DOMOPS Bid SPEC 051023.pdf
PDF 6 MB Posted
- Attached to
- 23-R-1002 - DOMOPS Storage Federal contract opportunity
- Solicitation number
- W912LM23R1002
About this file
This document provides specifications for a federal construction contract opportunity for the Minnesota Air National Guard Domestic Operations Storage facility project. Key details include the construction of an approximately 11,265 square foot heated building with steel framing and insulated metal wall panels to house general purpose storage. The project also involves site work such as grading, utilities, and pavements. Submissions are due by June 15, 2023 with award planned for July 15, 2023. The soliciting agency is the Department of the Army Minnesota Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23-R-1002 Amendment 02.pdf | ||
| 20230912 Addendum 02 Chgs and Attachments.pdf | ||
| 20230912 Amendment 02 - DOMOPS.docx | DOCX document | |
| 20230901 Addendum 01 LHB.pdf | ||
| 20230901 Amendment 01 - DOMOPS.docx | DOCX document | |
| 23-R-1002 Amendment 01.pdf | ||
| DOMOPS Pre Proposal.pptx | PPTX presentation | |
| DOMOPS site visit roster - 16 Aug 23.pdf | ||
| 20230807 23-R-1002 DOMOPS.pdf | ||
| 20230804 23-R-1002 DOMOPS.pdf | ||
| 20230510 EXHIBIT B.docx | DOCX document | |
| DOMOPS BID DWGS 051023.pdf | ||
| 20230804 23-R-1002 DOMOPS.pdf | ||
| 20230510 EXHIBIT A.docx | DOCX document | |
| 20230510 EXHIBIT C Reference_Questionnaire_Package.docx | DOCX document | |
| 20230510 EXHIBIT D Letter of Commitment.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINNESOTA
AIR NATIONAL GUARD
DULUTH INTERNATIONAL AIRPORT
DELIVERY ORDER NO. W912LM-17-D-0003-0004
PROJECT FMKM169006
CONSTRUCT DOMOPS STORAGE
SPECIFICATIONS
FOR BID
May 10, 2023
LHB Project No. 170859
MnANG CONSTRUCT DOMOPS STORAGE LHB Project No. 170859 FMKM169006
Issued for BID 05/10/2023
TOC - 1
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0105 CERTIFICATIONS PAGE
00 3100 AVAILABLE PROJECT INFORMATION
GEOTECHNICAL EVALUATION REPORT
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 SUMMARY
01 1005 GOVERNING SPECIFICATIONS
01 2200 UNIT PRICES
01 2300 BID OPTIONS
01 2500 SUBSTITUTION PROCEDURES
01 3000 ADMINISTRATIVE REQUIREMENTS
01 3260 ENVIRONMENTAL REQUIREMENTS
01 4000 QUALITY REQUIREMENTS
01 4533 CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
01 5000 TEMPORARY FACILITIES AND CONTROLS
01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01 6000 PRODUCT REQUIREMENTS
01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 7800 CLOSEOUT SUBMITTALS
DIVISION 03 - CONCRETE
03 0516 UNDERSLAB VAPOR BARRIER
03 1000 CONCRETE FORMING AND ACCESSORIES
03 2000 CONCRETE REINFORCING
03 3000 CAST-IN-PLACE CONCRETE
03 3511 CONCRETE FLOOR FINISHES
03 3900 CONCRETE CURING
DIVISION 04 - MASONRY
04 2900 ENGINEERED UNIT MASONRY
DIVISION 05 - METALS
05 1200 STRUCTURAL STEEL FRAMING
05 3100 STEEL DECKING
05 4000 COLD-FORMED METAL FRAMING
05 5000 METAL FABRICATIONS
05 5213 PIPE AND TUBE RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 THERMAL INSULATION
07 2119 FOAMED-IN-PLACE INSULATION
07 4113 METAL ROOF PANELS
07 4213.19 INSULATED METAL WALL PANELS
07 6200 SHEET METAL FLASHING AND TRIM
07 7200 ROOF ACCESSORIES
07 9200 JOINT SEALANTS
MnANG CONSTRUCT DOMOPS STORAGE LHB Project No. 17859 FMKM169006
Issued for BID 05/10/2023
TOC - 2
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES
08 3613 SECTIONAL DOORS
08 4500 TRANSLUCENT WALL AND ROOF ASSEMBLIES
08 7100 DOOR HARDWARE
DIVISION 09 - FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES
09 6700 FLUID-APPLIED FLOORING
09 9000 PAINTING AND COATING
DIVISION 10 - SPECIALTIES
10 1400 SIGNAGE
10 2213 WIRE MESH PARTITIONS
10 2800 TOILET ACCESSORIES
DIVISION 13 - SPECIAL CONSTRUCTION
13 3419 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 0100 FIRE SUPPRESSION GENERAL PROVISIONS
21 0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 0523 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING
21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
21 1300 FIRE-SUPPRESSION SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
22 0501 PLUMBING GENERAL PROVISIONS
22 0519 METERS AND GAUGES FOR PLUMBING PIPING
22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 0719 PLUMBING PIPING INSULATION
22 1005 PLUMBING PIPING
22 1006 PLUMBING PIPING SPECIALTIES
22 3000 PLUMBING EQUIPMENT
22 4000 PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 0501 HVAC GENERAL PROVISIONS
23 0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0713 DUCT INSULATION
23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
23 0993 HVAC SEQUENCE OF OPERATIONS
23 3100 HVAC DUCTS AND CASINGS
23 3423 HVAC POWER VENTILATORS
23 3700 AIR OUTLETS AND INLETS
23 5533 FUEL-FIRED UNIT HEATERS
23 7200 ENERGY RECOVERY UNITS
23 8126 SMALL-CAPACITY SPLIT-SYSTEM AIR CONDITIONERS
23 8200 CONVECTION HEATING AND COOLING UNITS
LHB Project No. 170859 FMKM169006
Issued for BID 05/10/2023
TOC - 3
DIVISION 26 - ELECTRICAL
26 0500 BASIC ELECTRICAL REQUIREMENTS
26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 0520 PATHWAYS FOR COMMUNICATIONS AND ELECTRONIC SAFETY AND SECURITY
