17._Attachment_A_Specifications.pdf

PDF 99 KB Posted

Attached to
Remove and Replace both AC/Heating Units and Condensing Units
Solicitation number
DE-SOL-0009329
Issued by

About this file

DE-SOL-0009329 - Attachment A Specifications

View the file

Other files

File Type Posted
17._DE-SOL-0009329_000002.pdf PDF
17._DE-SOL-0009329_000001.pdf PDF
17._RFQ_Letter.pdf PDF
17._DE-SOL-0009329.pdf PDF
17._Attachment_B_Foreign_National_Data_Card.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

Specifications

DE-SOL-0009329

DEPARTEMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

ROCKY MOUNTAIN REGION

WYOMING NEBRASKA MAINTENANCE OFFICE

Replace both AC/Heating units with “in kind” equipment at Boysen, Copper Mountain, and Pilot Butte Substations Specification

Basic Description

Remove all old AC/Heating and Condensing Units and install new “in Kind” equipment at Boysen, Copper Mountain, and Pilot butte substations located in Natrona County, Wyoming. There are currently two Lennox units at each substation. Test for proper operation and dispose of all old equipment. The replacements must be completed between April 1, 2016 – June 30, 2016.

Replace 6 existing Lennox AC/Heating units:

(2) 2.5 ton evaporator coils

(2) air handlers

(2) 8 kw electric heat kits

(2) complete line sets (current lines are not compatible with new refrigerant)

(2) 2.5 ton condensing units with low ambient kits

The existing ductwork, framing, and drain lines must be adapted to fit the new equipment.