About this file
This is an Invitation for Bids (IFB) document issued by the State of Maryland, Department of Transportation–State Highway Administration (MDOT-SHA) for maintenance, brush, tree clearing, and spraying services at the Fairland Shop facility in Montgomery County, Maryland. The contractor shall provide tree and brush removal, landscape services, wall cutting, underbrush removal, litter and debris clearing, grass mowing and trimming to a 4-inch height, and pesticide spraying along state highways. Work areas extend 4 to 14 feet from the pavement edge on both sides of eight ramps, including acceleration/deceleration lanes, approaches, and exits. All work must be performed Monday through Friday between 7:30 a.m. and 4:00 p.m. The anticipated contract commencement date is the end of June 2026, with a term not to exceed six months. Questions are due by June 22, 2026, at 2:00 p.m. local time, and sealed bids must be submitted through the eMMA platform by June 23, 2026, at 2:00 p.m. local time. Public bid opening is scheduled for June 24, 2026, at 2:00 p.m. at the Fairland Maintenance Facility. No pre-bid conference or site visit is scheduled; however, bidders are required to review the site and specifications before submitting bids.
This is a Small Business Reserve procurement limited to certified small businesses with a firm fixed-price contract type and single award basis. The procurement method follows Competitive Sealed Bidding under COMAR 21.05.02, with contract award to the responsive and responsible bidder submitting the lowest total bid price. MBE/DBE subcontracting goals and VSBE participation goals are set at 0 percent. No federal funding is involved in this procurement. Bidders must meet minimum qualifications including three years of experience providing services within Maryland, current certification by the Maryland Insurance Administration, and DNR licensure as a Tree Expert with a valid pesticide license. Required insurance includes Commercial General Liability of $1,000,000 per occurrence and $3,000,000 annual aggregate, plus Workers' Compensation insurance of $1,000,000 per occurrence. Bidders must submit required attachments including bid affidavits, price forms, bidder information sheets, conflict of interest disclosures, reference checks, financial capability documentation, and Maryland registration verification. The contractor must provide all equipment, labor, fuel, and traffic control measures, with costs included in the total bid amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID FORMS D332TREE27SB.xlsx | XLSX spreadsheet | |
| D332TREE27SB ADDENDUM - REJECTION OF ALL BIDS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maintenance, Brush, Tree Clearing & Spraying Solicitation #: D332TREE27SB IFB Document
IFB for State Highway Administration Page 1 of 26
STATE OF MARYLAND
STATE HIGHWAY ADMINISTRATION
FAIRLAND SHOP
INVITATION FOR BIDS (IFB)
MAINTENANCE, Brush, Tree Clearing & Spraying
IFB NUMBER D332TREE27SB
ISSUE DATE: 06/15/2026
A Prospective Bidder that has received this document from a source other than eMarylandMarketplace Advantage (eMMA) https://procurement.maryland.gov should register on eMMA https://emma.maryland.gov/
NOTICE TO BIDDERS
SMALL BUSINESS RESERVE PROCUREMENT
This is a Small Business Reserve Procurement for which the award will be limited to certified small business vendors. Only businesses that meet the statutory requirements set forth in State Finance and Procurement Article, §§14-501—14-505, Annotated Code of Maryland, and that are certified by the Governor’s Office of Small, Minority & Women Business Affairs (GOSBA) Small Business Reserve Program are eligible for award of a contract. Before awarding a contract under a procurement designated as a small business reserve procurement, the Procurement Officer shall verify that the apparent awardee is certified by the GOSBA as a small business through eMMA. However, if small businesses do not show interest in this solicitation, the Procurement Officer has the right to remove the SBR designation via an Amendment on eMMA.
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS
SOLICITATION.
https://procurement.maryland.gov/ https://emma.maryland.gov/ https://gomdsmallbiz.maryland.gov/Pages/sbr-program.aspx https://gomdsmallbiz.maryland.gov/Pages/sbr-program.aspx
IFB for State Highway Administration Page 2 of 26
KEY INFORMATION SUMMARY SHEET (KISS)
Invitation for Bids Maintenance - Brush, Tree Clearing & Spraying
Solicitation Number:
D332TREE27SB
IFB Issue Date: 06/15/2026
IFB Issuing Office:
State Highway Administration (MDOT-SHA)
Procurement Officer:
Cheri Hodges 12020 Plum Orchard Drive Silver Spring, MD 20904
Email:
Phone Number:
Chodges2@mdot.maryland.gov
301-572-5166
Bids are to be sent to:
Submit on emma.maryland.gov under Solicitation Number
D332TREE27SB
To submit a bid, bidders must first register on emma.maryland.gov. We recommend registering in advance to become acquainted with the site.
No Bid Notice Feedback Form
If you are not submitting a bid for this solicitation, submit Attachment 1 with your reasons why.
Pre-Bid Conference:
No Pre-bid Conference will be held for this advertisement
See Section 4.3 for additional details.
See Attachment 2 to RSVP by N/A
Scheduled Site Visit
N/A
Questions Due Date and Time:
6/22/2026 2:00 PM Local Time
Bid Due (Closing) Date and Time:
06/23/2026 by 2:00 PM Local Time Bidders are reminded that a completed Feedback Form is requested if a no-bid decision is made (see Attachment 1 - No Bid Notice/Vendor Feedback Form).
mailto:Chodges2@mdot.maryland.gov
IFB for State Highway Administration Page 3 of 26
Public Bid Opening Date, Time, and Location
06/24/2026 at 2:00 PM Local Time Fairland Maintenance Facility
MBE/DBE
Subcontracting Goal:
An overall Minority Business Enterprise (MBE) or Disadvantaged Business Enterprise (DBE) subcontract participation goal of zero percent of the total contract dollar amount, including all renewal option terms, if any, has been established for this procurement. The overall MBE or DBE subcontract participation goal includes the following subgoals, which have been established for this procurement:
0% for African-American MBEs;
0% for Asian-American MBEs;
0% for Hispanic-American MBEs; and
0% for Woman-Owned MBEs.
N/A
VSBE
Subcontracting Goal:
This solicitation includes a VSBE participation Goal of 0% N/A
Procurement Method:
A Contract will be awarded in accordance with the Competitive Sealed Bidding method under COMAR 21.05.02.
Multiple or Alternate Bids:
Multiple or alternate Bids will not be accepted.
Contract Type: Firm fixed price
Contract Duration:
The duration/ term of the Contract is not to exceed 6 months
Primary Place of Performance:
Montgomery County, MD
SBR Designation: Yes
Federal Funding: No
IFB for State Highway Administration Page 4 of 26
Table of Contents - IFB
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.2 Background and Purpose
2.2.1 Project Goals
2.2.2 State Staff and Roles
2.2.3 Other State Responsibilities
2.3 Contractor Responsibilities and Tasks
2.4 Supplemental Category of Work Requirements and Responsibilities
3 Standard Terms and Conditions
3.1 Contract Initiation Requirements
3.2 End of Contract Transition
3.3 Invoicing
3.3.1 Invoice Submission Schedule
3.3.2 Deliverable Invoicing
3.3.3 Labor Hour/Time and Materials Invoicing
3.3.4 Travel Reimbursement
3.4 Liquidated Damages
3.4.1 MBE Liquidated Damages
3.4.2 Liquidated Damages other than MBE
3.4.3 Problem Escalation Procedure
3.5 Work Orders
3.6 Payments by Electronic Funds Transfer
3.7 Prompt Payment Policy
3.8 Federal Funding Acknowledgement
3.9 Conflict of Interest Affidavit and Disclosure
3.10 Non-Disclosure Agreement
3.10.1 Non-Disclosure Agreement (Bidder/Offeror)
3.10.2 Non-Disclosure Agreement (Contractor)
3.11 Maryland Healthy Working Families Act Requirements
3.12 The State of Maryland’s Commitment to Purchasing Environmentally Preferred Products and
Services (EPPs)
3.13 Insurance Requirements
4 Bid Submission Information and Instructions
4.1 eMaryland Marketplace Advantage (eMMA)
IFB for State Highway Administration Page 5 of 26
4.2 Electronic Means
4.3 Pre-Bid Conference
4.4 Questions
4.5 Bid Due (Closing) Date and Time
4.6 Receipt, Opening and Recording of Bids
4.7 Duration of Bids
4.8 Revisions to the IFB
4.9 Cancellations
4.10 Incurred Expenses
4.11 Protest/Disputes
4.12 Bidder Responsibilities
4.13 Acceptance of Terms and Conditions
4.14 Compliance with Laws/Arrearages
4.15 Verification of Registration and Tax Payment
4.16 False Statements
4.17 Confidentiality of Bids / Public Information Act Notice
4.18 Use of Bidder’s Form Not Binding on State
4.19 Attachments and Documents Required with the Bid (Table A)
4.20 Bid Delivery Instructions
4.21 Tie Bids
4.22 Reciprocal Preference
4.23 Documents Required upon Notice of Recommendation for Contract Award (Table B)
5 IFB Appendices and Exhibits
5.1 Appendices (Table C)
5.2 Exhibits (Table D)
IFB for State Highway Administration Page 6 of 26
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
The Bidder must document in its Bid that it satisfies the following Minimum Qualifications:
A. The Bidder shall have three (3) years of experience providing the service detailed in this contract within the State of Maryland. Required Documentation: The Bidder shall provide with its Bid one or more references from the past three years that collectively are able to attest to the Bidder’s required years of experience in providing.
B. The Bidder shall be certified by the Maryland Insurance Administration. Required Documentation: The Bidder shall provide with its Bid current certificate issued by the Maryland Insurance Administration, evidencing the Bidder’s certification.
C. The bidder must be fully qualified to legally provide the services detailed in this IFB within the State of Maryland. All applicable Federal, State, County, and Local statutes, laws, and regulations must be followed by all parties when performing work related to this IFB. This requirement includes, but is not limited to, the standards established by the MDE, EPA, UASCE, FCWA, MOSH, OSHA, NFPA, and other relevant governmental agencies
D. The Bidder shall provide with its Bid "Attachment L Reference Checks" with one or more references filled out.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK.
IFB for State Highway Administration Page 7 of 26
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.1.1 This Invitation for Bids (IFB) is issued to procure the goods or services, as specified in this Section 2, from a contract between the successful bidder(s) and the State of Maryland (“State”): This Invitation for Bids (IFB) is issued to procure the goods or services, as specified in this Section 2, from a contract between the successful bidder(s) and the State of Maryland (“State”): provide tree and brush removal and landscape services for MDOT SHA located in Montgomery County.
It is the State’s intention to obtain goods and services, as specified in this IFB, from a contract between the selected Bidder and the State.
2.1.2 This is a single award IFB Categories/Functional Areas or Regions/Counties, state so here. See IFB Section 4.21 Bid Brush, Tree Clearing and Spraying Criteria and Award Basis for more Contract award information
A Contract award does not ensure a Contractor will receive all or any State business under the Contract.
2.2 Background and Purpose
The contractor shall provide clearing and maintenance work at state highways in Montgomery County, MD. Removal of brush, trees, litter, grass, debris, and nuisance weeds/vines. Flush cut and remove leaning or dead trees away from the pavement edge. Clearance area: 4 to 14 feet from the edge of the pavement on both sides of all eight ramps, including acceleration/deceleration lanes, approaches, and exits. Contractor Requirements: Must be a Maryland Licensed contractor. Required to review the site and specifications before bidding. Contract Commencement: Anticipated to begin in end of June 2026.
2.2.1 Project Goals
This section is inapplicable to this IFB.
2.2.2 State Staff and Roles
In addition to the Procurement Officer and Contract Monitor, the State Office Manager
State Office Manager
A. The State Office Manager is responsible for processing invoices The State Office Manager will provide the following: Facility Availability
2.2.3 Other State Responsibilities
This section is inapplicable to this IFB.
IFB for State Highway Administration Page 8 of 26
2.3 Contractor Responsibilities and Tasks
A. The contractor shall make available all necessary equipment to perform the mowing, wall cut, and tree removal activities.
B. Contractor provides wall cut, underbrush, and tree removal services, spraying, and grass mowing/trimming. Areas are to be cut and trimmed between four and fourteen feet up from the roadway shoulder back to and along the tree line, and underbrush back to and along the tree line, including any leaning and/or dead tree removal (flush cut). This service includes:
C. Wall cut trees on both sides of roadways from the roadway shoulder edge to a distance between four and fourteen feet back to and along the tree line areas.
D. Cut and remove all underbrush back to and along the tree line areas.
E. Remove Road dirt, weeds, and debris collecting along the gutter line in front of all jersey walls.
F. Contractor must be a DNR licensed Tree Expert.
G. Provide all equipment, tools, labor, fuels, maintenance of traffic, etc., to perform the services in a safe manner.
H. Contractors must adhere to DNR, MDE, and MOSH guidelines.
I. Clean the area of all debris upon completion of work.
J. All work to be performed during the hours of 7:30 am and 4:00 pm – Monday-Friday.
K. Remove vines and brush.
L. Mow and trim grass to a 4-inch height.
M. Contractor shall have a valid pesticide license.
N. Contractors shall follow attached standards for treatment of cut stumps (see attached standards).
O. The contractor shall make available all necessary skilled and unskilled personnel to perform tree and brush removal activities. The personnel may include but not be limited to: Foreman (crew leader), Tree Climber (pruner, cutter), Laborer(s), Traffic control manager, Herbicide applicator(s).
P. The contractor shall make available all necessary equipment to perform the mowing, wall cut, and tree removal activities. This may include, but not be limited to:
* Pick-up truck
* Hydraulic lift or bucket truck able to reach full canopy or height of cut
* Brush and limb chipper
* Chainsaws, various hand tools, pole saws, etc.
* And other specialized tools associated with expert tree removal.
* Mowers and trimmers
* Herbicide applicator(s)
* Protection vehicles such as TMA (Truck Mounted Attenuator)
* Arrow panel(s)
All equipment, fuel, and transportation costs shall be included in the total bid.
2.4 Supplemental Category of Work Requirements and Responsibilities
See the attached Scope of Contractor Services associated with this solicitation.
IFB for State Highway Administration Page 9 of 26
3 Standard Terms and Conditions
3.1 Contract Initiation Requirements
Once all approvals have been obtained and the Contract is fully executed, the Procurement Officer may schedule a kickoff meeting to be held prior to commencement of Contract performance.
3.2 End of Contract Transition
The Contractor shall cooperate in the orderly transition of services from it to a subsequent contractor at the end of the contract term or upon receipt of a Notice of Termination from the State. Transitions shall be provided in a prompt and timely manner and shall proceed in accordance with the schedule provided to the Contractor by the State in the Notice of Transition. Additional instructions regarding transition services may be provided in the event of a Notice of Termination issued by the State.
3.3 Invoicing
Submission of an invoice constitutes the Contractor’s verification that the information in the invoice is accurate as of the time of submission.
An invoice not satisfying the requirements of a Proper Invoice (as defined in COMAR 21.06.09) will not be processed for payment. To be considered a Proper Invoice, invoices must include the following information, without error:
A. Contractor’s name and address.
B. Remittance address.
C. Federal taxpayer identification (FEIN) number, social security number, as appropriate.
D. Invoice period (i.e. time period during which services covered by invoice were performed).
E. Invoice date;
F. Invoice number;
G. State assigned Contract number;
H. State assigned (Blanket) Purchase Order number(s);
I. Goods or services provided;
J. Amount due; and
K. Any additional documentation required by regulation or the Contract.
Invoices that contain both fixed price and labor hour or time and material items shall clearly identify each item as either fixed price, and labor hour, or time and material billing.
The State reserves the right to reduce or withhold Contract payment in the event the Contractor does not provide all required deliverables within the time frame specified in the Contract or otherwise breaches the terms and conditions of the Contract until such time as the Contractor brings itself into full compliance with the Contract.
The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of Columbia sales taxes and transportation taxes. The Contractor, however, is not exempt from such sales and use taxes and may be liable for the same.
IFB for State Highway Administration Page 10 of 26
Invoices for final payment shall be clearly marked as “FINAL” and submitted when all work requirements have been completed, and no further charges are to be incurred under the Contract.
In no event shall any invoice be submitted later than 60 calendar days from the Contract termination date.
Invoices shall be sent to the following email address: D3FairInv@mdot.maryland.gov
3.3.1 Invoice Submission Schedule
The Contractor shall submit invoices in accordance with the following schedule:
A. For items of work for which there is one-time pricing (see Attachment B –The Price Form), those items shall be billed in the month following the acceptance of the work by the State.
B. Invoices for work performed on a labor hour or time and materials basis shall be submitted on or before the 5th business day of the month following the end of the invoice period.
3.3.2 Deliverable Invoicing
This section is inapplicable to this IFB.
3.3.3 Labor Hour/Time and Materials Invoicing
This section is inapplicable to this IFB.
1. Timesheet Reporting
This section is inapplicable to this IFB.
2. Materials Reporting
Submit evidence to support the cost of materials and that billing on the invoice is consistent with the requirements stated in Section 2 of the IFB.
A. For the purposes of the Contract an amount will not be deemed due and payable if:
B. The amount invoiced is inconsistent with the Contract;
C. The proper invoice has not been received by the party or office specified in the
Contract;
D. The invoice or performance is in dispute or the Contractor has failed to otherwise comply with the provisions of the Contract;
E. The item or services have not been accepted;
F. The quantity of items delivered is less than the quantity ordered;
G. The items or services do not meet the quality requirements of the Contract;
H. If the Contract provides for progress payments, the proper invoice for the progress payment has not been submitted pursuant to the schedule;
I. If the Contract provides for withholding a retainage and the invoice is for the retainage, all stipulated conditions for release of the retainage have not been met; or J. The Contractor has not submitted satisfactory documentation or other evidence reasonably required by the Procurement Officer or by the Contract concerning performance under the Contract and compliance with its provisions.
3.3.4 Travel Reimbursement
Travel will not be reimbursed under this IFB.
mailto:D3FairInv@mdot.maryland.gov
IFB for State Highway Administration Page 11 of 26
3.4 Liquidated Damages
3.4.1 MBE Liquidated Damages
Inapplicable because there is no MBE goal for this IFB.
3.4.2 Liquidated Damages other than MBE
This section is inapplicable to this IFB.
3.4.3 Problem Escalation Procedure
No later than ten (10) Business Days after notice of recommended award or after the date of the Notice to Proceed, whichever is earlier, the Contractor must provide, and thereafter, maintain a Problem Escalation Procedure (PEP) for both routine and emergency situations. The PEP must state how the Contractor will address problem situations as they occur during the performance of the Contract, especially problems that are not resolved to the satisfaction of the State within appropriate timeframes and must include:
A. Contact information B. The process for establishing the existence of a problem;
C. Names, titles, and contact information for progressively higher levels of personnel in the Contractor’s organization who would become involved in resolving a problem;
D. For each individual listed in the Contractor’s PEP, the maximum amount of time a problem will remain unresolved with that individual before the problem escalates to the next contact person listed in the Contractor’s PEP;
E. Expedited escalation procedures and any circumstances that would trigger expediting them;
F. The method of providing feedback on resolution progress, including the frequency of feedback to be provided to the State;
G. Contact information for persons responsible for resolving issues after normal business hours (e.g., evenings, weekends, holidays) and on an emergency basis; and
H. A process for updating and notifying the Contract Monitor of any changes to the PEP.
I. The PEP must be updated within ten (10) Business Days after any change in circumstance which changes the PEP but not less than annually within ten (10) Business Days after the start of each Contract year .
Nothing in this section shall be construed to limit any rights of the Contract Monitor or the State which may be allowed by the Contract or applicable law.
3.5 Work Orders
THIS SECTION IS INAPPLICABLE TO THIS IFB.
3.6 Payments by Electronic Funds Transfer
By submitting a Bid in response to this solicitation, the Bidder, if selected for award:
Agrees to accept payments by electronic funds transfer (EFT) unless the State Comptroller’s Office grants an exemption. Payment by EFT is mandatory for contracts exceeding $200,000. The successful Bidder shall register using the COT/GAD X-10 Vendor Electronic Funds (EFT) Registration Request Form.
Any request for exemption must be submitted to the State Comptroller’s Office for approval at the address specified on the COT/GAD X-10 form, must include the business identification
IFB for State Highway Administration Page 12 of 26 information as stated on the form, and must include the reason for the exemption. The COT/GAD X-10 form may be downloaded from the Comptroller’s website at:
http://comptroller.marylandtaxes.com/Vendor_Services/Accounting_Information/Static_Files/GA DX10Form20150615.pdf.
3.7 Prompt Payment Policy
This procurement and the Contract(s) to be awarded pursuant to this solicitation are subject to the Prompt Payment Policy Directive issued by the Governor’s Office of Small, Minority & Women Business Affairs (GOSBA) and dated August 1, 2008. Promulgated pursuant to Md. Code Ann., State Finance and Procurement Article, §§ 11-201, 13-205(a), and Title 14, Subtitle 3, and COMAR 21.01.01.03 and 21.11.03.01, the Directive seeks to ensure the prompt payment of all subcontractors on non-construction procurement contracts. The Contractor shall comply with the prompt payment requirements outlined in the Contract, Section 31 “Prompt Pay Requirements” (see Exhibit 2 - Sample Contract). Additional information is available on GOSBA’s website at:
http://www.gomdsmallbiz.maryland.gov/documents/legislation/promptpaymentfaqs.pdf.
3.8 Federal Funding Acknowledgement
This Contract does not contain federal funds.
3.9 Conflict of Interest Affidavit and Disclosure
The Bidder shall complete and sign the Conflict of Interest Affidavit and Disclosure (Attachment I) and submit it with its Bid.
By submitting a Conflict of Interest Affidavit and Disclosure, the Contractor shall be construed as certifying all Contractor Personnel and subcontractors are also without a conflict of interest as defined in COMAR 21.05.08.08A.
Additionally, a Contractor has an ongoing obligation to ensure that all Contractor Personnel are without conflicts of interest prior to providing services under OR individual Task Orders issued under the Contract. For policies and procedures applying specifically to Conflict of Interests, the Contract is governed by COMAR 21.05.08.08.
Participation in Drafting of Specifications: Disqualifying Event: Bidders are advised that Md. Code Ann. State Finance and Procurement Article §13-212.1(a) provides generally that “an individual who assists an executive unit in the drafting of specifications, an invitation for bids, a request for proposals for a procurement, or the selection or award made in response to an invitation for bids or a request for proposals, or a person that employs the individual, may not: (1) submit a bid or proposal for that procurement; or (2) assist or represent another person, directly or indirectly, who is submitting a bid or proposal for that procurement.” Any Bidder submitting a Bid in violation of this provision shall be classified as “not responsible.”
3.10 Non-Disclosure Agreement
3.10.1 Non-Disclosure Agreement (Bidder/Offeror)
A Non-Disclosure Agreement (Bidder/Offeror) is not required for this procurement.
3.10.2 Non-Disclosure Agreement (Contractor)
A Non-Disclosure Agreement (Contractor) is not required for this procurement.
IFB for State Highway Administration Page 13 of 26
3.11 Maryland Healthy Working Families Act Requirements
On February 11, 2018, the Maryland Healthy Working Families Act went into effect. All Bidders should be aware of how this Act could affect your potential contract award with the State of Maryland. See the Department of Labor, Licensing and Regulations website for Maryland Healthy Working Families Act Information: https://dllr.state.md.us/paidleave/.
3.12 The State of Maryland’s Commitment to Purchasing Environmentally Preferred Products and Services (EPPs)
Maryland’s State Finance & Procurement Article §14-410 defines environmentally preferable purchasing as “the procurement or acquisition of goods and services that have a lesser or reduced effect on human health and the environment when compared with competing goods or services that serve the same purpose.” Accordingly, Bidders are strongly encouraged to offer EPPs to fulfill this contract, to the greatest extent practicable.
3.13 Insurance Requirements
The Contractor shall maintain, at a minimum, the insurance coverages outlined below, or any minimum requirements established by law if higher, for the duration of the Contract, including option periods, if exercised:
3.13.1 The following type(s) of insurance and minimum amount(s) of coverage are required:
A. Commercial General Liability - One million dollars ($1,000,000) combined single limit per occurrence for bodily injury, property damage, and personal and advertising injury and three million dollars ($3,000,000) annual aggregate. The minimum limits required herein may be satisfied through any combination of primary and umbrella/excess liability policies.
B. Worker’s Compensation - The Contractor shall maintain such insurance as necessary or as required under Workers’ Compensation Acts, the Longshore and Harbor Workers’ Compensation Act, and the Federal Employers’ Liability Act, to not be less than. one million dollars ($1,000,000) per occurrence (unless a state’s law requires a greater amount of coverage). Coverage must be valid in all states where work is performed.
3.13.2 The State shall be listed as an additional insured on the faces of the certificates associated with the coverages listed above, including umbrella policies, excluding Workers’ Compensation Insurance and professional liability.
3.13.3 All insurance policies shall be endorsed to include a clause requiring the insurance carrier to provide the Procurement Officer, by certified mail, not less than 30 days’ advance notice of any non-renewal, cancellation, or expiration. The Contractor shall notify the Procurement Officer in writing, if policies are canceled or not renewed within five (5) days of learning of such cancellation or nonrenewal. The Contractor shall provide evidence of replacement insurance coverage to the Procurement Officer at least 15 days prior to the expiration of the insurance policy then in effect.
3.13.4 Any insurance furnished as a condition of the Contract shall be issued by a company authorized to do business in the State.
3.13.5 The recommended awardee must provide current certificate(s) of insurance with the prescribed coverages, limits and requirements set forth in this section within five (5) Business Days from notice of recommended award. During the period of performance for https://dllr.state.md.us/paidleave/ https://trackbill.com/bill/maryland-house-bill-629-environmentally-preferable-procurement-maryland-green-purchasing-committee/647077/
IFB for State Highway Administration Page 14 of 26 multi-year contracts, the Contractor shall provide certificates of insurance annually, or as otherwise directed by the Contract Monitor.
3.13.6 Subcontractor Insurance
The Contractor shall require any subcontractors to obtain and maintain comparable levels of coverage and shall provide the Contract Monitor with the same documentation as is required of the Contractor.
IFB for State Highway Administration Page 15 of 26
4 Bid Submission Information and Instructions
4.1 eMaryland Marketplace Advantage (eMMA) eMMA is the electronic commerce system for the State of Maryland. The IFB, Pre-Bid Conference (Conference)summary and attendance sheet, Bidders’ questions and the Procurement Officer’s responses, addenda, and other solicitation-related information will be made available via eMMA.
To receive a contract award, a vendor must be registered on eMMA. Registration is free. Go to emma.maryland.gov, click on “New Vendor? Register Now” to begin the process, and then follow the prompts.
4.2 Electronic Means
The following transactions related to this procurement and any Contract awarded pursuant to it are not authorized to be conducted by electronic means:
A. Submission of Bond documents determined by the State to require original signatures; or
B. Any transaction, submission, or communication where the Procurement Officer has specifically directed that a response from the Contractor or Offeror be provided in writing or hard copy.
Any e-mail transmission is only authorized to the email addresses for the identified person as provided in the solicitation, the Contract, or in the direction from the Procurement Officer or Contract Monitor.
“Electronic means” refers to exchanges or communications using electronic, digital, magnetic, wireless, optical, electromagnetic, or other means of electronically conducting transactions.
Electronic means includes e-mail, internet-based communications, electronic funds transfer, specific electronic bidding platforms (e.g., https://procurement.maryland.gov), and electronic data interchange.
4.3 Pre-Bid Conference
If a Conference will be held, the date, time, and location is indicated on the Key Information Summary Sheet. Attendance at the Conference is not mandatory, but all interested parties are encouraged to attend in order to facilitate better preparation of their Bids. If the solicitation includes an MBE participating goal, failure to attend the Conference will be taken into consideration as part of the evaluation of a bidder’s good faith efforts if there is a waiver request.
It is highly recommended that all Prime Contractors bring their intended subcontractors to the Conference/Site Visit to ensure that all parties understand the IFB requirements and the socio-economic goals for this solicitation.
MBE subcontractors are encouraged to attend the Conference to market their participation to potential prime contractors.
In order to assure adequate accommodations at the Conference, please email the completed Attachment 2 for those expected to attend the Conference to the Procurement Officer no later than the time and date indicated on the Key Information Summary Sheet. In addition, if there is a need for sign language interpretation or other special accommodations due to a disability, please notify the Procurement Officer at least five (5) Business Days prior to the Conference date. Reasonable effort will be made to provide such special accommodation.
https://emma.maryland.gov/page.aspx/en/usr/login?ReturnUrl=%2fpage.aspx%2fen%2fbuy%2fhomepage https://procurement.maryland.gov/
IFB for State Highway Administration Page 16 of 26
If the Conference is in person, attendees should bring a copy of the solicitation and a business card to help facilitate the sign-in process.
4.4 Questions
All questions, including concerns regarding any applicable MBE or VSBE participation goals, shall identify in the subject line the Solicitation Number and Title for this IFB and must be submitted in writing via e-mail or eMMA to the Procurement Officer no later than the date and time specified in the Key Information Summary Sheet. The Procurement Officer, based on the availability of time to research and communicate an answer, shall decide whether an answer can be given before the Bid due date.
4.4.1 Answers to all questions that are not clearly specific only to the requestor will be distributed via the same mechanism as for IFB amendments and posted on eMMA.
4.4.2 The statements and interpretations contained in responses to any questions, whether responded to verbally or in writing, are not binding on the State unless it issues an amendment to the solicitation in writing.
4.4.3 MDOT-SHA will not respond to telephone requests for information concerning this Invitation for Bids that would materially affect the bid. Written requests for information or questions shall be submitted in writing. They must be emailed to the Procurement Officer (if attached to the email please provide in Word format).
4.5 Bid Due (Closing) Date and Time
Bids must be received by the Procurement Officer no later than the Bid due date and time indicated on the Key Information Summary Sheet to be considered. Except as provided in COMAR
21.05.02.10. Bids received after that date will not be considered. Requests for an extension of this date or time shall not be granted.
For Bids accepted via email, the time stamp to indicate receipt of the Bid by the State, is the posted date and time in the Procurement Officer’s email inbox.
Bids may be modified or withdrawn by written notice received by the Procurement Officer before the time and date set forth in the Key Information Summary Sheet for receipt of Bids.
Potential Bidders not responding to this solicitation are requested to submit the “No Bid/Proposal Notice/Vendor Feedback” form Attachment 1, which includes company information and the reason for not responding (e.g., too busy, cannot meet mandatory requirements).
4.6 Receipt, Opening and Recording of Bids
Upon receipt, each Bid and any timely modification(s) to a Bid shall be stored in a secure place until the time and date set for Bid opening. Before Bid opening, the State may not disclose the identity of any Bidder.
Bids shall be opened publicly at the time, date and place designated in the Key Information Summary Sheet.
The name of each Bidder, the Total Bid Price, and such other information as is deemed appropriate shall be read aloud or otherwise made available and recorded at the time of Bid opening.
IFB for State Highway Administration Page 17 of 26
4.7 Duration of Bids
Bids submitted in response to this IFB are irrevocable for the latest of the following: 120 days following the Bid due date and time or the date any protest concerning this IFB is finally resolved.
This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement.
4.8 Revisions to the IFB
4.8.1 All revisions to the IFB before the due date for Bids will be published in an addendum to the IFB and posted on eMMA and reasonable effort will be made to provide such addenda to all prospective Bidders that were sent this IFB or are otherwise known by the Procurement Officer to have obtained this IFB. It is the responsibility of all prospective Bidders to check eMMA for any addenda issued prior to the submission of Bids.
4.8.2 Bidders shall acknowledge in the Bid the receipt of all addenda to this IFB issued before the Bid due date.
4.8.3 Failure to acknowledge receipt of an addendum does not relieve the Bidder from complying with the terms, additions, deletions, or corrections set forth in the addendum, and may cause the Bid to be deemed not responsive.
4.9 Cancellations
4.9.1 This IFB may be cancelled as provided in COMAR 21.06.02.02
4.9.2 The State reserves the right to cancel this IFB, accept or reject any and all Bids, in whole or in part, received in response to this IFB and to waive or permit the cure of minor irregularities.
4.9.3 In the event a government entity proposes and receives the recommendation for award, this procurement may be canceled, and the award processed in accordance with COMAR 21.01.03.01.A(4).
4.9.4 If the services that are the subject of the IFB are currently being provided under an interagency agreement with a public institution of higher education and the State determines that the services can be provided more cost effectively by the public institution of higher education, then the IFB may be canceled in accordance with Md.
Code Ann., State Finance and Procurement Art., § 3-207(b)(2).
4.10 Incurred Expenses
The State will not be responsible for any costs incurred by any Bidder in preparing and submitting a Bid or performing any other activities related to submitting a Bid in response to this solicitation.
4.11 Protest/Disputes
Any protest or claim related to this IFB or the Contract award hereunder shall be subject to the provisions of COMAR 21.10 (Administrative and Civil Remedies).
4.12 Bidder Responsibilities
4.12.1 A Bidder, either directly or through its subcontractor(s), must be able to provide all goods and services and meet all of the requirements requested in this solicitation and the
IFB for State Highway Administration Page 18 of 26 successful Bidder (the Contractor) shall remain responsible for Contract performance regardless of subcontractor participation in the work.
4.12.2 If applicable, subcontractors utilized in meeting the established MBE or VSBE participation goal(s) for this solicitation shall be identified using Attachment D or Attachment E as appropriate. Guidance for completing the Attachments is provided in the appropriate Appendix to this IFB (see “Appendix 4 - MBE Participation Goal” and “Appendix 5 - VSBE Participation Goal”).
4.12.3 If the Bidder is the subsidiary of another entity, all information submitted by the Bidder, including but not limited to references, financial reports, or experience and documentation (e.g., insurance policies, bonds, letters of credit) used to meet minimum qualifications, if any, shall pertain exclusively to the Bidder, unless the parent organization will guarantee the performance of the subsidiary. If applicable, the Bidder’s Bid shall contain an explicit statement, signed by an authorized representative of the parent organization, stating that the parent organization will guarantee the performance of the subsidiary.
4.12.4 A parental guarantee of the performance of the Bidder under this section will not automatically result in crediting the Bidder with the experience or qualifications of the parent under any evaluation criteria pertaining to the actual Bidder’s experience and qualifications. Instead, the Bidder’s responsibility will be assessed to the extent to which the State determines that the experience and qualifications of the parent are applicable to and shared with the Bidder, any stated intent by the parent to be directly involved in the performance of the Contract, and the value of the parent’s participation as determined by the State.
4.13 Acceptance of Terms and Conditions
By submitting a Bid in response to this IFB, the Bidder, if selected for award, is deemed to have accepted the terms and conditions of this IFB and the Contract, attached hereto as Exhibit 2 – Sample Contract. Any questions or exceptions to this IFB or the Contract must be submitted by the “Questions Due Date and Time” prior to Bid submission. Changes to the solicitation, including the Bid Form or Contract, made by the Bidder may result in Bid rejection.
4.14 Compliance with Laws/Arrearages
By submitting a Bid in response to this IFB, the Bidder, if selected for award, agrees that it will comply with all federal, State, and local laws applicable to its activities and obligations under the Contract.
By submitting a response to this solicitation, each Bidder represents that it is not in arrears in the payment of any obligations due and owing the State, including the payment of taxes and employee benefits, and shall not become so in arrears during the term of the Contract if selected for Contract award.
4.15 Verification of Registration and Tax Payment
Before a business entity can do business in the State, it must be registered with the State Department of Assessments and Taxation (SDAT). SDAT is located at State Office Building, Room 803, 301 West Preston Street, Baltimore, Maryland 21201. For registration information, visit https://egov.maryland.gov/BusinessExpress/.
https://egov.maryland.gov/BusinessExpress/
IFB for State Highway Administration Page 19 of 26
It is strongly recommended that any potential Bidder complete registration prior to the Bid due date and time. The Bidder’s failure to complete registration with SDAT may disqualify an otherwise responsive successful Bidder from final consideration and recommendation for Contract award.
4.16 False Statements
Bidders are advised that Md. Code Ann., State Finance and Procurement Article, § 11-205.1 provides as follows:
In connection with a procurement contract a person may not willfully:
A. Falsify, conceal, or suppress a material fact by any scheme or device;
B. Make a false or fraudulent statement or representation of a material fact; or C. Use a false writing or document that contains a false or fraudulent statement or entry of a material fact.
A person may not aid or conspire with another person to commit an act under this section.
A person who violates any provision of this section is guilty of a felony and on conviction is subject to a fine not exceeding $20,000 or imprisonment not exceeding five (5) years or both.
4.17 Confidentiality of Bids / Public Information Act Notice
The Bidder should give specific attention to the clear identification of those portions of its Bid that it considers to contain confidential and/or proprietary commercial information or trade secrets, and provide justification why such materials, upon request, should not be disclosed by the State under the Public Information Act, Md. Code Ann., General Provisions Article, Title 4. This information should be identified by page number and placed in the Transmittal Letter with the Bid.
The Bids shall be tabulated or a Bid abstract made. The opened Bids shall be available for public inspection at a reasonable time after Bid opening, but in any case before contract award, except to the extent the Bidder designates trade secrets or other proprietary data to be confidential as set forth in this solicitation. Material so designated as confidential shall accompany the Bid and shall be readily separable from the Bid to facilitate public inspection of the non-confidential portion of the Bid, including the Total Bid Price.
For requests for information made under the PIA, the Procurement Officer shall examine the Bids to determine the validity of any requests for nondisclosure. Nondisclosure is permissible only if approved by the Office of the Attorney General.
4.18 Use of Bidder’s Form Not Binding on State
The Bidder may not substitute, modify, or provide any other document in lieu of the documents provided with this Bid. Only those forms and documents provided with this solicitation and by the Procurement Officer will be considered acceptable as bid submission.
4.19 Attachments and Documents Required with the Bid (Table A) A Bidder shall include the following Attachments with its Bid as a single Bid Package:
Attachments A through E = Bid will be rejected if the required Attachment is not submitted or is incomplete.
Attachments F through R = Bid may be rejected if the required Attachment is not submitted or is incomplete.
IFB for State Highway Administration Page 20 of 26
TABLE A - Attachments and Documents Required with the Bid
Attachment Attachment Name
A
Bid/Proposal Affidavit A Bid submitted by the Bidder must be accompanied by a completed Bid/Proposal
Affidavit.
https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf
B
The Price Form (as specified within eMMA) Do not alter this Price Form or the Bid may be determined to be not responsive.
The Price Form must be signed and dated, where requested, by an individual who is authorized to bind the Bidder to the prices entered on the Bid Form.
(See Appendix 2 for specific Price Form Instructions.)
C Bid Bond
N/A
D MBE Forms D-1A
N/A
E Veteran-Owned Small Business Enterprise (VSBE) Form E-1A
N/A
F
Bidder Information Sheet https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-F.-Bidder-Offeror-Information- Sheet.pdf
G
Maryland Living Wage Requirements Affidavit of Agreement (for Services and Facilities Maintenance Contracts - See Appendix 6 for
Details) N/A
H Federal Funds Attachments
N/A
I
Conflict of Interest Affidavit and Disclosure https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-I.-Conflict-of-Interest-Affidavit.pdf Note: If this solicitation will result in the “selection of a contractor who will assist a unit in the formation, evaluation, selection, award, or execution of another State contract” the Bidder shall provide this Affidavit and other times as requested by the Procurement Officer.
J Mercury Affidavit https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-F.-Bidder-Offeror-Information-Sheet.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-F.-Bidder-Offeror-Information-Sheet.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-F.-Bidder-Offeror-Information-Sheet.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-I.-Conflict-of-Interest-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-I.-Conflict-of-Interest-Affidavit.pdf
IFB for State Highway Administration Page 21 of 26
TABLE A - Attachments and Documents Required with the Bid
Attachment Attachment Name
N/A
K Location of the Performance of Services Disclosure
N/A
L
Reference Checks (Each reference shall be from a customer for whom the Bidder has provided goods or services within the most recent past three years) https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-L.-Reference-Checks.pdf
M
List of Current or Prior State Contracts https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-M.-List-of-Current-or-Prior-State- Contracts.pdf
N Legal Action Summary https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-N.-Legal-Action-Summary.pdf
O Payment of Employee Healthcare Expenses Certification
N/A
P
Prime Contractor List of ALL Subcontractors
Anticipated/Used During Contract
N/A
Q Labor Resume Form
N/A
R Corporate Diversity Addendum
N/A
Additional Required Documents with the Bid
Financial Capability. The Bidder must include in its Bid a commonly-accepted method to prove its fiscal integrity.
If available, the Bidder shall include Financial Statements, preferably a Profit and Loss (P&L) statement and a Balance Sheet, for the last two (2) years (independently audited preferred).
In addition, the Bidder may supplement its response to this Section by including one or more of the following with its response:
https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-L.-Reference-Checks.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-L.-Reference-Checks.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-M.-List-of-Current-or-Prior-State-Contracts.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-M.-List-of-Current-or-Prior-State-Contracts.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-M.-List-of-Current-or-Prior-State-Contracts.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-N.-Legal-Action-Summary.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-N.-Legal-Action-Summary.pdf
IFB for State Highway Administration Page 22 of 26
● Dun & Bradstreet Number and Rating;
● Standard and Poor’s Rating;
● Lines of credit;
● Evidence of a successful financial track record; and
● Evidence of adequate working capital.
Minimum Qualifications Documentation. The Bidder shall submit any Minimum Qualifications documentation that may be required, as set forth in IFB Section 1. If references are required in IFB Section 1, those references shall be included in Attachment L. Reference Checks.
Acknowledgement of all addenda to this IFB.
4.20 Bid Delivery Instructions
Each Bidder shall submit its Bid Package as specified below.
Bids shall only be accepted via the State’s internet-based electronic procurement system, eMMA.
Bidders shall provide their Bids in one submission through eMMA following the Quick Reference Guides (QRG) labeled “4 - eMMA QRG Responding to Solicitations (IFB)” for single envelope submissions Bid Evaluation Criteria and Award Basis
The Bids will be evaluated based on the Total Bid Price, as per COMAR 21.05.02.13. All Bids will be ranked from the lowest (most favorable) to the highest (least favorable) price based on the Total Bid Price as submitted in its Bid.
A Contract shall be awarded to the responsible Bidder(s) submitting a responsive Bid with the most favorable Bid Price or most favorable evaluated Bid Price for providing the goods and services as specified in this IFB.
The award for this solicitation will be made (BY LOT) to the responsive and responsible Vendor with the lowest price, as determined by the Procurement Officer to be in the best interests of the State of Maryland.
BY LOT is defined as all items or none. The bidder must bid ALL line items.
Vendor shall submit a bid price based on product description (specification) and unit of measure specified on each line. For example:
Unit of Measure (U/M) – (“By Lot”)
Specification – (LITTER) https://procurement.maryland.gov/emma-qrgs/ https://procurement.maryland.gov/emma-qrgs/
IFB for State Highway Administration Page 23 of 26
Award of this contract will not be final and complete until after: (1) the Contractor submits complete and satisfactory documentation required under the Contract and/or documentation required by the Procurement Officer; and (2) the Contract is signed by the Department following any approvals of the Contract required by law or regulation.
4.21 Tie Bids
Tie Bids will be decided pursuant to COMAR 21.05.02.14.
4.22 Reciprocal Preference
Although Maryland law does not authorize procuring agencies to favor resident Bidders in awarding procurement contracts, many other states do grant their resident businesses preferences over Maryland contractors. COMAR 21.05.01.04 permits procuring agencies to apply a reciprocal preference under the following conditions:
A. The Maryland resident business is a responsible Bidder;
B. The lowest responsive Bid is from a responsible Bidder whose principal office, or principal base of operations is in another state;
C. The other state gives a preference to its resident businesses through law, policy, or practice; and
D. The preference does not conflict with a federal law or grant affecting the procurement Contract.
The preference given shall be identical to the preference that the other state, through law, policy, or practice gives to its resident businesses.
4.23 Documents Required upon Notice of Recommendation for Contract Award (Table B)
Upon receipt of a…