Demolition of 906 Prospect Street.pdf

PDF 3 MB Posted

Attached to
Demolition Project - 906 Prospect Street
Solicitation number
B/27/006
Issued by
Grand Traverse County, Michigan

About this file

Demolition of 906 Prospect Street - City of Lansing

This is a Notice to Bid and supporting documentation from the City of Lansing Purchasing Office for the demolition of a residential property located at 906 Prospect Street (Parcel # 33-01-01-15-311-252, Lot 4, Block 15 Green Oak Addition). The project encompasses the complete demolition of the main structure, garage, shed, and all accessory structures, followed by site restoration including grading, topsoil placement, seeding, and mulching. Bids are due on July 27, 2026 at 2:00 p.m. local time, with bids accepted at the City of Lansing Purchasing Office, 124 W. Michigan Ave, 3rd Floor, or electronically through the Michigan Inter-Governmental Trade Network (MITN). The completion deadline is 30 days from the date of the purchase order issuance. Site examination of premises and working conditions may be arranged by contacting Rawley Van Fossen at the Code Enforcement Office (517-483-4068). The successful bidder must obtain a Demolition Permit from the Office of Building Safety and possess current City of Lansing demolition and building wrecker licenses, along with State of Michigan licensure as either a residential builder or maintenance and alteration contractor.

All demolition must occur during Code Enforcement business hours (Monday-Thursday, 8:00 a.m. to 4:00 p.m.). The contractor is responsible for all costs including landfill fees of $29.48 per cubic yard (Granger Landfill, 8550 W. Grand River, Grand Ledge, Michigan), utility disconnection fees, asbestos abatement, hazardous materials removal, soil erosion and sedimentation control, engineered fill, property owner notifications, and public infrastructure protection. The asbestos survey report dated June 5, 2026 indicates no hazardous asbestos-containing materials (ACM) were detected in building samples; however, other hazardous materials including vehicles, chemicals, appliances, and drums were identified requiring special handling. The City provides preference to Lansing-based businesses within 10% of the low bid, and all vendors must be current in payment of taxes, licenses, and fees due the City. The contractor must provide $1,000,000 combined single limit insurance coverage and submit proof of insurance prior to work commencement. Final payment is withheld 25 percent until grading and seeding are completed and deemed satisfactory following a 30-day inspection period.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF LANSING

Purchasing Office

124 W. Michigan Ave Lansing, Michigan 48933

(517) 483-4282 http://www.lansingmi.gov/463/purchasing

Andy Schor, Mayor

July 8, 2026

NOTICE TO BID

B/27/006

DEMOLITION OF 1 PROPERTY 906 PROSPECT STREET

The City of Lansing officially distributes all Purchasing documents through the Michigan Inter- Governmental Trade Network (MITN) and the City of Lansing Purchasing Office. Our office no longer mails bid documents, notices or addendums to our vendors. To register for the MITN system or access bid information, including addendums, go to www.mitn.info

BIDS marked “B/27/006, DEMOLITION OF 1 PROPERTY 906 PROSPECT STREET” will be accepted at the City of Lansing Purchasing Office, 124 W. Michigan Ave, 3RD Floor Lansing, Michigan 48933, until 2:00 p.m., local time in effect on JULY 27, 2026 or electronically on MITN.

Official City issued bids may be returned in person, Fed Ex or electronically on MITN site.

Bid results will only be released via email or self-addressed stamped envelopes. Please forward your email request to: marilyn.chick@lansingmi.gov

The City of Lansing encourages bids from all vendors including MBE/WBE vendors.

The City of Lansing gives preference to Lansing-based job providers in the procurement of all goods and services, and will give priority to those firms that provide the City with goods the City may require for this or other projects as made or provided for by United States based firms, with appropriate documentation provided with bid response showing U.S. manufacturing or assembly.

Any contractual or quote package questions should be directed to Marilyn Chick, Senior Buyer at (517) 483-4282 or Marilyn.chick@lansingmi.gov. Technical questions should be directed to Rawley Van Fossen at (517) 483-4068.

MICHIGAN CIVIL RIGHTS ACT Contractor shall not discriminate in hiring or its terms and conditions of employment on the basis of race, religion, creed, nation origin, color, sex, marital status, age, height, or weight, nor on the basis of handicap except where the same is based on a bona fide job requirement. Neither shall Contractor discriminate in the sales of products or the rendering of services pursuant to this contract on the basis of any of those categories.

Marilyn Chick Senior Buyer mailto:marilyn.chick@lansingmi.gov

Attention Bidders

The City of Lansing in partnership with the business community recognizes the need to facilitate economic development in our community. As part of the economic growth strategy, the City has incorporated Local Preference into City Purchasing policies.

Local Preference Statement:

A Lansing based business that has been deemed responsive and responsible according to the requirements of the Purchasing Ordinance that is within 10% of the low bid will be given an opportunity to match the low bid amount to receive the contract. If there is more than one qualified, responsive and responsible Lansing based bidder, the first opportunity to match the low bid will go to the Lansing based firm with the lowest bid.

If the Lansing based business refuses to match the low bid, the contract will be awarded to the responsive and responsible low bidder.

Qualifications for Lansing Based Business status:

1) Pay City income taxes on Net Profits

2) Pay City property taxes on a plant or office and equipment used for the performance of the contract bid upon - or - other real or personal property in the City of Lansing equivalent in value to such plant or office and equipment for not less than one year prior to determination.

Additional Information:

The full copy of the Ordinance is on file in the Purchasing Office, the City Clerk’s office or on the City of Lansing Purchasing Web site located at:

http://www.lansingmi.gov/460/purchasing http://www.lansingmi.gov/460/purchasing

Solicitation Number: B/27/006

Solicitation Name: DEMOLITION OF 1 PROPERTY 906 PROSPECT STREET

The City of Lansing Purchasing Office is collecting information regarding the use of the MITN e-procurement system. We are also collecting demographic information regarding Lansing based business.

This form will not be used during the evaluation of bids or proposals. You may return this sheet in your bid envelope or mail it back separately. Please, do not staple this to your bid document.

I. Where did your firm receive of this solicitation? Please check all that apply.

____ City of Lansing Purchasing Web Page http://www.govbids.com/scripts/MITN/public/home1.asp _____ City of Lansing Purchasing Office ____ Other, please list:___________________________________________________________________________

II. Demographic Information:

Is your firm located or have a business office within the corporate city limits of Lansing yes_____ no______

III. Company Information

Firm Name

Address (Street, City, State, ZIP)

Phone Number Fax Number

Web Site Address Contact Person

Email address

Thank you for your participation.

BIDDERS

SEE INSTRUCTIONS TO BIDDERS

GENERAL CONDITIONS ON

REVERSE SIDE OF THIS SHEET

For examination of premises and working conditions, contact: Rawley Van Fossen CODE

ENFORCEMENT OFFICE

Phone:517- 483-4068 Opening Date:

Quote No: B/27/006

City Dept: Department of Economic Development and Planning

Subject: Demolition of 1 Property 906 PROSPECT

STREET

FINANCE DEPT/PURCHASING

PROPOSAL AND CONTRACT

JULY 27, 2026 PROPOSAL: We propose to furnish all labor, materials equipment, tools and services required to complete the work in accordance with the specifications and conditions contained herein in consideration of the sum or sums stated below and agree that this document will constitute the contract if accepted by the City of Lansing.

We will start work within ____ days and complete the contract within ____ days after the award.

BID DUE 2:00 PM LOCAL TIME IN EFFECT JULY 27, 2026

Please bid on the demolition and removal of the following structures and miscellaneous site materials not exempted below. A Performance Bond and Bid Guarantee will not be required (Item C and 11, reverse side of page one of this contract form).

Insurance will be required. **NOTE: VENDOR MUST INCLUDE COPY OF CITY OF LANSING DEMOLITION LICENSE, IN ADDITION TO THE CITY OF LANSING BUILDING WRECKER LICENSE INFORMATION, PROOF OF LICENSURE BY THE STATE OF MICHIGAN AS EITHER A RESIDENTIAL BUILDER OR A RESIDENTIAL

MAINTENANCE AND ALTERATION CONTRACTOR. WITH YOUR SUBMITTAL. VENDOR MUST PROVIDE

PROOF OF INSURANCE**

ITEM A –906 PROSPECT STREET

Parcel Number: Parcel# 33-01-01-15-311-252, Lot 4 ALSO N ½ OF E 16.5 FT OF LOT 5 BLOCK 15 GREEN OAK ADD, City of Lansing, Ingham County, Michigan. Additional Terms:

Demolition must be done during business hours of the Office of Code Enforcement (Mon.- Thurs 8am -4pm)

Demolition of Structure(s):

Estimated Cubic Yards:

FEES:

LANDFILL FEES: Landfill fees are $29.48 per cubic yard for approved City of Lansing projects only. Please use this rate to calculate landfill fees. Your estimated yardage will be recorded on your purchase order and a copy will be mailed to Granger for monitoring purposes or approved landfill.

UTILITY FEES: Contractor to include utility shut-off charges in final submittal(s).

BID PRICE: Contractor shall enter the cost of all work related to the demolition of the listed structure(s), including landfill fees and fees for all materials removed from the site that can not be deposited at the landfill.

All vendors shall be current in payment of any taxes, licenses, fees, permits or any other monies due the City of Lansing at time of quote due date as per City of Lansing Ordinance Section 206.02(a)1(G).

We understand that the items “Instructions to Bidders” and General Conditions” are fully incorporated herein as a material and necessary part of the contract.

FEDERAL I.D.#___________________________

COMPANY_______________________________

SIGNATURE_____________________________

PRINTED NAME_________________________

TITLE__________________________________

DATE:_________________________

ADDRESS _________________________________

CITY & STATE _____________________________

TELEPHONE _______________________________

F.O.B.______________________________________

SHIP VIA/ROUTING:________________________

TERMS: ___________________________________

NOTE: No bid tabulation will be mailed after the award of the bid unless by a bidder who submits a stamped, self-addressed envelope with his bid.

Purchasing Office

124 W. MICHIGAN AVE

LANSING MI 48933

(517) 483-4282

Andy Schor, Mayor

CERTIFICATION REGARDING

DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS

The prospective participant certifies, to the best of its knowledge and belief, that it and its principals:

(1) Are not presently debarred, suspended, proposed for debarment, and declared ineligible or voluntarily excluded from participation in transactions under any non-procurement programs by any federal, state or local agency.

(2) Have not, within the three-year period preceding, had one or more public transactions (federal, state, or local) terminated for cause or default; and

(3) Are not presently indicted or otherwise criminally or civilly charged by a government entity (federal, state, or local) and have not, within the three-year period preceding the proposal, been convicted of or had a civil judgment rendered against it:

(a) For the commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public transaction (federal, state, or local), or a procurement contract under such a public transaction.

(b) For the violation of federal, or state antitrust statutes, including those proscribing price fixing between competitors, the allocation of customers between competitors, or bid rigging; or

(c) For the commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property.

I understand that a false statement on this certification may be grounds for the rejection of this proposal or the termination of the award. In addition, the general grant of this authority exists within the City’s Purchasing Ordinance, Sec. 206.02 (a) (1) (G).

[ ] I am unable to certify to the above statements. Attached is my explanation. [ ] I am able to certify to the above statements.

Name of Agency/Company/Firm (Please Print)

Name and title of authorized representative (Please Print)

Signature of authorized representative Date http://www.lansingmi.gov/787/purchasing

Department of Economic Development and Planning

The following are additional requirements for demolition of structures awarded under a Purchase Order to the lowest and most qualified bidder.

1. The successful bidder shall be licensed with the City of Lansing for demolition. Said license shall be on file with the City Clerk at the time of bid opening.

2. The successful bidder shall obtain a Demolition Permit from the Office of Building Safety.

3. The City of Lansing has inspected for Asbestos and will submit report to and will provide report, vendor should include all cost associated for abatement in their quote.

4. The successful bidder shall verify and demonstrate that all utilities have been properly terminated and/or disconnected prior to commencement of demolition activities. Any and all costs associated with utility disconnections shall be included within the bid. If the successful bidder has difficulty getting utility releases from either Board of Water & Light or Consumers Energy that would prevent them from completing the scope of work within the timeframe allotted within this document the successful bidder shall contact the Office of Building Safety for assistance.

5. The successful bidder shall include all costs associated with hazardous materials report and abatement in accordance with all local, state and federal rules and regulations.

6. The successful bidder shall include all costs associated with Soil Erosion and Sedimentation Control methods as required by state rules and regulations.

7. The successful bidder shall follow the city of Lansing’s Development Ready standards

(revised 8/13/15). All costs associated with compliance with the Development Ready standards shall be included within bid.

8. The successful bidder shall inspect the site and structure to address and identify any areas of influence the demolition activity may disturb or affect. All areas of influence identified and unidentified shall be protected or repaired at the successful bidders’ costs. This is including but not limited to areas of influence that may require engineered fill or demolition activates that expose adjacent walls/foundations requiring the exposure to be protected.

9. The successful bidder shall notify the adjacent property owners 72 hours prior to commencement of work. Adjacent property owners shall consist of the adjacent contiguous property owners and property owners on both sides of the block of the demolition activity.

Acceptable methods would include direct mail, door hangers or fliers.

10. The successful bidder shall include costs to protect public owned infrastructure such as, but not limited to, sidewalks, curb and gutters, roads, utilities and green spaces at the contractor’s own cost.

11. The successful bidder shall obtain and include costs associated with other necessary permits required to work within the road Right-of-Way. Repairs to city sidewalks, curb and gutter infill and driveway approach removal require permits from the City of Lansing’s

Public Service Department. Specifications and standards set forth by the Public Service Department shall be adhered to and verified by that department prior to a final inspection request by the Office of Building Safety.

12. The successful bidder shall inspect the structure and site and include any costs associated with the extermination of any rodents or infestation prior to commencement of work.

NOT TO EXCEED OR NON-APPROPRIATION

The contractor hereby recognizes that the City of Lansing is a political body corporate and that in the event the City is unable to appropriate monies sufficient enough to pay its obligations herein, the City may terminate this agreement without incurring any liability thereof.

NON-PERFORMANCE BY CITY OF LANSING

The contractor recognizes that the performance of this contract may be delayed or prohibited in part, or in whole, by court order, and that in that event the City of Lansing may terminate the Purchase Order without incurring any liability, financial or otherwise. The City of Lansing agrees to pay the contractor for any work completed by the contractor up to the date of the court order.

NOTE: Bidders must be aware that if this contract and proposal form is not filled out entirely, it may be declared non-responsive.

TOPSOIL DEFINED

TOPSOIL shall provide fertile, friable, natural topsoil of loamy character without a mixture of subsoil material and obtained from naturally well-drained areas. It shall be a soil of proper balance and contain a sufficient amount of decomposed organic matter to normally sustain vegetative growth. It shall be free from heavy clay, coarse sand, stones, lumps, roots, sticks and other foreign materials. Topsoil shall not be delivered or spread in a frozen or muddy condition.

FILL

There must be enough fill brought in to COMPLETELY FILL THE ENTIRE LOT (every corner and edge) and bring the lot up to an even grade with the existing lots immediately adjacent to the subject property in such a way as to prevent water drainage from going onto existing lots immediately adjacent to the subject property.

SEEDING

Materials:

Name & Germination Proportion Kentucky Bluegrass 60% 95% 28# Wt. per bushel Creeping Red Fescus 40% 85%

As specified, seed shall be applied evenly over the entire area. This moisture shall be evenly applied by seeding or drilling with Brillion Seeder, Viking roller blade or equal, at the rate of three pounds (3#) per 1,000 square feet. NOTE: Hydro-seeder is considered acceptable equipment if contractor desires to use this method.

NOTE: The tag from each bag is to be submitted to the Department of Economic Development and Planning.

MULCH

Mulch shall be straw, hay, or other organic material. See attached copy of State of Michigan Department of Transportation (MDOT) Standards of Construction 917.15.

Mulch shall be used which will form a protective covering on the soil surface at the rate of 1 to 3 tons per acre in accordance with State of Michigan Department of Transportation (MDOT) Standards of Construction 816.03.

GRADING

Provide a smooth sub-grade that is 3" below finished grade that does not vary more than three-tenths (0.3) of a foot from established grade. Remove all roots, debris and stones larger than 2" from the sub-grade. This must be completed to show the lot level and COMPLETELY free of holes, hills, divots, etc. that would hinder mowing of the property when grass starts growing. It needs to be graded smoothly with no lumps, holes, etc.

TOPSOIL

The topsoil shall be uniformly distributed on the designated areas to a minimum depth of 3" after firming.

After spreading, the topsoil shall be finely raked by York rake, Viking roller blade or equal, or by hand to produce a smooth, even surface that conforms to the grades established by plans and specifications. Any irregularities in the surface resulting from top soiling or other operations shall be corrected in order to prevent the formation of depressions or water pockets.

TOLERANCE

Tolerance of the seeded area will be three-tenths (0.3) foot, plus or minus. Slope for drainage over turf area shall have a minimum slope of 1%.

DRIVEWAYS

These are to be completely removed up to the sidewalk without damaging the sidewalk. All bids should include the cost to remove the driveway and its approach. Replacement curb and any expense to replace damaged sidewalk should be included in your bid.

GARAGE CONCRETE PADS

Garage Concrete pads are to be completely removed.

ACCESSORY STRUCTURES

All accessory structures (i.e., garage, shed, decks, pole barns, carports) are to be removed at the time of the demolition.

INSPECTION

Thirty (30) days after seeding it is to be expected that 60% to 80% of the seed will have germinated and grown. Should growth not be evident, it will be the responsibility of the contractor to perform any repairs and/or re-seeding of all sparse, bare and/or eroded areas.

FINAL ACCEPTANCE

It is the intent of the City of Lansing to obtain and the responsibility of the contractor to produce smooth ground surface and to establish thereon any even dense seeding of permanent grasses. Final acceptance shall be given by the Department of Economic Development and Planning Department upon the correction of any unsatisfactory condition noted at the time of the thirty (30) day inspection.

FINAL PAYMENT

Final payment will not be approved by the City of Lansing on this contract until after the thirty (30) day inspection of the seeding, and seeding is deemed satisfactory. The City will withhold 25 percent (25%) of total bid price until grading and seeding of the property has been completed.

RELEASE OF STRUCTURE

Demolition of the structure is subject to all applicable State and local regulations as follows:

A structure shall be released under a Purchase Order as it becomes available for demolition. It shall be the successful bidder’s responsibility after the Purchase Order is issued to keep the structure secure and boarded prior and during demolition. It shall also be the contractor's responsibility, during demolition, to secure the job site in a manner that will protect public health and safety. Costs associated with securing the structure and site shall be included in the bid and at the successful bidder’s expense.

The contractor shall have thirty (30) days after the release of the purchase order issued by the City of Lansing, to complete the demolition of the structure(s) and establish a safe site.

SPECIAL CONDITIONS RELATING TO DUMPING OF MATERIALS

1. The contractor shall dispose of all building materials removed under this contract in accordance with applicable laws. Materials to be dumped shall be deposited at the Granger Landfill locate at 8550 W.

Grand River, Grand Ledge, Michigan.

2. The contractor shall notify Granger Company, Phil Newsome (371-9714), prior to delivery of materials to the landfill to obtain an approval code identifying each property. Receipts obtained from the landfill for each location showing this "code" will be submitted with invoices for payment.

3. Granger will bill the contractor at $29.48 per cubic yard for all City projects. This special rate is based upon concrete with rebar or large pieces of concrete and steel being removed before material is delivered to Granger Landfill. You may select to use Granger and cannot exceed the landfill fee per yard that’s already in the bid OR detail which landfill you will be using and the estimated cost to dispose of.

COMPLETION OF CONTRACT

Completion date of this contract shall be 30 days from the date of the Purchase Order. The following are conditions in accordance with this contract.

1. All trees and shrubs are to be retained unless otherwise directed by the City of Lansing's Department of

Economic Development and Planning.

2. All non-public paved areas and buildings are to be removed in their entirety. Basement walls and foundations shall be removed completely and verified by inspection by the assigned building inspector.

3. Fill shall be enough to completely fill the entire lot and bring the lot up to an even grade with the existing lots immediately adjacent to the subject parcel in such a way as to prevent water drainage from the subject parcel onto the adjacent parcels. Areas of influence shall be filled in with engineered fill and subject to special inspections outlined in PA 230 of 1972. All costs associated with engineered fill including special inspections shall be included in the bid.

4. All existing sewer and water drains shall be plugged with concrete at the property line. The successful bidder is responsible to obtain release from Public Service for sewer line cap offs. These must be obtained by the City of Lansing, Public Service Department (517 483-4455).

5. Any and all trash accumulations including bulk items and miscellaneous brush shall be removed from the premises. All demolition materials and on-site materials must be removed to a dump site that is approved by the State or local authority.

NOTE: Per P.A. 641 dump site must be located in Ingham, Eaton or Clinton counties.

6. The Contractor shall obtain photographs showing the condition of all driveways, driveway approaches, sidewalks, and curb and gutters either on or immediately adjacent to the demolition site prior to the start of demolition work. The contractor shall also obtain photographs of property boundaries in situations involving trees, shrubs, fences, etc., along with the property lines. All photographs shall be retained by the contractor in their file.

7. In the event a claim for damages arises alleging property damage as a result of demolition work, the contractor must be able to produce photographs showing the condition before the start of the demolition work. Failure to produce such photographs shall result in the contractor being held fully and solely responsible for all alleged damages.

8. Site shall be filled to existing grade with clean material free from large stones, debris, concrete, etc.

9. Grading and seeding must be completed within 30 days of demolition, unless prior approval by

Department of Economic Development and Planning.

10. Contractor shall pay for and include in pricing the cost of the BWL and Consumers Energy abandonment fee.

11. Contractor shall pay for Street Curb Fill and include in pricing City Permit Fee and Sewer cut/cap permit on 7th floor City Hall.

Note: City has inspected for Asbestos prior to bidding out the project report attached.

Resolution #2025-296 By the Committee on Public Safety

Resolved by the City Council of the City of Lansing

WHEREAS, the Code Enforcement Officer has determined that the building located at , 906 PROSPECT STREET, 33-01-01-15-311-252, LOT 4 ALSO N ½ OF E 16.5 FT OF

LOT 5 BLOCK 15 GREEN OAK ADD, City of Lansing, Ingham County, Michigan, as recorded in Ingham County Records, is an unsafe or dangerous building as defined in Section 108.1 of the International Property Maintenance Code as adopted by Lansing Codified Ordinance 1460.01, and the Housing Law of Michigan, and the building was red tagged on AUGUST 02nd, 2024; and

WHEREAS, a hearing was held by a Lansing Demolition Hearing Officer on JULY 31st, 2025, at which the Hearing Officer determined that said building was an unsafe and dangerous building and ordered the building demolished or made safe by SEPTEMBER 02nd, 2025 and

WHEREAS, said Hearing Officer filed a report of their findings and order with the City Council and requested the City Council to take appropriate action under the Lansing Codified Ordinances and the Housing Law of Michigan; and

WHEREAS, the Housing Law of Michigan and Lansing Codified Ordinances require a hearing be conducted to give the property owner an opportunity to show cause why a dangerous structure should not be demolished or otherwise made safe; and

WHEREAS, the City Council held a public show cause hearing on November 10, 2025 to review the findings and the order of the Hearing Officer, and the owners were notified in writing of said hearing and had an opportunity to appear and show cause why said building should not be demolished or otherwise made safe; and

WHEREAS, the Office of Code Enforcement has determined that compliance with the order of the Lansing Demolition Hearing Officer has not occurred.

NOW, THEREFORE, BE IT RESOLVED that the owner(s) of 906 PROSPECT STREET, as legally described above, are hereby directed to comply with the order of the Hearing Officer to demolish or otherwise make safe the said building within 60 days from the date of this resolution, December 8, 2025.

BE IT FURTHER RESOLVED that the property owner(s) is hereby notified that this order must be appealed within twenty days pursuant to MCL 125.542 and should the owners fail to comply with the Hearing Officer’s order for demolition or make safe, the Code Enforcement Officer is hereby directed to proceed with demolition of said building.

BE IT FURTHER RESOLVED, whether demolition is accomplished by said property owner or the City, that appropriate seeding and restoration of property take place to avoid run-off to adjacent properties.

BE IT FURTHER RESOLVED that if the demolition is accomplished by the City, the cost of such demolition shall be a lien against the real property and shall be reported to the City Assessor.

BE IT FINALLY RESOLVED that the owners in whose name the property appears upon the last local tax assessment record shall be notified by the City Assessor of the amount of such cost by first class mail at the address shown on the records. Upon the owner’s failure to pay the same within thirty (30) days after mailing by the City Assessor of the notice of the amount thereof, the amount of said costs shall be a lien and shall be filed and recovered as provided by law and the lien shall be collected and treated in the same manner as provided for property tax liens under the general property tax act.

Asbestos Survey Report

FOR THE PROPERTY AT:

906 Prospect Street Lansing, MI 48912

ETC Job #: 291073

Prepared For:

City of Lansing Department of Planning & Neighborhood Development 316 North Capitol Avenue, Suite D-1

Lansing, MI 48933 517-483-4365

Date of Inspection: 05/18/2026

Date of Report: 06/05/2026

Report Prepared and Submitted By:

Andre Richardson, Jacob Williams & Amir Richards

Michigan Asbestos Inspector License #: A45125, A65359 & A65593

Reviewed & approved by: Mark Smith

38900 West Huron River Drive Romulus, MI 48174

734-955-6600 www.2etc.com

ETC Job #: 291073 Page 2 of 22

TABLE OF CONTENTS

ASBESTOS SURVEY REPORT

PURPOSE OF THIS INVESTIGATION

KEY DEFINITIONS

EXECUTIVE SUMMARY

MATERIALS TABLE

MATERIALS SAMPLED AND ASBESTOS CONTENT

OTHER HAZARDOUS MATERIALS

INSPECTOR CERTIFICATION

APPENDICES

APPENDIX A – MAPS

APPENDIX B – PHOTOS

APPENDIX C – EDUCATION, TESTING, RESOURCES & LAWS

APPENDIX D – LABORATORIES USED & ORIGINAL LABORATORY ANALYSIS REPORTS

ETC Job #: 291073 Page 3 of 22

Purpose of this investigation The purpose of this inspection was to determine the presence and quantity of ACM’s.

KEY DEFINITIONS

ACM Asbestos containing material. ACM’s fall into 1 of 3 types. See Appendix C-1

Friable Can be crumbled, pulverized, or reduced to powder by the pressure of an ordinary human hand.

Non-Friable Cannot be pulverized under hand pressure.

Potentially Can become friable if disturbed.

Friable

Category Refers to the two (2) types of Non-Friable ACM’s. See Appendix C-1

Hazardous Non-asbestos materials that may be hazardous, and may require special handling Materials and disposal requirements.

Room The room testing occurred. Rooms are identified by a number because room usage may change (i.e., a bedroom may become an office). Some rooms may be labeled as functional spaces (FS).

Inaccessible These are locations around the property that could not be examined because the Area’s investigator could not gain access to them. These include areas that are unsafe to enter, locked rooms, areas with too much debris/clutter, etc.

Quantity Materials are usually quantified in square feet (SF), cubic feet (CF), linear feet (LF), cubic yards (CY), or units.

EPA Environmental Protection Agency

OSHA Occupational Safety and Health Administration

ETC Job #: 291073 Page 4 of 22

Executive Summary

After a thorough investigation of the premises was conducted, and samples were collected and analyzed, it was determined that there were NO HAZARDOUS ACM’s (asbestos containing materials) present in this building.

In addition, other hazardous materials (non-asbestos materials that may be hazardous, and may require special handling and disposal requirements) were found and are located in:

Cars/Trucks – EA 2, 4

Chemicals – FS 2

Refrigerator – FS 1

Stove – FS 1

Dryer – FS 1

Finally, some areas were inaccessible and were unable to be examined for ACM. These areas include:

Interior House – Due to being unsafe

Note: If renovations are not being done in a specific room that was found to have positive ACMs you do not need to remove that material as long as it is intact.

Before renovation or demolition activities can begin, and depending on the ACM found and the condition that it is in, it may be necessary that friable or potentially friable ACMs be removed.

ETC Job #: 291073 Page 5 of 22

Materials Table

MATERIALS SAMPLED AND ASBESTOS CONTENT

TABLE 1: ASBESTOS CONTENT RESULTS

SA

M

P

LE

CLASSIFICATION MATERIAL DESCRIPTION

LOCATION

(REFER TO MAPS IN APPENDIX A)

QUANTITY HAZARDOUS

ASBESTOS

1 M Concrete / Porch - Grey EA 1 15 SF No

2 M Concrete / Driveway - Grey EA 2 650 SF No

3 M Cinderblock - Grey EA 1-4 1197 SF No

4 M Mortar / Block - Grey EA 2-4 1197 SF No

5 T Insulation / Rolled-In - Pink EA 1-4 1850 SF No

6 M Caulk / Exterior - Clear EA 1-4 10 SF No

7 M Roofing / Asphalt (Shingles) - Black EA 5 1550 SF No

8 M Roofing / Tar Paper - Black EA 5 1550 SF No

9 M Roofing / Asphalt (Shingles) - Black EA 10 610 SF No

10 M Roofing / Tar Paper - Black EA 10 610 SF No

11 M Roofing / Asphalt (Shingles) - Black EA 15 205 SF No

12 M Roofing / Tar Paper - Black EA 15 205 SF No Bolded materials are those that were found to contain asbestos at a concentration >1%. Please refer to “Interpretation of Inspection Results” in section C-2.

Quantities that are listed are estimates only; in general, listed quantities represent only what was visible during testing. It is likely that where ACM has been identified throughout specific floors, similar materials and quantities exist on other like floors. It is the contractors’/client’s responsibility to verify all amounts of asbestos identified during any bid process, or during future renovation and/or demolition activities. Materials that are identical in both relative location and physical description to already tested materials listed in this report should always be assumed to be ACM.

ETC Job #: 291073 Page 6 of 22

OTHER HAZARDOUS MATERIALS

TABLE 2: OTHER HAZARDOUS MATERIALS

SA

M

PL

E

# MATERIAL DESCRIPTION QUANTITY LOCATION

1 Vans & Truck 5 EA 1 ,2, 4

2 Chemicals 100 FS 2

3 Refrigerator 1 FS 1

4 Stove 1 FS 1

5 Dryer 1 FS 1

6 Boat 1 EA 8

7 Drums Numerous Throughout Property Materials found in this chart are above the household quantity limitations. Refer to “Other Hazardous Materials and Vermiculite” in section C-3.

Quantities that are listed are estimates only; in general, listed quantities represent only what was visible during testing. It is likely that where ACM has been identified throughout specific floors, similar materials and quantities exist on other like floors. It is the contractors’/client’s responsibility to verify all amounts of asbestos identified during any bid process, or during future renovation and/or demolition activities. Materials that are identical in both relative location and physical description to already tested materials listed in this report should always be assumed to be ACM.

ETC Job #: 291073 Page 7 of 22

Inspector Certification

The information contained in this report is a true and accurate representation of the conditions and activities at this property at the time of this investigation, based on the professional judgment of the person(s) who conducted and reported this asbestos inspection. All inspection work was completed by the Michigan certified asbestos inspector(s) listed below.

Andre Richardson, Jacob Williams & Amir Richards

Inspector E-Mail address: Andre.Richardson@2etc.com, Jacob.Williams@2etc.com & Amir.Richards@2etc.com

ETC Job #: 291073 Page 8 of 22

Appendices

APPENDIX A – MAPS

Floor Plans

EXTERIOR HOUSE

EA 2

EA 1

EA 3

EA 4

Please Note: This is a rough floor plan only. All items, (doorways, windows, etc.) may not be included in this illustration. Also, room and component sizes are not drawn to scale.

Yellow Highlights are asbestos positive samples

FS 1

ETC Job #: 291073 Page 9 of 22

GARAGE

EA 7

EA 6

EA 8

EA 9

Please Note: This is a rough floor plan only. All items, (doorways, windows, etc.) may not be included in this illustration. Also, room and component sizes are not drawn to scale.

FS 2

ETC Job #: 291073 Page 10 of 22

SHED

EA 12

EA 11

EA 13

EA 14

Please Note: This is a rough floor plan only. All items, (doorways, windows, etc.) may not be included in this illustration. Also, room and component sizes are not drawn to scale.

FS 3

ETC Job #: 291073 Page 11 of 22

APPENDIX B – PHOTOS

EA1 & EA2

EA3

EA4

EA6

ETC Job #: 291073 Page 12 of 22

EA7

EA8

EA9

EA11

ETC Job #: 291073 Page 13 of 22

EA12

EA13

EA14

Shed Interior

ETC Job #: 291073 Page 14 of 22

Ceiling Caved due to Water Damage

Floors unsafe

Sinking Floors

Structure Damage

ETC Job #: 291073 Page 15 of 22

APPENDIX C – EDUCATION, TESTING, RESOURCES & LAWS

C-1: Asbestos Education

ASBESTOS

Asbestos is a generic term encompassing various fibrous mineral silicates from 2 groups:

Serpentine – “curly fibers” and layered structure o Chrysotile (hydrated magnesium silicate) – about 95% of asbestos in US buildings

Amphibole – “needle-like” structure o Amosite (iron magnesium silicate) – 2nd most commonly used asbestos o Crocidolite (sodium-iron silicate) o Tremolite (calcium-magnesium silicate) – potential contaminate in vermiculite o Anthophyllite (another iron-magnesium silicate) o Actinolite (calcium-magnesium-iron silicate)

CATEGORIES OF ASBESTOS CONTAINING MATERIALS

The EPA identifies three (3) categories of ACM used in buildings:

Surface Materials – ACM sprayed or troweled on surfaces (i.e. walls, ceilings, etc.) for acoustical, decorative, or fireproofing purposes (i.e. plaster and fireproofing insulation).

Thermal System Insulation (TSI) – Insulation used to inhibit heat transfer or prevent condensation on pipes, boilers, ducts, HVAC systems, etc. This includes pipe lagging, pipe wrap, block, batt, cements, “muds”, ropes, gaskets, etc.

Miscellaneous Materials – Other, largely non-friable products, that include floor tile, ceiling tile, roofing felt, wall board, outdoor siding, etc.

CHARACTERISTICS OF ASBESTOS CONTAINING MATERIALS

ACMs are characterized in one of two ways. They are either:

Friable – when dry, can be crumbled, pulverized, or reduced to powder by the pressure of an ordinary human hand.

Non-Friable – cannot be pulverized under hand pressure.

o Category I – includes asbestos packings, gaskets, resilient floor covering, and asphalt roofing products.

o Category II – any non-friable ACM not included in Category I such as mastic, cementitious materials, and ceiling tiles.

ASBESTOS EXPOSURE

Airborne asbestos contamination in buildings is a significant environmental problem. It has been determined and documented that inhalation of significant quantities of airborne asbestos fibers over an extended period of time can have serious health effects.

ETC Job #: 291073 Page 16 of 22

In order to assess any potential health risks within a building, it is necessary to conduct a survey of the building to identify and locate any friable or non-friable asbestos containing materials (ACM) that may be located within.

If and when ACM are located within a building, the ACM must then be evaluated and assessed to determine whether any immediate health hazards are presented to the building occupants. It must be noted that the presence of asbestos in a building does not necessarily mean that the health of the building occupants is endangered. As long as an ACM remains intact (in good condition and is not disturbed, damaged, or mutilated) exposure of asbestos fibers to the air is unlikely.

HEALTH EFFECTS OF ASBESTOS EXPOSURE

The potential health hazards associated with exposure to asbestos results from inhalation of airborne fibers; small asbestos fibers can pass readily through the upper respiratory tract and be deposited in the terminal bronchioles of the lung. There they can produce a local irritation which the body attempts to neutralize by initiating a tissue response. The resulting body response is encapsulation of the fibers and consequent formation of "asbestos nodules."

Common asbestos related diseases include:

Lung Cancer

Mesothelioma

Asbestosis

Chronic Obstructive Pulmonary Disease (COPD)

C-2: Asbestos Testing

SAMPLING

Representative bulk samples of suspected ACBMs were randomly collected within each building area. The materials sampled were broken down into distinct homogenous (similar) materials.

Homogenous material determination was based on the following criteria:

Similar physical characteristics (same color and texture, etc.)

Application (sprayed-on, troweled-on, assembly into a system etc.)

Material function (Thermal insulation, floor tile, wallboard system etc.)

While the NESHAP regulation allows for the taking of one sample of select non-friable materials, the OSHA standard suggests a minimum of three samples of each homogeneous material be taken. This is a better approach due the potential errors in the analytical method used.

To provide the most accurate information possible and be sure of our results, ETC may choose to take three samples of each material.

If materials are being assumed to contain asbestos, they must be treated as asbestos containing, even if they are not. This can lead to significantly increased costs for the building owner.

In general, ETC only assumes materials to be asbestos when sampling them will ruin their integrity (i.e. fire doors) or when they are too dangerous to sample (i.e. live electrical lines).

ETC Job #: 291073 Page 17 of 22

FOLLOW-UP INSPECTIONS

In some cases, ETC may identify areas where destructive access was required to review materials that were not readily accessible. In these cases, a follow-up inspection may be required once access to these areas is granted in order to assess these previously inaccessible areas.

Additionally, materials that were deemed to be positive for asbestos content during the initial survey will need to be quantified and have their conditions assessed in a follow-up inspection.

PLM ANALYSIS METHODOLOGY

Bulk samples submitted for Polarized Light Microscopy (PLM) analysis were analyzed utilizing the Environmental Protection Agency’s Test Method: Method for the determination of Asbestos in Bulk Building Materials (EPA 600/R-93/116, July 1993). Additional treatment and tests may be required to accurately define composition (e.g. ashing, fiber extraction, acid dissolution, TEM).

Analysis was performed by visual and stereoscopic examination of the bulk sample followed by microscopic examination and quantification using a polarized light microscope. The samples were analyzed for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), fibrous non-asbestos constituents (mineral wool, cellulose, etc.) and non-fibrous constituents.

According to NESHAP requirements, any bulk sample that has an asbestos content above 0% but below 10% should be point counted for final determination of percentage. Please note, that when a contract DOES NOT include point counting as defined in NESHAP, and additional analysis is desired, ETC can send any samples in this range for point counting. However, this will require additional charges for analysis. Therefore, for any samples in the range above 0% but below 10%, these results can only be considered estimates.

INTERPRETATION OF INSPECTION RESULTS

A material is considered by the EPA, OSHA, and other federal, state, and local agencies to be asbestos-containing if at least one sample collected from the homogenous material has asbestos fibers present in a concentration greater than one percent (>1 %).

However, materials with concentrations greater than zero percent (0%) but less than or equal to one percent (≤1%), will now be considered regulated under certain sections of the OSHA Asbestos in Construction Standard (29 CFR 1926.1101).

The standard contains numerous work practice requirements and prohibitions which apply, regardless of the exposure levels. However, only two of the requirements and three of the prohibitions must be observed in the case of work activities involving installed construction materials that do not contain >1% asbestos. Those work practice requirements and prohibitions that must be observed regardless of the exposure levels and of the percentage of asbestos in the installed construction materials are:

29 CFR 1926.1101(g)(1)(ii), which requires: wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup, except where employers demonstrate that the use of wet methods is infeasible

ETC Job #: 291073 Page 18 of 22 due to, for example, the creation of electrical hazards, equipment malfunction, and, in roofing, except as provided in paragraph (g)(8)(ii)2 of this section;

29 CFR 1926.1101(g)(1)(iii), which requires: prompt clean-up and disposal of wastes and debris contaminated with asbestos in leak-tight containers except in roofing operations, where the procedures specified in paragraph (g)(8)(ii)3 of this section apply;

29 CFR 1926.1101(g)(3)(i), which prohibits: high-speed abrasive disc saws that are not equipped with point-of-cut ventilator or enclosures with HEPA filtered exhaust air;

29 CFR 1926.1101(g)(3)(ii), which prohibits: compressed air used to remove asbestos, or materials containing asbestos, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air; and

29 CFR 1926.1101(g)(3)(iv), which prohibits: employee rotation as a means of reducing employee exposure to asbestos.

There are also some other provisions that apply to work activities involving installed construction materials even where the material does not contain >1% asbestos. However, if neither asbestos PEL is exceeded, only the following few provisions apply:

29 CFR 1926.1101(f)(2)(i), the provision for establishing that neither asbestos PEL is exceeded: Each employer who has a workplace or work operation covered by this standard shall ensure that a "competent person" conducts an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace. The assessment must be completed in time to comply with requirements which are triggered by exposure data or the lack of a "negative exposure assessment," and to provide information necessary to assure that all control systems planned are appropriate for that operation and will work properly;

29 CFR 1926.1101(f)(6)(i), a provision covering the observation of monitoring: The employer shall provide affected employees and their designated representatives an opportunity to observe any monitoring of employee exposure to asbestos conducted in accordance with this section;

29 CFR 1926.1101(f)(5)(i), a provision covering employee notification of monitoring results: The employer shall notify affected employees of the monitoring results that represent that employee's exposure as soon as possible following receipt of monitoring results;

29 CFR 1926.1101(f)(5)(ii), another provision covering employee notification of monitoring results: The employer shall notify affected employees of the results of monitoring representing the employee's exposure in writing either individually or by posting at a centrally located place that is accessible to affected employees; and

29 CFR 1926.1101(n)(2)(i)-(iii), a set of provisions covering recordkeeping for measurements of exposures to airborne asbestos.

There are numerous additional provisions of the standard that apply to work activities involving installed construction materials even where the material does not contain >1% asbestos if at least one of the asbestos PELs is exceeded.

ETC Job #: 291073 Page 19 of 22

A letter of interpretation from Federal OSHA authorities that explains this position can be found by following the link below:

https://www.osha.gov/laws-regs/standardinterpretations/2003-11-24-0

Note: A summary of the materials sampled, asbestos content, quantities and locations can be found in Table 1.

C-3: Other Hazardous Materials and Vermiculite

Hazardous Materials

Additionally, information showing other hazardous materials (above the household quantity limitations) found at the site is included in Table 2. This lists non-asbestos materials that may be hazardous, and may require special handling and disposal requirements. Items that might be in this category include things like tires, mercury switches, florescent lighting tubes, halogen lights, Freon in refrigeration units, pesticides, herbicides, paints, solvents, etc.

However, under the Resource Conservation and Recovery Act (RCRA) that addresses hazardous wastes, there is residential household quantity exclusion. Therefore, these materials will only be listed in this chart if they are present in quantities larger than what would be expected in a normal household. For instance, if the home was a farm and had a 55-gallon drum of pesticide present, this would be listed in Table 2. On the other hand, if there were a few pesticide containers present as would be found in most homes, these materials would not be listed.

Vermiculite

The EPA is informing the public to consider all vermiculite insulation as ACM, and is doing so because the current method is not accurate and yields false negatives when used on vermiculite.

However, the current standard PLM and point count methods satisfy the minimum EPA regulatory requirements for analysis of vermiculite loose fill insulation under 40 CFR part 61, subpart M. The EPA plans on publishing an analysis method that will be more accurate for vermiculite insulation. Upon its publishing, this method will supersede the current methods and continue use of the old methods will be subject to enforcement action.

ETC Job #: 291073 Page 20 of 22

C-4: Additional Resources

Additional information about asbestos is available on the Internet through the U.S. EPA’s homepage (www2.epa.gov/asbestos). Demolition specific information can be found at https://www.epa.gov/large-scale-residential-demolition/asbestos-containing-materials-acm-and-demolition. In addition, the Asbestos NESHAP notification form, guidelines for completing the form and regulations are located at www.michigan.gov/air. Select “Asbestos NESHAP Program”.

Questions about the federal OSHA standards or the state’s asbestos compliance and training requirements can be obtained by visiting the LARA Asbestos Program’s web site at www.michigan.gov/asbestos. Questions related to the transportation of asbestos can be addressed by the U.S. Department of Transportation’s (U.S. DOT) Hazmat Information Center at 800-467-4922.

Head to https://asbestosprogram.apps.lara.state.mi.us/Contractor/ContractorSearch for a list of

Michigan asbestos abatement contractors.

A “Notification of Intent to Renovate/Demolish” form can be found online at https://www.michigan.gov/documents/deq/deq-aqd-field-tpu-asbestos-notification-form_262676_7.pdf.

Additional information about vermiculite is available on the EPA’s website and is located at https://www.epa.gov/asbestos/protect-your-family-asbestos-contaminated-vermiculite-insulation.

C-5: Regulatory Information

The Environmental Protection Agency (EPA) set the standard for asbestos surveys in the AHERA regulations (40 CFR Part 763) which required surveys of all school buildings in the United States.

Additionally, the Department of Occupational Safety and Health (OSHA) has also passed regulations affecting the performance of asbestos surveys in buildings. According to current OSHA regulations (29 CFR 1926.1101), building owners must inform occupants of the location, quantity and condition of confirmed or assumed asbestos containing materials within all public and commercial facilities.

In addition to these regulations regarding surveys, facility owners and operators are also required to insure that employees or occupants of their buildings are not exposed to unsafe levels of airborne asbestos. Allowable fiber levels as defined by the regulatory agencies and standards below dictate which levels are applicable in which facilities:

ETC Job #: 291073 Page 21 of 22

0.01 f/cc - Environmental Protection Agency (EPA) Clean Air Standard

This standard was…