SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to Parker Dam Substation Erosion Repair, newest first.
File Type Posted
Bidding_Schedule.pdf PDF
Revised_Specs_2-9-2017.pdf PDF
Wage_Rate_-_CA37.docx DOCX document
Amend_1.pdf PDF
Attachment_B.__PAD-Rock_Surfacing_12-14-16.pdf PDF
Attachment_D.__Foreign_National_Data_Card.pdf PDF
Attachment_A.__PAD_Specs_12-14-16.pdf PDF
Attachment_C.__Wage_Grade_-_Davis_Bacon.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

17WA120479

WAPA (DSW)

US DOE/WESTERN AREA POWER

DESERT SOUTHWEST REGIONAL OFFICE

PO BOX 6457

DSW

PHOENIX AZ 85005-6457

Don Reed

615 S 43rd Street Phoenix, AZ 85009 dreed@wapa.gov

Don Reed 602-605-2768

101/23/2017

DE-SOL-0010751

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This project will require the contractor to provide all necessary equipment, material and labor to completely install the following: provide surface gravel and repair structural fill. All work shall be in strict compliance with the specifications and drawings.

The project magnitude is estimated between $25,000 and $100,000. Place of performance will be the Parker Dam Substation near Parker, Arizona.

This is a competitive 100% Small Business Set-aside Request for Quotation (RFQ). The acquisition is subject to the North American Industry Classification System (NAICS) code of 237990 with a size standard of $36.5 million.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 55 calendar days and complete it within ________________ ________________ calendar days after receiving

02/23/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

WAPA (DSW)

US DOE/WESTERN AREA POWER

DESERT SOUTHWEST REGIONAL OFFICE

PO BOX 6457

DSW

PHOENIX AZ 85005-6457

Eric W. Jordan

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

01/23/2017

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 28

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DE-SOL-0010751

Delivery: 03/31/2017

Delivery Location Code: 3H17

WAPA (DSW)

US DOE/WESTERN AREA POWER

PARKER DAM WAREHOUSE

PARKER DAM CA 92267 US

FOB: Destination

00001 PAD 230/161KV YARDS ADD MATERIAL TO COVER EXPOSED

GROUND GRID (SEE SPECIFICATIONS)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Section C - Description/Specifications

Section E - Inspection and Acceptance

Section F - Deliveries or Performance

Section G - Contract Administration Data

Section H - Special Contract Requirements

Section I - Contract Clauses

Section J - List of Documents, Exhibits and Other Attachments List of Documents, Exhibits, and Other Attachments

Section K - Representations, Certifications, and Other Statements of Bidders

Section L - Instructions,Conditions, and Notices to Bidders

Section M - Evaluation Factors for Award

Section C - Description/Specifications

DOE-C-2001 Statement of Work (OCT 2014)

Section J - See Attachments

Section D - Packaging and Marking

Section E - Inspection and Acceptance

52.246-12 Inspection of Construction. (APR 1996)

DOE-E-2001 Inspection and Acceptance (OCT 2014)

Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled [insert title of the applicable inspection clause contained in contract and any other clauses applicable to inspection and/or acceptance]. If the Contracting Officer assigns this responsibility to the Contracting Officer’s Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.

See Attachments

Section F - Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 55 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

52.242-14 Suspension of Work. (APR 1984)

Section G - Contract Administration Data

DOE-G-2001 Contracting Officer Authority (OCT 2014)

The Contracting Officer is responsible for administration of the contract. The Contracting Officer may appoint a Contracting Officer’s Representative (COR), in accordance with the clause entitled Contracting Officer’s Representative, to perform specifically delegated functions. The Contracting Officer is the only individual who has the authority on behalf of the Government, among other things, to take the following actions under the contract:

(a) Assign additional work within the general scope of the contract.

(b) Issue a change in accordance with the clause entitled Changes.

(c) Change the cost or price of the contract.

(d) Change any of the terms, conditions, specifications, or services required by the contract.

(e) Accept non-conforming work.

(f) Waive any requirement of the contract.

