619_DD_TEF_11ER1_Blank.pdf

PDF 22 KB Posted

Attached to
USCGC CONFIDENCE (WMEC 619) DRYDOCK
Solicitation number
DD HSCG80-11-Q-P45407
Issued by

About this file

Amended schedule of supplies services

View the file

Other files

File Type Posted
619_DD_TEF_11R2.pdf PDF
SF30 Amendment 02 DD CONFIDENCE.pdf PDF
619_DD_TEF_11R1.pdf PDF
SF30 Amendment 01 DD CONFIDENCE.pdf PDF
619_DD_TEF_11R0.pdf PDF
CONFIDENCE RFQ.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLIES/SERVICES AND PRICES/COSTS FOR:

USCGC CONFIDENCE (WMEC-619) DRYDOCK REPAIRS 2011

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

1-D Appendages (U/W), Leak Test Job 1 2-D Appendages (U/W), Internal, Preserve Job 1 3-D Fairwaters and Rope Guards, Propulsion Shaft, Inspect Job 1 4-D Chain Locker, Preserve 100% Job 1 5-D Tanks (Aviation Fuel Service), Clean, AFC-30 Job 1 6-D Tanks (Aviation Fuel Service), Inspect, AFC-30 Job 1 7-D Tanks (MP Fuel Service), Clean, AFC-30 Job 1 8-D Tanks (MP Fuel Service), Inspect, AFC-30 Job 1 9-D Tanks (Potable Water), Clean and Inspect, AFC-30 Job 1

10-D Potable Water Pneumatic Tanks, Clean and Inspect Job 1 11-D Tanks (Potable Water), Preserve "Partial" Job 1 12-D Grey Water Holding Tanks, Clean and Inspect Job 1 13-D Grey Water Piping, Clean and Inspect Job 1 14-D Sewage Holding Tanks, Clean and Inspect Job 1 15-D Propulsion Shafting Strain Gage Alignment Inspections Job 115-D Propulsion Shafting, Strain Gage Alignment Inspections Job 1 16-D Propulsion Shafting, Remove, Inspect, and Reinstall Job 1 17-D Propulsion Shaft Coating, Renew Job 1 18-O Propulsion Shafting, Straighten Job 1 19-D Work Item Deleted Job 1 20-O Propeller Shaft Sleeve(s), Renew Job 1 21-D Propulsion Shaft Bearings (External), Renew Job 1 22-D Propulsion Stern Tube Bearings, Renew Job 1 23-D Stern Tube Interior Surfaces, Preserve 100% Job 1 24-D Controllable Pitch Propeller System, General Maintenance Job 1 25-D Controllable Pitch Propeller Hub Assembly, General Maintenance Job 1 26-D Rudder Assembly; Remove, Inspect and Reinstall Job 1 27-D Transducer, Fathometer, Renew, AFC-42 Job 1 28-D Transducer, Doppler Speed Log, Renew, AFC-42 Job 1 29-D Sea Strainers, Duplex, Overhaul Job 1 30-D Fuel Manifold, Overhaul Job 1 31-D Compressed Air Receivers; Clean, Inspect, and Test Job 1

619_DD_TEF_11ER1_Blank12/17/20101

32-D Firemain Valve, Renew Job 1 33-D Sea Valves and Waster Pieces, Overhaul or Renew Job 1 34-D Ultrasonic Testing, Hull Plating (U/W Body) Job 1 35-D Cathodic Protection, Zincs, Renew Job 1

36-D Perform Ultrasonic Thickness Measurements - Steel Plating Set of 50 Shots

37-D U/W Body, Preserve ("100%") Job 1 38-D Freeboard, Preserve, Partial, AFC-30 Job 1 39-D Superstructure, Preserve, Partial, AFC-30 Job 1 40-D Decks - Exterior, Forecastle, "Mil-Spec/Flight Deck" System, AFC-30 Job 1 41-D Bilge (Machinery Space), Preserve, AFC-30 Job 1 42-D Davit Control Console, Single Point, Upgrade Job 1 43-D Davit Console, Single Point, Level 2 Inspect and Repair Job 1 44-D Anchor Windlass Maintenance, Port and Starboard Job 1 45-D Ammunition Elevator (Level 2), Inspect, Repair and Test Job 1 46-D Sewage Piping, Renew Job 1 47-D Watertight Doors and Scuttles (Internal, DC Deck and Below), Renew Job 1 48-D Watertight Doors and Scuttles (External), Renew Job 1 49-D Bulkhead, Laundry Room (1-20-0-Q), Repair Job 1 50-D Bulkhead and Deck Plating (1-FP-0-A), Renew Job 1 51-D Bulkhead Plating (1-138), Renew Job 1 52-D Transverse Bulkhead (3-52-0-Q), Repair Job 1 53-D Deck Plating, Passageway (1-52-01-L), Renew Job 1 54-D Galley Deck (1-146-0-Q), Renew, AFC-30 Job 1 55-D Fore Peak Tank Vent, Renew Job 1 56-D Anchor Windlass Foundation, Renew Job 1 57-D Magnetic Compass Foundation, Inspect and Repair Job 1 58-D Deck and Bulkhead Plating, Gear Locker (1-162-1-A), Renew Job 1 59-D Gunwale Stiffener, Renew Job 1 60-D Anchor Chain Fairlead and Cats Pawl Base, Renew Job 1 61-D Fan Room (1-63-1-Q), Refurbish Job 1 62-D Drydocking Job 1 63-D Temporary Services, Provide Job 1 64-D Sea Trial Performance, Provide Support Job 1 65-D Weather Door, CIC - Renew, AFC-30 Job 1

619_DD_TEF_11ER1_Blank12/17/20102

66-D Bilge (Aft Steering), Repair Job 1 67-D Bilge (Armory), Repair Job 1 68-D Bilge (Engine Room), Repair Job 1 69-D Bilge (Flammable Liquid Stores), Repair Job 1 70-D Bilge (Sewage Disposal), Repair Job 1 71-D Fuel Oil Piping, Renew Job 1 72-D Deck Plating (Fan Room), Renew Job 1 73-D Propulsion Shaft Stern Tube Bearings, Overhaul Job 1 A-O Composite Labor Rate Hour 1 B-D GFP Report NSP EA 1 NSP C-O Laydays Day 5

Total Price of Definite Items Total Price of Option Items Total Price of Definite and Optional Items

619_DD_TEF_11ER1_Blank12/17/20103

SOS&S

File details come from the government source that posted it. Updated .