Design Services for Broughton High School Partial Roof Replacement.pdf

PDF 158 KB Posted

Attached to
Design Services for Partial Roof Replacement at Broughton High School
Solicitation number
RFQ-26-I-LC
Issued by
Wake County, Teachey Town, North Carolina

About this file

This is a Design Services document for Broughton High School in North Carolina, outlining requirements for a partial roof replacement project. The scope of work encompasses design services for replacing approximately 50,814 square feet of existing 2-ply modified bitumen roofing system on roof areas A4-A6 and A10-A24, and approximately 5,577 square feet of gravel surface modified bitumen roofing on roof area A8, both with new 2-ply modified bitumen roofing systems. The project includes design for replacement and attachment of new thermal roof insulation with coverboard, replacement of new sheet metal coping and flashing, and assessment of additional items of concern identified during the initial site visit. The selected firm will provide comprehensive turnkey design services including permit applications, preparation of bidding documents, construction administration with scheduling coordination, pre-bid and preconstruction meetings, regular site construction meetings throughout the project duration, and project closeout services.

The document does not contain specific information regarding pricing terms, set-asides, contract duration, renewal options, funding sources, or award amounts. No response deadlines, due dates, site visit schedules, or bidders' conference details are specified in this design services file. Interested firms should reference the related state and local contract opportunity posting for additional procurement details, submission requirements, and timeline information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.wcpss.net

Facilities Design and Construction Facility Assessments and Lifecycle Department

REQUEST FOR QUALIFICATIONS

Designer Selection

RFQ-26-I-LC Broughton HS - Partial Roof Replacement

Firms wishing to submit for consideration should follow the guidelines established herein. A Statement of Qualifications along with supporting documentation should be submitted electronically to: Tim Muller, Senior Admin of WCPSS Facility Assessments and Lifecycle, at tjmuller@wcpss.net, by 12:00 p.m. Friday September 30, 2026. Statements of Qualifications received after that time will not be considered. Time indicated on received email will be official time.

1. Project Scope of Work – Design for partial roof replacement of the existing 2-ply modified bitumen roofing system on Roof area A4-A6, A10-A24 with a new 2-ply modified bitumen roofing system, approximately 50,814 sq ft. Design for partial roof replacement of the existing gravel surface modified bitumen on Roof area A8 with a new 2-ply modified bitumen roofing system, approximately 5,577 sq ft. Design the replacement and attachment of new thermal roof insulation with a coverboard. Design the replacement of new sheet metal coping and flashing. Design work will also include additional items of concern during initial site visit.

2. Professional Services Required – Firm will provide turnkey design services including but not limited to roof replacement, permit applications as required, bidding, construction administration including scheduling, pre bid, preconstruction meetings, regular site construction meetings during the project, and project closeout.

3. Schedule – Qualifications submitted September 30, 2026, with design fee negotiations immediately following the selection with an anticipated design notice to proceed of November 4, 2026.

4. Selection Criteria & Format of Proposal – The qualifications presented will be used for ranking and selection.

5. Insurance – The selected design firm must carry a minimum of $1,000,000 of professional liability insurance.

mailto:tjmuller@wcpss.net

File details come from the government source that posted it. Updated .