D.1 - Building 25 Room Drawings.pdf

PDF 4 MB Posted

Attached to
6515--Ceiling Mounted Patient Lift System - NWI VAHCS Federal contract opportunity
Solicitation number
36C26323Q0747
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

View the file

Other files for this federal contract opportunity

Other files attached to 6515--Ceiling Mounted Patient Lift System - NWI VAHCS, newest first.
File Type Posted
36C26323Q0747 A0002_1.docx DOCX document
Updated Section B.2.pdf PDF
36C26323Q0747 A0002.pdf PDF
36C26323Q0747 A0001.pdf PDF
36C26323Q0747 A0001_1.docx DOCX document
D.2 - Installation Checklist for Ceiling Lifts.pdf PDF
36C26323Q0747_1.docx DOCX document
36C26323Q0747.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:xxxxxxCOPYRIGHT

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

C U s e rs

\n g ri m it \D o c u m e n ts

\R

-2 n g ri m it .r v t

/1 /2

:5

:1

A

M

G-001

TITLE SHEET

NRG KK11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE, 68105

R E

N O

V A

T E

B U

IL

D

IN

G

F O

R S

P E

C

IA

LT

Y

C A

R E

C D

-1 C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

/0 4/

O m ah a, N E

, 6

VA Nebraska-Western Iowa Health Care System Renovate Building 25 for Specialty Care Project Number 636-18-117

4101 Woolworth Ave, Omaha, NE, 68105

Sheet List - All Parameters (Edit) Sheet

Number Sheet Name

Sheet List - All Parameters (Edit) Sheet

Number Sheet Name

MP603 MECHANICAL DIAGRAMS

MP701 MECHANICAL SCHEDULES

MP702 MECHANICAL SCHEDULES

MP703 MECHANICAL SCHEDULES

ELECTRICAL

EG101 GENERAL ELECTRICAL NOTES & SYMBOLS LEGEND

ED101 FIRST FLOORS ELECTRICAL DEMOLITION PLAN - AREA A

ED102 FIRST FLOORS ELECTRICAL DEMOLITION PLAN - AREA B

EL101 FIRST FLOOR LIGHTING PLAN - AREA A

EL102 FIRST FLOOR LIGHTING PLAN AREA B

EL401 LARGE SCALE LIGHTING PLAN - AREA A - BLOOD DRAW / ELEGIBILITY

EL402 LARGE SCALE LIGHTING PLANS - AREA A - COMP&PEN

EL403 LARGE SCALE LIGHTING PLANS AREA B - NUC MED

EL404 LARGE SCALE LIGHTING PLAN - AREA B - ULTRASOUND

EL405 LARGE SCALE LIGHTING PLANS AREA B - ADMINISTRATION

EP100 BASEMENT POWER PLAN

EP101 FIRST FLOOR POWER PLAN - AREA A & BASEMENT

EP102 FIRST FLOOR POWER PLAN - AREA B

EP103 ROOF POWER PLANS

EP401 LARGE SCALE POWER PLAN - AREA A - BLOOD DRAW / ELEGIBILITY

EP402 LARGE SCALE POWER PLAN - AREA A - COMP & PEN

EP403 LARGE SCALE POWER PLAN - AREA B -NUC MED

EP404 LARGE SCALE POWER PLAN - AREA B - ULTRSOUND /

ADMINISTRATION

EY101 FIRST FLOOR SPECIAL SYSTEMS PLAN - AREA A

EY102 FIRST FLOOR SPECIAL SYSTEMS PLAN - AREA B

EY401 LARGE SCALE SPECIAL SYSTEMS PLAN - AREA A - BLOOD DRAW

EY402 LARGE SCALE SPECIAL SYSTEMS PLAN - AREA B - COMP & PEN

EY403 LARGE SCALE SPECIAL SYSTEMS PLAN - AREA B - NUC MED

EY404 LARGE SCALE SPECIAL SYSTEMS PLAN - AREA B - ULTRASOUND /

ADMIN

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

E-701 ELECTRICAL SCHEDULES

E-702 ELECTRICAL SCHEDULES

E-703 ELECTRICAL SCHEDULES

E-704 ELECTRICAL SCHEDULES

FA101 FIRST FLOOR FIRE ALARM PLAN - AREA A

FA102 FIRST FLOOR FIRE ALARM PLAN - AREA B

EQIPMENT

Q-101 EQUIPMENT - FLOOR PLAN - COMP. & PEN.

Q-102 EQUIPMENT - FLOOR PLAN - BLOOD DRAW / ELIGIBILITY

Q-103 EQUIPMENT - FLOOR PLAN - NUC MED

Q-104 EQUIPMENT - FLOOR PLAN - ULTRASOUND / ADMIN.

Q-105 EQUIPMENT - FLOOR PLAN WAITING ROOM

Sheet List - All Parameters (Edit) Sheet

Number Sheet Name

INTERIORS

AI101 FIRST FLOOR - INTERIOR FLOOR FINISH PLAN AREA A

AI102 FIRST FLOOR - INTERIOR FLOOR FINISH PLAN AREA B

FIRE PROTECTION

FG101 GENERAL FIRE SUPPRESSION NOTES & DETAILS

FD101 FIRST FLOOR FIRE SUPPRESSION DEMO PLAN - NUC MED

/ULTRASOUND

FD102 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - COMP & PEN

FX101 FIRST FLOOR - FIRE SUPPRESSION PLAN - NUC MED/ ULTRASOUND

FX102 FIRST FLOOR - FIRE DETAILS

PLUMBING

PD100 PLUMBING - LEGENDS AND NOTES

PD101 BASEMENT PLUMBING - PLUMBING DEMOLITION PLAN - AREA B

PD102 BASEMENT PLUMBING - PLUMBING DEMOLITION PLAN - AREA A

PD103 FIRST FLOOR PLUMBING - PLUMBING DEMOLITION - AREA B

PL100 BASEMENT PLUMBING PLAN - AREA A

PL101 BASMENT PLUMBING PLAN - AREA B

PL102 FIRST FLOOR PLUMBING PLAN - AREA A

PL103 FIRST FLOOR PLUMBING PLAN - AREA B

P-301 PLUMBING FIXTURES

P-401 PLUMBING LARGE SCALE PLANS

P-501 PLUMBING DETAILS AND SCHEDULES

MECHANICAL

MG101 GENERAL MECHANICAL NOTES & SYMBOLS LEGEND

MD101 MECHANICAL DEMOLITION PLANS

MD102 FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA B

MH101 FIRST FLOOR & BASMENT HVAC PLANS

MH102 FIRST FLOOR HVAC PLAN - AREA B

MH103 ROOF MECHANICAL PLANS

MH301 LARGE SCALE HVAC SECTIONS

MH401 LARGE SCALE HVAC PLANS - AREA A - FIRST AND SECOND FLOOR

MH402 LARGE SCALE HVAC PLAN - AREA A - COMP & PEN

MH403 LARGE SCALE HVAC PLANS - AREA B - NUC MED

MH404 LARGE SCALE HVAC PLANS AREA B - ULTRASOUND/ADMIN

MH405 LARGE SCALE HVAC PLANS AREA B - ULTRASOUND/ADMIN

MP101 FIRST FLOOR & BASEMENT PIPING PLANS

MP102 FIRST FLOOR PIPING PLAN - AREA B

MP401 LARGE SCALE PIPING PLANS - AREA A - FIRST AND SECOND FLOORS

MP402 LARGE SCALE PIPING PLANS - AREA A - COMP & PEN

MP403 LARGE SCALE PIPING PLANS - AREA B - NUC MED

MP404 LARGE SCALE PIPING PLANS - AREA B - ULTRASOUND/ADMIN

MP405 LARGE SCALE PIPING PLANS - AREA B - ULTRASOUND/ADMIN

MP501 MECHANICAL DETAILS

MP502 MECHANICAL DETAILS

MP503 MECHAINCAL DETAILS

MP602 MECHANICAL DIAGRAMS

Sheet List - All Parameters (Edit) Sheet

Number Sheet Name

GENERAL INFORMATION

G-001 TITLE SHEET

LS101 LIFE SAFETY PLAN - AREA A

LS102 LIFE SAFETY PLAN - AREA B

GI-001 OVERALL PHASING PLAN

GI-101 PHASING PLAN - FIRST FLOOR - PHASE 1

GI-102 PHASING PLAN - FIRST FLOOR - PHASE 2

GI-103 PHASING PLAN - FIRST FLOOR - PHASE 3

HAZARDOUS

HA100 HAZARDOUS MATERIALS DESIGN DOCUMENTS

STRUCTURAL

S-101 FIRST LEVEL FRAMING PLAN - AREA B

S-102 FOUNDATION PLAN

S-201 STRUCTURAL FRAMING AND NOTES

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

AD101 FIRST FLOOR - DEMOLITION PLAN AREA A

AD102 FIRST FLOOR - DEMOLITION PLAN AREA B

CD-101 DEMO CEILING PLAN AREA A

CD-102 DEMO CEILING PLAN AREA B

A-100 FLOOR PLAN - OVERALL AREA A & AREA B

A-101 FIRST FLOOR - FLOOR PLAN - AREA - A

A-102 FIRST FLOOR - FLOOR PLAN - AREA - B

AC101 FIRST FLOOR - REFLECTED CEILING PLAN AREA A

AC102 FIRST FLOOR - REFLECTED CEILING PLAN AREA B

A-201 EXTERIOR ELEVATIONS

A-301 LARGE SCALE PLANS - AREA A - BLOOD DRAW / ELIGIBILITY

A-302 LARGE SCALE PLANS - AREA A - COMP. & PEN.

A-303 LARGE SCALE PLANS - AREA B - NUC MED

A-304 LARGE SCALE PLANS - AREA B - ULTRASOUND

A-305 LARGE SCALE PLANS - AREA B - ADMIN.

A-306 LARGE SCALE PLANS - AREA B - WAITING ROOM

A-401 WALL SECTIONS

A-402 WALL SECTIONS

A-701 DOOR & WINDOW SCHEDULES & DETAILS

A-702 DOOR & FRAME TYPES AND DETAILS

A-703 ROOM FINISH SCHEDULE

A-801 INTERIOR DETAILS - WALL TYPES

A-802 INTERIOR DETAILS

A-803 SIGNAGE SCHEDULE & DETAILS

A-901 CASEWORK DETAILS

A-902 CASEWORK SECTIONS

A-903 INTERIOR ELEVATIONS

A-904 INTERIOR ELEVATIONS

A-905 INTERIOR ELEVATIONS

A-906 INTERIOR ELEVATIONS

A-907 INTERIOR ELEVATIONS

A-908 INTERIOR ELEVATIONS - RESTROOMS AREA A

A-909 INTERIOR ELEVATIONS - RESTROOMS AREA B

A-910 INTERIOR ELEVATIONS - RESTROOMS AREA B

A-911 INTERIOR ELEVATIONS - COORIDORS AREA B

A-912 INTERIOR ELEVATIONS - COORIDORS AREA B

A-913 INTERIOR ELEVATIONS - COORIDORS AREA A

A-914 INTERIOR ELEVATIONS - COORIDORS AREA A

Revisions: Date:

ngrimit Snapshot

PHASING NOTES & LEGEND

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND LEAD-BASE PAINT REPORT ARE TO BE OBTAINED FROM THE

COR.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

PHASE 1 PHASE 2 PHASE 3

PHASE 1 – PARTIAL DEMOLITION & RENOVATION OF AREA A & AREA C ON FIRST FLOOR

A. LAB, COMP & PEN MEDICAL ADMINISTRATION AREAS UNDER CONSTRUCTION. PATIENT TRAFFIC GENERALLY FLOWS AS NORMAL

AROUND THE AREA WITH SOME POSSIBLE NARROWING OF CORRIDORS.

B. CONTRACTOR SHALL PROVIDE A DEMISING WALL AROUND CONSTRUCTION AREA FOR NOISE CONTROL AND CONSTRUCTION

DEBRIS.

C. CONTRACTOR SHALL NOTIFY VA OF THE PLANNED COMPLETION DATE OF PHASE 1 SO VA CAN PLAN THE TRANSITION OF

OPERATIONS BACK INTO PHASE 1 AREA ACCORDINGLY.

PHASE 2 - DEMOLITION & RENOVATION OF EXISTING MRI AREA.

NOTE: MRI PORTION OF PHASE 2 IS A SEPARATE PROJECT.

