Responses to questions

View the file

Other files

File Type Posted
FBO_for_New_Galaxy_VS_80_KVA_Unit.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. What is the size and voltage of input breaker feeding the UPS system?

80 kVA 480v

2. What is the distance from input breaker to the UPS?

Use existing cabling. This is a UPS replacement.

3. What is the size and voltage of the output distribution panel?

Use existing.

4. What is the distance from the output distribution panel to the UPS Use existing cable.

5. What is the existing UPS make and model?

Eaton 9535

6. What is the existing input voltage?

480v

7. What is the existing output voltage?

208/120v

8. What is the existing UPS KVA size?

80kVA

9. What is the required battery run time @ full load?

30 minutes at 75% of 80 kVA

10. Is there an existing external maintenance bypass? If so, can it be utilized for this job?

No.

11. Is the existing UPS installed on a raised floor?

No.

12. Is inside delivery required for the equipment?

Yes.

13. Is work to be performed during or off business hours?

Weekend only. Can shut down from Friday night to Sunday night. Contractor is responsible to offload UPS, move into place and remove the old UPS from the site, dispose of the batteries properly and remove all debris from site. NOTE: All Contractors accessing the site must first pass an FBI security background investigation. NOTE 2: Contractor may use the loading dock area during the weekend only as a temporary staging area.