DFO Segment 2 Section G Draft 2.pdf
PDF 233 KB Posted
- Attached to
- Dual Frequency Operations (DFO) Segment 2 Federal contract opportunity
- Solicitation number
- 693KA8-21-R-00001
About this file
This document outlines the requirements for a multiple award indefinite delivery indefinite quantity contract to provide services in support of the Federal Aviation Administration's Dual Frequency Operations Segment 2 program. The FAA seeks to upgrade its Wide Area Augmentation System to utilize GPS L1, L2, and L5 signals to maintain existing single frequency services and provide new dual frequency capabilities. Services will include technical refresh of major processing components, transitioning infrastructure to FAA cloud services, and sustaining the WAAS geostationary satellite constellation. Contractors are invited to review the draft solicitation and identify areas for improvement, as well as provide a list of questions and assumptions. The response deadline is not provided. The document includes background on WAAS and DFO Segment 1 as context for the new DFO Segment 2 requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Vendor QA Responses.pdf | ||
| DFO Segment 2 TO1 Draft 2.pdf | ||
| DFO Segment 2 Section K Draft 2.pdf | ||
| DFO Segment 2 Section F Draft 2.pdf | ||
| DFO Segment 2 Section D Draft 2.pdf | ||
| DFO Segment 2 Section C Draft 2.pdf | ||
| DFO Segment 2 Section E Draft 2.pdf | ||
| DFO Segment 2 Section B Draft 2.pdf | ||
| DFO Segment 2 Section H Draft 2.pdf | ||
| DFO Segment 2 Section I Draft 2.pdf | ||
| DFO Segment 2 Section J Draft 2.pdf | ||
| DFO Segment 2 TO2 Draft 2.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – SECTION G CONTRACT ADMINISTRATION DATA
Screening Information Request (SIR) 693KA8-21-R-00001
1 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
G.1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JULY 2019)
(AMS 3.1-1)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at: https://fast.faa.gov/contractclauses.cfm.
(End of clause)
AMS Clause Number Title and Date 3.10.1-22 Contracting Officer's Representative (April 2012) 3.10.1-26 Contractor Performance Assessment Reporting System (April 2013)
G.2 BACKGROUND
This section provides roles, responsibilities, and contract administration requirements for the DFO Segment 2 IDIQ Contract and each task order placed under this IDIQ contract.
Additional clauses and other requirements regarding contract administration may be designated at the Delivery/Task Order level.
G.3 ROLES AND RESPONSIBILITIES OF GOVERNMENT KEY PERSONNEL
This section describes the roles and responsibilities of Government and Contractor personnel. Additional Key Personnel and Key Personnel Roles and Responsibilities may be defined in individual task orders.
G.3.1 CONTRACTING OFFICER
(a) The Contracting Officer is the only individual who can legally commit or obligate the
Government for the expenditure of public funds. The technical administration of this DFO Contract must not be construed to authorize the revision of the terms and conditions of the Contract. Any such revision must be authorized in writing by the Contracting Officer. The CO will designate the COR via a Designation Letter, which will specify the COR’s extent of authority.
(b) The Contracting Officer may designate, in writing, representatives to perform functions required to administer this contract, however, any implied or expressed actions taken by those representatives must be within the limits cited within the Contracting Officer’s written designations. If any individual alleges to be a representative of the Contracting Officer and the Contractor has not received a copy of the document designating that representative, the Contractor must refrain from acting upon the representative’s requirements and immediately contact the Contracting Officer to obtain a copy of the document designating that individual as a representative of the Contracting Officer.
(c) In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change thereof will be considered to have been made without https://fast.faa.gov/contractclauses.cfm
2 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
(d) The Contractor must immediately notify the Contracting Officer for clarification when a question arises regarding the authority of any person to act for the Contracting Officer under the contract. The Contractor must submit request for modification(s) of this contract to the Contracting Officer, with a copy of the request to any appointed
COR/TOR.
(e) The designated Contracting Officer for the DFO IDIQ Contract is:
Name: Iann T. Washington
Address: Federal Aviation Administration
ATTN: AAQ-340
800 Independence Avenue, S.W.
Washington, D.C. 20591 Office Email:iann.washington@faa.gov
Task Orders may or may not have a Contracting Officer different from the IDIQ CO.
G.3.2 CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND TASK ORDER
REPRESENTATIVE (TOR)
(a) The Contracting Officer may designate other Government personnel (known as the
Contracting Officer’s Representative) to act as his or her authorized representative for contract administration functions which do not involve changes to the scope, price, schedule, or terms and conditions of the contract. The designation will be in writing, signed by the Contracting Officer, and will set forth the authorities and limitations of the representative(s) under the contract. Such designation will not contain authority to sign contractual documents, order contract changes, modify contract terms, or create any commitment or liability on the part of the Government different from that set forth in the contract.
b) The DFO Contract COR is responsible for the technical administration of the DFO Contract and will be the technical liaison with the Contractor. The DFO Contract COR IS NOT authorized to change the scope of work or specifications as stated in the DFO Contract or any contract Task Order, to make any commitments or otherwise obligate the Government or authorize any changes which affect the task order price, delivery schedule, period of performance or other terms or conditions. The COR will be designated by CO via a Designation Letter, which will specify the COR’s extent of authority.
c) The Contracting Officer will also designate a Task Order Representative (TOR) for each awarded Task Order, who may be the same individual(s) who serves as the DFO Contract COR. The TOR is responsible for the day-to-day administration and oversight of the Task Order. The TOR will represent the CO and COR in the administration of technical details within the scope of the Task Order. The TOR is also responsible for the final inspection and
3 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
acceptance of all Task Order deliverables and reports, and other responsibilities as may be specified. The TOR is not otherwise authorized to make any representations or commitments of any kind on behalf of the CO or the Government. The TOR does not have authority to alter the Contractor’s obligations or to change the Task Order scope of work, specifications, price, terms, or conditions. If, as a result of technical discussions, it is desirable to modify the Task Order scope of work, obligations, or the specification, changes will be issued through the issuance of a task order modification. The TOR will be designated by CO via a Designation Letter, which will specify the TOR’s extent of authority.
d) The Contractor must immediately contact the Contracting Officer if there is any question regarding the authority of an individual to act on behalf of the Contracting Officer under this contract.
e) The COR is responsible for monitoring progress and overall technical management of the work hereunder and must be contacted regarding questions or problems of a technical nature. In no event, however, will any understanding or agreement, modification, change order, or other matter deviating from the terms of the contract between the Contractor and any person other than the Contracting Officer be effective or binding upon the Government, unless a contract modification or letter of direction is executed by the Contracting Officer prior to completion of this contract.
f) On all matters that pertain to contract terms, the Contractor must contact the Contracting
Officer. When, in the opinion of the Contractor, the COR requests effort outside the existing scope of the contract, the Contractor will promptly notify the Contracting Officer.
The Contractor must not take any action under such a request, unless and until the Contracting Officer has issued a letter of direction or a contract modification.
g) The designated Contracting Officer Representative for the DFO IDIQ Contract is:
Name: TBD Address: Federal Aviation Administration
ATTN: TBD
800 Independence Avenue, S.W.
Washington, D.C. 20591 Office Email: TBD
G.3.3 OFFICER’S QUALITY RELIABILITY OFFICER (QRO) OR ALTERNATE
The FAA will designate a QRO/Alternate with the authority to perform surveillance of the contract work and conduct such inspections as are necessary to assure compliance with the contract terms and conditions and accept or reject the required material, equipment, or services in accordance with the terms of the contract. The QRO or Alternate does not have authority to change the contract price, schedule, quantities, or any terms and conditions of the contract.
G.4 CONTRACTING OFFICER SUPPORT PERSONNEL
(a) The Contracting Officer may designate certain individuals to assist in the administration of this Contract and Delivery/Task Orders.
4 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
(b) In no event will the designee(s) be empowered to change the contract scope of work, the price, or the delivery schedule.
(c) The Contracting Officer must immediately be contacted for clarification if a question arises regarding the authority of any person to act for the Contracting Officer under this Contract and Delivery/Task Orders.
G.5 CORRESPONDENCE PROCEDURES
To promote timely and effective contract administration, correspondence submitted under this contract (except invoices and deliverable items) must be subject to the following procedures:
(a) All correspondence must contain a subject line commencing with the contract number as follows:
SUBJECT: Contract Number (TBD); TASK ORDER NUMBER; TOPIC: (Insert Brief Topic of Correspondence) & Unique Document Number
Technical Correspondence of a routine nature: must be addressed to the designated COR with an information copy of the correspondence to the Contracting Officer.
(b) Other correspondence including technical correspondence where patent or technical data issues (if any) are involved, and correspondence which proposes or otherwise involves waivers, deviations, or modifications to the contract requirements, terms or conditions, etc., must be addressed to the Contracting Officer, with an information copy of the correspondence to the
COR.
(c) The Contractor must use discretion in the use of "express" or "overnight" mail. These premium services should be used sparingly and in situations where the regular U.S. mail system would not be adequate for the timely transfer of technical or contract related documentation. Use of electronic mail is encouraged where appropriate.
G.6 ELECTRONIC COMMUNICATIONS
The Contractor must assure an electronic means for communicating with FAA personnel. The Contractor must ensure that the communications are compatible with the FAA’s electronic mail system, which is currently Microsoft Outlook. The Contractor must also ensure that the Contractor’s electronic mail has the capability to send and receive attachments.
All contract reports and deliverables, including invoices, must be provided in electronic format with all linkages and interdependencies.
G.7 TECHNICAL DIRECTION
(a) Performance of the work under this contract will be subject to the technical direction of the
COR identified in G.3. The term technical direction is defined to include, without limitation, the following:
5 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
(1) Directions to the Contractor which redirect the contract effort, shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish the contractual Statement of Work provided that there is no cost or schedule impact or change in the contract requirement consistent with Section C;
(2) Provision of written information to the Contractor which assists in the interpretation of drawings, specifications, or technical portions of the work description; and
(3) Review and where required by the contract, approve technical reports, drawings, specifications, and technical information to be delivered by the Contractor to the Government under the contract.
(b) Technical direction must be issued in writing by the COR and must be within the scope of Section C, Statement of Work. The COR does not have the authority to and may not issue any technical direction which:
(1) Constitutes an assignment of additional work outside the Statement of Work;
(2) Constitutes a change as defined in the FAA Clauses 3.10.1-12 Changes—Fixed Price, 3.10.1-14 Changes – Time and Materials or Labor Hours, and 3.10.1-13 Changes - - Cost Reimbursement;
(3) In any manner causes an increase or decrease in the total estimated contract cost, the fixed fee (if any), or the time required for contract performance;
(4) Changes any of the expressed terms, conditions, or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
G.8 ACCOUNTING AND APPROPRIATION DATA
Accounting and appropriation data for obligations under this contract will be set forth in individual Delivery/Task Orders.
G.9 PREPARATION OF INVOICES
G.9.1 General
(a) An Invoice must be prepared and submitted for payments under this contract, unless otherwise specified in the individual Delivery/Task Order.
(b) Per AMS, a Proper Invoice includes the following:
(1) For FAA to make payment under a contract, a proper invoice must be submitted to FAA by the contractor. If the invoice does not meet the definition of a proper invoice per section (2) below, it must be rejected within seven (7) days of receipt.
(2) A proper invoice contains the following:
(a) Name and address of contractor;
(b) Invoice date;
(c) Contract number (to include applicable order numbers and Contract Line Item Numbers (CLINs);
6 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
(d) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed;
(e) Shipping and payment terms, to include, when applicable:
(i) Shipment number and date of shipment,
(ii) Bill of lading number and weight (for government bills of lading), and
(iii) Prompt payment discount terms.
(f) Contractor or bank address where electronic payment is to be sent;
(g) Name, title, phone number, and mailing address of person to be notified of a defective invoice;
(h) Other information required by the contract (i.e. certified payrolls, evidence of shipment, etc.); and
(i) Invoice number, account number, and/or any other identifying umber agreed under the contract.
G.9.2 Billing Instructions
(a) The Contractor must submit invoices no more often than monthly unless otherwise authorized, in writing, by the Contracting Officer. All invoices for payment under this contract must include the following information:
1. The Contract Number;
2. The Invoice Number and Date prepared;
3. The Contractor’s name, mailing address, and telephone number;
4. Delivery/Task Order period of performance in the invoice must match exactly the period of performance used in the Contractor’s Integrated Program Management Report
(IPMR);
5. Billing period covered by month, day, and year;
6. Dollar amount for the current billing period grouped and totaled by Task Order number and CLIN number; the Contractor must itemize individual labor by name, CLIN, labor category, labor rate, hours, and total cost;
7. Cumulative dollar amount for the contract grouped and totaled by Task Order number and CLIN number; the Contractor must itemize labor by individual name, CLIN, labor category, labor rate, hours, and extended cost; additionally, when applicable, the invoice must break out dollar amounts by subtask and type of funding as obligated on the task order by the FAA, e.g. F&E or Operations;
1. Supporting or backup documentation as follows:
a. Travel Expense Claims (Include receipts for lodging, rental car, airfare, and other expenses greater than $75);
b. Receipts for all invoiced purchases and ODCs greater than $75; and
c. Copies of the COR’s authorizations for each trip and ODC expense invoiced;
8. Certification and signature of an appropriate management official as follows:
“This is to certify that the services set forth herein were performed during the period stated, and that incurred costs billed were actually expended. “
7 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
Signature of Contractor’s Authorized Official Date Signer's name typed or printed Signer's Title
(b) The Federal Aviation Administration intends to make payment within 30 days of receipt of a properly prepared invoice submitted to the billing office below at either address or sent via email to 9-AMC-AMZ-FAA-APInvoices@faa.gov:
U.S. MAIL: FAA Accounts Payable Branch, AMZ-110
PO Box 25710 Oklahoma City, OK 73125
FEDEX: FAA Accounts Payable Branch, AMZ-110 6500 S MacArthur Blvd.
Oklahoma City, OK 73169
The Contractor must submit an original copy of all invoices to the above designated billing office not more than once monthly. All invoices must comply with the FAA Acquisition Management System (FAAAMS) Clause 3.3.1-17, Prompt Payment. The Contractor must provide simultaneously with the original, an electronic copy of each certified invoice to the Contracting Officer along with attachments to both the Contracting Officer and the Contracting Officer’s Representative in a format which will allow data manipulation.
The Contracting Officer will authorize payment in amounts determined to be allowable, allocable, and reasonable in accordance with the FAA AMS. The payment will be made pursuant to the “Payment by Electronic Funds Transfer - Central Contractor Registration” clause in Section I of this contract.
G.10 METHOD OF PAYMENT
Payments under this Contract will be made by wire transfer through the Treasury Financial Communications System.
The Contractor must forward the following information in writing to the paying office (see clause G.9) not later than 7 calendar days after receipt of notice of award.
(a) Full name (where practicable), title, phone number, and complete mailing address of responsible official(s) (i) to whom check payments are to be sent, and (ii) who may be contacted concerning the bank account information requested below.
(b) The following bank account information is required to accomplish wire transfers:
1. Name, address, and telegraphic abbreviation of the receiving financial institution.
2. Receiving financial institution's 9-digit American Banker's Association (ABA) identifying number for routing transfer of funds. (Provide this number only if the receiving financial institution has access to the Federal Reserve Communications System).
mailto:9-AMC-AMZ-FAA-APInvoices@faa.gov
8 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
3. Recipient's name and account number and the receiving financial institution to be credited with the funds.
4. If the receiving financial institution does not have access to the Federal Reserve
Communications System, provide the name of the correspondent financial institution through which the receiving financial institution receives electronic funds transfer messages. If a correspondent financial institution is specified, also provide:
(c) Address and telegraphic abbreviation of the correspondent financial institution, and the correspondent financial institution's 9-digit ABA identifying number for routing transfer of funds.
G.11 TRAVEL
All Contractor travel must be authorized in a Task Order and specifically approved by the Contracting Officer or COR in writing before commencing travel. The contractor will be reimbursed for travel expenses in accordance with the Federal Travel Regulation, and the following:
(a) The contractor must use alternate airports when available and within a reasonable commuting distance if it will result in lower costs;
(b) The contractor must conduct a cost analysis prior to the start of travel to determine the overall most cost-effective means and then use the most cost-effective means; and
(c) The Contractor must, when possible, use discount hotel rates, marked CRC in the Federal Travel Directory, which the GSA publishes monthly. Questions on travel must be addressed to the CO.
G.12 OTHER DIRECT COST (ODC) REIMBURSEMENT
(a) Any ODC must be preapproved by the Contracting Officer or COR and is subject to the limits defined in the associated TO. If preapproved, the contractor will be reimbursed for allocable, allowable, and reasonable ODCs.
(b) The Contractor’s facility costs (including but not limited to office space, office equipment, utilities, office supplies, and office furniture) are not an allowable ODC expense.
(c) Cellular phone usage charges are not an allowable ODC expense unless required to perform time- critical duties and roles and preapproved by the Task Order Manager and either the Contracting Officer or COR.
(d) All ODC expenses must be consistent with the costs of comparable items or services.
(e) The Contractor must submit a copy of the Contracting Officer’s or COR’s authorization for the expense and a copy of the receipt when invoicing an ODC expense.
All materials required for performance under the TOs issued pursuant to this contract that are not Government-furnished, must be furnished by the Contractor. When requisitioning procedures reveal that required materials are not available from Government supply sources, the Contractor must identify them in each TO proposal. Ownership of supplies acquired by the Contractor with Government funds, for performance of this contract, must vest with the Government. The
9 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
Contractor must include a detailed description of all proposed materials in individual TO proposals. Materials are defined in the clause at AMS 3.3.1-5 Payments under Time-and- Materials and Labor-Hour Contracts (May 2001).
G.13 ORDERING PROCEDURES
G.13.1 General Information All Delivery/Task Orders under the DFO Segment 2 IDIQ Contract must:
a. Be solicited and awarded by an authorized, warranted CO within the FAA;
b. Be within the scope of Section C and all other terms and conditions of the DFO Segment
2 IDIQ contract;
c. Identify the Labor Categories that will perform the Delivery/Task Order work;
d. Comply with the ordering procedures in AMS, Ordering, and other applicable agency specific regulatory supplements.
All costs associated with the preparation, presentation, and discussion of the Contractor’s proposal in response to a task order solicitation will be at the Contractor’s sole and exclusive expense. The Contractor must generally be given ten business days to respond to a Task Order Request for Proposal (TORFP). However, in emergency situations this time frame may be greatly reduced. The Task Order Proposal must include a response to all sections of the TORFP, as laid out in the TORFP instructions.
The contractor must identify a person and/or dedicated email address to receive Task Order Requests for Proposal. This person must be available during regular business hours and must designate a backup during periods of extended absence, of more than two business days in a row.
Orders may be issued at any time during the effective period of performance for this contract;
however, the period of performance for any effort ordered may not exceed a period of twelve
(12) months beyond the expiration date of the IDIQ contract. An Order is considered “issued” when the Government transmits the Order regardless of the mode of transmission.