26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 0533.13 CONDUIT
26 0533.16 BOXES
26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 0573 POWER SYSTEM STUDIES
26 0583 EQUIPMENT WIRING
26 0916 ELECTRIC CONTROLS AND RELAYS
26 0923 LIGHTING CONTROL DEVICES
26 2100 LOW-VOLTAGE ELECTRICAL SERVICE ENTRANCE
26 2200 LOW-VOLTAGE TRANSFORMERS
26 2416 PANELBOARDS
26 2716 ELECTRICAL CABINETS AND ENCLOSURES
26 2726 WIRING DEVICES
26 2813 FUSES
26 2816.16 ENCLOSED SWITCHES
26 4300 SURGE PROTECTIVE DEVICES
26 5100 INTERIOR LIGHTING
26 5200 EMERGENCY LIGHTING
26 5600 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 0500 COMMON WORK RESULTS FOR COMMUNICATIONS
27 1100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27 1300 COMMUNICATIONS BACKBONE CABLING
27 1500 COMMUNICATIONS HORIZONTAL CABLING
27 5116 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 1800 ACCESS CONTROL
28 3139 FIRE ALARM AND MASS NOTIFICATION
SITE AND INFRASTRUCTURE SUBGROUP - DIVISIONS 31 THROUGH 35
30 1000 BASIC CIVIL REQUIREMENTS
DIVISION 31 - EARTHWORK
31 1000 SITE CLEARING
31 2200 GRADING
31 2316 EXCAVATION
31 2316.13 TRENCHING
31 2323 FILL
31 3219 GEOTEXTILE SOIL STABILIZATION AND LAYER SEPARATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1123 AGGREGATE BASE COURSES
32 1216 ASPHALT PAVING
32 1313 CONCRETE PAVING
32 3313 SITE BICYCLE RACKS
32 9219 SEEDING
32 9223 SODDING
Issued for BID 05/10/2023
TOC - 4
DIVISION 33 - UTILITIES
33 0513 MANHOLES AND STRUCTURES
33 1416 SITE WATER UTILITY DISTRIBUTION PIPING
33 3113 SITE SANITARY SEWERAGE GRAVITY PIPING
33 4100 SUBDRAINAGE
33 4211 STORMWATER GRAVITY PIPING
MnANG Construct DOMOPS Storage
Issued for BID 05/10/2023
CERTIFICATIONS PAGE
00 0105 - 1
SECTION 00 0105
CERTIFICATIONS PAGE
CIVIL ENGINEER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED ENGINEER UNDER THE LAWS
OF THE STATE OF MINNESOTA.
DAN G. SHAW
REG #41423 DATE: 05/10/2023
ARCHITECT
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED ARCHITECT UNDER THE LAWS
OF THE STATE OF MINNESOTA.
CYNTHIA I. POIRIER
REG #22021 DATE: 05/10/2023
STRUCTURAL
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED ENGINEER UNDER THE LAWS
OF THE STATE OF MINNESOTA.
JENNIFER M. ALLEN
REG #40768 DATE: 05/10/2023
MECHANICAL ENGINEER, FIRE PROTECTION ENGINEER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED ENGINEER UNDER THE LAWS
OF THE STATE OF MINNESOTA.
STEWART D. CRAN
REG #21202 DATE: 05/10/2023
ELECTRICAL ENGINEER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
MARK J. VINCENT
REG #52349 DATE: 05/10/2023
END OF SECTION
Issued for BID 05/10/2023
CERTIFICATIONS PAGE
00 0105 - 2
Issued for BID 05/10/2023
AVAILABLE PROJECT INFORMATION
00 3100 - 1
SECTION 00 3100
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 EXISTING CONDITIONS
A. Certain information relating to existing surface and subsurface conditions is available to bidders but will not be part of Contract Documents, as follows:
B. Geotechnical Report: Entitled Minnesota National Guard Domestic Operations, dated Jan. 14, 2019.
1. A copy of the report is attached to this sectionl
2. This report identifies properties of below grade conditions and offers recommendations for the design of foundations, prepared primarily for the use of Architect.
3. The recommendations described shall not be construed as a requirement of this Contract, unless specifically referenced in Contract Documents.
4. This report, by its nature, cannot reveal all conditions that exist on the site. Should subsurface conditions be found to vary substantially from this report, changes in the design and construction of foundations will be made, with resulting credits or expenditures to the Contract Price accruing to Government.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
Issued for BID 05/10/2023
AVAILABLE PROJECT INFORMATION
00 3100 - 2
Geotechnical Evaluation Report
Minnesota Air National Guard Domestic Operations Minnesota Air National Guard 148th Fighter Wing Duluth, Minnesota
Prepared for
LHB, Inc.
Professional Certification:
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
Joseph C. Butler, PE Principal / Senior Engineer License Number: 47600 January 14, 2019
Project B1803803
Braun Intertec Corporation
AA/EOE
Braun Intertec Corporation 3404 15th Avenue East, Suite 9 Hibbing, MN 55746
Phone: 218.263.8869 Fax: 218.263.6700 Web: braunintertec.com
January 14, 2019 Project B1803803
Mr. Daniel Shaw
21 West Superior St., Suite 500 Duluth, MN 55802
Re: Geotechnical Evaluation Minnesota Air National Guard Domestic Operations Minnesota Air National Guard 148th Fighter Wing Duluth, Minnesota
Dear Mr. Shaw:
We are pleased to present this Geotechnical Evaluation Report for the Minnesota Air National Guard Domestic Operations (MNANG DOMOPS) Project.
Thank you for making Braun Intertec your geotechnical consultant for this project. If you have questions about this report, or if there are other services that we can provide in support of our work to date, please contact Molly Johnson at 218.263.8869 (mjohnson@braunintertec.com).
