21._Attachment_A_Specifications.pdf

PDF 471 KB Posted

Attached to
Shiprock Substation Stage 07 Federal contract opportunity
Solicitation number
DE-SOL-0008089
Issued by
Department of Energy Western Area Power Administration

About this file

Attachment A Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Shiprock Substation Stage 07, newest first.
File Type Posted
21._Attachment_B_-_Revised_Drawings_.pdf PDF
21._Attachment_G_-_Shiprock_Site_Visit_Q A.pdf PDF
21._Amendment_000001.pdf PDF
21._Attachment_H_-_Site_Visit_Attendance_Sheet.pdf PDF
21._Attachment_F_-_Bid _Performance _Payment_Bonds_-_Cover_Page.pdf PDF
21._Attachment_B_Drawings.pdf PDF
21._DE-SOL-0008089.pdf PDF
21._Attachment_D_-_CRD_DPO.pdf PDF
21._Attachment_C__Wage_Determinations.pdf PDF
21._Attachment_E_Form_W3000-72.pdf PDF
21._IFB_Letter-signed.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A Shiprock Substation Stage 07

- Specifications 04/29/2015

DE- SOL-0008089

SHIPROCK SUBSTATION

STAGE 07

Spec. No. 821

SECTION C

DESCRIPTION/SPECIFICATIONS

NEW MEXICO

SECTION C

DESCRIPTION/SPECIFICATIONS

SHIPROCK SUBSTATION STAGE 07

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT

B. DESCRIPTION OF WORK

1. Substation Civil

2. Substation Electrical

C. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1. Commencement and Completion

2. Submittal Approval Time

3. Commencement of Control Work

4. Outage Restrictions

5. Construction Schedule Restrictions

6. Maximum Available Fault Current

E. CONSTRUCTION PROGRAM

1. Submittal Time

2. Format and Detail

F. MATERIAL

1. Points-of-Delivery

G. RIGHTS-OF-WAY

1. General

H. GEOLOGIC INVESTIGATIONS

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES

J. WATER FOR CONSTRUCTION PURPOSES

K. EXPLOSIVES AND BLASTING

L. SUBMITTALS

1. General

2. Submittal Response

3. Approval Time

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Miscellaneous sitework”

2. Bidding Schedule item “Demolition”

3. Bidding Schedule does not contain separate items

DIVISION 3 – CONCRETE

A. GENERAL

1. Material

2. Test for Potential Reactivity of Sand and Coarse Aggregate

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Concrete foundations”

DIVISION 4 – SUBSTATION METALWORK

A. GENERAL

1. Government-Furnished Drawings

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Steel structures, welded (galvanized)”

DIVISION 9 – SUBSTATION ELECTRICAL

A. GENERAL

1. Bidding Schedule for Government-furnished items

2. Bidding Schedule for items furnished by the Contractor

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Power circuit breaker, 230-kV, 3,000 amp

(Government-furnished)”

2. Bidding Schedule item “Disconnecting switch, manual group-operated, 230-kV, 2,000 amp”

3. Bidding Schedule item “Associated outdoor electrical equipment and material”

4. Bidding Schedule items “Furnishing 5/c No. 10 AWG Control Cable” and “Furnishing 12/c

No. 10 AWG Control Cable”

5. Bidding Schedule items “Installing 5/c No. 10 AWG Control Cable” and “Installing 12/c

No. 10 AWG Control Cable”

6. Bidding Schedule item “Existing outdoor electrical equipment and material”

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION

1. Environmental Quality Protection

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete Shiprock Substation – Stage 07, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 2 – Sitework (September 2013), Standard 3 – Concrete (September 2013), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2013), Standard 9 – Substation Electrical (September 2013), Standard 13 – Environmental Quality Protection (September 2013), Standard 15 – Drawings (September 2013); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the Drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at http://www.wapa.gov/business/buys.htm.

Western Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1 “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 4, 9, and 13 describe the work to be performed.

The work is located near Waterflow, New Mexico as shown on Drawing SHR 0015.

The principal components of the work include the following:

1. SUBSTATION CIVIL:

a. Provide foundations and anchor bolts for substation structures and electrical equipment.

b. Demolition of existing foundations and removal of existing steel structures.

c. Provide galvanized steel structures.

2. SUBSTATION ELECTRICAL:

a. Install one (1) Government-furnished 230-kV power circuit breaker.

b. Furnish and install 230-kV disconnecting switches, high voltage bus, grounding system, conduit, and insulated cables.

c. Remove and dispose of existing electrical equipment consisting of one (1) 230-kV power circuit breaker, eight (8) 230-kV disconnecting switches, and one (1) 230-kV coupling capacitor voltage transformer.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Providing a Construction Program and a Safety and Health Program.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION: Begin work within (see Clause 52.211-10) days after date of receipt of Notice to Proceed, and complete all work within (see Clause 52.211-10) days from the date of receipt of such notice.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of Drawings or data submitted for approval.

3. COMMENCEMENT OF CONTROL WORK: Do not perform any outdoor equipment wiring until receipt of Government-furnished wiring diagrams. Western will furnish outdoor wiring diagrams no later than July 15, 2015. Include these restrictions in the construction program.

4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:

a. The Contractor shall complete all work associated with the KU1A breaker 1982 bay under one (1) 3-week outage.

b. The Contractor shall complete all work associated with the two (2) breaker bays under three (3) 230-kV main bus outages:

(1) The first outage the Contractor shall remove the jumpers located between 1983 and the 230-kV main bus.

(2) The second outage the Contractor shall install the jumpers located between 1983 and the 230-kV main bus and remove the jumpers located between 1583 and the 230-kV main bus.

(3) The third outage the Contractor shall install the jumpers located between 1583 and the 230-kV main bus.

c. The Contractor shall complete all work associated with replacing switch 1283 and 1285 under two (2) 230-kV main bus outages and one (1) KV1A and transfer bus outage.

(1) The first outage the Contractor shall remove the jumpers located between 1283 and the 230-kV main bus.

(2) The second outage the Contractor shall replace switches 1283 and 1285 under the KV1A and transfer bus outage.

(3) The third outage the Contractor shall install the jumpers located between 1283 and the 230-kV main bus.

5. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply:

a. The Contractor shall complete all work associated with the KU1A breaker 1982 bay prior to work associated with 1586 breaker bay. The Contractor shall complete all work associated 1586 breaker bay prior to work associated with replacing switches 1283 and 1285,

b. The Contractor shall not work more than 60-hours in one (1) calendar week without prior approval from the Contracting Officer Representative (COR).

6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current in the 230-kV area is 16,022 amps and the X/R ratio is 16.3 prior to completing construction and 16,022 amps and the X/R ratio is 16.3 after completing construction.

b. A minimum of one (1) 1/0 AWG ground lead shall be used in the 230-kV area.

c. No protective ground lead shall be longer than 36-feet in length, unless approved by the COR. Resistance values given in Personal Protective Grounds Test Report shall be less than or equal to those allowed in ASTM F 2249.

E. CONSTRUCTION PROGRAM:

1. SUBMITTAL TIME: Submit a construction program to the COR within 45-calendar days after date of Notice to Proceed.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.

F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERYDATE

ESTIMATED

COST

1. One (1) 3-phase, power circuit breaker, 230-kV, 3,000 amp 11,100 Delivered January 2015 $125,000

NST – No sooner than.

NLT – No later than.

1. POINTS-OF-DELIVERY: The 230-kV power circuit breaker furnished by Western will be delivered to Shiprock Substation and unloaded by the supplier.

G. RIGHTS-OF-WAY:

1. GENERAL: Orient construction methods and equipment to utilize Government-furnished rights-of-way, or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prior COR approval. During the contract period, Western reserves the right to use Contractor-obtained access.

H. GEOLOGIC INVESTIGATIONS:

Geologic logs of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the Drawings.

Samples and cores of recovered material were not retained. Bidders shall obtain their own samples and perform tests on the material to evaluate properties, which they believe to be significant.

Western does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Electric power up to a maximum of approximately 25-kVA for construction purposes will be available without cost. Source of supply is located in the receptacles throughout the substation. The Contractor may furnish power for his operations by other means. Power made available by Western will be delivered as single-phase, 60 Hz, AC, at approximately 120-240 V.

J. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.

K. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

L. SUBMITTALS:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include the Western contract number (DE-WA000XXXX), Western project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. Multiple CLIN’s on a single submittal are not permitted. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email. Email submittals shall be delivered to: RMR-J5600-CS@wapa.gov.

2. SUBMITTAL RESPONSE: Western will return all submittals electronically with an “Approved” or “Not Approved” status with comments as appropriate to the email address where the submittal originated.

3. APPROVAL TIME: Approval time for submittals shall be in accordance with the

“Commencement, Prosecution, and Completion of Work” paragraph.

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Miscellaneous sitework” includes the following:

a. Clearing and grubbing.

b. Replacing and protecting existing gravel surfacing.

c. Providing a soil-applied herbicide where gravel surfacing is placed.

2. Bidding Schedule item “Demolition” includes the following:

a. Completely removing the following concrete foundations designated on Existing

Installation Drawing SHR 2009 EI.

(1) 4EA of 3CB8.

(2) 4EA of SS1.

(3) 2EA of CS1.

b. Removing the following structures:

(1) 230-kV instrument transformer VZ7A1.

(2) 230-kV disconnecting switch YZ7A-ZZ7A, complete with platform.

(3) Platform for circuit breaker JZ11A.

Drawings SHR 2022 and SHR 2025 are included showing existing structure details and SHR 2011 and SHR 2075 show existing foundation details.

3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Excavations for foundations, structures, and trenches.

b. Placing and compacting earth material and backfill.

c. Providing gravelfills under concrete foundations as shown on the foundation drawings.

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

a. Cement: Type IIA cement.

b. Compressive Strength: 4000 psi at 28-days for substation concrete.

c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed .45 by weight.

d. Type A and D water-reducing and retarding admixtures may be used if approved by the

COR.

e. Use of fly ash if readily available.

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used. Perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source will be obtained by the Contractor.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Concrete foundations” includes the following:

a. Earthwork, formwork, reinforcement, material used in concrete, void forming material, drilling and grouting anchor bars, anchor bolts, curing, finishing, joints, and other related work and material needed to complete the concrete construction.

b. Concrete foundations for steel structures shown on SHR 2301.

c. Concrete foundations for electrical equipment shown on SHR 2301.

Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing SHR 2052. If separate quantities of formed and auger concrete for each type of foundation are shown on the Drawing, the concrete quantity shall be the total of the formed and auger concrete quantities. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on the Drawing.

DIVISION 4 – SUBSTATION METALWORK

A. GENERAL:

1. GOVERNMENT-FURNISHED DRAWINGS: Except for the standard drawing listed below, existing shop drawings for steel structures are not available.

1. Bidding Schedule item “Steel structures, welded (galvanized)” includes providing the following:

a. Three (3) 230-kV Bus Poles – Type I*.

b. Equipment cabinet platforms as follows, including gratings and concrete foundations.

(1) One (1) – Type III for the 230-kV Circuit Breaker (JZ11A) (31 2044).

*Denotes structures requiring approval drawings.

The above material including connection bolts, nuts, washers, and lock nuts shall be galvanized and dulled. Drawing 31 2044 is included in the standard drawings available at http://www.wapa.gov/business/buys.htm.

DIVISION 9 – SUBSTATION ELECTRICAL

A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES”

Standard Equipment Specifications, as shown on Project Drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal Specifications and Standards as applicable. Applicable requirements shall be met under the following service conditions:

Ambient Temperatures:

Maximum ............................................................................................ +40°C Maximum 24-Hour Average ................................................................ +30°C Minimum .............................................................................................. -40°C

Elevation:

Above Mean Sea Level ............................................................... 5,360-Feet

*ASCE-7 Wind Load:

Minimum Basic Wind Speed ............................................................ 90 MPH Importance Factor.................................................................................. 1.15

*IEEE 693 Seismic Qualification:

Performance Level................................................................................. Low

*Wind and seismic loads are non-simultaneous.

1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide:

a. Unless otherwise indicated, unloading and inspecting of Government-furnished items.

b. Installing Government-furnished items as shown on the Drawings.

c. Additional equipment and material as necessary to complete the installation.

2. Bidding Schedule for items furnished by the Contractor shall include the following:

a. Providing (furnishing and installing) bid items.

b. Additional equipment and material as necessary to complete the installation.

c. Installing bid items as shown on the Drawings.

d. Associated support structures provided for electrical equipment rated above 7-kV shall be

102-inches in height and hot-dip galvanized, if made of steel (unless otherwise specified).

If tubular steel supports are furnished, they shall be galvanized internally and externally.

e. Installation and painting of electrical equipment and material shall be provided in accordance with Western Construction Standards 9 and 12 respectively.

1. Bidding Schedule item “Power circuit breaker, 230-kV, 3,000 amp (Government-furnished)” includes furnishing equipment and material not furnished by Western and installing the following Government-furnished power circuit breaker:

DESIGNATION JZ11A

Manufacturer Mitsubishi

Type SF6 Gas

Nominal Voltage Rating (kV) 230

Maximum Voltage Rating (kV) 245

Amps (Continuous) 3,000

Fault Interrupter Rating (Amps) 40,000 Multiratio Current Transformer, each bushing (Amps) 2-3000:5

Multiratio Current Transformer Thermal Rating Factor 1.5

Rated Interrupting Time 3 cycles

Basic Impulse Insulation Level 900 kV Estimated weight of 3-pole breaker

(LBS) 11,100

a. The equipment supplier will unload the 230-kV power circuit breaker from the truck and

Contractor personnel shall inspect the circuit breaker for damage during shipment and immediately report any damage to the COR.

b. Special tools and appliances and spare parts will be furnished with the power circuit breaker that will include, but are not limited to the following (a complete list will be included with the breaker instruction books):

(1) One (1) set of special tools and appliances will include one (1) mechanism jacking unit and one (1) SF6 gas breaker filling connection assembly (including hose, pressure gauge, and the hose end connections to the breaker and SF6 gas cylinder). The Contractor shall deliver the special tools and appliances furnished with the breaker to Western’s onsite representative after the circuit breaker has been installed.

(2) One (1) set of spare parts will include three (3) trip coils, three (3) close coils, and one (1) spring charging motor. The Contractor shall deliver the spare parts furnished with the breaker to Western’s onsite representative after the circuit breaker has been installed.

2. Bidding Schedule item “Disconnecting switch, manual group-operated, 230-kV, 2,000 amp” includes providing the following disconnecting switches as shown on the Drawings and in accordance with WAPA ES 8.1 Equipment Standard:

DESIGNATION

WZ1A, WZ1B, WZ7A,

YZ7B, WZ11A, YZ11A,

YZ11B

Type 3-pole, single throw, outdoor, vertical break, rotating insulator

System Nominal Voltage Rating (kV) 230

Rated Maximum Voltage (kV) 245

Basic Impulse Insulation Level (kV) 1050

Continuous Current Rating (Amps) 2,000

Momentary Current Rating (kA) 100

Grounding Blades None

Phase Spacing (FT) 11’-0”

Mounting Position Horizontal

Key Interlock None

a. The Contractor shall coordinate with their equipment supplier the mounting and group-operated switch retrofit to the existing support structures.

3. Bidding Schedule item “Associated outdoor electrical equipment and material” includes furnishing and installing the following substation installations as shown on the Drawings:

a. Grounding System: Complete the substation grounding system. Splices, connections and other fittings may be compression type (DMC Power’s Swage or equal). Due to ongoing copper theft problems, all new exposed ground wire shall be copper clad steel.

NOTE: The included drawings and standards have not been revised to show this new requirement.

b. Insulated Conductors and Cables: Includes all insulated conductors and cables except

5/c No. 10 AWG and 12/c No.10 AWG control cable, which are covered under separate bidding items.

c. Electrical Conduit System: Includes embedded and exposed conduit. Conduit entering the cable trench with a 90 degree bend is allowed to be Schedule 40 PVC as shown on standard Drawing 31 1006. All other 90 degree bends shall be rigid metal. All conduits shall have sealing compound installed at both ends.

d. Outdoor Bus System: Outdoor strain and jumper buses, rigid buses, splices, elbows, pad-type terminal connectors and other fittings may be compression type (DMC Power’s Bus and Cable Connectors and Swage System or equal). Station post insulators for new structures shall use industry standard 3-, 5-, or 7-inch base cap bolt circles in lieu of WAPA Standard 9.3.1.1.3.2 and Drawing 31 1081. Replacement insulators shall match existing bolt circles. Insulators shall be ANSI 70 gray.

e. Identification Signs:

(1) Equipment Identification Signs: Signs shall be in accordance with Standard Drawing 31 1000. Lettering on the signs shall be as follows:

(a) XFMR KU1A

SHR 1981

DISC SW YZ11A 230KV

(b) XFMR KU1A

SHR 1982

PCB JZ11A 230KV

(c) MAIN BUS

SHR 1983

DISC SW WZ11A 230KV

(d) TRANSFER BUS

SHR 1985

DISC SW YZ11B 230KV

(e) MAIN BUS

SHR 1583

DISC SW WZ7A 230KV

(f) TRANSFER BUS

SHR 1585

DISC SW YZ7B 230KV

4. Bidding Schedule items “Furnishing 5/c No. 10 AWG Control Cable” and “Furnishing

12/c No. 10 AWG Control Cable” include furnishing 5/c No. 10 and 12/c No. 10 control cable, respectively for new electrical equipment.

5. Bidding Schedule items “Installing 5/c No. 10 AWG Control Cable” and “Installing 12/c

No. 10 AWG Control Cable” include installing 5/c No. 10 and 12/c No. 10 control cable, respectively, for new electrical equipment. The Contractor shall install the cables in the conduit and cable trench between the outdoor equipment and control panels according to Drawing SHR T600. All control cables shall be labeled according to Drawing SHR T600 and Standard 9

– Substation Electrical (September 2013), paragraph 9.2.3.2 (6), and shall be able to reach the furthest point in the designated control panel plus an additional 10-feet. At the outdoor equipment cabinets, the control cables shall be able to reach the furthest point in the cabinets.

The Contractor shall only terminate the outdoor equipment end of the control cables.

6. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removing and disposing of the following existing outdoor electrical equipment and material:

a. Material to be removed and disposed:

(1) Seven (7) 230-kV disconnecting switches designated WZ1A, WZ1B, WZ7A, YZ7B, WZ11A, YZ11A, and YZ11B.

(2) One (1) 230-kV disconnecting switch with ground blades designated YZ7A-ZZ7A.

(3) One (1) 230-kV power circuit breaker designated JZ11A.

(4) One (1) 230-kV coupling capacitor voltage transformer designated VZ7A1.

(5) Substation Control and Power Cables: All portions of cables, including those that are direct buried shall be removed and disposed of. Western will disconnect control cables in the service building prior to removal.

(6) Miscellaneous aluminum tubing, aluminum conductor, porcelain insulators, conduit, and exposed and buried ground cables.

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION:

1. ENVIRONMENTAL QUALITY PROTECTION: The Bidding Schedule does not contain separate items for the following. Include these items in the applicable Bidding Schedule items.

a. Environmental Requirements (See Section 13.2 of Standard).

b. Landscape Preservation (See Section 13.3 of Standard).

c. Preservation of Cultural Resources (See Section 13.4 of Standard).

d. Noxious Weed Control (See Section 13.5 of Standard).

e. Recycled Material Quantities (See Section 13.6 of Standard).

f. Use of Products Containing Recovered Materials (See Section 13.7 of Standard).

g. Disposal of Waste Material (See Section 13.8 of Standard).

h. Contractor’s Liability for Regulated Material Incidents (See Section 13.9 of Standard).

i. Pollutant Spill Prevention, Notification, and Cleanup (See Section 13.10 of Standard).

j. Pesticides (See Section 13.11 of Standard).

k. Treated Wood Poles and Members Recycling or Disposal (See Section 13.12 of Standard).

l. Prevention of Air Pollution (See Section 13.13 of Standard).

m. Prevention of Water Pollution (See Section 13.16 of Standard).

n. Conservation of Natural Resources (See Section 13.19 of Standard).

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each

Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Mark A. Gabriel Administrator

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BID ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Begin work within 10-calendar days after date of receipt of Notice to Proceed, and complete all work within 365-calendar days from the date of receipt of such notice.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 21-calendar days for review of drawings or data submitted for approval.
3. OUTAGE RESTRICTIONS: In addition to the restrictions listed in the standard specifications, the following outage restrictions shall apply:
Outages for all transmission line sections will be issued between February 1, 2015 and May 30, 2015 only. All work requiring any transmission line outage shall be completed during this time.
4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized to carry the maximum available fault current in accordance with the Standard 1 – General Requirements, Section 1.4 “Safety and H...
E. CONSTRUCTION PROGRAM:
1. SUBMITTAL TIME: Submit a Construction Program to the COR within 30-calendar days after date of Notice to Proceed.
F. RIGHTS-OF-WAY:
1. GENERAL: Transmission lines right-of-way is 125-feet wide for the Currecanti (CCI) – MID 230-kV transmission line and 75-feet wide for the BPT – SD and BPT – GS 115-kV transmission lines, except at locations where guys and anchors require addition...
2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission ...
3. WORK ON THE RIGHT-OF-WAY:
G. GEOLOGIC INVESTIGATIONS:
H. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
I. WATER FOR CONSTRUCTION PURPOSES:
J. CONTRACTOR COMMUNICATIONS:
K. EXPLOSIVES AND BLASTING:
L. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals as specified in Construction Standards and Project Specifications.
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.
3. ADDRESSES: The Contractor shall transmit submittals to the following addresses:
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Removing existing transmission line” includes the following:
2. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 4 – TRANSMISSION LINE LATTICE STRUCTURES
A. DESCRIPTION OF BID ITEM:
1. Bidding Schedule item “Modifying steel structures” includes providing the following:
DIVISION 7 – WOOD POLE STRUCTURES
A. DESCRIPTION OF BID ITEM:
1. Bidding Schedule item “Modifying wood structures” includes providing the following:
DIVISION 9 – SUBSTATION – ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s Electrical Equipment Standards (WAPA ES), as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal specifications an...
1. Bidding Schedule items shall be furnished by the Contractor and shall include the following:
2. Installation and painting of electrical equipment and material shall be provided in accordance with Standards 9 and 12 respectively.
B. DESCRIPTION OF BID ITEM:
1. Bidding Schedule item “Furnish and install fiber optics” includes determining lengths, furnishing and installing conduit, fiber optic distribution cable (FODC), inner-duct, and patch panels, terminating the FODC and connecting it to the installed p...
1) CAUTION.
2) BURIED COMMUNICATION CABLE.
3) WESTERN AREA POWER ADMINISTRATION.
1) For BPT:
FIBER OPTIC
SPLICE ENCLOSURE
OY6A
FIBER OPTIC
SPLICE ENCLOSURE
OY5A
2) For GS:
FIBER OPTIC
SPLICE ENCLOSURE
OY6A
3) For MID:
FIBER OPTIC
SPLICE ENCLOSURE
OV2A
4) For CCW:
FIBER OPTIC
SPLICE ENCLOSURE
OV1A
FIBER OPTIC
SPLICE ENCLOSURE
OV3A
5) For PON:
DIVISION 10 – TRANSMISSION LINE ELECTRICAL
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule items for “Furnishing and installing optical overhead ground wire assemblies, complete with suspension clamp or bolted deadend, suitable for 0.465-inch and 0.472-inch diameter optical overhead ground wire with armor rods” includes ...
2. Bidding Schedule item “Furnish and install 0.465-inch diameter, 48-fiber optical overhead ground wire” includes furnishing and stringing, sagging, clipping in and deadending the OPGW and furnishing and installing material to complete the optical ov...
3. Bidding Schedule item “Furnish and install 0.472-inch diameter, 48-fiber optical overhead ground wire” includes furnishing and stringing, sagging, clipping in, and deadending the OPGW and furnishing and installing material to complete the OPGW inst...
4. Bidding Schedule item “Furnish and install optical splice enclosures” includes determining the number and location of optical splice enclosures along the transmission line based on reel lengths and set-ups, furnishing material, and performing work ...
5. Bidding Schedule item “Furnish and install spiral-type vibration dampers for 0.465-inch and 0.472-inch diameter optical overhead ground wire” includes determining the number of vibration dampers needed, furnishing material, and performing all work,...
6. Bidding Schedule item for “Furnishing and installing line marking devices” includes furnishing and installing markers on the overhead ground wires. The line marking devices shall be installed in the spans ahead and back of Structure numbers 277, 2...
7. Bidding Schedule item “Spare parts” includes furnishing the following material:
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. DESCRIPTION:
1. The Bidding Schedule does not contain separate items for Environmental Quality Protection. Include this work in applicable Bidding Schedule items.
B. SPECIAL REQUIREMENTS:
1. The following requirements must be observed for the Gering-Sidney and Midway-Poncha OPGW Installation project.
Attachment A 12 2 14.pdf
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BID ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Begin work within 30-calendar days after date of receipt of Notice to Proceed, and complete all work within 400-calendar days from date of receipt of such notice.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of drawings or data submitted for approval.
3. OUTAGE AND CONSTRUCTION SCHEDULE RESTRICTIONS: In addition to the restrictions listed in the standard specifications, the following outage and construction schedule restrictions shall apply:
4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
E. CONSTRUCTION PROGRAM:
1. SUBMITTAL TIME: Submit a construction program to the COR within 45-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. MATERIAL: Furnish all material for completing the work.
G. RIGHTS-OF-WAY:
1. GENERAL: Typical transmission line right-of-way for 115-kV transmission lines is 75-feet-wide. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line. Orient cons...
2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission ...
3. WORK ON THE RIGHT-OF-WAY:
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. EXPLOSIVES AND BLASTING:
L. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals as specified in the construction standards and the project specifications.
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.
3. ADDRESSES: The Contractor shall transmit submittals to the following addresses:
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Removing existing single-circuit 115-kV wood transmission line structure 12/7” includes the following:
2. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used.
B. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Concrete foundations” includes the following:
DIVISION 4 – SUBSTATION METALWORK
A. GENERAL:
1. GOVERNMENT-FURNISHED DRAWINGS: Existing shop drawings for steel structures are not available.
2. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Steel structures, welded (galvanized)” will be made on the basis of weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, ex...
B. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Steel structures, welded (galvanized)” includes furnishing and installing the following materials:
DIVISION 9 – SUBSTATION - ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES” Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal specifications...
1. Bidding Schedule for items shall be furnished by the Contractor and shall include the following:
B. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule items “Disconnecting switch, 115-kV, 1,200 amps” and “Disconnecting switch, 115-kV, 1,200 amps, with vacuum bottles mounted” includes providing switches in accordance with WAPA ES 8.1 equipment standard.
2. Bidding Schedule items “Associated and miscellaneous equipment and material” includes providing equipment, material, and services required to complete the following tap installations as shown on the drawings:
DIVISION 10 – TRANSMISSION LINE ELECTRICAL
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item for “Approach spans” includes furnishing material and performing work and tests to provide insulator assemblies shown on Drawing 41 1022. An estimate of material quantities for each type of structure is shown in table below.
2. Bidding Schedule item for “Approach spans” includes furnishing material and performing work and tests to provide overhead ground wire assemblies shown on Drawing 41 1018. An estimate of material quantities for each type of structure is shown in ta...
3. Bidding Schedule item for “Approach spans” includes furnishing material and performing work to provide structure grounds.
4. Bidding Schedule item for “Approach spans” include, stringing, splicing, repairing, sagging, and clipping in the conductors; installing jumper loops; and installing material to complete the conductor installations, except for material furnished and...
5. Bidding Schedule item for “Approach spans” include, stringing, splicing, sagging, and clipping in the overhead ground wires, as described; and installing material to complete the overhead ground wire installations, except for material furnished and...
6. Bidding Schedule item for “Approach spans” include determining the number of vibration dampers needed, furnishing material, and performing all work, including testing, required to furnish and install vibration dampers for ACSR conductors and steel-...
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION – RMR
A. GENERAL:
1. GENERAL REQUIREMENTS:
Sheridan Hill Tap spec final 1-14-15.pdf
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BID ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Begin work within 30-calendar days after date of receipt of Notice to Proceed, and complete all work within 140-calendar days from date of receipt of such notice.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of drawings or data submitted for approval.
3. OUTAGE AND CONSTRUCTION SCHEDULE RESTRICTIONS: In addition to the restrictions listed in the standard specifications, the following outage and construction schedule restrictions shall apply:
4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
E. CONSTRUCTION PROGRAM:
1. SUBMITTAL TIME: Submit a construction program to the COR within 45-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. MATERIAL: Furnish all material for completing the work.
G. RIGHTS-OF-WAY:
1. GENERAL: Typical transmission line right-of-way for 115-kV transmission lines is 75-feet-wide. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line. Orient cons...
2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line and some off right-of-way (ROW) access along the transmission line. This off ROW access route is to provide access to the transmission lin...
3. WORK ON THE RIGHT-OF-WAY:
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. EXPLOSIVES AND BLASTING:
L. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals s...
2. SUBMITTAL RESPONSE: Western will return all submittals electronically with an “Approved” or “Not Approved” status with comments as appropriate to the email address where the submittal originated.
3. APPROVAL TIME: Approval time for submittals shall be in accordance with the "Commencement, Prosecution, and Completion of Work" paragraph.
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Removing existing single-circuit 115-kV wood transmission line structure 12/7” includes the following:
2. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used.
B. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Concrete foundations” includes the following:
DIVISION 4 – SUBSTATION METALWORK
A. GENERAL:
1. GOVERNMENT-FURNISHED DRAWINGS: Existing shop drawings for steel structures are not available.
2. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Steel structures, welded (galvanized)” will be made on the basis of weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, ex...
B. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item “Steel structures, welded (galvanized)” includes furnishing and installing the following materials:
DIVISION 9 – SUBSTATION - ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES” Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal specifications...
1. Bidding Schedule items shall include the following:
B. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule items “Disconnecting switch, 115-kV, 1,200 amps” and “Disconnecting switch, 115-kV, 1,200 amps, with vacuum bottles mounted” includes providing switches in accordance with WAPA ES 8.1 Equipment Standard.
2. Bidding Schedule items “Associated and miscellaneous equipment and material” includes providing equipment, material, and services required to complete the following tap installations as shown on the drawings:
DIVISION 10 – TRANSMISSION LINE ELECTRICAL
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule item for “Approach spans” includes:
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. GENERAL:
1. GENERAL REQUIREMENTS:
SHR07-Compiled (2) (2).pdf
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
1. SUBSTATION CIVIL:
2. SUBSTATION ELECTRICAL:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Begin work within 10-calendar days after date of receipt of Notice to Proceed, and complete all work within 180-calendar days from the date of receipt of such notice.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of Drawings or data submitted for approval.
3. COMMENCEMENT OF CONTROL WORK: Do not perform any outdoor equipment wiring until receipt of Government-furnished wiring diagrams. Western will furnish outdoor wiring diagrams no later than July 15, 2015. Include these restrictions in the construc...
4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:
5. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply:
6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
E. CONSTRUCTION PROGRAM:
1. SUBMITTAL TIME: Submit a construction program to the COR within 45-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:
1. POINTS-OF-DELIVERY: The 230-kV power circuit breaker furnished by Western will be delivered to Shiprock Substation and unloaded by the supplier.
G. RIGHTS-OF-WAY:
1. GENERAL: Orient construction methods and equipment to utilize Government-furnished rights-of-way, or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prio...
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. EXPLOSIVES AND BLASTING:
L. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals s...
2. SUBMITTAL RESPONSE: Western will return all submittals electronically with an “Approved” or “Not Approved” status with comments as appropriate to the email address where the submittal originated.
3. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Miscellaneous sitework” includes the following:
2. Bidding Schedule item “Demolition” includes the following:
3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used. Perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be u...
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Concrete foundations” includes the following:
DIVISION 4 – SUBSTATION METALWORK
A. GENERAL:
1. GOVERNMENT-FURNISHED DRAWINGS: Except for the standard drawing listed below, existing shop drawings for steel structures are not available.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Steel structures, welded (galvanized)” includes providing the following:
DIVISION 9 – SUBSTATION ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES” Standard Equipment Specifications, as shown on Project Drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal Specifications...
1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide:
2. Bidding Schedule for items furnished by the Contractor shall include the following:
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Power circuit breaker, 230-kV, 3,000 amp (Government-furnished)” includes furnishing equipment and material not furnished by Western and installing the following Government-furnished power circuit breaker:
2. Bidding Schedule item “Disconnecting switch, manual group-operated, 230-kV, 2,000 amp” includes providing the following disconnecting switches as shown on the Drawings and in accordance with WAPA ES 8.1 Equipment Standard:
3. Bidding Schedule item “Associated outdoor electrical equipment and material” includes furnishing and installing the following substation installations as shown on the Drawings:
4. Bidding Schedule items “Furnishing 5/c No. 10 AWG Control Cable” and “Furnishing 12/c No. 10 AWG Control Cable” include furnishing 5/c No. 10 and 12/c No. 10 control cable, respectively for new electrical equipment.
5. Bidding Schedule items “Installing 5/c No. 10 AWG Control Cable” and “Installing 12/c No. 10 AWG Control Cable” include installing 5/c No. 10 and 12/c No. 10 control cable, respectively, for new electrical equipment. The Contractor shall install t...
6. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removing and disposing of the following existing outdoor electrical equipment and material:
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. DESCRIPTION:
1. ENVIRONMENTAL QUALITY PROTECTION: The Bidding Schedule does not contain separate items for the following. Include these items in the applicable Bidding Schedule items.