G.13.2 Delivery/Task Ordering Procedures The following ordering guidelines must be followed when placing a Delivery/Task Orders against this IDIQ contract:
(a) All work to be performed under this contract must be within the scope of Section C and must not commence until authorized by the Contracting Officer via Delivery Order (DO)/Task Order (TO). The contractor must incur costs only in the performance of TOs issued in accordance with these ordering procedures. No other costs are authorized under this contract without the express written consent of the Contracting Officer.
(b) During the period of performance of this contract, the Contracting Officer will request Task Plans (i.e. proposals) from the Contractor for efforts related to certain requirements. The request will include a due date for proposal submission, a SOW, PWS or SOO that describes the work to be accomplished; a listing of deliverables; any additional requirements as appropriate, such as travel requirements; and a cost proposal.
10 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
(c) The Contractor must submit a Contractor Task Plan by the date of submission stipulated by the Contracting Officer. The Contracting Officer may allow for additional time to submit the Task Plan if requested by the Contractor. The Task Plan is the Contractor’s proposal to accomplish the FAA’s requirements. At a minimum, the Contractor’s Task Plan must include the following:
1. Contractor’s approach to accomplishing the FAA requirements;
2. Date of commencement of work, and any necessary revisions to earlier schedules of performance;
3. Labor rates, estimated labor hours by applicable labor category to complete the effort;
4. Rationale for estimated labor hours, by applicable labor category; the rationale must include a basis of estimate for the proposed hours;
5. The travel and material costs needed to perform the task, including a rationale for each; the rationale must include a detailed justification for each proposed trip or other ODC proposed; and
6. The total estimated cost for completion of the work, broken out by labor, travel, and material costs.
(d) The Contractor’s Task Plan is subject to the review and approval of the Contracting Officer.
The Contracting Officer will issue a Task Order once the Contracting Officer approves an acceptable Task Plan.
(e) Delivery/Task Orders will be issued by the Contracting Officer to cover specific work assignments within the scope of the contract. All TOs will contain the following information:
1. DO/TO number;
2. FAA technical point of contact and phone number;
3. Period of performance;
4. Description of the work to be performed;
5. Ceiling price;
6. Estimated labor-hours by category;
7. Anticipated Travel and ODC requirements;
8. Start and completion dates, with major milestones;
9. Deliverables with required delivery dates;
10. Applicable security requirements; and
11. List of Government Furnished Property, Equipment, and Information (GFP, GFE, and GFI).
(f) Award – The DO/TO CO must prepare the award in accordance with all agency acquisition regulations, including required reviews. The CO must forward all award documents, including Standard Form with Delivery/Task Order number and value, and SOO/SOW to the DFO Segment 2 contractor email address identified, the DFO Contract CO/Contract Specialist (CS), and the DFO IDIQ Contract COR.
11 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
G.14 INTERPREATION OR MODIFICATIONS
No verbal statement by any person, and no written statement by anyone other than the CO, or his/her authorized representative acting within the scope of his/her authority, shall be interpreted as modifying or otherwise affecting the terms of this solicitation or resulting contract. All requests for interpretation or modification must be made in writing to the CO.
G.15 MODIFICATION OF ORDERS
Established pricing for each task order may not be changed except when authorized by a modification to the specific delivery/task order.
G.16 UNAUTHORIZED WORK
The Contractor is not authorized at any time to commence TO performance prior to issuance of a signed TO or other written approval provided by the TO CO to begin work.
G.17 CONTRACTOR ACCOUNTING SYSTEM
For Cost Reimbursable Task Orders, contractors must maintain an adequate accounting system to substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment and by:
(i) Individual daily job timekeeping records;
(ii) Records that verify the employees meet the qualifications for the labor categories specified in the contract; or
(iii) Other substantiation approved by the Contracting Officer.
The Contractor must present evidence of an adequate accounting system before award of a Cost Reimbursable Task Order to the IDIQ contract CO. The Contractor must notify the CO in writing if there is any change in the status of its approved accounting system and provide the reason(s) for the change.
G.18 INDIRECT RATE SUBMISSION FOR COST CONTRACT LINE ITEM
NUMBERS (CLINs)
(a) The Contractor, as soon as possible but not later than 180 days after the expiration of the federal fiscal year, must submit to the Contracting Officer, specified in paragraph G.2, proposed final indirect rates together with supporting data, for the Contractor fiscal year just completed, based on the Contractor’s actual cost experience during that period. The data will be used for financial planning purposes only.
(b) The cognizant Corporate Administrative Contracting Officer (CACO) is delegated responsibility to negotiate the Contractor’s billing and final indirect rates, in accordance with appropriate guidelines and procedures, and to administer Cost Accounting Standards and applicable Department of Defense Instruction (DODI) 5000.2 compliance.
(c) Allowability of costs and acceptability of cost allocation methods must be determined in accordance with the cost principles in effect as of the date of this contract.
12 | P a g e “This contract may contain information considered sensitive unclassified information (SUI) and would merit protection from unauthorized disclosure under 5 U.S.C, Section 552(b)(4). No information shall be released except as authorized by the Contracting Officer.”
(d) The settlement of the final indirect rates and indirect costs must be accomplished prior to the Contracting Officer’s approval of the final payment.
(e) Pending settlement of final indirect expense rates for any period, the Contractor will be reimbursed at billing rates acceptable to the Contracting Officer. These billing rates are subject to appropriate adjustments when the final indirect rates are settled. On an annual basis the Contractor must provide to the Contracting Officer, within 90 days after the expiration of his fiscal year, a billing rate proposal with supporting data. If billing rates change substantially at any time during the contract performance period, the Contractor must notify the Contracting Officer in writing. Upon review of the annual billing rate proposal or any modification of substantial rate change during the contract performance period, the Contracting Officer may adjust the approved billing rate(s). Such adjustment may apply retroactively and/or prospectively. In the event the adjustment is to be applied retroactively, the Contractor must make appropriate adjustments on its next invoice.
G.19 CONTRACTOR PERFORMANCE EVALUATIONS
Performance evaluations shall be completed in accordance with 3.10.1-26 Contractor Performance Assessment Reporting System (April 2013). The FAA uses the Contractor Performance Assessment Review System (CPARS) as the primary method to complete evaluations. Completed performance evaluations may be accessed in the Past Performance Information Retrieval System (PPIRS). The Contractor is required to register in CPARS and shall have thirty (30) calendar days in which to respond to Government comments. The Government will consider any comments provided by the Contractor before finalizing a Performance Evaluation Report and the Contractor’s comments will be attached to the Report.
END OF SECTION G
| G.2 BACKGROUND |
| G.3 ROLES AND RESPONSIBILITIES OF GOVERNMENT KEY PERSONNEL |
| G.3.1 CONTRACTING OFFICER |
| G.3.2 CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND TASK ORDER REPRESENTATIVE (TOR) |
| G.3.3 OFFICER’S QUALITY RELIABILITY OFFICER (QRO) OR ALTERNATE |
| G.4 CONTRACTING OFFICER SUPPORT PERSONNEL |
| G.5 CORRESPONDENCE PROCEDURES |
| G.6 ELECTRONIC COMMUNICATIONS |
| G.7 TECHNICAL DIRECTION |
| G.8 ACCOUNTING AND APPROPRIATION DATA |
| G.9 PREPARATION OF INVOICES |
| G.10 METHOD OF PAYMENT |
| G.13.1 General Information |
| G.13.2 Delivery/Task Ordering Procedures |
| G.14 INTERPREATION OR MODIFICATIONS |
| G.15 MODIFICATION OF ORDERS |
| G.16 UNAUTHORIZED WORK |
| G.17 CONTRACTOR ACCOUNTING SYSTEM |
File details come from the government source that posted it. Updated .