This document contains questions and responses regarding solicitation number DJa-17-AHDQ-R-0035 for administrative and technical support services for the Bureau of Alcohol, Tobacco, Firearms and Explosives laboratories. The incumbent contractor is NLT Management Services LLC. Key details include an extension of the due date for questions to July 5th and the due date for proposals and past performance questionnaires to July 21st. Services required include general maintenance, general clerical duties, and engineering technician support. Locations include facilities in Beltsville, Maryland and Atlanta, Georgia. The document clarifies labor categories and pricing templates to ensure an accurate understanding of requirements.
Questions and Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PricingTemplate-REVISED-Amend2.xlsx | XLSX spreadsheet | |
| PastAndPresentPerformanceQuestionnaire_REV-Amend2.pdf | ||
| DJA-17-AHDQ-R-0035_0002.pdf | ||
| QRs-Amendment2.pdf | ||
| SolicitationAmendment.pdf | ||
| WD2015-5623_Rev2.pdf | ||
| DJA-17-AHDQ-R-0035_0001.pdf | ||
| WD2015-5831_Rev2.pdf | ||
| PricingTemplate-REVISED-Amend1.xlsx | XLSX spreadsheet | |
| PastAndPresentPerformanceQuestionnaire_REV-Amend1.pdf | ||
| WD2015-4281_Rev5.pdf | ||
| PastAndPresentPerformanceQuestionnaire_.pdf | ||
| DJA-17-AHDQ-R-0035.pdf | ||
| ATFO1850.2F.pdf | ||
| PricingTemplate.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions + Responses DJA-17-AHDQ-R-0035, Administrative Technical Support Services
No. RFP Section QUESTION RESPONSE
1 2(a) of L1 (pg. 44) Regarding the proposal guidelines, it says not to include the logo in the header or footer. Are we allowed to add the logo to the master page?
This Section has been revised as follows: ‘The prospective contractor's name, the date, RFP number, volume number and section shall be included on each page of the proposal (may be included in a header/footer) . The Company’s logo is allowed on the cover sheet/master page.’
2 3 of L1 (pgs. 44-48)
Also, regarding the Volume 1, since it has 4 sections, instead of 4 separate files, would it be acceptable to include all 4 sections in one document? The reason for this is if all for sections are included in one document, it will be easier to reference and click-on in the table of contents for each section within the document.
As long as the Volumes, Sections & Tabs are titled as per this Section, that should be acceptable.
3 (General) Is there an incumbent on the contract, and if so who?
Yes, NLT Management Services LLC
4 (General) Can the incumbent bid on the contract? Yes
5 (General)
If the incumbent can bid on the contract, can the Contracting Office please remove the requirement for letters of commitment for contractor staff members that are covered under the Service Contract Act (SCA)? This will eliminate the unfair advantage that the incumbent may obtain by bidding all current staff members, and SCA staff members are required to be offered the right of first refusal anyway.
(Response Pending)
6 (General) How many employees are currently on the contract and can they be hired? Which positions are covered under the SCA?
(Response Pending)
No. RFP Section QUESTION RESPONSE
3.1.6.1 (pg. 45 of 62)
Past Performance Questionnaire
The RFP states “Prospective contractors shall instruct their selected references to complete the “Past and Present Performance Questionnaire” (Attachment 1) and include in Section 3 of Volume I”. Attachment 1 instructs the reference to “Please complete the following questionnaire and return directly to the ATF Contract Specialist, Sheray Milhouse, via email…”. The two instructions are conflicting. Is the contractor to provide the questionnaire in their proposal in Section 3 or should the reference send directly to the ATF Contract Specialist or both? Please clarify.
The Offeror shall list its references in Section 3 of Volume I, and those references should submit the Questionnaire directly to the ATF Contract Specialist.
SOW, Section 3.1 Pricing Template
SOW section 3.1 states there is 1 part time General Maintenance Worker in Beltsville, MD, while the Pricing Template lists 1.5 General Maintenance Workers in MD.
Please clarify the number of General Maintenance Worker FTEs in MD.
We will update.
SOW, Section 3.1 Pricing Template
This Section states that there are 2 General Clerks II in Beltsville, MD, while the Pricing Template lists 3 General Clerks II—2 in MD and 1 in GA. Please clarify the number of General Clerk II FTEs and their locations.
(Response Pending)
SOW, Section 3.1 Pricing Template
This Section states there are 2 Engineering Technician I positions in MD, while the Pricing Template provides only enough hours for 1 Engineering Technician I. Please clarify the number of Engineering Technician FTEs. (Rephrased: There is only one Engineering Technician I among the "non-optional" CLINs of the pricing template. Should there be two?)
We will update.
SOW, Section 3.1 Pricing Template
This Section indicates there are 17 FTEs, while the Pricing Template provides 17.5 FTEs to price (excluding optional positions) . Please clarify the total number of FTEs.
We will update.
12 RFP 2.1
Price/Cost Info for Contractor states that Wage Determinations apply—please provide the SCA Wage Determinations for each location.
Previously referenced in the RFP (pg. 5 of 62) ; now attached (via Amendment 0001)
No. RFP Section QUESTION RESPONSE
Attachment A – Labor Category
Descriptions
The asterisk used throughout this section represents “…positions and/or duties not mentioned in the SCA Directory of Occupations.” However, for the Administrative Assistant, there is an asterisk after the word “technical.” Is that supposed to indicate that this position is not impacted by SCA regulations? This position is on the SCA Directory of Occupations. Also, Engineering Technician Levels I – VI are on the SCA list of occupations but there is an asterisk on Attachment A for Engineering Technician IV.
The * after 'technical' means that that particular word wasn't included in the SCA description. The description for the Eng. Tech IV is different from SCA.
3.1.5 (pg. 45 of 62)
Personnel Qualifications
The requirement to provide resumes and letters of commitment for "ALL personnel (non-optional and optional)" appears to give an unfair advantage to the incumbent contractor. Accordingly, will the government consider removing this requirement or allowing offerors to staff per the dislocation of qualified workers and thereby only provide resumes and letters of commitment for "open" positions on the contract?
(Response Pending)
3.1.5 (pg. 45 of 62)
Personnel Qualifications
Which positions on the contract are currently open? (Response Pending)
16 (General)
We request that the closing date for responding be extended and a vendor day be held at the ATF National Laboratory Center. Such an event would allow vendors to adequately understand the requirements.
Via Amendment 0001:
The Due Date for Questions has been extended to 7/5.
The Due Date for Proposal Submissions & Past Performance Questionnaires has been extended to 7/21.
Information re a 'Vendor Day' is forthcoming.
17 (General)
Additionally, for purposes of assuring personnel retention, can the Government provide a list by position (not name) indicating the overall time the individual has worked at the ATF facility and how long they have been in their current position? This will allow all bidders to assess the requirements for benefits and wages, and structure their proposals to achieve retention, based upon a greater understanding of potential requirements.
No. RFP Section QUESTION RESPONSE
RFP Instructions w/in Section 3.1.7 Section
4 – Technical/ Managerial Approach
(page 36 of 62)
This Section asks offerors to identify a list of costs associated with each major milestone of the Transition-in Plan (TIP).
However, neither the CLIN structure in Section 2 – Commodity or Services Schedule on page 4 of 62 of the solicitation nor the Pricing Template provided in Excel format allows for any pricing of the 15-day Transition-In period. Can the Government please modify the Commodity or Services Schedule and the Pricing Spreadsheet to allow for pricing of the Transition-In Period?
CLIN 0007 has been added for the Transition cost; also a Row has been added to the Pricing Template for such.
19 RFP
It provides the applicable Wage Determinations for contract labor categories ,and the Pricing Spreadsheet appears to contain labor hour estimates for full-time equivalent (FTE) contractor employees that are covered under the Service Contract Act. The labor hour estimates provided in the pricing spreadsheet do not appear to account for the first note within each applicable Wage Determination that cites Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors, which applies to this contract and provides up to 56 hours of paid sick leave per FTE per year. In light of this new requirement, can the Government please amend the pricing spreadsheet so that offerors price 1864 hours per year for each FTE covered under the Service Contract Act? 1864 productive hours per year would account for 10 holidays (80 hours), 10 days of paid time off (80 hours), and 56 hours of sick leave.
(Response Pending)
SOW (pg. 8 of 62) &
Pricing Template
There appears to be a conflict between the required labor for the General Maintenance Worker listed in the Statement of Work and the Pricing Spreadsheet. The Statement of Work on page 8 of 62 lists one part-time General Maintenance Worker in Maryland, however, the Pricing Spreadsheet lists one full-time and one part-time General Maintenance Worker contractor employees in Maryland. Which is correct?
See Response to Question #8
No. RFP Section QUESTION RESPONSE
RFP Instructions w/in Section 3.1.7 Section
4 – Technical/ Managerial Approach
(page 46 of 62)
This Section asks offerors to identify a detailed work breakdown structure with intermediate and major milestones for the Transition-In Plan (TIP). Since a detailed work breakdown structure will include a detailed description of intermediate and milestones, will the Government allow for this requirement to be excluded from page count limits? If not, can the Government please increase the page count limit by 5 pages to allow offerors to provide appropriate details?
(Response Pending)
RFP Instructions w/in Section 3.1.7 Section
4 – Technical/ Managerial Approach
(pgs. 46-47 of 62)
This Section asks offerors to include a Transition Quality Plan (TQP). Will the Government allow the TQP to be excluded from page count limits? If not, can the Government please increase the page count limit by 5 pages to allow offerors to provide appropriate details?
(Response Pending)
pg. 5 of the RFP
Wage Determination
The applicable Wage Determination for staff that will be assigned to ATF FSL-A, 2600 Century Boulevard, NE, Atlanta, GA 30345 appears to be missing. Can the Government please confirm the correct Wage Determinations that are applicable to each location of support under this contract?
See Response to Question #12
RFP Instructions w/in Section 3.1.6 Section 3 – Past Performance
Will the Government consider task orders, under the same contract numbers, as separate past performance references?
No...unless different functions are being performed for a different customer/client per Section 3.1.6 (pg. 45 of 62) .
As we understand certain positions require a hazardous duty pay premium to staff members to perform work, will the Government perform an Independent Government Cost Estimate to determine price realism of unrealistically-low labor rates?
(Response Pending)
There appears to be a discrepancy between the excel pricing worksheet and the SOW. The pricing template includes a General Clerk II position in Georgia; however, no such position is listed in the SOW. Can the Government please correct the discrepancy?
We will update.
No. RFP Section QUESTION RESPONSE
Would the Government consider extending the proposal due date?
See Response to Question #16
How can the offeror get a letter of commitment from an individual who has not been extended a job offer?
29 Schedule B It lists a “ZB” in the unit price – we assume this means “total cost” for the “job”/Item number. Please advise It actually reads 'JB' for 'Job' - Yes, total cost.
Instructions to
Offerors
Your instructions states that candidate resumes should indicate the proposed job category as well a listing A-F of specific information to be contained within – We assume you are looking for a standardized resume for all the selected candidates to be submitted with the proposal.
Standardized would be nice but not required as long as it addresses what's requested in the RFP.
Instructions to
Offerors
Your instructions state that the LOI must include the % of time the candidate can dedicate to the Contract – Does stating that they will work Full-time satisfy this requirement?
Sheet1