DOL_Wage_Determination.pdf
PDF 2 MB Posted
- Attached to
- Dune Climb Well Replacement
- Solicitation number
- 140P6425Q0042
About this file
This document is a Davis-Bacon wage determination for building construction projects in Leelanau County, Michigan, effective 02/21/2025. The document specifies prevailing wage rates for multiple construction trades, including asbestos workers, boilermakers, bricklayers, carpenters, electricians, ironworkers, laborers, millwrights, pipefitters, plumbers, sheet metal workers, and various equipment operators. Hourly rates range from $11.04 for landscape laborers to $47.28 for power equipment operators in Group 1, with corresponding fringe benefits varying by trade. The wage determination applies to contracts entered into on or after January 30, 2022, and requires contractors to pay workers at least the specified hourly rates for all hours worked on the contract in 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Provisions_to_be_Completed.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| Sol_140P6425Q0042.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .