D.3 QUALITY ASSURANCE SURVEILLANCE PLAN .pdf
PDF 237 KB Posted
- Attached to
- Shuttle Services Federal contract opportunity
- Solicitation number
- 36C25725R0036
About this file
The document is a Quality Assurance Surveillance Plan (QASP) for shuttle services at the North Texas Veteran Affairs Health Care System (NTXVAHCS) under solicitation 36C25725R0036. The QASP outlines the government's methodology for monitoring and evaluating contractor performance across four key service areas: shuttle services, certifications/training, report submissions, and vehicle maintenance/safety. Performance standards include 90-100% compliance levels for timely shuttle pickups, proper employee certifications, report submissions, and vehicle safety, with monitoring conducted through random surveillance, customer feedback, and 100% inspections.
The government will use Favorable/Unfavorable Contractor Performance Assessment Reporting System (CPARS) as incentives to maintain acceptable performance levels. The Contracting Officer (Francisco Mendoza) and Contracting Officer's Representative (Bobbie Scoggins) will conduct monthly progress meetings to assess performance, with provisions for more frequent meetings if marginal or substandard performance is observed. The surveillance plan ensures the contractor meets specified performance metrics and provides quality shuttle transportation services for VA North Texas Health Care System campuses, supporting veterans, patients, families, visitors, volunteers, and employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06_36C25725R0036 0002.pdf | ||
| S06_36C25725R0036 0001 .pdf | ||
| D.4 WAGE DETERMINATION 2015-5231_TARRANT CTY.pdf | ||
| D.5 PAST PERFORMANCE SURVEY.pdf | ||
| S02_36C25725R0036 .pdf | ||
| D.2 DALLAS VAMC SHUTTLE BUS ROUTES.pdf | ||
| D.4 WAGE DETERMINATION 2015-5227_DALLAS CTY.pdf | ||
| D.6 PAST PERFORMANCE REFERENCES.pdf | ||
| D.1 PERFORMANCE WORK STATEMENT.pdf | ||
| D.4 WAGE DETERMINATION 2015-5273_FANNIN CTY.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) North Texas Veteran Affairs Health Care System (NTXVAHCS) Shuttle Services
36C25725R0036
FOR OFFICIAL USE ONLY
D.3 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2. SCOPE
To fully understand the roles and the responsibilities of the parties, it is important to first define the distinction in terminology between the Quality Control Plan and the Quality Assurance Surveillance Plan. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth in the contract. The Contractor develops and submits his/her Quality Control Plan (QCP) for Government approval in compliance with his contract deliverables. Once accepted, the Contractor then uses the QCP to guide and to rigorously document the implementation of the required management and quality control actions to achieve the specified results. The QASP on the other hand, is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The QASP is not intended to duplicate the Contractor’s QCP. The Government may provide the Contractor an information copy of the QASP as an Attachment to the solicitation to support the Contractor’s efforts in developing a QCP that will interrelate with the Government’s QASP.
3. GOVERNMENT RESOURCES/RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. CONTRACTING OFFICER: The Contracting Officer (C.O.) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Assigned CO: Francisco Mendoza Organization or Agency: Department of Veterans Affairs, NCO - 17
36C25725R0036
b. Contracting Officer’s Representative (COR) - The COR provides detailed technical oversight of the Contractor’s performance and reports his or her findings to the C.O. in a timely, complete and impartial fashion. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
Assigned COR: Bobbie Scoggins
4. METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of the QASP. In addition to specific instructions that may be mentioned, the appropriate and standardized form that is to be used for documentation of QA surveillance is the Surveillance Activity Checklist, included as Attachment A.
Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and forwarded to the COR. The COR shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file. The COR shall also keep the tabulated results of all customer satisfaction surveys on file and shall enter the summary results into the Surveillance Activity Checklist.
(Copies of all records shall be submitted to the CO upon receipt for placement in the official contract file, and when necessary, determination of actions.)
100% Inspection – The COR shall monitor shuttle services and enter performance results into the Surveillance Activity Checklist.
Periodic Inspection - Periodic inspections shall be conducted when specified in the contract/PWS. For the potential tasks that have been identified so far and included in this QASP, the COR performs the periodic inspection on a monthly basis.
Random Monitoring - Random monitoring shall be conducted if and when specified in the contract. For the potential tasks that have been identified so far and included in this QASP, the random monitoring shall be performed by the COR.
5. PERFORMANCE STANDARDS
The Performance Requirements Summary in the Performance Work Statement (PWS) includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL) and determine incentives.
36C25725R0036
6. INCENTIVES
The Government shall use Favorable/Unfavorable CPARS as incentives for Contractors to maintain acceptable performance level. Incentives shall be based on meeting, or not meeting performance standards.
The CO and COR shall monthly progress meetings to assess performance and shall provide a written assessment. Should the CO experience marginal or sub-standard performance, they should consider more frequent progress meetings.
Signature – Contractor
Required Services (Tasks)
PWS
Para. Performance Standard
Acceptable Quality Level
(AQL)
Method of Monitoring
Incentive (Positive and/or Negative
Impact on Contractor Payments)
Shuttle Services
1, 2, 4
The Contractor will provide shuttle service pickups within the agreed-upon time frames.
90% Random Surveillance/Customer Complaint record
Favorable/Unfavorable
CPARS
Certifications and Training/Customer Service
5.5, 5.7, 5.8, 5.9, 10.11, 12.1.5
Contractor/employee to maintain current proper licenses and ensure all attendants are properly trained and competent to provide service
100% 100% inspection Favorable/Unfavorable
CPARS
Submit Reports
8.11, 12.1.8, 13.3.10
All reports are submitted within 5 calendar days of the due date.
90% 100% inspection Favorable/Unfavorable
CPARS
Vehicle Maintenance/Safety
1, 5.4, 7.1, 12.1.4, 13.3
Ensure all Vehicles are in proper condition and fit for public safety
100% Random Surveillance Favorable/Unfavorable
CPARS
36C25725R0036
Bobbie Scoggins Contracting Officer Representative (COR)
Francisco Mendoza Contracting Officer
D.3 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
File details come from the government source that posted it. Updated .