Project_Specifications.pdf

PDF 352 KB Posted

Attached to
UGP Tower Raising Indefinite Delivery Indefinate Quantity
Solicitation number
DE-SOL-0008121
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Contract_Clauses_and_Bid_Schedule.pdf PDF
Project_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPPER GREAT PLAINS 230-KV DOUBLE CIRCUIT

STEEL LATTICE TOWER RAISES

Solicitation No. DE-SOL-0008121 Spec. No. 15WC110939-840

SECTION C

DESCRIPTION/SPECIFICATIONS

UPPER GREAT PLAINS REGION

SECTION C

DESCRIPTION/SPECIFICATIONS

UPPER GREAT PLAINS

230-KV DOUBLE CIRCUIT STEEL LATTICE TOWER RAISES

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

B. DESCRIPTION OF WORK:

C. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule items No. 1 – 2 to include the following:

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION:

2. SUBMITTAL APPROVAL TIME:

3. OUTAGE RESTRICTIONS:

4. CONSTRUCTION SCHEDULE RESTRICTIONS:

5. MAXIMUM AVAILABLE FAULT CURRENT:

E. CONSTRUCTION PROGRAM:

1. SUBMITTAL TIME:

2. FORMAT AND DETAIL:

F. CONSTRUCTION PLAN (Descriptive Literature):

1. The construction plan shall include but not be limited to the following items

G. MATERIAL:

1. GENERAL:

2. POINTS-OF-DELIVERY:

H. RIGHTS-OF-WAY:

1. GENERAL:

2. ACCESS EASEMENTS:

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

J. WATER FOR CONSTRUCTION PURPOSES:

K. SAFETY PROFESSIONAL/SUPERINTENDENT (Descriptive Literature):

1. SAFETY PROFESSIONAL/SUPERINTENDENT:

2. CONTRACTOR’S SAFETY AND HEALTH PROGRAM (Descriptive Literature):

L. EXPLOSIVES AND BLASTING:

M. SUBMITTALS:

1. GENERAL:

2. DESCRIPTIVE LITERATURE:

3. The Contractor shall submit for approval samples (where specifically required), shop drawings, manufacture’s brochures, engineering design data and test results, installation procedures, and all other supporting material

4. OTHER SUBMITTALS:

5. GENERAL:

6. APPROVAL TIME:

7. TRANSMITTAL:

DIVISION 4 - TRANSMISSION LINE LATTICE STRUCTURES

A. GENERAL

1. Work performed under this specification shall conform to the following:

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item "Fort Randall – Sioux City (FR-SC) 111/3" includes furnishing and installing the following:

2. Bidding Schedule item "Fort Randall – Sioux City (FR-SC) 119/2" includes installing the following:

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete the Upper Great Plains 230-kV double circuit steel lattice tower raises, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2013), Standard 13

– Environmental Quality Protection (September 2013), Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at http://www.wapa.gov/business/buys.htm.

Western Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

The principal components of work include raising two (2) existing double circuit steel lattice towers by installing mast extensions. The technique used must allow for the conductors to remain attached to the steel structures and the conductors to remain energized.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1 and 4 describe the work to be performed.

The work is located along transmission lines between substations near Sioux City, IA. Substation locations are shown on drawings FR 0015 and SC 0015. Specific transmission line structure locations are shown on drawings FR-SC D 0007 and 0008.

C. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule items No. 1 – 2 to include the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Providing a Construction Program

c. Providing a Safety and Health Program. (Descriptive Literature)

d. Providing a detailed Construction Plan outlining the process for installation of the mast extensions. (Descriptive Literature)

e. Complying with environmental standards (Standard 13 - Environmental Quality Protection).

f. Complying with DOE O 442.2, Differing Professional Opinions for Technical Issues

Involving Environment, Safety and Health

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION: Begin work within 10 calendar days after date of receipt of Notice to Proceed, and complete all work within 90 calendar days from the date of receipt of such notice.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar days for review of drawings or data submitted for approval.

3. OUTAGE RESTRICTIONS: In addition to the restrictions listed in the standard specifications, the following outage restrictions shall apply: Obtain outage restrictions from Region.

a. The electrical operation of the transmission lines are under the jurisdiction of Western’s

Watertown Operations Office. All outage requests by the Contractor shall be subject to the approval of the COR. Approval or denial of an individual outage request will be based on transmission system electrical loads, system operating configurations and weather conditions at the time the outage is scheduled to begin. At any time because of transmission system electrical loads, system operating configurations, weather conditions or any conditions which may cause an adverse effect on the transmission system operation or reliability, Western may deny an outage request or direct the Contractor to return facilities to operating conditions and release the applicable Special Work Permit.

b. Make all outage requests in writing to the COR a minimum of 3 weeks in advance. If during this time frame it is anticipated by the Contractor that there will be a delay in the ability to perform work on the scheduled day(s), the Contractor shall notify the COR as soon as practicable so a new outage date can be arranged.

4. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply:

a. First tower raise shall be FR – SC 119/2.

b. The contractor shall not perform work at more than 1 structure at any time. With submittal by the contractor of a request to the COR 2 weeks in advance of the planned work, Western may, based on available resources allow work to be performed at more than one structure. At no time shall the contractor be allowed on site without a Government representative present unless otherwise approved by the COR.

5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

A minimum of 1 - 2/0 ground shall be used to bond each section of the tower as they are separated and raised. The conductor shall not be grounded to the tower at any time, in order to prevent injury to the workers caused by a fault traveling through the tower sections.

No protective ground lead shall be longer than 36 feet in length, unless approved by COR.

Resistance values given in Personal Protective Grounds Test Report shall be less than or equal to those allowed in ASTM F 2249.

E. CONSTRUCTION PROGRAM:

1. SUBMITTAL TIME: Submit a Construction Program to the COR within 10 calendar days after date of Notice to Proceed.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.

F. CONSTRUCTION PLAN (Descriptive Literature):

1. The construction plan shall include but not be limited to the following items.

a. Provide a resume of all employees performing work on the job, include both prime and subcontractor employees. The resume shall include the employees past experience with the company submitting the bid, training they have had individually and with the company, years of experience in the field of work being bid under this contract, and prior jobs held.

b. The employees submitted at the time of bid shall remain on the contract unless given approval by the COR to be replaced,

c. Provide a list all equipment that will be used to complete the work outlined in the specification.

d. Provide a detailed description of the process that will be used to split the steel lattice tower, how it will be elevated to allow for placement of the new mast extension, and how the mast extension will be installed.

e. Provide conditions for the most severe weather in which work will be performed and for which construction loads will be analyzed. Also include how the process for which work can be safely left for a period of time in the event an unforeseen conditions halts work.

G. MATERIAL:

1. GENERAL: Furnish all material for completing the work, except material furnished by Western.

Western will furnish the material shown in Western Drawings FR-SC D 2201 and 2202.

Quantity is for one (1) tower and is to be used for lifting Fort Randall – Sioux City structure 119/2. Total estimated weight of this material is 1335 lbs. Material required to complete the installation that is not shown on Western drawings shall be furnished by the Contractor. It is the Contractor’s responsibility to verify proper fit-up of members prior to installation.

2. POINTS-OF-DELIVERY: Material furnished by Western has been delivered to Western’s facility at Sioux City, IA shown on drawing SC 0015. The Contractor shall load, transport, and unload the material to the jobsite. The Contractor shall inspect the material and report any damages to the COR.

H. RIGHTS-OF-WAY:

1. GENERAL: Transmission line right-of-way is 125-feet-wide, except at locations where guys and anchors require additional right-of-way. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line.

Orient construction methods and equipment to utilize Government-furnished rights-of-way. Any additional temporary access acquired by the Contractor shall have prior COR approval, since several areas of the transmission line have travel restricted areas.

No alterations are to be done to the existing right of way. This includes, but not limited to excavations, building of embankments, building of work pads, or removal of vegetation.

2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission line structure sites not accessible by traveling the transmission line.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.

J. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.

K. SAFETY PROFESSIONAL/SUPERINTENDENT (Descriptive Literature):

1. SAFETY PROFESSIONAL/SUPERINTENDENT: Prior to the submission of bids, the Contractor shall designate a competent Safety Professional/Superintendent who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous. The person shall be qualified by possession of a recognized degree, certificate, or professional standing; or one who, by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve or resolve problems relating to the subject matter, the work, or the project, and satisfactory to the COR. This person shall be onsite during all work phases, and at any time other contract personal are present. At no time shall the Safety Professional/Superintendent be in a working status on the ground or on the tower while other contractor employees are working. The sole intent of the position is to oversee the safety of the job, and direct the contractor’s staff on performing their duties in the safest manner possible. The effectiveness of the Safety Professional/Superintendent in executing the Contractor’s Safety Program will be subject to continued review and approval by the COR.

As a minimum, the Safety Professional/Superintendent shall perform the following safety duties:

a. Prepare/review all safety related plans required by these specifications (e.g., removal, structure erection, stringing, and Safety and Health Program).

b. Participate in, and prepare/review Job hazard Analysis (JHA) on unusual or recurring work processes.

c. Attend Pre-construction/Management Safety Awareness/Joint Policy Safety Meetings.

2. CONTRACTOR’S SAFETY AND HEALTH PROGRAM (Descriptive Literature): Shall also include designation of the Safety Professional with resume of qualifications, experience, and training as related to this subject.

L. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

M. SUBMITTALS:

1. GENERAL: The Contractor shall furnish submittals as specified in the construction standards and the project specifications. Table 1 “Submittal List” is provided for identification and tracking purposes but may not include all required submittals.

2. DESCRIPTIVE LITERATURE: The contractor shall furnish descriptive literature WITH THE BID as specified in Section L.11 (FAR 52.214-21) of this specification. Where specified and requested. The items to be submitted as descriptive literature are indicated throughout the specifications as follows (Descriptive Literature).

3. The Contractor shall submit for approval samples (where specifically required), shop drawings, manufacture’s brochures, engineering design data and test results, installation procedures, and all other supporting material.

4. OTHER SUBMITTALS: In addition to the submittals in Table 1, other submittals, including optional submittals, may be required in the construction standards and the project specifications.

5. GENERAL: The Contractor shall furnish submittals, other than the descriptive literature, via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include the specification number, Western project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email.

6. APPROVAL TIME: Approval time for submittals shall be in accordance with the

“Commencement, Prosecution, and Completion of Work” paragraph.

7. TRANSMITTAL: The Contractor shall transmit submittals to the Construction Office Engineer.

a. Construction Office Engineer:

Western Area Power Administration Western Construction Office Engineer ATTN: B5620.HU, Trevor Howard 200 4th Street SW Huron, South Dakota 57350-2474 Email: THoward@wapa.gov

TABLE 1

SUBMITTAL LIST

Key to symbols and abbreviations used in the table: NTP = notice to proceed (Task Order Execution);

NCR = Number of Copies Required

Item

Specs. Par

Submittal Required

NCR

Due Date

Tower Analysis Report

4.A.1.f

Analysis report showing tower member usages under construction loads.

Approval required prior to start of onsite construction

Shop and Erection Drawings

4.A.1.e

Shop and Erection drawings detailing fabrication of each structural member.

Approval required prior to start of fabrication.

DIVISION 4 - TRANSMISSION LINE LATTICE STRUCTURES

A. GENERAL

1. Work performed under this specification shall conform to the following:

a. Contractor shall be capable of installing mast extensions while all energized conductors and ground wires are attached to the structure.

b. No alterations are to be done to the existing right of way. This includes, but not limited to excavations, building of embankments, building of work pads, or removal of vegetation.

c. The Contractor is responsible for determining where temporary tower member support is required during mast extension installation and for providing and installing such support.

d. Towers shall not be modified except as shown on Western approved drawings or drawings furnished by the Contractor and accepted by Western. Any holes created in the field shall be coated with zinc rich paint.

e. The Contractor shall be responsible for detailing and fabricating all structural materials.

Members shall be detailed to minimize eccentricity. All tower members and hardware shall be galvanized in accordance with Construction Standard 4. Prior to fabrication, the Contractor shall submit shop drawings and erection drawings for approval. The Contractor shall have complete responsibility for proper fit of members. Upon request and after the contract is awarded, Western will furnish to the Contractor detailed shop drawings for existing Western towers.

f. The Contractor shall analyze Western’s structures for the most severe weather condition during all phases of construction. The Contractor shall submit a report of the analysis to include, at a minimum: the weather cases used, the phase of construction, and the maximum usage of each member tower member. Western will furnish TOWER models and PLS-CADD models upon request from the Contractor after the contract is awarded.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item "Fort Randall – Sioux City (FR-SC) 111/3" includes furnishing and installing the following:

a. Detailing, fabricating, and installing an 8’-0” mast extension and ladder extension as shown in Western drawings 43-205S2 2200-1 and 43-205S2 2200-2.

b. Analyzing structure for construction loads.

2. Bidding Schedule item "Fort Randall – Sioux City (FR-SC) 119/2" includes installing the following:

a. Verifying fit-up of government-furnished material prior to installation.

b. Installing an 8’-0” mast extension as shown in Western drawings FR-SC D 2200 and 2201.

c. Installing an 8’-0” ladder extension as shown in Western drawings FR-SC D 2200 and 2202.

d. Analyzing structure for construction loads.

e. See paragraph 1.G.1 for description of government-furnished material for this structure.

f. This structure has a line angle of approximately 3°. For this reason, Western will remove all conductors and ground wires from the structure prior to the mast extension installation.

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Mark A. Gabriel Administrator

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule items No. 1 – 2 to include the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Begin work within 10 calendar days after date of receipt of Notice to Proceed, and complete all work within 90 calendar days from the date of receipt of such notice.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar days for review of drawings or data submitted for approval.
3. OUTAGE RESTRICTIONS: In addition to the restrictions listed in the standard specifications, the following outage restrictions shall apply: Obtain outage restrictions from Region.
4. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply:
5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
A minimum of 1 - 2/0 ground shall be used to bond each section of the tower as they are separated and raised. The conductor shall not be grounded to the tower at any time, in order to prevent injury to the workers caused by a fault traveling through ...
No protective ground lead shall be longer than 36 feet in length, unless approved by COR. Resistance values given in Personal Protective Grounds Test Report shall be less than or equal to those allowed in ASTM F 2249.
E. CONSTRUCTION PROGRAM:
1. SUBMITTAL TIME: Submit a Construction Program to the COR within 10 calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. CONSTRUCTION PLAN (Descriptive Literature):
1. The construction plan shall include but not be limited to the following items.
G. MATERIAL:
1. GENERAL: Furnish all material for completing the work, except material furnished by Western. Western will furnish the material shown in Western Drawings FR-SC D 2201 and 2202. Quantity is for one (1) tower and is to be used for lifting Fort Rand...
2. POINTS-OF-DELIVERY: Material furnished by Western has been delivered to Western’s facility at Sioux City, IA shown on drawing SC 0015. The Contractor shall load, transport, and unload the material to the jobsite. The Contractor shall inspect th...
H. RIGHTS-OF-WAY:
1. GENERAL: Transmission line right-of-way is 125-feet-wide, except at locations where guys and anchors require additional right-of-way. Western does not represent that the Contractor can gain access to every structure site or travel continuously al...
Orient construction methods and equipment to utilize Government-furnished rights-of-way. Any additional temporary access acquired by the Contractor shall have prior COR approval, since several areas of the transmission line have travel restricted are...
No alterations are to be done to the existing right of way. This includes, but not limited to excavations, building of embankments, building of work pads, or removal of vegetation.
2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission ...
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. SAFETY PROFESSIONAL/SUPERINTENDENT (Descriptive Literature):
1. SAFETY PROFESSIONAL/SUPERINTENDENT: Prior to the submission of bids, the Contractor shall designate a competent Safety Professional/Superintendent who is capable of identifying existing and predictable hazards in the surroundings or working condit...
2. CONTRACTOR’S SAFETY AND HEALTH PROGRAM (Descriptive Literature): Shall also include designation of the Safety Professional with resume of qualifications, experience, and training as related to this subject.
L. EXPLOSIVES AND BLASTING:
M. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals as specified in the construction standards and the project specifications. Table 1 “Submittal List” is provided for identification and tracking purposes but may not include all required submittals.
2. DESCRIPTIVE LITERATURE: The contractor shall furnish descriptive literature WITH THE BID as specified in Section L.11 (FAR 52.214-21) of this specification. Where specified and requested. The items to be submitted as descriptive literature are in...
3. The Contractor shall submit for approval samples (where specifically required), shop drawings, manufacture’s brochures, engineering design data and test results, installation procedures, and all other supporting material.
4. OTHER SUBMITTALS: In addition to the submittals in Table 1, other submittals, including optional submittals, may be required in the construction standards and the project specifications.
5. GENERAL: The Contractor shall furnish submittals, other than the descriptive literature, via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (...
6. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.
7. TRANSMITTAL: The Contractor shall transmit submittals to the Construction Office Engineer.
DIVISION 4 - TRANSMISSION LINE LATTICE STRUCTURES
A. GENERAL
1. Work performed under this specification shall conform to the following:
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item "Fort Randall – Sioux City (FR-SC) 111/3" includes furnishing and installing the following:
2. Bidding Schedule item "Fort Randall – Sioux City (FR-SC) 119/2" includes installing the following: