Douglas Street Intersection Improvements and Vista Del Mar Improvements Project.pdf

PDF 159 KB Posted

Attached to
Douglas Street Intersection Improvements and Vista Del Mar Improvements Project
Solicitation number
PW 26-12
Issued by
Los Angeles County, California

About this file

This is a sealed bid solicitation issued by the City of El Segundo's Public Works Department for roadway safety and pedestrian accessibility improvements at two project locations. The project encompasses improvements at Douglas Street intersections with Utah Avenue and Alaska Avenue, as well as Vista del Mar between approximately 800 feet south of Grand Avenue and 1,000 feet north of 45th Street. Work at Douglas Street includes reconstruction and modification of concrete and asphalt, new and upgraded curb ramps and sidewalks, curb and gutter, median improvements, detectable warning surfaces, solar-powered Rectangular Rapid Flashing Beacons, flashing stop signs, and associated signing and striping. Vista del Mar improvements include installation of a vehicle speed feedback sign, sequential dynamic curve warning system, raised rumble strips, and associated signing and pavement marking. An alternative bid item for a lane separator system with delineator panels is also included. The bid opening is scheduled for 11:00 a.m. on Wednesday, November 18, 2026. A mandatory pre-bid meeting is required on Wednesday, October 28, 2026, at 10:00 a.m. at City Hall Courtyard, 350 Main Street, El Segundo, California 90245; failure to attend will disqualify the bid. All questions regarding the project must be submitted by Thursday, November 5, 2026, at 5:00 p.m.

The solicitation document does not specify pricing terms, set-asides, incumbent contractor information, funding sources, or contract award amounts. Alberto Oliveros is identified as the project manager. Sealed bids will not be accepted after the 11:00 a.m. closing time on November 18, 2026. Complete project specifications, plans, and additional solicitation materials are available through the City of El Segundo's website and ShareFile portal.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid / RFP Douglas Street Intersection Improvements and Vista Del Mar Improvements Project Department: Public Works

Category: Bids

RFP Number: PW 26-12

Start Date: 10/08/2026 6:00 AM

Close Date: 11/18/2026 11:00 AM

Project Manager: Alberto Oliveros

The City of El Segundo is accepting sealed bids until 11:00 a.m. on Wednesday, November 18, 2026, at which time they will be publicly opened. Bids will not be accepted after that time.

A MANDATORY pre-bid meeting is scheduled for Wednesday, October 28, 2026, at 10:00 AM at the City Hall

Courtyard 350 Main St, El Segundo, CA 90245. Failure to attend the mandatory meeting will disqualify your bid.

The project consists of roadway safety and pedestrian accessibility improvements at two locations: Douglas Street at the Utah Avenue and Alaska Avenue intersections, and Vista del Mar between approximately 800 feet south of

Grand Avenue and 1,000 feet north of 45th Street.

Improvements along Douglas Street include reconstruction and modification of concrete and asphalt improvements, new and upgraded curb ramps and sidewalks, curb and gutter, median improvements, detectable warning surfaces, solar-powered Rectangular Rapid Flashing Beacons (RRFBs), flashing stop signs, and associated signing and striping improvements intended to enhance pedestrian visibility, accessibility, and traffic operations.

Improvements along Vista del Mar include installation of a vehicle speed feedback sign, a sequential dynamic curve warning system, raised rumble strips, and associated signing and pavement marking improvements to increase driver awareness and improve safety along the roadway curve. The project also includes an alternative bid item for installation of a lane separator system with delineator panels.

The project includes all associated roadway, signing, striping, concrete, asphalt, and related construction necessary to complete the improvements.

All questions regarding the project are due by Thursday, November 5, 2026 at 5:00pm. (click here to submit questions)

Notice Inviting Bids

Project Location Map

Request Plan Specifications

JUMP TO SUBPAGE...

10/13/26, 3:57 PM Douglas Street Intersection Improvements and Vista Del Mar Improvements Project | Bid / RFP | El Segundo https://www.elsegundo.gov/Home/Components/RFP/RFP/269/268895 1/2 https://www.elsegundo.org/Home/Components/FormBuilder/FormBuilder/bd5eae29c9ba489b831833a3c728e23d/268819 https://www.elsegundo.org/Home/Components/FormBuilder/FormBuilder/bd5eae29c9ba489b831833a3c728e23d/268819 https://cityofelsegundo.sharefile.com/d-s4559beceba3e463787693ecdc7c7747b https://cityofelsegundo.sharefile.com/d-scfca1982f9034d72aaff4b73131162d9 https://www.elsegundo.org/Home/Components/FormBuilder/FormBuilder/bd5eae29c9ba489b831833a3c728e23d/268819

Return to full list >>

10/13/26, 3:57 PM Douglas Street Intersection Improvements and Vista Del Mar Improvements Project | Bid / RFP | El Segundo https://www.elsegundo.gov/Home/Components/RFP/RFP/269/268895 2/2 https://www.elsegundo.gov/government/departments/city-clerk/bid-rfp

File details come from the government source that posted it. Updated .