Document1 (003).docx
DOCX document 13 KB Posted
- Attached to
- Building 34 Grit Removal
- Solicitation number
- 2123403Y4262A81001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Far Smart Matrix Acquisition.GOV.pdf | ||
| Solicitation - 2123403Y4262A81001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
PR2123403Y4262A81001
NONHAZARDOUS ABRASIVE REMOVAL AND DISPOSAL
SCOPE: Contractor shall provide all personnel, equipment, tools, supervision and other items Necessary to perform Abrasive Media Removal and Disposal Services. The Contractor must comply to the Yard Statement for Removal and Disposal of Nonhazardous Abrasive Media. The Contractor must provide weight tickets for all material removed from inside Bldg. 34 within two days from removal until the amount of approx. 300 Tons has been removed. The Material in Dust Drums under the Dust Collector should be removed as well and any material on the ground around the Bldg. The service should happen every other week until the quoted amount has been reach. The service can be performed during day hours or night hours if the Contractor prefer. The end of the Period of Performance shall end 11/31/23 or sooner if the 300 Tons has been reached. The Contractor must keep track of the material removed as to not exceed the Contract amount. The POC will be either Mr. Weldon Legg (443) 829-6793 or Larry Phinney (410) 320-9108.
File details come from the government source that posted it. Updated .