Attachment 2 QASP

View the file

Other files for this federal contract opportunity

Other files attached to Computerized Maintenance Management Software (CMMS) Solution, newest first.
File Type Posted
Questions_for_DHQCAP15P60007.docx DOCX document
RFP_CMMS_DHQCAP15MP60007_17_March.docx DOCX document
Sources_Sought_Questions.docx DOCX document
RFP_CMMS_DHQCAP15MP60007_8_March.docx DOCX document
DHQCAP15MP60007_CMMS_PWS_8_March.docx DOCX document
CMMS_-_Functional_Test_Plan_Attachment_3.docx DOCX document
DHQCAP15MP60007_CMMS_PWS.docx DOCX document
RFP_CLIN_Pricing_Worksheet.xlsx XLSX spreadsheet
Provisions_Clauses.docx DOCX document
RFP_CMMS_DHQCAP15MP60007.docx DOCX document
RFP_CMMS_DHQCAP15MP60007.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title: Computerized Maintenance Management Software (CMMS) Solution

2. Work Requirements:

· Task Area 1 – Software

· Task Area 2 – Technical Support

· Task Area 3 – Implementation of the CMMS Solution

· Task Area 4 – Operations Support

· Task Area 5 – Option Year Software Support

· Task Area 6 – Optional on-site data collection for Stuttgart-Vaihingen, Germany for the CMMS Solution

· Task Area 7 – Optional on-site data collection for Bahrain for the CMMS Solution

3. Primary Method of Surveillance: Random sampling, training surveys, and 100% inspection of deliverable products and services as specified below.

4. Scope of Performance: The scope of this requirement is to provide a COTS solution meeting all Government technical requirements in the Performance Work Statement (PWS) which includes software licenses, implementation services, onsite technical support, system documentation, training, and software/solution maintenance. The contractor shall provide implementation support to include engineering, system architecture, security posture, configuration, implementation, training, data migration/data collection, and integration development for the solution. The contractor shall deploy a fully functional and accredited CMMS environment in Montgomery, AL and Oklahoma City, OK. DISA personnel will work side-by-side with vendor personnel during the system implementation effort, so that DISA personnel are capable of supporting/sustaining all of the infrastructure identified in the PWS for additional service environments at the DISA Defense Enterprise Computing Centers (DECCs) with minimal support from the contractor.

5. Performance Standards/Acceptable Quality Level:

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance

Task 3 Implementation of CMMS Solution (PWS para 6.3)

Deliverables –

· Weekly Activity Report

· Monthly Status Report

Delivery occurs on time in accordance with PWS para 11. Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 1 - Stage 1 - Project Setup and Initiation (PWS para 6.3.1)

Deliverables –

· TIM Minutes

· Approved Draft Project Management Plan

· Approved Draft Engineering/Implementation Plan

· Solution Requirements Document

Delivery occurs on time in accordance with PWS para 11. Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 2 - Stage 2 – Solution Requirements Definition (PWS para 6.3.2)

Deliverables

· Solution Requirements Specification

· Final Project Management Plan

· Final Engineering/Implementation Plan

· Test and Integration Plan

Delivery occurs on time in accordance with PWS para 11. Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 3 - Stage 3 – Solution Install, Configuration, and STIG (PWS para 6.3.3)

Deliverables –

· Installation Guide

· Draft Configuration Design Document

· PO&AM Documentation

Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 4 - Stage 4 – Production Deployment and Integration (PWS para 6.3.4)

Deliverables –

· Final Engineering Solution Design Document

· Final Configuration Design Document

· Knowledge Transfer Activity Document

Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 80% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 5 - Stage 5 – Testing and Quality Assurance (PWS para 6.3.5)

Deliverable

· Testing and Quality Assurance Report

Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 6 - Stage 6 – Configuration Documentation and Backup (PWS para 6.3.6)

Deliverables –

· Systems Configuration Documentation

· Backup Strategy Documentations

Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Subtask 7 - Stage 7 – Implementation and Handoff (PWS para 6.3.7)

Deliverables

· Finalize Project Documentation

· Implementation Sign-off Letter

Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Task 4 – Operations Support (PWS para 6.4)

Subtask 1 – Classroom training

Deliverable – Training Classes
Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
Random sampling/Training surveys

Subtask 2 – Training Materials

Deliverable – Course Material
Delivery occurs on time in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Task 5 - Option Year Software Support (PWS para 6.5)

Deliverable – Software maintenance support agreement
Contractor –Determined format. Delivery occurs in accordance with PWS para 11. Materials/Performance occurs with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Task 6 – Optional on-site data collection for Stuttgart-Vaihingen, Germany (PWS para 6.6)

Deliverable – Option Year travel to Stuttgart-Vaihingen, Germany OCONUS site for collection and inclusion of data in CMMS system
Delivery occurs on time in accordance with paragraph 11. Materials/Performance occur with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

Task 7 – Optional on-site data collection for Bahrain (PWS para 6.7)

Deliverable – Option Year travel to Bahrain OCONUS site for collection and inclusion of data in CMMS system
Delivery occurs on time in accordance with paragraph 11. Materials/Performance occur with no required re-work, contains required information at least 90% of the time. Revisions/problems that occur are minor and are resolved in a satisfactory manner.
100% inspection

6. Mandatory or regulatory compliance items: The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer’s Representative (COR) and the contracting officer (KO) will evaluate the initial submission. The COR and KO will conduct ad hoc reviews of the contractor’s compliance throughout the remainder of the contract.

7. Evaluation Method: The COR will track the response to the requirements of inspected tasks, conduct a comparison with actual maintenance performance, and otherwise verify and validate contractor performance. Service desk ticket logs and automated reports generated from the software will be used as documentation and compared to the AQL specific to the task.

8. Incentives (Positive and/or Negative): All minimum standards will be met. Any negative performance will be officially documenting the Contractor Performance Assessment Reporting System (CPARS). The incentive is established by using a FFP CLIN for the conclusion of each phase.