Sincerely, BRAUN INTERTEC CORPORATION
Molly A. Johnson, EIT Staff Engineer
Joseph C. Butler, PE Principal / Senior Engineer
Table of Contents
Description Page
A. Introduction
A.1. Project Description A.2. Site Conditions and History A.3. Purpose A.4. Seismic A.5. Background Information and Reference Documents A.6. Scope of Services
B. Results B.1. Geologic Overview B.2. Boring Results B.3. Groundwater B.4. Laboratory Test Results
C. Recommendations C.1. Design and Construction Discussion
C.1.a. Building Subgrade Preparation C.1.b. Existing Fill C.1.c. Reuse of On-Site Soils
C.2. Site Grading and Subgrade Preparation C.2.a. Building Subgrade Excavations C.2.b. Excavation Oversizing C.2.c. Excavated Slopes C.2.d. Excavation Dewatering C.2.e. Pavement and Exterior Slab Subgrade Preparation C.2.f. Pavement Subgrade Proofroll C.2.g. Engineered Fill Materials and Compaction C.2.h. Special Inspections of Soils
C.3. Spread Footings C.4. Interior Slabs
C.4.a. Subgrade Modulus C.4.b. Moisture Vapor Protection
C.5. Frost Protection C.5.a. General C.5.b. Frost Heave Mitigation
C.6. Pavements and Exterior Slabs C.6.a. Design Sections C.6.b. Bituminous Pavement Materials C.6.c. Subgrade Drainage C.6.d. Performance and Maintenance
C.7. Utilities C.7.a. Subgrade Stabilization C.7.b. Corrosion Potential
Table of Contents (continued)
C.8. Equipment Support D. Procedures
D.1. Penetration Test Borings D.2. Exploration Logs
D.2.a. Log of Boring Sheets D.2.b. Geologic Origins
D.3. Material Classification and Testing D.3.a. Visual and Manual Classification D.3.b. Laboratory Testing
D.4. Groundwater Measurements E. Qualifications
E.1. Variations in Subsurface Conditions E.1.a. Material Strata E.1.b. Groundwater Levels
E.2. Continuity of Professional Responsibility E.2.a. Plan Review E.2.b. Construction Observations and Testing
E.3. Use of Report E.4. Standard of Care
Appendix Soil Boring Location Sketch Log of Boring Sheets B-1 to B-9 and B-12 Descriptive Terminology of Soil
A. Introduction
A.1. Project Description
This Geotechnical Evaluation Report addresses the proposed design and construction of the Domestic
Operations (DOMOPS) general purpose storage facility, located at the Minnesota Air National Guard
148th Fighter Wing, in Duluth, Minnesota. The project will include the construction of an approximately
11,265 square foot, heated building. The building will be steel framed, supporting a steel deck roof system. The desired foundation system is conventional frost depth concrete footings. Exterior walls will consist of insulated metal panels and girts. Tables 1 and 2 provide project details.
Table 1. Building Description
Aspect Description
Below grade levels None (Assumed)
Above grade levels Single (Assumed)
Finished floor elevation 1399.5 (Provided)
Column loads (kips) Less than 200 (Assumed)
Wall loads (kips) Less than 15 (Assumed)
Nature of construction Concrete foundations, Steel framing, Insulated metal panel and girt exterior walls (Provided)
Cuts or fills for buildings Less than 2 feet (Provided)
Tolerable building settlement Less than 1 inch (Assumed)
Table 2. Site Aspects and Grading Description
Aspect Description
Pavement type Bituminous
Assumed Pavement loads
Light-duty: 75,000 ESALs*
Medium-duty: 100,000 ESALs*
Heavy-duty: 150,000 ESALs*
Grade changes Less than 2 feet (Assumed)
*Equivalent 18,000-lb single axle loads based on 20-year design.
The figure below shows an illustration of the proposed site layout.
Figure 1. Site Layout
Figure provided by LHB, Inc. dated November 19, 2018.
A.2. Site Conditions and History
Currently, the site exists as an undeveloped parcel with storage containers, an aggregate surfaced road and laydown yard area. Current grades range from 1397 to 1401. Generally, the site is sloping downward, from northwest to southeast.
A.3. Purpose
The purpose of our geotechnical evaluation is to characterize subsurface geologic conditions at selected exploration locations and evaluate their impact on the design and construction of the foundations and pavements.
A.4. Seismic
While national building codes indicate that the project site is in an area of potential seismic activity, the local building codes have deemed the risk as low enough that they do not require seismic evaluation as part of the building design.
A.5. Background Information and Reference Documents
We reviewed the following information:
Site layout, provided by LHB, Inc.
Aerial photographs of the project area using Google Earth©
A geologic Map of Minnesota, prepared by Howard C. Hobbs and Joseph E. Goebel, dated
1982.
We have described our understanding of the proposed construction and site to the extent others reported it to us. Depending on the extent of available information, we may have made assumptions based on our experience with similar projects. If we have not correctly recorded or interpreted the project details, the project team should notify us. New or changed information could require additional evaluation, analyses and/or recommendations.
A.6. Scope of Services
We performed our scope of services for the project in accordance with our Proposal QTB071299 to LHB, Inc., dated January 8, 2018, and authorized on April 23, 2018. The following list describes the geotechnical tasks completed in accordance with our authorized scope of services.
Reviewing the background information and reference documents previously cited.
Clearing the exploration location of underground utilities. LHB, Inc. selected and staked the new exploration locations.
Performing 10 standard penetration test (SPT) borings, denoted as B-1 to B-9, and B-12, to nominal depths of 11 to 51 feet below grade across the site.
Performing laboratory testing on select samples to aid in soil classification and engineering analysis.
Preparing this report containing a boring location sketch, logs of soil borings, a summary of the soils encountered, results of laboratory tests, and recommendations for structure and pavement subgrade preparation and the design of foundations, floor slabs, exterior slabs, utilities, and pavements.
Our scope of services did not include environmental services or testing, and we did not train the personnel performing this evaluation to provide environmental services or testing. We can provide these services or testing at your request.
B. Results
B.1. Geologic Overview
The soils on the site generally consisted of a silty sand fill underlain by buried topsoil and glacially deposited silty sand or silt.
We based the geologic origins used in this report on the soil types, in-situ and laboratory testing, and available common knowledge of the geological history of the site. Because of the complex depositional history, geologic origins can be difficult to ascertain. We did not perform a detailed investigation of the geologic history for the site.
B.2. Boring Results
Table 3 provides a summary of the soil boring results, in the general order we encountered the strata.
Please refer to the Log of Boring sheets in the Appendix for additional details. The Descriptive
Terminology sheets in the Appendix include definitions of abbreviations used in Table 3.
Table 3. Subsurface Profile Summary*
Strata Soil Type -
ASTM
Classification
Range of Penetration Resistances
Commentary and Details
Fill SM, GP NA
Thicknesses at boring locations varied from 7 to 13 feet.
Existing fill contained variable amounts of debris, including concrete and bituminous in borings B-1, B-4, B- 5, B-7, B-8, and B-12.
Moisture condition generally moist.
Buried Topsoil
SM NA
Present in Borings B-2 and B-3.
Thicknesses at boring locations varied from 2 to 3 feet.
Moisture condition generally moist.
Glacial deposits
SM 5 to 50+ BPF Glacial till.
Variable amounts of gravel.
Moisture condition generally moist to wet. ML 12 to 22 BPF
*Abbreviations defined in the attached Descriptive Terminology sheets. NA=Not Applicable.
For simplicity in this report, we define existing fill to mean existing, uncontrolled or undocumented fill.
B.3. Groundwater
Table 4 summarizes the depths where we observed groundwater; the attached Log of Boring sheets in the Appendix also include this information and additional details.
Table 4. Groundwater Summary
Location Surface
Elevation
Measured or Estimated Depth to Groundwater
(ft)
Corresponding Groundwater Elevation
(ft)
B-1 1399.03 N/A N/A
B-2 1399.65 N/A N/A
B-3 1399.37 13 1386
B-4 1397.29 10 1387
B-5 1397.56 34 ½ 1363
B-6 1400.07 24 ½ 1375 ½
B-7 1400.07 13 1387
B-8 1399.35 N/A N/A
B-9 1397.56 13 1384 ½
B-12 1401.35 N/A N/A
Project planning should expect groundwater will fluctuate in relation to seasonal changes.
B.4. Laboratory Test Results
The boring logs show the results of laboratory testing we performed, next to the tested sample depth.
The moisture content of the silty sand fill varied from approximately 6 to 8 percent, indicating that the material was likely below its probable optimum moisture content.
Our mechanical analyses indicated that the silty sand fill contained 20.5 to 35.5 percent silt and clay by weight.
The moisture content of the buried topsoil silty sand was found to be 11 percent and the moisture content of the glacial till silt was found to be 15 percent.
C. Recommendations
C.1. Design and Construction Discussion
C.1.a. Building Subgrade Preparation
Based on the encountered soil profile across the proposed building area, it is our opinion the building can be supported on conventional spread footings. The soils present in the proposed building area include existing silty sand fill overlying buried topsoil and glacially deposited silty sand. The overlying fill soils may be variably compacted and contain traces of organics, and concrete and bituminous debris, these pose a risk for detrimental settlement under building loads. To reduce the risk we recommend the fill soils and buried topsoil be removed and replaced with engineered, compacted fill.
C.1.b. Existing Fill
Fill materials (materials placed by man rather than nature) were encountered in all of the borings. The existing fill was variable and does not appear to have been placed in a controlled manner. Unless documentation of its placement and compaction is available, we recommend the existing fill not be relied upon for the structural support of the foundations and floor slabs.
Existing fill soils should be removed within the building and oversize area. Once the existing fill has been removed, compacted structural fill can be placed to reach desired grades.
Beneath driveways and parking area, we recommend removing any organics, debris or other unsuitable materials from within 3 feet of finished grades. Compacted fill can then be placed to reach desired grades.
C.1.c. Reuse of On-Site Soils
The existing, non-organic, debris-free, soil is suitable for reuse as engineered fill below the proposed building and pavement areas.
C.2. Site Grading and Subgrade Preparation
C.2.a. Building Subgrade Excavations
We recommend removing unsuitable materials from below the building and its oversized areas. We define unsuitable materials as existing fill, frozen materials, organic soils, existing debris, soft/loose soils and buried topsoil. Table 5 shows the anticipated excavation depths and bottom elevations for each of the borings.
Table 5. Building Excavation Depths
Location Approximate Surface
Elevation (ft) Anticipated Excavation
Depth (ft) Anticipated Excavation Bottom Elevation (ft)
B-3 1399.37 12 1387
B-4 1397.29 11 1386
B-5 1397.56 12 1385 ½
B-6 1400.07 9 1391
B-7 1400.07 9 1391
Excavation depths will vary between the borings. Portions of the excavations may also extend deeper than indicated by the borings. A geotechnical representative should observe the excavations to make the necessary field judgments regarding the suitability of the exposed soils.
The contractor should use equipment and techniques to minimize soil disturbance. If soils become disturbed or are wet, we recommend excavation and replacement/mud slab/surface compaction/etc.
C.2.b. Excavation Oversizing
When removing unsuitable materials below structures or pavements, we recommend the excavation extend outward and downward at a slope of 1H:1V (horizontal: vertical) or flatter. See Figure 2 for an illustration of excavation oversizing.
Figure 2. Generalized Illustration of Oversizing
C.2.c. Excavated Slopes
Based on the borings, we anticipate on-site soils in excavations will consist of fill and silty sand. These soils are typically considered Type C Soil under OSHA (Occupational Safety and Health Administration) guidelines. OSHA guidelines indicate unsupported excavations in Type C soils should have a gradient no steeper than 1 ½ H: 1 V. Slopes constructed in this manner may still exhibit surface sloughing. OSHA requires an engineer to evaluate slopes or excavations over 20 feet in depth.
1. Engineered fill as defined in C.3
2. Excavation oversizing minimum of 1 to 1
(horizontal to vertical) slope or flatter
3. Engineered fill as required to meet pavement support or landscaping requirements as defined in C.3
4. Backslope to OSHA requirements
An OSHA-approved qualified person should review the soil classification in the field. Excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations and Trenches.” This document states excavation safety is the responsibility of the contractor. The project specifications should reference these OSHA requirements.
C.2.d. Excavation Dewatering
We recommend removing groundwater from the excavations. Project planning should include temporary sumps and pumps for dewatering excavations.
C.2.e. Pavement and Exterior Slab Subgrade Preparation
We recommend the following steps for pavement and exterior slab subgrade preparation. Note that project planning may need to require additional subcuts to limit frost heave.
1. Strip unsuitable soils consisting of topsoil, organic soils, debris and vegetation from the area, within 3 feet of the surface of the proposed pavement grade.
2. Have a geotechnical representative observe the excavated subgrade to evaluate if additional subgrade improvements are necessary.
3. Slope subgrade soils to areas of sand or drain tile to allow the removal of accumulating water.
4. Scarify, moisture condition and surface compact the subgrade with at least 3 passes of a large roller with a minimum drum diameter of 3 ½ feet.
5. Place pavement engineered fill to grade and compact in accordance with Section C.2.g to bottom of pavement and exterior slab section. See Section C.5 for additional considerations related to frost heave.
6. Proofroll the pavement or exterior slab subgrade as described in Section C.2.f.
To improve long-term pavement performance, we recommend incorporating 18 inches of engineered fill in paved areas, in addition to the recommendations above, as a sand subbase. Note we recommend sloping subgrade soils to promote drainage and removal of accumulated water.
C.2.f. Pavement Subgrade Proofroll
After preparing the subgrade as described above and prior to the placement of the aggregate base, we recommend proofrolling the subgrade soils with a fully loaded tandem-axle truck. We also recommend having a geotechnical representative observe the proofroll. Areas that fail the proofroll likely indicate soft or weak areas that will require additional soil correction work to support pavements.
The contractor should correct areas that display excessive yielding or rutting during the proofroll, as determined by the geotechnical representative. Possible options for subgrade correction include moisture conditioning and recompaction, subcutting and replacement with soil or crushed aggregate, chemical stabilization and/or geotextiles. We recommend performing a second proofroll after the aggregate base material is in place, and prior to placing bituminous or concrete pavement.
C.2.g. Engineered Fill Materials and Compaction
Table 6 below contains our recommendations for engineered fill materials.
Table 6. Engineered Fill Materials*
Locations To Be Used Engineered Fill Classification
Possible Soil Type Descriptions
Gradation Additional
Requirements
Below foundations Below interior slabs
Structural fill SP, SP-SM, SM 100% passing 2-inch sieve < 2% Organic Content (OC)
Drainage layer Non-frost-susceptible
Free-draining Non-frost-susceptible fill
GP, GW, SP, SW
100% passing 1-inch sieve < 50% passing #40 sieve < 5% passing #200 sieve
< 2% OC
Pavements Pavement fill SP, SP-SM 100% passing 3-inch sieve < 7% passing #200 sieve
< 2% OC
PI < 15%
Below landscaped surfaces, where subsidence is not a concern
Non-structural fill - 100% passing 6-inch sieve < 10% OC
* Engineered fill materials should satisfy the approved Response Action Plan (RAP), or applicable environmental requirements.
* More select soils comprised of coarse sands with < 5% passing #200 sieve may be needed to accommodate work occurring in periods of wet or freezing weather.
We recommend spreading engineered fill in loose lifts of approximately 12 inches thick. We recommend compacting engineered fill in accordance with the criteria presented below in Table 7. The project documents should specify relative compaction of engineered fill, based on the structure located above the engineered fill, and vertical proximity to that structure.
Table 7. Compaction Recommendations Summary
Reference
Relative Compaction, percent
(ASTM D698 –
Standard Proctor)
Moisture Content Variance from Optimum, percentage points
< 12% Passing #200 Sieve (typically SP, SP-SM)
> 12% Passing #200 Sieve (typically CL, SC, ML, SM)
Below foundations and oversizing zones
95 ±3 -1 to +3
Below interior slabs 95 ±3 -1 to +3
Within 3 feet of pavement subgrade
100 ±3 -1 to +3
More than 3 feet below pavement subgrade
95 ±3 ±3
Below landscaped surfaces
90 ±5 ±4
The project documents should not allow the contractor to use frozen material as engineered fill or to place engineered fill on frozen material. Frost should not penetrate under foundations during construction.
We recommend performing density tests in engineered fill to evaluate if the contractors are effectively compacting the soil and meeting project requirements.
C.2.h. Special Inspections of Soils
We recommend including the site grading and placement of engineered fill within the building pad under the requirements of Special Inspections, as provided in Chapter 17 of the International Building Code, which is part of the Minnesota State Building Code. Special Inspection requires observation of soil conditions below engineered fill or footings, evaluations to determine if excavations extend to the anticipated soils, and if engineered fill materials meet requirements for type of engineered fill and compaction condition of engineered fill. A licensed geotechnical engineer should direct the Special
Inspections of site grading and engineered fill placement. The purpose of these Special Inspections is to evaluate whether the work is in accordance with the approved Geotechnical Report for the project.
Special Inspections should include evaluation of the subgrade, observing preparation of the subgrade
(surface compaction or dewatering, excavation oversizing, placement procedures and materials used for engineered fill, etc.) and compaction testing of the engineered fill.
C.3. Spread Footings
Table 8 below contains our recommended parameters for foundation design.
Table 8. Recommended Spread Footing Design Parameters
Item Description
Maximum net allowable bearing pressure (psf) 3,000
Minimum factor of safety for bearing capacity failure 3.0
Minimum embedment below final exterior grade for heated structures (inches)
Minimum embedment below final exterior grade for unheated structures or for footings not protected from freezing temperatures during construction (inches)
Total estimated settlement (inches) Less than 1
Differential settlement Typically about 2/3 of total settlement*
* Actual differential settlement amounts will depend on final loads and foundation layout. When tying into the existing buildings, the total settlement of this new building will be differential to the existing building. We can evaluate differential settlement based on final foundation plans and loadings.
C.4. Interior Slabs
C.4.a. Subgrade Modulus
The anticipated floor subgrade is structural fill. We recommend using a modulus of subgrade reaction, k, of 200 pounds per square inch per inch of deflection (pci) to design the slabs. If the slab design requires placing 6 inches of compacted crushed aggregate base immediately below the slab, the slab design may increase the k-value by 50 pci. We recommend that the aggregate base materials be free of bituminous.
In addition to improving the modulus of subgrade reaction, an aggregate base facilitates construction activities and is less weather sensitive.
C.4.b. Moisture Vapor Protection
Excess transmission of water vapor could cause floor dampness, certain types of floor bonding agents to separate, or mold to form under floor coverings. If project planning includes using floor coverings or coatings, we recommend placing a vapor retarder or vapor barrier immediately beneath the slab. We also recommend consulting with floor covering manufacturers regarding the appropriate type, use and installation of the vapor retarder or barrier to preserve warranty assurances.
C.5. Frost Protection
C.5.a. General
Silty sand will underlie all or some of the exterior slabs, as well as pavements. We consider silty sands moderately to highly frost susceptible. Soils of this type can retain moisture and heave upon freezing. In general, this characteristic is not an issue unless these soils become saturated, due to surface runoff or infiltration, or are excessively wet in situ. Once frozen, unfavorable amounts of general and isolated heaving of the soils and the surface structures supported on them could develop. This type of heaving could affect design drainage patterns and the performance of exterior slabs and pavements, as well as any isolated exterior footings and piers.
Note that general runoff and infiltration from precipitation are not the only sources of water that can saturate subgrade soils and contribute to frost heave. Roof drainage and irrigation of landscaped areas in close proximity to exterior slabs, pavements, and isolated footings and piers, contribute as well.
C.5.b. Frost Heave Mitigation
To address most of the heave related issues, we recommend setting general site grades and grades for exterior surface features to direct surface drainage away from buildings, across large paved areas and away from walkways. Such grading will limit the potential for saturation of the subgrade and subsequent heaving. General grades should also have enough “slope” to tolerate potential larger areas of heave, which may not fully settle after thawing.
Even small amounts of frost-related differential movement at walkway joints or cracks can create tripping hazards. Project planning can explore several subgrade improvement options to address this condition.
One of the more conservative subgrade improvement options to mitigate potential heave is removing any frost-susceptible soils present below the exterior slab areas down to a minimum depth of 3 feet below subgrade elevations. We recommend filling the resulting excavation with non-frost-susceptible fill.
We also recommend sloping the bottom of the excavation toward one or more collection points to remove any water entering the engineered fill. This approach will not be effective in controlling frost heave without removing the water.
An important geometric aspect of the excavation and replacement approach described above is sloping the banks of the excavations to create a more gradual transition between the unexcavated soils considered frost susceptible and the engineered fill in the excavated area, which is not frost susceptible.
The slope allows attenuation of differential movement that may occur along the excavation boundary.
We recommend slopes that are 3H:1V, or flatter, along transitions between frost-susceptible and non-frost-susceptible soils.
Figure 3 shows an illustration summarizing some of the recommendations.
Figure 3. Frost Protection Geometry Illustration
Another option is to limit frost heave in critical areas, such as doorways and entrances, via frost-depth footings or localized excavations with sloped transitions between frost-susceptible and non-frost-susceptible soils, as described above.
Over the life of slabs and pavements, cracks will develop and joints will open up, which will expose the subgrade and allow water to enter from the surface and either saturate or perch atop the subgrade soils.
This water intrusion increases the potential for frost heave or moisture-related distress near the crack or joint. Therefore, we recommend implementing a detailed maintenance program to seal and/or fill any cracks and joints. The maintenance program should give special attention to areas where dissimilar materials abut one another, where construction joints occur and where shrinkage cracks develop.
C.6. Pavements and Exterior Slabs
C.6.a. Design Sections
Our scope of services for this project did not include laboratory tests on subgrade soils to determine an
R-value for pavement design. Based on our experience with similar silty sand soils anticipated at the pavement subgrade elevation, we recommend pavement design assume an R-value of 20. Note the contractor may need to perform limited removal of unsuitable or less suitable soils to achieve this value.
Table 9 provides recommended pavement sections, based on the soils support and traffic loads.
Table 9. Recommended Bituminous Pavement Sections
Use Light Duty Medium Duty Heavy Duty
Minimum asphalt thickness (inches) 3 4 5
Minimum aggregate base thickness (inches) 6 8 10
Minimum granular subbase (inches) 18 18 18
C.6.b. Bituminous Pavement Materials
Appropriate mix designs are critical to the performance of flexible pavements. We can provide recommendations for pavement material selection during final pavement design.
C.6.c. Subgrade Drainage
We recommend installing perforated drainpipes throughout pavement areas at low points, around catch basins, and behind curb in landscaped areas. We also recommend installing drainpipes along pavement and exterior slab edges where exterior grades promote drainage toward those edge areas. The contractor should place drainpipes in small trenches, extended at least 8 inches below the granular subbase layer, or below the aggregate base material where no subbase is present.
C.6.d. Performance and Maintenance
We based the above pavement designs on a 20-year performance life for bituminous. This is the amount of time before we anticipate the pavement will require reconstruction. This performance life assumes routine maintenance, such as seal coating and crack sealing. The actual pavement life will vary depending on variations in weather, traffic conditions and maintenance.
It is common to place the non-wear course of bituminous and then delay placement of wear course. For this situation, we recommend evaluating if the reduced pavement section will have sufficient structure to support construction traffic.
Many conditions affect the overall performance of the exterior slabs and pavements. Some of these conditions include the environment, loading conditions and the level of ongoing maintenance. With regard to bituminous pavements in particular, it is common to have thermal cracking develop within the first few years of placement, and continue throughout the life of the pavement. We recommend developing a regular maintenance plan for filling cracks in exterior slabs and pavements to lessen the potential impacts for cold weather distress due to frost heave or warm weather distress due to wetting and softening of the subgrade.
C.7. Utilities
C.7.a. Subgrade Stabilization
Earthwork activities associated with utility installations located inside the building area should adhere to the recommendations in Section C.2.g for engineered fill.
For exterior utilities, we anticipate the soils at typical invert elevations will be suitable for utility support.
However, if construction encounters unfavorable conditions such as soft clay, organic soils or perched water at invert grades, the unsuitable soils may require some additional subcutting and replacement with sand or crushed rock to prepare a proper subgrade for pipe support. Project design and construction should not place utilities within the 1H:1V oversizing of foundations.
C.7.b. Corrosion Potential
A majority of the soil borings indicated the site predominantly consists of sandy soils. We consider these soils non- to slightly-corrosive to metallic conduits. If utilities extend through clay soils, we recommend bedding the utilities in sandy soil free of any clay lumps or constructing the utilities with non-corrosive materials.
C.8. Equipment Support
The recommendations included in the report may not be applicable to equipment used for the construction and maintenance of this project. We recommend evaluating subgrade conditions in areas of shoring, scaffolding, cranes, pumps, lifts and other construction equipment prior to mobilization to determine if the exposed materials are suitable for equipment support, or require some form of subgrade improvement. We also recommend project planning consider the effect that loads applied by such equipment may have on structures they bear on or surcharge – including pavements, buried utilities, below-grade walls, etc. We can assist you in this evaluation.
D. Procedures
D.1. Penetration Test Borings
We drilled the penetration test borings with a floatation tire-mounted core and auger drill equipped with hollow-stem auger. We performed the borings in general accordance with ASTM D6151 taking penetration test samples at 2 1/2- or 5-foot intervals in general accordance to ASTM D1586. The boring logs show the actual sample intervals and corresponding depths.
We sealed penetration test boreholes meeting the Minnesota Department of Health (MDH)
Environmental Borehole criteria with an MDH-approved grout. We will forward a sealing record for those boreholes to the Minnesota Department of Health Well Management Section.
D.2. Exploration Logs
D.2.a. Log of Boring Sheets
The Appendix includes Log of Boring sheets for our penetration test borings. The logs identify and describe the penetrated geologic materials, and present the results of penetration resistance and other in-situ tests performed. The logs also present the results of laboratory tests performed on penetration test samples, and groundwater measurements.
We inferred strata boundaries from changes in the penetration test samples and the auger cuttings.
Because we did not perform continuous sampling, the strata boundary depths are only approximate. The boundary depths likely vary away from the boring locations, and the boundaries themselves may occur as gradual rather than abrupt transitions.
D.2.b. Geologic Origins
We assigned geologic origins to the materials shown on the logs and referenced within this report, based on: (1) a review of the background information and reference documents cited above, (2) visual classification of the various geologic material samples retrieved during the course of our subsurface exploration, (3) penetration resistance and other in-situ testing performed for the project, (4) laboratory test results, and (5) available common knowledge of the geologic processes and environments that have impacted the site and surrounding area in the past.
D.3. Material Classification and Testing
D.3.a. Visual and Manual Classification
We visually and manually classified the geologic materials encountered based on ASTM D2488. When we performed laboratory classification tests, we used the results to classify the geologic materials in accordance with ASTM D2487. The Appendix includes a chart explaining the classification system we used.
D.3.b. Laboratory Testing
The exploration logs in the Appendix note most of the results of the laboratory tests performed on geologic material samples. The remaining laboratory test results follow the exploration logs. We performed the tests in general accordance with ASTM or AASHTO procedures.
D.4. Groundwater Measurements
The drillers checked for groundwater while advancing the penetration test borings, and again after auger withdrawal. We then filled the boreholes or allowed them to remain open for an extended period of observation, as noted on the boring logs.
E. Qualifications
E.1. Variations in Subsurface Conditions
E.1.a. Material Strata
We developed our evaluation, analyses and recommendations from a limited amount of site and subsurface information. It is not standard engineering practice to retrieve material samples from exploration locations continuously with depth. Therefore, we must infer strata boundaries and thicknesses to some extent. Strata boundaries may also be gradual transitions, and project planning should expect the strata to vary in depth, elevation and thickness, away from the exploration locations.
Variations in subsurface conditions present between exploration locations may not be revealed until performing additional exploration work, or starting construction. If future activity for this project reveals any such variations, you should notify us so that we may reevaluate our recommendations. Such variations could increase construction costs, and we recommend including a contingency to accommodate them.
E.1.b. Groundwater Levels
We made groundwater measurements under the conditions reported herein and shown on the exploration logs, and interpreted in the text of this report. Note that the observation periods were relatively short, and project planning can expect groundwater levels to fluctuate in response to rainfall, flooding, irrigation, seasonal freezing and thawing, surface drainage modifications and other seasonal and annual factors.
E.2. Continuity of Professional Responsibility
E.2.a. Plan Review
We based this report on a limited amount of information, and we made a number of assumptions to help us develop our recommendations. We should be retained to review the geotechnical aspects of the designs and specifications. This review will allow us to evaluate whether we anticipated the design correctly, if any design changes affect the validity of our recommendations, and if the design and specifications correctly interpret and implement our recommendations.
E.2.b. Construction Observations and Testing
We recommend retaining us to perform the required observations and testing during construction as part of the ongoing geotechnical evaluation. This will allow us to correlate the subsurface conditions exposed during construction with those encountered by the borings and provide professional continuity from the design phase to the construction phase. If we do not perform observations and testing during construction, it becomes the responsibility of others to validate the assumption made during the preparation of this report and to accept the construction-related geotechnical engineer-of-record responsibilities.
E.3. Use of Report
This report is for the exclusive use of the addressed parties. Without written approval, we assume no responsibility to other parties regarding this report. Our evaluation, analyses and recommendations may not be appropriate for other parties or projects.
E.4. Standard of Care
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under similar circumstances by reputable members of its profession currently practicing in the same locality.
No warranty, express or implied, is made.
Appendix
1425.28
CP 02
M W
M W
M W
S
M W
M W
T P
M W
V E
N T
S
S
T P
S
S
M W
6"
8"
J B
12"
12" 10"
12"
10"
12"
12"
12" DEAD
10"
12"
10"
10"
10"
3"
12"
8"
12"
12"
12"
8"
10"
10"
10"
2"
W V
X X X
X X
X X
X X
X X X X
X X
X X
X X
X X
X
X
X
X
X
X
G A
S
G A
S
G A
S
G A
S
G A
S
G A
S
G A
S
G
A
S
G
A S
G
A S
G
A S
G
A S
G
A S
G
A S
GAS
G
A
S
G
A
S
F M
F M
F M
F M
F M
F M
F M
F M
F M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
The ground surface elevations at the boring locations were surveyed by LHB personnel using Global Positioning System (GPS) technology.
FILL
FILL
FILL
SM
FILL: Silty Sand, fine- to medium-grained, with Gravel and roots, brown, moist.
FILL: Silty Sand, fine- to medium-grained, with Gravel and crushed bituminous, black, moist.
FILL: Silty Sand, fine- to medium-grained, with Gravel, brown, moist.
SILTY SAND, fine- to medium-grained, with Gravel, brown, moist, loose to medium dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Boring immediately backfilled with auger cuttings.
1395.0
1394.0
1392.0
1388.0
4.0
5.0
7.0
11.0
12/5/18 1" = 4'DATE: SCALE:DRILLER:
Tests or NotesWL
B-1 page 1 of 1
3 1/4" HSA, AutohammerM. Heinzen
L O G O F B O R I N G (S ee D es cr ip tiv e T er m in ol og y sh ee t f or e xp la na tio n of a bb re vi at io ns
LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
B-1
METHOD:
BORING:
BPF
Braun Intertec CorporationB1803803
LO
G
O F
BO
RI
N G
N
G
IN
T\
PR
O
JE
CT
S\
AX
P
RO
JE
CT
S\
\0
.G
PJ
B
RA
U
N _V
8_
CU
RR
EN
T.
G
D T
/1
4/
8:
Braun Project B1803803 Geotechnical Evaluation
MNANG DOMOPS
Minnesota Air National Guard 148th Fighter Wing Duluth, Minnesota
Symbol
Elev.
feet
1399.0
Depth feet
0.0
17*
*No recovery.
FILL
FILL
SM
FILL: Silty Sand, fine- to medium-grained, with Gravel, dark brown, moist.
FILL: Silty Sand, fine- to medium-grained, with Gravel, brown, moist.
SILTY SAND, fine- to medium-grained, with Gravel, organics and roots, black, moist, loose.
(Buried Topsoil)
END OF BORING.
Water not observed while drilling.
Boring immediately backfilled with auger cuttings.
1397.7
1390.7
1388.7
2.0
9.0
11.0
12/5/18 1" = 4'DATE: SCALE:DRILLER:
Tests or NotesWL
B-2 page 1 of 1
3 1/4" HSA, AutohammerM. Heinzen
L O G O F B O R I N G (S ee D es cr ip tiv e T er m in ol og y sh ee t f or e xp la na tio n of a bb re vi at io ns
LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
B-2
METHOD:
BORING:
BPF
Braun Intertec CorporationB1803803
LO
G
O F
BO
RI
N G
N
G
IN
T\
PR
O
JE
CT
S\
AX
P
RO
JE
CT
S\
\0
.G
PJ
B
RA
U
N _V
8_
CU
RR
EN
T.
G
D T
/1
4/
8:
Braun Project B1803803 Geotechnical Evaluation
MNANG DOMOPS
Minnesota Air National Guard 148th Fighter Wing Duluth, Minnesota
Symbol
Elev.
feet
1399.7
Depth
WH
20.5
An open triangle in the water level (WL) column indicates the depth at which groundwater was observed while drilling. A solid triangle indicates the groundwater level in the boring on the date indicated.
Groundwater levels fluctuate.
6.0
FILL
FILL
SM
SM
SM
SM
FILL: Silty Sand, fine- to medium-grained, with Gravel, dark brown, moist.
FILL: Silty Sand, fine- to medium-grained, with Gravel, brown, moist.
SILTY SAND, fine- to medium-grained, with Gravel, organics and wood, black, moist, very loose.
(Buried Topsoil)
SILTY SAND, fine- to medium-grained, with Gravel, organics, brown, wet, loose.
(Glacial Till)
SILTY SAND, fine- to coarse-grained, with Gravel, brown, moist, dense.
(Glacial Till)
SILTY SAND, fine- to medium-grained, with Gravel, brown, moist to very moist, medium dense.
(Glacial Till)
END OF BORING.
Water observed at 13.2 feet while drilling.
Boring immediately backfilled with bentonite grout.
1397.4
1390.4
1387.4
1385.4
1381.4
1373.4
2.0
9.0
12.0
14.0
18.0
26.0
12/5/18 1" = 4'DATE: SCALE:DRILLER:
Tests or NotesWL
B-3 page 1 of 1
3 1/4" HSA, AutohammerM. Heinzen
L O G O F B O R I N G (S ee D es cr ip tiv e T er m in ol og y sh ee t f or e xp la na tio n of a bb re vi at io ns
LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
B-3
METHOD:
BORING:
BPF
Braun Intertec CorporationB1803803
LO
G
O F
BO
RI
N G
N
G
IN
T\
PR
O
JE
CT
S\
AX
P
RO
JE
CT
S\
\0
.G
PJ
B
RA
U
N _V
8_
CU
RR
EN
T.
G
D T
/1
4/
8:
Braun Project B1803803 Geotechnical Evaluation
MNANG DOMOPS
Minnesota Air National Guard 148th Fighter Wing Duluth, Minnesota
P200
MC
%Symbol
Elev.
feet
1399.4
Depth
9*
*No recovery.
FILL
FILL
FILL
SM
SM
FILL: Silty Sand, fine- to medium-grained, with Gravel and organics, dark brown, moist.
FILL: Silty Sand, fine- to medium-grained, with Gravel and concrete debris, brown, moist.
FILL: Poorly Graded Gravel, course grained, with concrete debris, brown, wet.
SILTY SAND, fine- to medium-grained, with a trace of Gravel and organics, brown, very moist, loose.
(Glacial Till)
SILTY SAND, fine- to medium-grained, with a trace of Gravel, brown, very moist, medium dense to loose.
(Glacial Till)
END OF BORING.
Water observed at 10 feet while drilling.
Boring immediately backfilled with bentonite grout.
1395.3
1388.3
1386.3
1383.3
1371.3
2.0
9.0
11.0
14.0
26.0
12/5/18 1" = 4'DATE: SCALE:DRILLER:
Tests or NotesWL
B-4 page 1 of 1
3 1/4" HSA, AutohammerM. Heinzen
L O G O F B O R I N G (S ee D es cr ip tiv e T er m in ol og y sh ee t f or e xp la na tio n of a bb re vi at io ns
LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
B-4
METHOD:
BORING:
BPF
Braun Intertec CorporationB1803803
LO
G
O F
BO
RI
N G
N
G
IN
T\
PR
O
JE
CT
S\
AX
P
RO
JE
CT
S\
\0
.G
PJ
B
RA
U
N _V
8_
CU
RR
EN
T.
G
D T
/1
4/
8:
Braun Project B1803803 Geotechnical Evaluation
MNANG DOMOPS
Minnesota Air National Guard 148th Fighter Wing Duluth, Minnesota
Symbol
Elev.
feet
1397…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .