21._Attachment_B_Drawings.pdf

PDF 5 MB Posted

Attached to
Shiprock Substation Stage 07 Federal contract opportunity
Solicitation number
DE-SOL-0008089
Issued by
Department of Energy Western Area Power Administration

About this file

Attachment B Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Shiprock Substation Stage 07, newest first.
File Type Posted
21._Amendment_000001.pdf PDF
21._Attachment_B_-_Revised_Drawings_.pdf PDF
21._Attachment_G_-_Shiprock_Site_Visit_Q A.pdf PDF
21._Attachment_H_-_Site_Visit_Attendance_Sheet.pdf PDF
21._DE-SOL-0008089.pdf PDF
21._Attachment_D_-_CRD_DPO.pdf PDF
21._Attachment_C__Wage_Determinations.pdf PDF
21._Attachment_E_Form_W3000-72.pdf PDF
21._Attachment_F_-_Bid _Performance _Payment_Bonds_-_Cover_Page.pdf PDF
21._Attachment_A_Specifications.pdf PDF
21._IFB_Letter-signed.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B Shiprock Substation Stage 07- Drawings 04/30/2015

DE- SOL-0008089

SHIPROCK SUBSTATION

STAGE 07

NEW MEXICO

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 821

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes.

These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. SHR 0015 Rev. D – Shiprock Substation Location and Vicinity Map

ELECTRICAL:

2. SHR 0001-1 Rev. H FIO – 345-KV Area Switching Diagram (Sheet 1 of 2) (For Information Only)

3. SHR 0001-2 Rev. E EI – 230KV and 115KV Areas Switching Diagram (Sheet 2 of 2) (Existing Installation)

4. SHR 0001-2 Rev. F – 230KV and 115KV Areas Switching Diagram (Sheet 2 of 2)

5. SHR 0010 Rev. L EI – General Plot Plan (Existing Installation)

6. SHR 0010 Rev. M – General Plot Plan

7. SHR 1000 Rev. I EI – 230KV Area Plan (Existing Installation)

8. SHR 1000 Rev. J – 230KV Area Plan

9. SHR 1004 Rev. K FIO – Key Grounding Plan (For Information Only)

10. SHR 1011 Rev. E FIO – XFMR KU1A Area Plan (For Information Only)

11. SHR 1019 Rev. E EI – 230KV and XFMR KU1A Area Sections A-A and B-B (Existing Installation)

12. SHR 1019 Rev. F – 230KV and XFMR KU1A Area Sections A-A and B-B

13. SHR 1020 Rev. D EI – XFMR KU1A Area Sections C-C and D-D (Existing Installation)

14. SHR 1020 Rev. E – XFMR KU1A Area Sections C-C and D-D

15. SHR 1040 Rev. E EI – 230KV Bus Structure Section B-B (Existing Installation)

16. SHR 1040 Rev. F – 230KV Bus Structure Section B-B

17. SHR 1043 Rev. B EI – 230KV Bus Structure Section E-E (Existing Installation)

18. SHR 1043 Rev. C – 230KV Bus Structure Section E-E

19. SHR 1516 EI – 230KV Area Grounding Plan (Existing Installation)

20. SHR 1516 Rev. A – 230KV Area Grounding Plan

21. SHR 1610-1 EI – 13.8/230/345KV Station Service Wiring Diagram (SH 1 of 3) (Existing Installation)

22. SHR 1610-1 Rev. A – 13.8/230/345KV Station Service Wiring Diagram (SH 1 of 3)

23. SHR 1610-2 Rev. A EI – 13.8/230/345KV Station Service Wiring Diagram (SH 2 of 3) (Existing Installation)

24. SHR 1610-2 Rev. B – 13.8/230/345KV Station Service Wiring Diagram (SH 2 of 3)

25. SHR 1715 EI – 230KV Area Conduit and Buried Cable Plan (Existing Installation)

26. SHR 1715 Rev. A – 230KV Area Conduit and Buried Cable Plan

PROTECTION & CONTROL SYSTEMS:

27. SHR T600 – Control Cable List

FOUNDATION AND STRUCTURAL DRAWING INDEX:

28. SHR 2051 Rev. M – Foundation/Structural Data and Drawings Index (Sheet 1of 2)

29. SHR 2052 Rev. J – Foundation/Structural Data and Drawings Index (Sheet 2 of 2)

SITEWORK:

30. SHR 2086 Rev. A FIO – Grading and Plot Plan (For Information Only)

CONCRETE:

31. SHR 2008 Rev. Q EI – General Foundation Plan (Existing Installation)

32. SHR 2008 Rev. R – General Foundation Plan

33. SHR 2009 Rev. N EI – Foundation Plan 230KV Area (Existing Installation)

34. SHR 2009 Rev. O – Foundation Plan 230KV Area http://www.wapa.gov/business/buys.htm

PROJECT DRAWINGS

35. SHR 2011 Rev. G FIO – Foundations Outline and Reinforcement (For Information Only)

36. SHR 2075 Rev. B FIO – Foundations Outline and Reinforcement (For Information Only)

37. SHR 2301 – Foundations Outline and Reinforcement

STEEL:

38. SHR 2022 Rev. B FIO – Steel Structures 230KV Capacitor Support (For Information Only)

39. SHR 2025 Rev. B FIO – Steel Structures 230KV Switch Support (For Information Only)

40. SHR 2550 Rev. A – Anchor Bolts

41. SHR 2603 – 230KV Bus Poles Type I

GEOLOGY:

42. SHR 8000 Rev. A – Logs of Exploration

43. SHR 8001 – Logs of Exploration

44. SHR 8002 – Logs of Exploration

45. SHR 8003 – Logs of Exploration

46. SHR 8004 – Logs of Exploration

47. SHR 8005 – Logs of Exploration

48. SHR 8006 – Logs of Exploration

49. SHR 8007 – Logs of Exploration

50. SHR 8008 – Logs of Exploration lampman Typewritten Text

FOR INFORMATION ONLY

FOR INFORMATION ONLY

FOR INFORMATION ONLY

Cover Page
Drawing List
gs_0015e
gs_0001p_fio
gs_1001g_ei
gs_1001h
gs_1014e_ei
gs_1014f
gs_1101
gs_1114e_ei
gs_1114f
gs_1500g_ei
gs_1500h
gs_1718g_ei
gs_1718h
gs_3017a_fio
gs_4050b
bpt_0015b
bpt_0001e_fio
bpt_1001c_ei
bpt_1001d
bpt_1012b_ei
bpt_1012c
bpt_1114b_ei
bpt_1114c
bpt_1130
bpt_1510b_ei
bpt_1510c
bpt_3000_fio
bpt_3001a_fio
bpt_4000d
sd_0015d
sd_0001_1d_fio
sd_0010h_ei
sd_0010i
sd_0011b_ei
sd_0011c
sd_1700d_ei
sd_1700e
41_1029f
41_1031f
sd_3000a_fio
sd_3002a_fio
sd_4006d
mid_0015b
mid_0001m_fio
mid_0010g_ei
mid_0010h
mid_1010e_ei
mid_1010f
mid_1101
mid_1110d_ei
mid_1110e
mid_1510d_ei
mid_1510e
mid_1514f_fio
mid_t170_fio
mid_3003a_fio
mid_3004a_fio
mid_t700
mid_t701
ccw_0015a
ccw_0001b_fio
ccw_1000a_ei
ccw_1000b
ccw_1010a_ei
ccw_1010b
ccw_1011_ei
ccw_1011a
ccw_1102
ccw_1111_ei
ccw_1111a
ccw_1114_ei
ccw_1114a
ccw_1710a_ei
ccw_1710b
ccw_1711_ei
ccw_1711a
ccw_3000a
ccw_3200_fio
ccw_3201_fio
pon_0015d
pon_0001d_fio
43_16_n_2200
43_16_t_2200
43_21_2011
43_21_2012
43_21_2201
43_21_a_2200
43_21_a_2201
43_21_d_2200
43_21_s_2200
43_21_s_2205
43_21_t_2200
43_21_x_2200
43_21_x_2200
41_6000c
41_6001c
41_6010d
41_6018e
41_6074a
41_6075b
41_6087a
41_6088a
41_6153
41_6168
bpt_gs_1002
bpt_gs_1003
bpt_gs_1004
bpt_sd_1002
bpt_sd_1003
bpt_sd_1004
cci_mid_1001
cci_mid_1002
cci_mid_1003
cci_mid_1004
cci_mid_4114b
cci_mid_4115b
cci_mid_4116b
cci_mid_4117b
cci_mid_4118b
cci_mid_4119b
cci_mid_4120b
cci_mid_4121b
cci_mid_4122b
cci_mid_4123b
cci_mid_4124b
cci_mid_4125b
cci_mid_4126b
cci_mid_4127b
cci_mid_4128b
cci_mid_4129b
cci_mid_4130b
cci_mid_4131b
gs_sd.min_pon_opgw_project_03-20-14_part2.pdf
cci_mid_4132b
cci_mid_4133b
cci_mid_4134b
cci_mid_4135b
cci_mid_4136b
cci_mid_4137b
cci_mid_4138b
cci_mid_4139b
cci_mid_4140b
cci_mid_4141b
cci_mid_4142b
cci_mid_4143b
cci_mid_4144b
cci_mid_4145b
cci_mid_4146b
cci_mid_4147b
cci_mid_4148b
cci_mid_4149b
cci_mid_4150b
cci_mid_4151b
cci_mid_4152b
cci_mid_4153b
cci_mid_4154b
cci_mid_4155b
cci_mid_4156b
cci_mid_4157b
cci_mid_4158b
cci_mid_4159a
cci_mid_4160b
cci_mid_4161b
cci_mid_4162b
cci_mid_4163b
cci_mid_4164b
gs_sd.min_pon_opgw_project_03-20-14_part3.pdf
cci_mid_4165b
cci_mid_4166b
cci_mid_4167b
cci_mid_4168b
cci_mid_4169b
cci_mid_4170b
cci_mid_4171b
cci_mid_4172b
cci_mid_4173c
cci_mid_4174b
cci_mid_4175b
cci_mid_4176b
cci_mid_4177b
cci_mid_4178b
cci_mid_4179b
cci_mid_4180b
cci_mid_4181b
cci_mid_4182b
cci_mid_4183b
cci_mid_4184b
cci_mid_4185b
cci_mid_4186b
cci_mid_4187b
cci_mid_4188b
cci_mid_4189b
cci_mid_4190b
cci_mid_4191b
cci_mid_4192b
cci_mid_4193b
cci_mid_4194b
cci_mid_4195b
cci_mid_4196b
gs_sd.min_pon_opgw_project_03-20-14_part4.pdf
cci_mid_4197b
cci_mid_4198b
cci_mid_4199b
cci_mid_4200b
cci_mid_4201b
cci_mid_4202b
cci_mid_4203b
cci_mid_4204b
cci_mid_4205b
cci_mid_4206b
cci_mid_4207b
cci_mid_4208b
cci_mid_4209b
cci_mid_4210b
cci_mid_4211b
cci_mid_4212b
cci_mid_4213b
cci_mid_4214b
cci_mid_4215b
bpt_gs_4000b
bpt_gs_4001b
bpt_gs_4002b
bpt_gs_4003a
bpt_gs_4004b
bpt_gs_4005a
bpt_gs_4006b
gs_sd.min_pon_opgw_project_03-20-14_part5.pdf
bpt_gs_4007a
bpt_gs_4008a
bpt_gs_4009b
bpt_gs_4010b
bpt_gs_4011a
bpt_gs_4012b
bpt_gs_4013b
bpt_gs_4014b
bpt_gs_4015b
bpt_gs_4016b
bpt_gs_4017a
bpt_sd_4000a
bpt_sd_4001b
bpt_sd_4002b
bpt_sd_4003b
bpt_sd_4004b
bpt_sd_4005b
bpt_sd_4006b
bpt_sd_4007b
bpt_sd_4008b
bpt_sd_4009b
bpt_sd_4010a
bpt_sd_4011b
bpt_sd_4012b
bpt_sd_4013b
bpt_sd_4014b
gs_sd.min_pon_opgw_project_03-20-14_part6.pdf
bpt_sd_4015b
bpt_sd_4016a
bpt_sd_4017b
bpt_sd_4018b
srh_review_dwgs_12_1_14.pdf
Cover Page
Drawing List
srh_0016
srh_0015
srh_2300
shr_2600
srh_2601
srh_2602
srh_2603
srh_2925
srh_2900
41_6010d_ei
srh_1000
frc_wan_0001_ei
frc_wan_4013b_ei
frc_wan_4013c
frc_wan_1004
srh_final_01_07_15.pdf
srh_0016
srh_0015
srh_2300
srh_2600
srh_2601
srh_2602
srh_2603
srh_2925
srh_2900
41_6010d_ei
41_6010d
srh_1000
frc_wan_0001_ei
frc_wan_0001
frc_wan_4013b_ei
frc_wan_4013c
frc_wan_1004
Sheridan Hill Tap Drawing List.pdf
A. GENERAL:
B. LIST OF DRAWINGS:
Following is a partial list of standard drawings that will be needed for this specification. The standard drawings are available at http://www.wapa.gov/business/buys.htm
shr_final_12_05_14.pdf
Cover page
Drawing List
shr_0015d
shr_0001_1h_fio
shr_0001_2e_ei
shr_0001_2f
shr_0010l_ei
shr_0010m
shr_1000i_ei
shr_1000j
shr_1004k_fio
shr_1011e_fio
shr_1019e_ei
shr_1019f
shr_1020d_ei
shr_1020e
shr_1040e_ei
shr_1040f
shr_1516_ei
shr_1516a
shr_1610_1_ei
shr_1610_1a
shr_1610_2a_ei
shr_1610_2b
shr_1715_ei
shr_1715a
shr_t600
shr_2051m
shr_2052j
shr_2086a_fio
shr_2008q_ei
shr_2008r
shr_2009n_ei
shr_2009o
shr_2011g_fio
shr_2075b_ei
shr_2301
shr_2022b_fio
shr_2025b_fio
shr_2550a
shr_2603
shr_8000a
shr_8001
shr_8002
shr_8003
shr_8004
shr_8005
shr_8006
shr_8007
shr_8008
shr_final_4_30_15.pdf
shr_0001_2h
shr_final_4_29_15
shr_final_2_23_15
Cover page
Drawing List
shr_0015d
shr_0001_1h_fio
shr_0001_2e_ei
shr_0010l_ei
shr_1000i_ei
shr_1004k_fio
shr_1011e_fio
shr_1019e_ei
shr_1019f
shr_1020d_ei
shr_1020e
shr_1040e_ei
shr_1043b_ei
shr_1043c
shr_1516_ei
shr_1610_1_ei
shr_1610_1a
shr_1610_2a_ei
shr_1610_2b
shr_1715_ei
shr_t600
shr_2051m
shr_2052j
shr_2086a_fio
shr_2008q_ei
shr_2008r
shr_2009n_ei
shr_2009o
shr_2011g_fio
shr_2075b_ei
shr_2301
shr_2022b_fio
shr_2025b_fio
shr_2550a
shr_2603
shr_8000a
shr_8001
shr_8002
shr_8003
shr_8004
shr_8005
shr_8006
shr_8007
shr_8008
shr_final_4_27_15
shr_0001_2g
shr_0010n
shr_1000k
shr_1040g
shr_1516b
shr_1715b

File details come from the government source that posted it. Updated .