- Parker Dam Substation Erosion Repair Federal contract opportunity
- Solicitation number
- DE-SOL-0010751
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bidding_Schedule.pdf | ||
| Revised_Specs_2-9-2017.pdf | ||
| Wage_Rate_-_CA37.docx | DOCX document | |
| Attachment_B.__PAD-Rock_Surfacing_12-14-16.pdf | ||
| Attachment_D.__Foreign_National_Data_Card.pdf | ||
| Attachment_A.__PAD_Specs_12-14-16.pdf | ||
| Attachment_C.__Wage_Grade_-_Davis_Bacon.pdf | ||
| DE-SOL-0010751.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DE-SOL-0010751
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
02/09/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/23/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE SCHEDULE
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Eric W. Jordan
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
02/09/2017
DE-SOL-0010751
Amendment 01
The purpose of this Amendment is to correct errors and/or emissions in the solicitation, revise several of the solicitation attachments, and post Contractors questions and answers as follows:
A. Make the following corrections to the solicitation document:
1. Section E, Clause DOE-E-2001, should read as follows:
Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled FAR 52.246-12, Inspection of Construction. If the Contracting Officer assigns this responsibility to the Contracting Officer’s Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.
2. Section L, Provision 52.222-23, paragraph (e), should read as follows:
As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Parker, San Bernardino County, CA
3. Section L, Provision WES-L-1005, paragraph (c), the time zone stated should read as 1400 MST (Mountain Standard Time).
B. Replace Attachment C, Wage Rate, with the attached Wage Rate. The site is in San Bernardino County, California. The correct California wage rate is incorporated by this Amendment.
C. Replace Attachment A, Specifications, with the attached revised Specification. The following changes were made:
DIVISION 1 – GENERAL REQUIREMENTS
1. Change the reference to Mead Substation in the first sentence of Division 1A to read:
Parker Substation.
2. Change the reference to Mead Substation in the paragraph showing the driving directions of Division 1B to read: Parker Substation.
3. Change the reference to Mead Substation in the paragraph referencing the Special Conditions of Division 13B(2) to read: Parker Substation.
4. Change the references to switchyard in Division 1B to read: substation.
DIVISION 2 – SITEWORK CORRECTIONS
5. The Project Specifications Division 2 Sitework Paragraph B Sub Paragraph 1 b makes reference to repair of the existing ground grid. The contractor is only responsible for repairs due to damage to the grounding grid by the contractor at no cost to WAPA.
If repairs must be done due to the contractor damaging the grid, the contractor is then also responsible for testing the repaired section.
6. The Project Specifications Division 2 Sitework Paragraph B Sub Paragraph 3 c- “Survey of the existing ground grid to determine depth of scarification to eliminate destruction of the ground grid.” A visual survey should be done by the contractor to locate and record any existing breaks or disconnection points in the exposed grid to prevent any liability by the contractor.
7. Division 2-Sitework, page 5, A. General, Paragraph 4. The last line in this paragraph mentions drawing “PAD 2047-1A.” There is no PAD 2047-1A. The last sentence of Division 2-Sitework, page 5, A. General, Paragraph 4 refers to the box at the bottom center of PAD 2047-1 which shows the cable trench and the transition of the new washed rock from 1 inch to 4 inches.
8. The solicitation should not reference WAPA Construction Standard 2 Division 2 Sitework Section 2.11.1 Gravel Surfacing Sub Paragraph 1 (4). There is no reference to
2.11.1 in the PAD 2047 Specs or solicitation. The current reference is:
WAPA 2016 Construction Standards 2.11.3 WASHED CRUSHED ROCK:
1. MATERIAL: Washed crushed rock material, of the thickness specified, shall be used as finished grade material placed over road base. Washed crushed rock material shall conform to the following requirements:
(1) 100 percent shall pass the 1 1/2-inch screen.
(2) 0 percent shall pass the 3/4-inch screen.
(3) Washed crushed rock shall have a minimum of three fractured faces.
9. Grouting Mortar is to be used for the slurry spec. for work in 230kv yard area. See WAPA 2016 Construction Standards Paragraph 3.1.10.
3.1.10 GROUTING MORTAR:
1. GROUTING MORTAR: Grouting mortar shall be composed of cement, water, and sand. Cement, water, and sand shall be as specified in Section 3.1, "Concrete Requirements", except use sand passing a No. 16 screen when clearances prevent use of the specified grading. Mix grouting mortar in proportion of 1 part Portland cement to 2 1/2 parts sand, by weight, and to approved consistency.
D. Include the attached Bid Schedule.
E. Provide the following answers to contractor questions:
1. In the Project Specifications Division 2 Sitework Paragraph B makes reference to Bidding Schedule Items. We did not find a Bidding Schedule in the documents. Please advise. The Bid Schedule has been added in this amendment.
2. The General Wage Decision is for Arizona. The work appears to be in California. Please advise. The corrected wage rate is attached to this amendment.
3. In the Project Specifications Division 2 Sitework Paragraph B Sub Paragraph 1 b makes reference to repair of the existing ground grid. At the prebid we were told to only repair the ground grid that was damaged by us during construction. Please advise. See B5 above.
4. At the prebid we were told that excess gravel material could be stockpiled. Please provide a stockpile location. The best place is on the west side of the lower 161 kV yard, just south of the drive to the upper 161 kV yard.
5. In the Project Specifications Division 2 Sitework Paragraph B Sub Paragraph 3 c- “Survey of the existing ground grid to determine depth of scarification to eliminate destruction of the ground grid.” This seems to conflict with the Project Specifications Division 2 Sitework Paragraph A Sub Paragraph 3-“ New washed crushed rock will be loosely placed over currently exposed horizontal ground grid.” Also any scarification will destroy the existing ground grid. A visual survey is required by the contractor to locate and record any existing visible breaks or disconnection points in the exposed grid to prevent any liability by the contractor.
6. We have been advised by a local aggregate supplier that his material will not meet the PI requirement in WAPA Construction Standard 2 Division 2 Sitework Section 2.11.1 Gravel Surfacing Sub Paragraph 1 (4). Please advise. See B8 above.
7. Please explain the intent of the grounding scope of work. Is this only mentioned in case the contractor damages ground cable by accident and needs to repair it or is there a grounding scope; we are not understanding? See B5 above.
8. Who supplies material for grounding repairs, contractor or WAPA? See B5 above.
9. Please reference Division 2-Sitework, page 5, A. General, Paragraph 4. The last line in this paragraph mentions drawing “PAD 2047-1A” we are unable to locate this drawing.
We have located PAD 2047-1, please advise. See B7 above.
10. Please provide or direct us to the slurry spec. for work in 230kv yard area, 1 sack? 2 sack? See B9 above.
11. Will the contractor be responsible for any testing? If repairs must be done due to the contractor damaging the grid, the contractor is then responsible for testing the repaired section.
12. Please reference Division 2- Site work, B., 3., Line C, this line mentions scarification, can you please clarify the intent of your scarification scope. This survey is not needed and should not have been included.
F. The date and time set for receipt of quotes remains unchanged. The bid opening date is February 23, 2017, at 1400 MST.