Amendment_2.pdf

PDF 118 KB Posted

Attached to
Series Capacitors Bank Federal contract opportunity
Solicitation number
DE-SOL-0011130
Issued by
Department of Energy Western Area Power Administration

View the file

Other files for this federal contract opportunity

Other files attached to Series Capacitors Bank, newest first.
File Type Posted
1_-_LIB_Cap_Spec_2017-06-14_revised_GH.pdf PDF
Amendment_3.pdf PDF
DE-SOL-0011130_Amendment_001.pdf PDF
Amendment_001_LIB_Cap_Spec_2017-06-06_revised_GH.pdf PDF
DE-SOL-0011130.pdf PDF
Attach_B_Wage_Determination_2015-5469_Rev_3_12_30_2016.pdf PDF
Attach_A__LIB_Cap_Spec_2017-05-08.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DE-SOL-0011130

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PHOENIX AZ 85005-6457

DSW

PO BOX 6457

DESERT SOUTHWEST REGIONAL OFFICE

US DOE/WESTERN AREA POWER

WAPA (DSW)

06/09/2017000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/15/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Pages

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gregory K. Cagle

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

06/09/2017 Signature on File

Solicitation DE-SOL-0011130 Amendment 0002

This Amendment incorporates the following changes into the solicitation:

A. Solicitation Page 18, Clause WES-H-1002 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA, is revised to reflect a reduction in the retainage/holdback for undeliverable data as shown below:

WES-H-1002 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA

The Government shall retain/holdback 10% of the amount of CLIN 0001 until commissioning has been completed placing the equipment in normal commercial service and all training, final drawings, as-builts, operation and maintenance manuals, and any other required, deliverable data have been delivered to and accepted by the Government.

A revised Page 18 is attached; revisions have been denoted by a line in the right-hand margin.

The date and time specified for receipt of quotes remains unchanged, June 21, 1:00 PM Local Time.

WES-G-1004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)

The name, title, phone number, office name, and complete mailing address of the Contractor's point of contact for contract administration, including defective or improper invoices, is as follows:

Name:_________________________________________

Title:__________________________________________

Phone Number:__________________________________

E-mail address:__________________________________

Fax Number:____________________________________

Company Name:_________________________________

Address:________________________________________

City/State/Zip:___________________________________]

WES-H-1002 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA

The Government shall retain/holdback 10% of the amount of CLIN 0001 until commissioning has been completed placing the equipment in normal commercial service and all training, final drawings, as-builts, operation and maintenance manuals, and any other required, deliverable data have been delivered to and accepted by the Government.

WES-H-1022 INDEMNITY (WAPA, FEB 2008)

The contractor shall hold harmless and indemnify the United States and its officers, representatives, and employees, from all claims, losses, damages, actions, causes of action, expenses, and/or liability resulting from, brought for, or on account of, any loss, personal injury, death, or property damage, including but not limited to incidents related to the transportation, removal, disposal, and/or accidental discharge of toxic and/or hazardous waste or material, received or sustained by any person or persons, including but not limited to the contractor, the United States, or third parties, and any of their employees, agents, officers, or representatives, to the extent caused by, growing out of, resulting from, incident to, or connected with, the contractor's negligent performance under this contract.

WES-H-1030 EXPRESS WARRANTY (WAPA, JUN 2008)

This contract requires offerors to provide at least the same warranty terms, including offers of extended warranties, that are customarily offered to the general public under the offeror's standard commercial practices. If the offeror's standard commercial warranty is for a period of less than 5 years, then this clause requires minimum warranty duration of 5 years from the date of acceptance of the equipment.

WES-H-1031 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2005)

The Contractor must receive prior, written approval from the appropriate Western Security Manager (WSM) before any non-U.S.

Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (Western) facility. The Contractor must certify in writing that:

1) each of their employees working under this contract that may visit or be assigned to work at any Western facility is a U.S. Citizen, or;

2) the Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000-72, (provided upon request) for each of their Foreign National employees that may visit or work at any Western facility. The Contractor shall forward the completed Form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning of work. Foreign National employees shall not be allowed on-site at any Western facility without prior approval of the cognizant WSM. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WSM. The Contractor shall include this

downloadForm
Continuation Page
DE-SOL-0011130 Revised Page 18

File details come from the government source that posted it. Updated .