D.2 - Installation Checklist for Ceiling Lifts.pdf
PDF 213 KB Posted
- Attached to
- 6515--Ceiling Mounted Patient Lift System - NWI VAHCS Federal contract opportunity
- Solicitation number
- 36C26323Q0747
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26323Q0747 A0002_1.docx | DOCX document | |
| Updated Section B.2.pdf | ||
| 36C26323Q0747 A0002.pdf | ||
| 36C26323Q0747 A0001.pdf | ||
| 36C26323Q0747 A0001_1.docx | DOCX document | |
| 36C26323Q0747_1.docx | DOCX document | |
| D.1 - Building 25 Room Drawings.pdf | ||
| 36C26323Q0747.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 4 Serial Number: __________________________
Manufacturer:
Model:
Serial Number:
COMPLETE
Mfgr Contact:VAMC Contact's Phone Number:
Installer:
Verify NFPA 99 and NFPA 70 compliance for proper grounding and bonding.
Verify NFPA 99 and NFPA 70 compliance for access to electrical and safety systems.
Verify required access to mechanical, HVAC, and fire systems components within the lift installation area.
Verifiy minimum clearances for operation are compliant with manufacturer recommendations. (Ensure room clearance and that the ceiling height is adequate for lift usage.)
Perform pre-installation walkthrough to confirm full understanding and consensus of design drawing(s) and installation conditions.
Verify proper connections of the lift's structural system to the building’s structure (including seismic bracing if applicable).
Verify proper interface at the ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.
NOTES:
Installation
Installation or Relocation Checklist for Ceiling Mounted Patient Lifts The commissioning for a patient ceiling lift system(s) shall include, but not be limited to, the following points as components of the commissioning procedures.
Verify that ceiling mounted patient lifts are not installed in treatment units with actively suicidal patients.
Facility:
Lift Location:
VAMC Contact:
Pre-Installation COMPLETE
Obtain structural and related engineering design drawings and calculations for the new lift installation.
Design drawings shall be developed for specific lift installation under specific pre-existing conditions of the facility.
Mfgr Contact's Phone Number:
Date:Installer's Phone Number:
Verify that the lift is listed by the manufacturer to be installed and operated in the environment that the lift is operating under. (For example, water tight lifts shall be installed and operated in wet, damp or humid locations such as pools or bathrooms.)
Verify NFPA 13 compliance for fire sprinkler system (including but not limited to fire sprinkler heads and piping).
If the facility is located in a seismic area, as identified in VA Handbook H-18-8 Seismic Design Requirements, verify that the ceiling mounted patient lift system installation is in compliance with the requirements of VA Directive 7512 Seismic Safety of VA Buildings and VA Master Design Specification
13.05.041 Seismic Restraint Requirements for Non-Structural Components.
Perform site survey of the pre-existing conditions and as-built drawings above and below finish ceiling at the installation location to confirm existing structural and ceiling conditions.
2 of 4 Serial Number: __________________________
PASS FAIL
PASS FAIL
COMPLETE
NOTES:
Verify proper structural component sizing and physical installation to make sure that proper structural system is in place and properly installed to support the lift.
Verify proper installation of electric motor per manufacturer's instructions to ensure operational rigidity of motor mounting.
Verify proper electrical connections per design drawings and manufacturer's instructions.
Verification that the lift unit charges properly.
Post-Installation Perform walkthrough to ensure compliance of the installation per the design drawing(s) and manufacturer's instructions.
Perform operational test to verify lift functionality.
NOTES:
Rails/Tracks and End Stops
NOTES:
Lift Unit and Straps
Inspection of lift unit casing for cracks and alignment.
Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.
Confirm any and all lift unit indicator lights are functioning. (e.g., red service warning light, charging state light) Inspection and activation of emergency up/down lift unit control buttons if applicable.
Verification that all fasteners and set screws are properly tightened on the trollies and rails/tracks.
Ensure that the rail/track is free of gaps (unless required by design). If included in installation, verify rail turntable function, exchanger function, gate alignment, and safety block installation.
Confirm track is clean and clear of all debris. (Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.)
Verification that all manufacturer specified end stops or docking gates are properly installed.
3 of 4 Serial Number: __________________________
PASS FAIL
NOTES:
Inspection of spreader bar and clips for cracks and for loose or missing rings or cotter pins.
Confirm that the manufacturer's operating and maintenance manuals for this lift have been received.
Verify that manufacturer or manufacturer’s representative has provided training on the use of patient handling equipment to clinicians and other staff who move and handle patients.
COMPLETE
COMPLETE
Full extension and inspection of lift strap for loose threads or frays.
Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.
Verification of load testing and deflection testing at lift listed maximum for each lift unit at its maximum rated lift capacity. Conduct this test at 100% of maximum rated lift capacity.
Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.
Verification of function of emergency stop at maximum rated lift capacity.
Verification of emergency lowering feature at maximum rated lift capacity.
Verify that training and competency are documented prior to release for use with patients.
Training
NOTES:
Load Testing
NOTES:
Manuals
NOTES:
4 of 4 Serial Number: __________________________
ADDITIONAL NOTES:
Manager of the Service Using the Ceiling Mounted Lifts COMPLETE Verify and confirm that VA clinical staff have been trained to operate the ceiling mounted patient lift, as required in the Training section.
After the activities listed in the above checklist and in the manufacturers installation/operations/owner’s manual(s) have been completed, the installing contractor shall release the ceiling mounted lift installation to VA representative.
SIGNATURE:
TITLE:
VA Representative After the activities listed in the above checklist and in the manufacturers installation/operations/owner’s manual(s) have been completed, the VA representative shall release the ceiling mounted lift installation to the Manager of the Service using the ceiling mounted lifts.
COMPLETE
SIGNATURE:
TITLE:
TITLE:
DATE:
DATE:
DATE:
COMPLETE
SIGNATURE:
Installing Contractor
Install and Relocation
| Facility: |
| Manufacturer: |
| Lift Location: |
| Model: |
| VAMC Contact: |
| VAMC Contacts Phone Number: |
| Mfgr Contact: |
| Installer: |
| Mfgr Contacts Phone Number: |
| Installers Phone Number: |
| Date: |
| NOTES: |
| NOTES_2: |
| NOTES_3: |
| NOTES_4: |
| NOTES_5: |
| NOTES_6: |
| NOTES_7: |
| NOTES_8: |
| SIGNATURE: |
| TITLE: |
| SIGNATURE_2: |
| TITLE_2: |
| SIGNATURE_3: |
| TITLE_3: |
| ADDITIONAL NOTES: |
| Check Box 1: Off |
| Check Box 2: Off |
| Check Box 3: Off |
| Check Box 4: Off |
| Check Box 5: Off |
| Check Box 8: Off |
| Check Box 6: Off |
| Check Box 7: Off |
| Check Box 9: Off |
| Check Box 10: Off |
| Serial Number: |
| Check Box 11: Off |
| Check Box 12: Off |
| Check Box 15: Off |
| Check Box 16: Off |
| Check Box 17: Off |
| Check Box 14: Off |
| Check Box 19: Off |
| Check Box 20: Off |
| Check Box 21: Off |
| Check Box 22: Off |
| Check Box 23: Off |
| Check Box 24: Off |
| Check Box 25: Off |
| Check Box 26: Off |
| Check Box 27: Off |
| Check Box 28: Off |
| Check Box 29: Off |
| Check Box 30: Off |
| Check Box 31: Off |
| Check Box 32: Off |
| Check Box 35: Off |
| Check Box 36: Off |
| Check Box 37: Off |
| Check Box 38: Off |
| Check Box 39: Off |
| Check Box 40: Off |
| Check Box 41: Off |
| Check Box 42: Off |
| Check Box 43: Off |
| Check Box 44: Off |
| Check Box 45: Off |
| DATE: |
| Check Box 18: Off |
| Check Box 13: Off |
| Check Box 46: Off |
| Check Box 47: Off |
| Check Box 48: Off |
| Check Box 34: Off |
| Check Box 49: Off |
| Check Box 50: Off |
| Check Box 51: Off |
| Check Box 52: Off |
| Check Box7: Off |
| Check Box 54: Off |
| Check Box 53: Off |
| Check Box 55: Off |
File details come from the government source that posted it. Updated .