DOE-G-2002 Contracting Officer’s Representative (OCT 2014)

Pursuant to the clause at DEAR 952.242-70, Technical Direction, the Contracting Officer shall designate in writing a Contracting Officer’s Representative (COR) for this contract, and provide a copy of such designation to the contractor, including the delegated responsibilities and functions. The COR does not have authority to perform those functions reserved exclusively for the Contracting Officer.

WES-G-1002 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)

a. The contractor is authorized up to 60 calendar days after the contract completion date to complete and submit final drawings, operation and maintenance manuals, and any other data required by the contract.

b. This period noted above is strictly for administrative purposes and is not an extension of the actual performance period of the contract. Liquidated damages are not applicable to this period.

WES-G-1004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)

The name, title, phone number, office name, and complete mailing address of the Contractor's point of contact for contract administration, including defective or improper invoices, is as follows:

Name:_____________________

Title:______________________

Phone Number:_______________________

E-mail address:_______________________

Fax Number:_________________________

Company Name:______________________

Address:_____________________________

City/State/Zip:________________________

Section H - Special Contract Requirements

DOE-H-2013 Consecutive Numbering (OCT 2014)

Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered.

(End of clause)

DOE-H-2033 Alternative Dispute Resolution (OCT 2014)

(a) The DOE and the Contractor both recognize that methods for fair and efficient resolution of contractual issues in controversy by mutual agreement are essential to the successful and timely completion of contract requirements. Accordingly, DOE and the Contractor shall use their best efforts to informally resolve any contractual issue in controversy by mutual agreement. Issues of controversy may include a dispute, claim, question, or other disagreement. The parties agree to negotiate with each other in good faith, recognizing their mutual interests, and attempt to reach a just and equitable solution satisfactory to both parties.

(b) If a mutual agreement cannot be reached through negotiations within a reasonable period of time, the parties may use a process of alternate dispute resolution (ADR) in accordance with the clause at FAR 52.233-1, Disputes. The ADR process may involve mediation, facilitation, fact-finding, group conflict management, and conflict coaching by a neutral party. The neutral party may be an individual, a board comprised of independent experts, or a company with specific expertise in conflict resolution or expertise in the specific area of controversy. The neutral party will not render a binding decision, but will assist the parties in reaching a mutually satisfactory agreement. Any opinions of the neutral party shall not be admissible in evidence in any subsequent litigation proceedings.

(c) Either party may request that the ADR process be used. The Contractor shall make a written request to the Contracting Officer, and the Contracting Officer shall make a written request to the appropriate official of the Contractor. A voluntary election by both parties is required to participate in the ADR process. The parties must agree on the procedures and terms of the process, and officials of both parties who have the authority to resolve the issue must participate in the agreed upon process.

(d) ADR procedures may be used at any time that the Contracting Officer has the authority to resolve the issue in controversy. If a claim has been submitted by the Contractor, ADR procedures may be applied to all or a portion of the claim. If ADR procedures are used subsequent to issuance of a Contracting Officer’s final decision under the clause at FAR 52.233-1, Disputes, their use does not alter any of the time limitations or procedural requirements for filing an appeal of the Contracting Officer’s final decision and does not constitute reconsideration of the final decision.

(e) If the Contracting Officer rejects the Contractor’s request for ADR proceedings, the Contracting Officer shall provide the Contractor with a written explanation of the specific reasons the ADR process is not appropriate for the resolution of the dispute. If the Contractor rejects the Contracting Officer’s request to use ADR procedures, the Contractor shall provide the Contracting Officer with the reasons for rejecting the request.

DOE-H-2034 Contractor Interface With Other Contractors And/Or Government Employees (OCT 2014)

The Government may award contracts to other contractors for work to be performed at a DOE-owned or –controlled site or facility.

The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as may be directed by the Contracting Officer or a duly authorized representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.

DOE-H-2059 Preservation Of Antiquities, Wildlife And Land Areas (OCT 2014)

(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel.

It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.

(b) The Contractor shall also preserve all vegetation (including wetlands) except where such vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contacting Officer.

(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.

DOE-H-2076 LOBBYING RESTRICTIONS (OCT 2014)

The Contractor agrees that none of the funds obligated on this award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. § 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation.

(End of clause)

WES-H-1006 BREAKDOWN OF CONTRACT PRICES (WAPA, FEB 2008)

In addition to the requirements of the contract clause entitled "Payments under Fixed Price Construction Contracts", the contractor shall submit a detailed breakdown of the total contract price within 30 calendar days after the date of the notice to proceed. The price breakdown shall be submitted in triplicate to the Contracting Officer's Representative (COR) designated in this contract. The breakdown of contract costs shall be arranged by bid item with a further, more detailed division into the various kinds of work which make up the bid item. Contract costs shall be furnished for each bid item detailing the various kinds of work covered in the technical paragraphs of the specifications. The cost breakdown shall show the quantities of each type of work, the unit prices for materials, labor, and equipment, as well as the total price. The contractor shall obtain cost information from its subcontractor(s) as required, to provide the Government with a complete breakdown of the actual bid price.

WES-H-1022 INDEMNITY (WAPA, FEB 2008)

The contractor shall hold harmless and indemnify the United States and its officers, representatives, and employees, from all claims, losses, damages, actions, causes of action, expenses, and/or liability resulting from, brought for, or on account of, any loss, personal injury, death, or property damage, including but not limited to incidents related to the transportation, removal, disposal, and/or accidental discharge of toxic and/or hazardous waste or material, received or sustained by any person or persons, including but not limited to the contractor, the United States, or third parties, and any of their employees, agents, officers, or representatives, to the extent caused by, growing out of, resulting from, incident to, or connected with, the contractor's negligent performance under this contract.

WES-H-1023 REQUIRED INSURANCE (WAPA, FEB 2008)

a. The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

(1) Workman's Compensation Insurance in accordance with the laws of the state where contract performance occurs; Occupational Disease Coverage; and Employees Liability Coverage.

(2) Comprehensive General and Automobile Liability Insurance with the following minimum coverages:

(i) GENERAL LIABILITY

(A) Bodily Injury $500,000 per occurrence.

(B) Property Damage $N/A unless otherwise required by Contracting Officer each accident;

$ [] in the aggregate.

(ii) AUTOMOBILE INSURANCE

(A) Bodily Injury, $200,000 per person;

$500,000 per occurrence.

(B) Property Damage, per occurrence: $20,000 .

b. These policies shall have appropriate language waiving all subrogation rights against the Government, unless otherwise approved by the Contracting Officer.

c. Prior to the commencement of work under this contract, the contractor shall furnish a copy of the insurance certificate (binder) or other objective evidence of the above-required insurance to the Contracting Officer. The policies shall contain an endorsement to the effect that cancellation or any material change in the insurance policies that adversely affect the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed, and in no event less than thirty (30) days after written notification is provided to the Contracting Officer.

d. The contractor agrees to insert the substance of this clause, including this paragraph (d), into any subcontracts issued under this contract.

WES-H-1024 CONTRACT PRICES (WAPA, FEB 2008)

Payment for the various line items listed in Section B shall constitute full compensation for furnishing all plant, labor, equipment, appliances and materials; for performing all operations required to complete the work in conformity with the drawings and specifications, including installation and erection of the total system; necessary engineering services; and all drawings, data and/or reports.

WES-H-1027 MOBILIZATION AND PREPARATORY WORK (WAPA, FEB 2008)

a. General. The contractor will be compensated for mobilization and preparatory work in accordance with the terms of this contract.

Mobilization and preparatory work may include movement of personnel, equipment, supplies, and incidentals to the project site;

establishment of offices, buildings, plants and other facilities at the project site; payment of premiums for bonds and insurance for the project; necessary costs for acquisition of equipment; and for any other work which must be performed incident to the start of construction at the site.

b. Facilities, plants, and equipment required for this project that are established at, or brought to, the worksite are subject to the provisions of this clause unless the Contracting Officer specifically excludes, in writing, a particular item or items. The contractor is solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all its facilities, plants, and equipment. The facilities, plants, and equipment covered by this paragraph shall not be dismantled or removed from the worksite prior to completion of the work specified in the contract without the written permission of the Contracting Officer.

c. Termination for Default. In the event the contractor's right to proceed is terminated as provided by the contract clause entitled Default, all facilities, plants, and equipment on the worksite are subject to Western's right to take possession of and utilize the same for completion of the work. In addition, any encumbrance, lien, or other security interest on any such facilities, plants, or equipment shall be subordinate to Western's right to utilize these facilities, plants and equipment to complete the work under the contract.

d. Payment. Payment for mobilization and preparatory work will be made at the lump sum price specified in Section B of the contract.

Progress payments for mobilization and preparatory work will be made as follows:

(1) When 5 percent of the total amount of the original contract is earned from other schedule items, 50 percent of the amount agreed upon for mobilization and preparatory work will be paid.

(2) When 10 percent of the total amount of the original contract is earned from other schedule items, the balance of the amount agreed upon for mobilization and preparatory work will be paid.

e. Progress payments for mobilization and preparatory work shall be subject to retainage as provided by FAR 52.232-5, "Payments Under Fixed-Price Construction Contracts." In addition, the line item for mobilization and preparatory work will not be considered to be a separate division of the work, completion of which would permit the payment of the complete item price without retention.

WES-H-1031 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2005)

The Contractor must receive prior, written approval from the appropriate Western Security Manager (WSM) before any non-U.S.

Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (Western) facility. The Contractor must certify in writing that:

1) each of their employees working under this contract that may visit or be assigned to work at any Western facility is a U.S. Citizen, or;

2) the Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000-72, Attachment 4 for each of their Foreign National employees that may visit or work at any Western facility. The Contractor shall forward the completed Form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning of work. Foreign National employees shall not be allowed on-site at any Western facility without prior approval of the cognizant WSM. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WSM. The Contractor shall include this requirement in any subcontract it issues under this contract. Western reserves the right to remove any contract employee from Western's property pending the conclusion of the Foreign National background check.

WES-H-1033 ACCESS TO DOE OWNED OR LEASED FACILITIES (WAPA, SEP 2011)

(a) The performance of this contract requires that employees of the Contractor have physical access to DOE owned or leased facilities.

The Contractor understands and agrees that DOE has a prescribed process with which the Contractor and its employees must comply in order to receive a security badge that allows such physical access. This process includes, but is not limited to an FBI fingerprint check and other background checks and investigations as required by DOE. The Contractor further understands that it must propose employees whose background offers the best prospect of obtaining a security badge approval for access, considering the following criteria, which are not all inclusive and may vary depending on access requirements:

(1) is, or is suspected of being, a terrorist;

(2) is the subject of an outstanding warrant;

(3) has deliberately omitted, concealed, or falsified relevant and material facts from any Questionnaire for National Security Positions (SF-86), Questionnaire for Non-Sensitive Positions (SF-85), or similar form;

(4) has presented false or forged identity source documents;

(5) has been barred from Federal employment;

(6) is currently awaiting a hearing or trial or has been convicted of a crime punishable by imprisonment of six (6) months or longer; or

(7) is awaiting or serving a form of pre-prosecution probation, suspended or deferred sentencing, probation or parole in conjunction with an arrest or criminal charges against the individual for a crime that is punishable by imprisonment of six (6) months or longer.

(b) The Contractor shall assure:

(1) In initiating the process for gaining physical access, (i) compliance with procedures established by DOE in providing its employee(s) with any forms directed by DOE, (ii) that the employee properly completes any forms, and (iii) that the employee(s) submits the forms to the person designated by the Contracting Officer.

(2) In completing the process for gaining physical access, that its employee (i) cooperates with DOE officials responsible for granting access to DOE owned or leased facilities and (ii) provides additional information, requested by those DOE officials.

(c) The Contractor understands and agrees that DOE may unilaterally deny a security badge to an employee and that the denial remains effective for that employee unless DOE subsequently determines that access may be granted. Upon notice from DOE that an employees application for a security badge is or will be denied, the Contractor shall promptly identify and submit the forms referred to in subparagraph (b)(1) of this clause for the substitute employee. The denial of a security badge to individual employees by DOE shall not be cause for extension of the period of performance of this Contract or any contractor claim against DOE.

(d) The Contractor shall return to the Contracting Officer or designee the badge(s) or other credential(s) provided by DOE pursuant to this clause, granting physical access to DOE owned or leased facilities by the Contractors employee(s), upon:

(1) the termination of this Contract;

(2) the expiration of this Contract;

(3) the termination of employment on this Contract by an individual employee; or

(4) demand by DOE for return of the badge.

(e) The Contractor shall include this clause, including this paragraph (e), in any subcontract, awarded in the performance of this Contract, in which an employee(s) of the subcontractor will require physical access to DOE owned or leased facilities.

WES-H-1037 SAFETY AND HEALTH - HIGH RISK (WAPA, MAY 2005)

In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration; Safety and Health Standards 29 CFR 1910, 29 CFR 1925; and the Construction Safety and Health regulations promulgated under Section 107 of the Contract Work Hours and Safety Standards Act, 29 CFR 1926. If there is a conflict between the requirements of the applicable Federal, State, or local safety, health, or industrial safety codes, the more stringent requirements shall prevail. For any cranes used in the performance of this contract, a copy of the crane inspection records shall be furnished to Western's on-site representative prior to the performance of work. The United States is liable only for negligence on the part of its employeees in accordance with the Federal Tort Claims Act, as amended.

Prior to starting work, an on-site safety meeting shall be held with Western's representative to address and discuss safety procedures related to the work required.

In addition, the contractor agrees to the following requirements:

1. A hazard evaluation will be developed for each major work component.

2. The Contractor agrees that Western has the right to remove any supervisor that does not adhere to said requirements.

Section I - Contract Clauses

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2015)

52.204-13 System for Award Management Maintenance. (JUL 2013)

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)

52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)

52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013)

(a) Definitions. As used in this clause-

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is $36.5 million.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Reprensentations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ___ is, ___ is not a small business concern under NAICS Code 237990 assigned to contract number DE-SOL-0010751. (Contractor to sign and date and insert authorized signer's name and title).(End of clause)

52.222-3 Convict Labor. (JUN 2003)

52.222-6 Construction Wage Rate Requirements. (MAY 2014)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (MAY 2014)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-21 Prohibition of segregated facilities. (APR 2015)

52.222-26 Equal Opportunity. (APR 2015)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60- 741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

52.222-50 Combating Trafficking in Persons. (MAR 2015)

52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2015)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)

52.225-9 Buy American - Construction Materials. (MAY 2014)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Unit of Quantity Price

Description Measure (Dollars)*

Item 1:

Foreign construction material ________ ________ ________

Domestic construction material ________ ________ ________

Item 2:

Foreign construction material ________ ________ ________

Domestic construction material ________ ________ ________

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-11 Pledges of Assets. (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014)

52.228-13 Alternative Payment Protections. (JUL 2000)

(a) The Contractor shall submit one of the following payment protections: Payment Bond and Irrevocable Letter of Credit

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 7 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

52.228-14 Irrevocable Letter of Credit. (NOV 2014)

52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt payment for construction contracts. (MAY 2014)

52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013)

52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-1 Performance of Work by the Contractor. (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 100% percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.243-5 Changes and Changed Conditions. (APR 1984)

52.244-6 Subcontracts for Commercial Items. (JUN 2016)

52.246-21 Warranty of Construction. (MAR 1994)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/

(End of clause)

52.252-6 Authorized Deviations in Clauses. (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation

Section J - List of Documents, Exhibits and Other Attachments

List of Documents, Exhibits, and Other Attachments

Attachment Number Title Date

A Specifications 12/14/2017 B Drawings 12/14/2017 C Wage Grade Determination 12/17/2017 D Foreign National Data Card 12/17/2017

Section K - Representations, Certifications, and Other Statements of Bidders

52.204-8 Annual Representations and Certifications. (APR 2016)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is Total Small Business.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is $36.5 million.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

___ (i) Paragraph (d) applies.

___ (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless-

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;

or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.

This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned…