05._IDIQ_1_Project_Drawings.pdf
PDF 8 MB Posted
- Attached to
- Facility Maintenance Services
- Solicitation number
- DE-SOL-0009769
About this file
Project Drawings Task Order 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 05._IDIQ__1_Project_Specifications.pdf | ||
| Contract_Clauses_and_Bid_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HURON O & M SERVICE CENTER
RENOVATION OF CONCRETE AND INSULATION
GARAGE/STORAGE BUILDING NO. 3
UPPER GREAT PLAINS REGION
SECTION C
DESCRIPTION/SPECIFICATIONS
Solicitation No. DE-SOL-0009769 Spec. No. 16WC117443-701
HURON O&M SERVICE CENTER
RENOVATION OF CONCRETE AND INSULATION
GARAGE/STORAGE BUILDING NO. 3
UPPER GREAT PLAINS REGION
DRAWINGS
A. GENERAL:
CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at:
https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: W here details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAW INGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omission.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. HU 0019 – Upper Great Plains Region (UGP) – Location Map
PHOTOGRAPHY:
2. HU T0001 – Building No. 3 – Garage and Storage Building – Aerial Photography
3. HU T0002 – Garage and Storage Building – Photographs (1 of 2)
4. HU T0003 – Garage and Storage Building – Photographs (2 of 2)
SITEWORK:
5. HU T0004 – Garage and Storage Building – Topography
6. HU 2002 – Garage and Storage Building – Grading Plan
7. HU 3016 Rev B FIO – Vehicle Storage Building – Floor Plan, Elevations, and Sections (For Information Only)
8. HU 3024 Rev C EI – Garage and Storage Building – Architectural Floor Plan (Existing Installation)
9. HU 3024 Rev D – Garage and Storage Building – Architectural Floor Plan
10. HU 3025 Rev B FIO – Garage and Storage Building – Architectural Elevations (For Information Only)
11. HU 3026 Rev C EI – General Underground Plan (Existing Installation)
12. HU 3026 Rev D – General Underground Plan
13. HU 3227 Rev A FIO – Civil - Utility Plan – Area B (For Information Only)
14. HU T0005 EI – Civil – Phase 2 – Demolition, Utility, Grading, and Paving Plan (Existing Installation)
15. HU T0006 EI – Civil – Utility Plan – Area B (Existing Installation)
16. HU T0007 EI – Civil – Drainage and Pavement Details (Existing Installation)
CONCRETE:
17. HU 3041 – Garage and Storage Building – Concrete Details
PHOTOGRAPHY:
18. HU T0008 – Garage and Storage Building – Photographs (1 of 2)
19. HU T0009 – Garage and Storage Building – Photographs (2 of 2)
BUILDING:
20. HU 3042 – Architectural – Wall and Roof Insulation Details
21. HU 3043 – Architectural – Wall and Roof Insulation Details
22. HU T0010 – Garage and Storage Building – Typical Purlin and Girt Dimensions
23. HU T0011 – Garage and Storage Building – Purlins and Girts (1 of 2)
24. HU T0012 – Garage and Storage Building – Purlins and Girts (2 of 2) https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx
HURON
HU
HU 3041
(HU)
(HU)
HURON MAINTENANCE
T0008HU
T0009HU
T0010HU
T0011HU
T0012HU
Message from the Administrator
At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
);;>- Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.
Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.
Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.
Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.
By integrating these principles into every task we take, together we can ensure Western is a safe place to work.