Amendment 002 Spec Pages Wage Rates.pdf
PDF 269 KB Posted
- Attached to
- Appeldorn Substation, Stage 01, Minnesota Federal contract opportunity
- Solicitation number
- DE-FB65-11WC92475
About this file
Amendment No 002 Spec pages and revised building wage rates
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 002 Drawing.pdf | ||
| Amendment 001 Spec Pages Wage Rates.pdf | ||
| Amendment 001 Drawings.pdf | ||
| Contract Clauses Bid Schedule.pdf | ||
| Project Drawings.pdf | ||
| Project Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
DE-FB65-11WC92475 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO 5. PROJECT NO. (If applicable)
002 July 8, 2011 N/A 65-11WC92475-735
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
U.S. DEPARTMENT OF ENERGY
Western Area Power Administration
200 4TH ST SW
Huron, SD 57350-2474
James E. Dickey
(605) 353-2640
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (√) 9A. AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE BIDDERS X
DE-FB65-11WC92475
9B. DATED (SEE ITEM 11)
June 1, 2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACITLITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OFO YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(√) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
APPELDORN SUBSTATION, STAGE 01
MINNESOTA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PRE VIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
DEPARTMENT OF ENERGY
WESTERN AREA POWER ADMINISTRATION
Appeldorn Substation, Stage 01 Solicitation No. DE-FB65-11WC92475 Minnesota Amendment No. 002 Page 2 of 2
The purpose of this amendment is to incorporate necessary changes in the solicitation prior to receipt of bids as follows:
1. The date and time set for receipt of bids is not extended and remains July 19, 2011 at 2:00
PM , local time at place of bid opening.
2. The Building wage rates for Lac Qui Parle County, Minnesota have been revised. In Section J, List of Attachments, Item C, change the Wage Determination Building Decision number to read as follows:
Decision Number: MN100114, Modification No. 11 (07/01/2011) Building
The following pages behind Attachment C are deleted and the attached revised pages are substituted therefor:
Remove pages Insert attached revised pages
General Decision No. MN100114 General Decision No. MN100114 Mod. No. 10 Pages 1-11 Mod. No. 11 Pages 1-11
3. In Section C, Description/Specifications, Project Specifications, Division 2, Paragraph A.2, add the following: “Strip topsoil to a depth of 18 inches.”
4. In Section C, Description/Specifications, Project Specifications, Division 9, Paragraph B.5:
Change the Fuse Interrupting Ratings RMS Symmetrical (Amps) for WW4A-FW4A from 34,000 amps to 12,500 amps.
5. In Section C, Description/Specifications, Project Specifications, Division 9, Paragraph B.6:
Change the Fuse Symmetrical Interrupting Rating (RMS amps) for FZ30A from 25,000 amps to 17,500 amps and delete the Fuse Asymmetrical Interrupting Rating (amps).
6. In Section C, Description/Specifications, Project Specifications, Division 9, Paragraph B.15, add the following: “The cable for the station ground mat shall be 19 strand 4/0 copper.”
7. In Section C, Description/Specifications, Project Drawings, the following page is deleted and the attached revised page is substituted therefor:
Remove drawing Insert attached revised drawing
3. APD 0016 3. APD 0016, Rev. A
8. If you have given your copy of the specifications to someone else, please forward this amendment also.
General Decision Number: MN100114 07/01/2011 MN114
Superseded General Decision Number: MN20080114
State: Minnesota
Construction Type: Building
Counties: Chippewa, Grant, Jackson, Kittson, Lac Qui Parle, Lincoln, Marshall, Murray, Norman, Pope, Red Lake, Swift and
Traverse Counties in Minnesota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 03/12/2010
1 08/06/2010
2 09/03/2010
3 09/24/2010
4 11/12/2010
5 01/07/2011
6 01/21/2011
7 02/04/2011
8 05/13/2011
9 06/03/2011
10 06/17/2011
11 07/01/2011
BOIL0647-001 07/01/2009
Rates Fringes
BOILERMAKER......................$ 33.84 18.53
BRMN0001-053 05/01/2010
CHIPPEWA, POPE & SWIFT
BRICKLAYER.......................$ 32.67 14.88
BRMN0001-054 05/01/2009
JACKSON, LAC QUI PARLE, LINCOLN, MURRAY
BRICKLAYER.......................$ 24.36 13.63
BRMN0015-016 05/01/2010
GRANT, KITTSON, MARSHALL, NORMAN, RED LAKE & TRAVERSE
BRICKLAYER.......................$ 30.72 15.03
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
Solicitation No. DE-FB65-11WC92475 Amendment No. 002
CARP0606-014 06/01/2009
KITTSON, MARSHALL, NORMAN, RED LAKE
CARPENTER (Acoustical Ceiling
Installation, Drywall
Hanging, Form Work & Metal
Stud Installation Only)..........$ 20.57 13.23
CARP1382-008 06/01/2009
CHIPPEWA, GRANT, LAC QUI PARLE, POPE, SWIFT, TRAVERSE
Hanging, Form Work & Metal
Stud Installation Only)..........$ 19.72 14.17
CARP1382-013 06/01/2009
JACKSON, LINCOLN, MURRAY
Hanging, Form Work & Metal
Stud Installation Only)
Projects $1,000,000 and over........................$ 19.11 13.68
Projects under $1,000,000...$ 17.71 12.93
ELEC0292-003 09/01/2008
McLEOD & MEEKER
ELECTRICIAN
Electrical Contracts $5
Million and Over............$ 28.74 65.19%
Electrical Contracts Under
$5 Milllion.................$ 28.17 65.86%
ELEC0292-019 09/01/2008
CHIPPEWA, LAC QUI PARLE, POPE, & SWIFT
Electrical Contracts
$300,000 and over...........$ 28.17 65.86%
Electrical Contracts under
$300,000....................$ 27.04 67.55%
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
ELEC0343-011 06/01/2009
JACKSON & LINCOLN
ELECTRICIAN......................$ 27.85 11.66
ELEC0426-006 06/01/2007
MURRAY
0 to 70 miles radius from
Sioux Falls, South Dakota...$ 22.19 8.34+10%
More than 70 miles radius from Sioux Falls, South
Dakota......................$ 25.75 7.67+10%
ELEC1426-016 06/01/2010
GRANT, KITTSON, MARSHALL, NORMAN, RED LAKE, TRAVERSE
ELECTRICIAN......................$ 25.41 10.92
* ELEV0009-004 01/01/2011
ELEVATOR MECHANIC................$ 42.06 21.785
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
ENGI0049-052 05/01/2010
CHIPPEWA
OPERATOR: Power Equipment
GROUP 1.....................$ 34.44 15.85
GROUP 2.....................$ 34.10 15.85
GROUP 3.....................$ 32.69 15.85
GROUP 4.....................$ 32.35 15.85
GROUP 5.....................$ 32.18 15.85
GROUP 6.....................$ 30.67 15.85
GROUP 7.....................$ 29.55 15.85
GROUP 8.....................$ 27.54 15.85
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.
GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane
200' & Over.
GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane
(Stationary) up to 200'; All-Terrain Vehicle Crane.
GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);
Overhead Crane (inside building perimeter).
GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor
450 CFM or over (2 or more machines); Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.
GROUP 6: Bobcat/Skid Loader, Tractor D2 or similar size.
GROUP 7: Crane Oiler.
GROUP 8: Oiler, Greaser (Tractor/Truck).
ENGI0049-058 05/01/2010
GRANT, JACKSON, KITTSON, LAC QUI PARLE, LINCOLN, MARSHALL,
MURRAY, NORMAN, POPE, RED LAKE, SWIFT, TRAVERSE
OPERATOR: Power Equipment
GROUP 1.....................$ 32.55 15.85
GROUP 2.....................$ 32.23 15.85
GROUP 3.....................$ 30.90 15.85
GROUP 4.....................$ 30.58 15.85
GROUP 5.....................$ 30.42 15.85
GROUP 6.....................$ 29.00 15.85
GROUP 7.....................$ 27.94 15.85
GROUP 8.....................$ 26.05 15.85
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.
GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane
200' & Over.
GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane
(Stationary) up to 200'; All-Terrain Vehicle Crane.
GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
Overhead Crane (inside building perimeter).
GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor
450 CFM or over (2 or more machines); Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.
GROUP 6: Bobcat/Skid Loader, Tractor D2 or similar size.
GROUP 7: Crane Oiler.
GROUP 8: Oiler, Greaser (Tractor/Truck).
IRON0512-031 05/01/2011
CHIPPEWA, GRANT, JACKSON, LAC QUI PARLE, LINCOLN, MURRAY, POPE,
SWIFT, TRAVERSE
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 34.05 20.37
IRON0512-032 05/01/2011
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 29.51 20.00
LABO0132-025 05/01/2010
LABORER (LANDSCAPE)..............$ 18.79 9.75
LABO0132-030 05/01/2010
LABORER
Mason Tender (Brick), Pipelayer
Projects $1 Million and
Over.......................$ 18.13 10.82
Projects Under $1 Million..$ 15.13 10.82
LABO0563-015 06/01/2010
CHIPPEWA, GRANT, SWIFT, TRAVERSE
Laborers:
(1) Mason Tender (Brick)....$ 22.56 12.18
(2) Pipelayer...............$ 23.31 12.18
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
PROJECTS OVER $950,000: $1.75 additional per hour.
LABO0563-021 06/01/2010
POPE
Laborers:
(1) Mason Tender (Brick)....$ 23.91 12.18
(2) Pipelayer...............$ 24.66 12.18
PROJECTS OVER $950,000: $1.75 additional per hour.
LABO1097-017 05/01/2010
LABORER (Projects $760,000 & over:)
(1) Mason Tender (Brick)....$ 19.06 12.13
(2) Pipelayer...............$ 19.46 12.13
LABORER (Projects under
$760,000:)
(1) Mason Tender (Brick)....$ 16.47 12.13
(2) Pipelayer...............$ 16.81 12.13
PAIN0681-015 05/01/2010
PAINTER (Brush & Roller, excluding Spray).................$ 26.29 12.70
PROJECTS UNDER $600,000 receive 85% of the basic hourly rate.
PREMIUM PAY:
Steel - $0.25 per hour additional.
Sandblast - $0.50 per hour additional
Stageman and Beltman - $1.00 per hour additional
Application of Epoxy, Creosote, other Toxic Materials - $0.25 per hour additional.
PAIN0884-014 06/01/2010
excluding Spray).................$ 21.86 8.66
PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.
PAINTER'S PREMIUM - $0.75 per hour additional for the
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb following: Two Component Paints; Epoxies; Sandblasting &
Rigging; Work done on Swing Scaffolding, Safety Harness, Window Jacks, Boatswain's Chair, Coverings & Erection of
Scaffolding for same; Work on Erected Structural Steel &
Abrasive Blasting
PAIN0884-023 06/01/2010
CHIPPEWA, GRANT, POPE, SWIFT, TRAVERSE
excluding Spray).................$ 24.16 13.31
PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.
PAINTER'S PREMIUM - $0.75 per hour additional for the following: Two Component Paints; Epoxies; Sandblasting &
Rigging; Work done on Swing Scaffolding, Safety Harness, Window Jacks, Boatswain's Chair, Coverings & Erection of
Scaffolding for same; Work on Erected Structural Steel &
Abrasive Blasting
PLUM0011-023 05/01/2010
GRANT, KITTSON, MARSHALL, NORMAN, RED LAKE, TRAVERSE
PLUMBER/PIPEFITTER...............$ 30.39 11.94
PLUM0015-014 05/01/2011
CHIPPEWA, LAC QUI PARLE, POPE, SWIFT
PLUMBER/PIPEFITTER...............$ 35.42 19.40
Paid Holiday: Labor Day
* PLUM0034-012 05/01/2011
PLUMBER..........................$ 28.00 18.79
Paid Holiday: Labor Day
PLUM0455-003 05/01/2011
PIPEFITTER.......................$ 27.79 19.04
ROOF0096-034 06/01/2008
POPE
ROOFER...........................$ 27.85 12.40
ROOF0096-035 07/01/2009
NORMAN
ROOFER...........................$ 27.93 10.18
ROOF0096-036 06/01/2008
CHIPPEWA, GRANT, SWIFT, TRAVERSE
ROOFER...........................$ 27.85 12.40
ROOF0096-039 06/01/2009
JACKSON, LAC QUI PARLE, LINCOLN, MARSHALL, MURRAY
ROOFER...........................$ 19.88 8.32
ROOF0096-048 05/01/2009
KITTSON, RED LAKE
ROOFER...........................$ 22.89 9.65
SHEE0010-060 05/01/2009
GRANT, POPE, TRAVERSE
SHEET METAL WORKER (HVAC Duct and System Installation only)....$ 32.57 16.18
SHEE0010-063 05/01/2009
and System Installation only)....$ 27.31 13.06
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
SHEE0010-069 09/01/2009
CHIPPEWA, LAC QUI PARLE, SWIFT
and System Installation only)....$ 28.38 14.06
SHEE0010-076 06/08/2009
KITTSON, MARSHALL, RED LAKE
and System Installation only)....$ 21.79 11.3
SHEE0010-078 06/08/2009
NORMAN
and System Installation only)....$ 22.75 12.60
SUMN2009-034 07/27/2009
CARPENTER, Excludes
Acoustical Ceiling
Installation, Drywall
Hanging, Form Work, and Metal
Stud Installation................$ 15.72 4.66
CEMENT MASON/CONCRETE FINISHER...$ 14.31 1.45
LABORER: Common or General......$ 12.28 2.32
LABORER: Mason Tender -
Cement/Concrete..................$ 12.70 3.89
LABORER: Roof Tearoff...........$ 10.42 2.08
OPERATOR: Excavator.............$ 17.64 2.97
OPERATOR: Loader................$ 15.50 1.56
OPERATOR: Mechanic..............$ 19.74 4.47
PAINTER: Spray Only.............$ 17.98 4.47
SHEETMETAL WORKER, Excluding
HVAC Duct and System
Installation.....................$ 16.73 4.86
TRUCK DRIVER: Dump Truck........$ 13.92 1.08
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
7/8/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MN114.dvb
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION