIGHTING WITHIN THE PROJECT LIMITS AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECT. ALL COSTS WITH MAINTAINING LIGHTING TO BE INCLUDED IN THE BID.
GEOR
L A
B A N
L
IC
E N
S E
F
LO
R
ID
A
PROFESS
IO
NA
L
E
NG
INEER
N o
ST
AT
E
F
LEGEND
C
EA
N
P
AR
K
PA
R
KI
N G
PH
AS
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F D
AN
IA
B
EA
C H
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
C0.20
NORTH
SCALE 1" = 10'
GEOR
L A
B A N
L
IC
E N
S E
F
LO
R
ID
A
PROFESS
IO
NA
L
E
NG
INEER
N o
ST
AT
E
EA
N
P
AR
K
PA
R
KI
N G
PH
AS
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F D
AN
IA
B
EA
C H
D
EM
O
LI
TI
O
N
ER
O
SI
O
N C
O N
TR
O
L N
O
TE
S
C1.00
BEST MANAGEMENT PRACTICES (BMPS):
THIS PLAN HAS BEEN PREPARED TO ENSURE COMPLIANCE WITH APPROPRIATE CONDITIONS OF THE BROWARD COUNTY LAND DEVELOPMENT REGULATIONS, THE RULES OF THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), CHAPTER 17-25, F.A.C., THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD), CHAPTER 40D-4, F.A.C. AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT NO. EPA 832/R-92-005 (SEPTEMBER 1992). THE PLAN ADDRESSES THE
FOLLOWING:
A. PREVENT LOSS OF SOIL DURING CONSTRUCTION BY STORMWATER RUNOFF AND/OR WIND EROSION, INCLUDING
PROTECTING TOPSOIL BY STOCKPILING FOR REUSE.
B. SEDIMENTION PROTECTION OF STORM SEWER OR RECEIVING STREAM.
C. PREVENT POLLUTING THE AIR WITH DUST AND PARTICULATE MATTER. THE VARIOUS TECHNIQUES OR ACTIONS IDENTIFIED UNDER EACH SECTION INDICATE THE APPROPRIATE SITUATION WHEN THE TECHNIQUES SHOULD BE EMPLOYED. ALSO IDENTIFIED IS A CROSS-REFERENCE TO A DIAGRAM OR FIGURE REPRESENTING THE TECHNIQUE. IT SHOULD BE NOTED THAT THE MEASURES IDENTIFIED ON THIS PLAN ARE ONLY SUGGESTED BMP(S). THE CONTRACTOR SHALL PROVIDE POLLUTION PREVENTION AND EROSION CONTROL MEASURES AS SPECIFIED IN ACCORDANCE WITH THE CURRENT FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) REQUIREMENTS. CONTRACTOR SHALL PREPARE REQUIRED NPDES DOCUMENTATION AND OBTAIN PERMIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO PREPARE THE REQUIRED NPDES DOCUMENT AND OBTAIN THE NPDES PERMIT. ALL COST ASSOCIATED WITH SUCH WORK SHALL BE DEEMED
INCIDENTAL TO THE PROJECT LUMP SUM COST.
GENERAL EROSION CONTROL NOTES:
A. THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THESE EROSION CONTROL DRAWINGS, THE STANDARD DETAILS, THE NPDES PERMIT (TO BE OBTAINED BY CONTRACTOR) AND ALL SUBSEQUENT REPORTS AND RELATED
DOCUMENTS.
B. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THIS DRAWING AND THE STATE OF FLORIDA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERIC PERMIT
(NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS.
C. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP) IN ALL CONSTRUCTION ACTIVITIES INCLUDING BUT
NOT LIMITED TO THE FOLLOWING:
1. FUEL SPILLS AND LEAKS PREVENTION
2. PREVENT/REDUCE VEHICLE AND EQUIPMENT WASHING AND STEAM CLEANING
3. VEHICLE AND EQUIPMENT MAINTENANCE AND REPAIR
4. PROPER OUTDOOR LOADING/UNLOADING OF MATERIALS
5. PREVENT/REDUCE OUTDOOR STORAGE OF RAW MATERIALS, PRODUCTS, AND BY-PRODUCTS
6. SOLID WASTE MANAGEMENT
7. HAZARDOUS WASTE MANAGEMENT
8. CONCRETE WASTE MANAGEMENT
9. SANDBLASTING WASTE MANAGEMENT
10. STRUCTURE CONSTRUCTION AND PAINTING
11. SPILL PREVENTION AND CONTROL
12. CONTAMINATED SOIL MANAGEMENT
13. SANITARY/SEPTIC WASTE MANAGEMENT
14. SOIL EROSION CONTROL
15. STORM WATER TURBIDITY MANAGEMENT
ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO
THE OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION.
D. BEST MANAGEMENT PRACTICES (BMPS) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY
PERMITTING AGENCY OR OWNER.
E. SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. CONTRACTOR MUST MAINTAIN ALL PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS ON SITE AT ALL TIMES.
F. CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT.
G. CONTRACTOR SHALL BEGIN CLEARING AND GRUBBING THOSE PORTIONS OF THE SITE NECESSARY TO IMPLEMENT PERIMETER CONTROL MEASURES. CLEARING AND GRUBBING FOR THE REMAINING PORTIONS OF THE PROPOSED SITE SHALL COMMENCE ONCE PERIMETER CONTROLS ARE IN PLACE. PERIMETER CONTROLS SHALL BE ACTIVELY MAINTAINED UNTIL SAID AREAS HAVE BEEN STABILIZED AND SHALL BE REMOVED ONCE FINAL STABILIZATION IS COMPLETE.
H. GENERAL EROSION CONTROL BMPS SHALL BE EMPLOYED TO MINIMIZE SOIL EROSION AND POTENTIAL LAKE SLOPE CAVE-INS.
WHILE THE VARIOUS TECHNIQUES REQUIRED WILL BE SITE AND PLAN SPECIFIC, THEY SHOULD BE EMPLOYED AS SOON AS
POSSIBLE DURING CONSTRUCTION.
I. ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS.
J. SURFACE WATER QUALITY SHALL BE MAINTAINED BY EMPLOYING THE FOLLOWING BMP'S IN THE CONSTRUCTION PLANNING
AND CONSTRUCTION OF ALL IMPROVEMENTS.
STORM WATER EROSION CONTROL PRACTICES:
A. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM DETENTION PONDS AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE
STABILIZATION OF THE SITE.
B. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND
EROSION.
C. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (COMPOST SOCK DEVICES, ETC.) TO PREVENT EROSION.
D. WHERE PRACTICAL, STORMWATER SHALL BE CONVEYED BY SWALES.
E. EROSION CONTROL MEASURES SHALL BE EMPLOYED TO MINIMIZE TURBIDITY OF SURFACE WATERS LOCATED DOWNSTREAM OF ANY CONSTRUCTION ACTIVITY. WHILE THE VARIOUS MEASURES REQUIRED WILL BE SITE SPECIFIC, THEY SHALL BE
EMPLOYED AS NEEDED IN ACCORDANCE WITH THE FOLLOWING:
1. IN GENERAL, EROSION SHALL BE CONTROLLED AT THE FURTHEST PRACTICAL UPSTREAM LOCATION.
2. STORMWATER INLETS SHALL BE PROTECTED DURING CONSTRUCTION. PROTECTION MEASURES SHALL BE EMPLOYED AS SOON AS PRACTICAL DURING THE VARIOUS STAGES OF INLET CONSTRUCTION. SILT BARRIERS SHALL REMAIN IN PLACE
UNTIL SODDING AROUND INLETS IS COMPLETE.
3. WHEN NEEDED A TEMPORARY SEDIMENT TRAP SHOULD BE CONSTRUCTED TO DETAIN SEDIMENT-LADEN RUNOFF FROM
DISTURBED AREAS.
F. SILT BARRIERS, ANY SILT WHICH ACCUMULATES BEHIND THE BARRIERS, AND ANY FILL USED TO ANCHOR THE BARRIERS SHALL BE REMOVED PROMPTLY AFTER THE END OF THE MAINTENANCE PERIOD SPECIFIED FOR THE BARRIERS.
G. SLOPES OF BANKS OF RETENTION/DETENTION PONDS SHALL BE CONSTRUCTED NOT STEEPER THAN 3H:1V FROM TOP OF
BANK TO TWO FEET BELOW NORMAL WATER LEVEL, AS APPLICABLE.
H. SOD SHALL BE PLACED FOR A 2-FOOT WIDE STRIP ADJOINING ALL CURBING AND AROUND ALL INLETS. SOD SHALL BE PLACED
BEFORE SILT BARRIERS ARE REMOVED.
I. WHERE REQUIRED TO PREVENT EROSION FROM SHEET FLOW ACROSS BARE GROUND FROM ENTERING A LAKE OR SWALE, A
TEMPORARY SEDIMENT SUMP SHALL BE CONSTRUCTED.
J. FILTER FABRIC SHOULD BE USED FOR STORM DRAIN INLET PROTECTION BEFORE FINAL STABILIZATION.
WIND EROSION CONTROL PRACTICES:
A. WIND EROSION SHALL BE CONTROLLED BY EMPLOYING THE FOLLOWING METHODS AS NECESSARY AND APPROPRIATE:
1. BARE EARTH AREAS SHALL BE WATERED DURING CONSTRUCTION AS NECESSARY TO MINIMIZE THE TRANSPORT OF FUGITIVE DUST. IT MAY BE NECESSARY TO LIMIT CONSTRUCTION VEHICLE SPEED IF BARE EARTH HAS NOT BEEN EFFECTIVELY WATERED. IN NO CASE SHALL FUGITIVE DUST BE ALLOWED TO LEAVE THE SITE UNDER CONSTRUCTION.
2. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED (SEE PERMANENT STABILIZATION PRACTICES FOR DETAILS). THESE AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN. CLEARED SITE DEVELOPMENT AREAS NOT CONTINUALLY SCHEDULED FOR CONSTRUCTION ACTIVITIES SHALL BE COVERED WITH HAY OR OVERSEEDED AND PERIODICALLY WATERED SUFFICIENTLY TO STABILIZE THE TEMPORARY GROUNDCOVER (SEE TEMPORARY STABILIZATION PRACTICES FOR DETAILS).
3. AT ANY TIME BOTH DURING AND AFTER SITE CONSTRUCTION THAT WATERING AND/OR VEGETATION ARE NOT EFFECTIVE IN CONTROLLING WIND EROSION AND/OR TRANSPORT OF FUGITIVE DUST, OTHER METHODS AS ARE NECESSARY FOR SUCH CONTROL SHALL BE EMPLOYED. THESE METHODS SHOULD INCLUDE ERECTION OF DUST CONTROL FENCES. A 6-FT GEOTEXTILE FILTER FABRIC SHOULD BE HANGING AGAINST THE EXISTING CHAIN LINK FENCE AND GATE.
B. ALL DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS
FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
STABILIZATION PRACTICES:
SHALL BE IN ACCORDANCE WITH DEP DOCUMENT NO. 62-621.300(4)(a)
STRUCTURAL PRACTICES:
SHALL BE IN ACCORDANCE WITH DEP DOCUMENT NO. 62-621.300(4)(a)
WASTE DISPOSAL:
A. WASTE MATERIALS - ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A METAL DUMPSTER WITH A SECURE LID IN ACCORDANCE WITH ALL LOCAL AND STATE LAWS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE SHALL BE DEPOSITED IN THE DUMPSTER. THE SUPERINTENDENT SHALL COORDINATE WITH THE LOCAL UTILITIES TO HAVE THE DUMPSTER EMPTIED AT LEAST TWICE A WEEK AND THE WASTE TAKEN TO AN APPROPRIATE LANDFILL. NO CONSTRUCTION WASTE MATERIALS SHALL BE BURIED ON SITE. THE SUPERINTENDENT SHALL ORGANIZE TRAINING FOR THE EMPLOYEES IN THE PROPER PRACTICES WHEN DEALING WITH WASTE MATERIALS. THE SUPERINTENDENT SHALL BE RESPONSIBLE FOR
POSTING AND ENFORCING WASTE MATERIAL PROCEDURES.
B. HAZARDOUS WASTE - HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL LOCAL AND STATE LAWS OR AS DIRECTED BY THE MANUFACTURER. THE SUPERINTENDENT SHALL ORGANIZE THE PROPER TRAINING FOR EMPLOYEES IN THE PROPER PRACTICES WHEN DEALING WITH HAZARDOUS WASTE MATERIALS. THESE PROCEDURES SHALL BE POSTED ON THE SITE. THE PERSON WHO MANAGES THE SITE SHALL BE RESPONSIBLE FOR ENFORCING THE
PROCEDURES.
C. SANITARY WASTE - SANITARY WASTE…