A. MRI & ADJACENT SPACES ARE RENOVATED IN ACCORDANCE WITH MRI RENOVATION CONSTRUCTION DOCUMENTS, BUT THE

MOBILE MRI WILL REMAIN IN USE.

B. AT THE COMPLETION OF MRI RENOVATION. CONTRACTOR WILL NEED TO COORDINATE PLANNING OF REMOVAL OF MOBILE MRI

WITH VA WHICH WILL HAPPEN IN PHASE 3.

C. CONTRACTOR WILL NEED TO NOTIFY VA OF THE PLANNED COMPLETION DATE OF PHASE 2 SO VA CAN PLAN THE TRANSITION OF

OPERATIONS BACK INTO PHASE 2 AREA ACCORDINGLY.

PHASE 3 - PARTIAL DEMOLITION & RENOVATION OF AREA B ON FIRST FLOOR, AS WELL AS REMOVAL OF EXISTING MOBILE MRI.

A. MOBILE MRI IS TO BE REMOVED. NUCLEAR MEDICINE, RADIOLOGY, & ULTRASOUND AREAS ARE UNDER CONSTRUCTION.

B. AT COMPLETION OF PHASE 3 RENOVATION NUCLEAR MEDICINE, RADIOLOGY, & ULTRASOUND WILL RELOCATE FROM UPPER

FLOORS.

C. CONTRACTOR WILL NEED TO NOTIFY VA OF THE PLANNED COMPLETION DATE OF PHASE 3 SO VA CAN PLAN THE TRANSITION OF

OPERATIONS BACK INTO PHASE 3 AREA ACCORDINGLY.

GI-101

GI-102

GI-103

DEMOLITION PLAN LEGEND

FULL HEIGHT ONE-HOUR FIRE RATED TEMPORARY

PARTITION

ELEMENT TO BE REMOVED, TYPICAL

EXISTING CONSTRUCTION TO REMAIN UNO.

INDICATES AREA TO BE REMOVED, TYPICAL

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:xxxxxxCOPYRIGHT

NORTH

B

A

C D

FIRST FLOOR KEY PLAN

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

C U s e rs

\n g ri m it \D o c u m e n ts

\R

-2 n g ri m it .r v t

/1 /2

:5

:2

A

M

GI-001

OVERALL PHASING PLAN

11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE, 68105

Revisions: Date:

1/16" = 1'-0"1

PHASING PLAN - FIRST FLOOR

ngrimit Snapshot

S S dd d d dd h

S

SS

S

S d d d d d d c a a a

S S d dS

S ,D h

S ,D

S

S,D S,Dh

S

S hS,D

K ,3

S ,D

S

K ,4

K ,3

S

,DK

d h a a

K ,3

K,3

K ,4

K ,3

K ,3

K,3K,3

K,3 h d f ff f f

K,3

S h

K

S h c c

K ,4

K,3

K,3

K ,3 a

A B C D E F G H J KB1 C1 D1

5'

7'

B2 C2 D1.5 L

4.1

5.1

5.9

3.3

G.1

EXISTING PANEL '1AE' EXISTING PANEL '1BNB'

EXISTING PANEL '1BL'

EL403

EL403

EL405

EL404

NUC-MED

PET/SPECT

COMPONENTS

1901.A

UPTAKE

ROOM

UPTAKE

ROOM

HOT LAB

HOT

WAITING

ROOM

HOLDING

BAY

RESTROOM

CORRIDOR

C1-21

RECEPTION

CONTROL

ROOM

1944.A

CONTROL

ROOM

SPECT/ CT

SPECT/ CT

NUC-MED

PET/SPECT

NUC-MED

DRESSING

RESTROOM

1903.A

NUC-MED

DRESSING

COMPONENTS

1944B

THERAPY

ADMIN.

COMPONENTS

STORAGE

ULTRASOUND

RESTROOM

DRESSING

1953.A

RESTROOM

DRESSING

1951.A

ULTRASOUND

ULTRASOUND

RESTROOM

DRESSING

1954.A

RESTROOM

DRESSING

1952.A

ULTRASOUND

STORAGE

RADIATION

SAFETY

OFFICE

MECHANICAL

RESTROOM

/ SHOWER

1916.A

RESTROOM

/ SHOWER

1914.A

WOMEN'S

LOCKER

MEN'S

LOCKER

VASCULAR

LAB

ULTRASOUND-VASCULAR

SUPERVISORS

MAIN

WAITING

STORAGE

STORAGE

CONFERENCE

1904.A

CARDIAC

STRESS

CHIEF

TECH

RESTROOM

1932.A

STORAGE

QA TECHS

ULTRASOUND-VASCULAR

SCHEDULING

CORRIDOR

C1-18

RESTROOM

1905.A

CORRIDOR

C1-16

OI&T

OI&T

CORRIDOR

C1-23

CORRIDOR

C1-21

ALCOVE

C1-18B

CORRIDOR

C1-25

CORRIDOR

C1-22

COLLIMATOR

STORAGE

1909.A

CORRIDOR

C1-17

CORRIDOR

C1-19

CORRIDOR

C1-20

EXISTING PANEL '1BC'

EXISTING PANEL '1CLA'

EXISTING PANEL '1BNA'

EXISTING PANEL '1AW'

S

S

S

S

S

S

S

S

S S S

S

S

S

S

S

S

S

S

S

S S

S

S

S S

S S

S

S

S

S

S

S

S S

S

S

S

S

S S

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com FEI#: 192044

NORTH

B

A

C D

FIRST FLOOR KEY PLAN

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

11/04/2020

C

U se rs \g h o lm e s \D o cu m e n ts

\1

C e n tr a l- R g h o lm e s2 W

D D

J.

rv t

/2

/2

:1

:2

P

M

EL102

FIRST FLOOR LIGHTING PLAN -

AREA B

11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE 68105

GTHEMN

KEYNOTES

1 TYPE 'F' LUMINAIRE TO BE SKY FACTORY LUMINOUS SKYCEILINGS CLASSIC ECOPLUS LED 'EP22'

SERIES. COORDINATE EXACT REQUIREMENTS AND LOCATION WITH OWNER.

SCALE: 1/8" = 1'-0"

1 FIRST FLOOR LIGHTING PLAN - AREA B

Revisions: Date:

S S dd d d dd h

S

S

S

S

S d d d d d d

S ,D

K ,4

K ,3

S ,D

K

K ,3

K,3

K ,4

S

K ,3

A B B1

B2

4.1

3.3

A1 A1

A

A

A1 A1

A A A

X

X

X X

C1CCCC

CC1C

C

A1AAA1AA1

AAA

A

A1

S

S

S

S

S

S

S

S

S

S

ULTRASOUND

RESTROOM

DRESSING

1953.A

RESTROOM

DRESSING

1951.A

ULTRASOUND

ULTRASOUND

RESTROOM

DRESSING

1954.A

RESTROOM

DRESSING

1952.A

ULTRASOUND

STORAGE

RADIATION

SAFETY

OFFICE

MECHANICAL

VASCULAR

LAB

ULTRASOUND-VASCULAR

STORAGE

STORAGE

ULTRASOUND-VASCULAR

CORRIDOR

C1-16

CORRIDOR

C1-17

G

G

A

1BNA-27

1BL-20

E

E

E

E E

E

E

S

S

S

E

S

V1 V1

E E

E

G

G

E

V1 V1

(TYP)

X

E

E

E

E

E

E

E

E

HD1,1

HD1,1

HD,1

HD,1

HD,1

HD,1

HC,2

HC,2

HC,2

HC,2

HC,2

HC,2

HC,2

HC,2

HC,2

HD,1

HD,1

HD1,1

HD1,1

HD,1

HD,1 HC,2

HC,2

HC,2

E

1BNA-31

1BNA-33

HC,2

HC,2

HC,2 HD,1

HD,1

HD1,1

HD,1

HD,1

HD1,1 HC,2

HC,2

HC,2

1BNA-29

E

E

E

E

1BNA-27

D1

D

D1 D D1

E

D1

D

D1

D

D1

D

D1

D

E

E

E

E

E

E

E

LJ

LL

LH

LF

LK

(TYP)

(TYP)

(TYP)

(TYP)

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com FEI#: 192044

NORTH

B

A

C D

FIRST FLOOR KEY PLAN

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

11/04/2020

C

U se rs \g h o lm e s \D o cu m e n ts

\1

C e n tr a l- R g h o lm e s2 W

D D

J.

rv t

/2

/2

:1

:5

P

M

EL404

LARGE SCALE LIGHTING PLAN -

AREA B - ULTRASOUND

11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE 68105

GTHEMN

KEYNOTES

1 COORDINATE MOUNTING LOCATION AND HEIGHTS WITH SURROUNDING MECHANICAL EQUIPMENT

AND OTHER SYSTEMS.

2 MOUNT LUMINAIRE ABOVE MIRROR. COORDINATE HEIGHT WITH ARCHITECT PRIOR TO ROUGH-IN.

SCALE: 1/4" = 1'-0"

1 LIGHTING - AREA A PLAN - ULTRASOUND

Revisions: Date:

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

C D E F G H JC1 D1

C2 D1.5 E1 G1G.1

A-905

A1 A-905

E3

A-909 B6

A-905

A-909

B3

A-905

B8

A-906 F3

A-907

F4

A-907

C6

A-907 A3

A-907

C2

A-909C8

F1

A3C3

A6

E6

C6

B8

A8

B4

D8

C4

D1

A5

F6

C3 A7

A-907F3

E1

C6

B5

C1

B3

A1

A-911

A-912

B1

C1

A-911

E1

F1

B1 B1

C1

A-906

E4

D4

E8 E1

A-906

A-909

C3

F8

F6

C4

SPECT/

CT

CONTROL

ROOM

NUC-MED

PET/SPECT

CARDIAC

STRESS

HOLDING

BAY

RESTROOM

1905.A

NUC-MED

DRESSING

1905 ALCOVE

C1-18B

NUC-MED

DRESSING

RESTROOM

1903.A

NUC-MED

PET/SPECT

COMPONENTS

1901.A

STORAGE

CORRIDOR

C1-18

CORRIDOR

C1-21

COMPONENTS

E0210

F0280

M1801 M7660

M1100

E0954

M4116

M3070

A5077

A5107

A5108

F3200

A5107

A5108

F3200

A5077

F0340

M3070

UPS

INTEGRATED

POWER

SUPPLY

POWER

DISTRIBUTION

UNIT

M4255

MAIN

DISCONNECT

M0765

M0755

M0750

M7040

CS090

A5075

A5080

A6200

A6210

F2000

M2055

M1840

F2245

F3200

A1012

A5077

A1012

A5080

CS090

A5075

M4266 A6200

F2000

M3070

MAIN

DISCONNECT

CONTROL

M4255

X6196

M3105

A5145

F0340

A5077

F3200

A5108

M2055

E0222

M0765

M0755

M0750

E0963

POWER

DISTRIBUTION

UNIT

UPS

QCORE

F2245 A5145

A1080

A5077

A5107

E0948

A1030

M1400

F2000

M0750

M0755

F0340

A5200 A5082

A5075

P3200

P9050

COLLIMATOR

STORAGE

1909.A

F2000

A5145

A5107

F0280

F0280

F0280

R6200

CE030

A5200

A5077

F2000

M0750

M0755

M1400F0340

E0948

A5080

A5075

A1030

F2245

A1080

A5108 A5145

A5107

M4040

CG-1

CG-1CG-1CG-2 CG-2

CG-1

M1801

M8185

M4655

CR-1 CR-1 CR-1

CR-1

F2010

F2010

R4650

M4266

P3200

M1800

A5107

X9500

M3105

A5108

A5077

A1012

C0036

A5145

M1400

A5077

A5108

F3200

A1012

M1801

CW090

A5077 F0340

F3200

A5108

F2000 M8810

F0265

A5210

A5220

F2300

A5075

A1066

P3200

A5200

A5090

M1800

A5077

F3200

A1012

UPS

CS090

M4266

A6200

CE030

F2000 M0750

M0755

M0765

A5075

A5107

F3200

M4255

F0280

E0222

M7040

M2055

MAIN

DISCONNECT

POWER

DISTRIBUTION

UNIT

INTEGRATED

POWER

SUPPLY

A1015

F0205

M1801

F0280

A6210

A5145

F0280 M2055

M2055

M2055

F0280

CS150

CS150

A5107

F3200

A5145

CG-2CG-2

CG-1

A5075

A5080

A5077

A5080

A5108

A5082

F2010

CG-2

M3070

CG-1

F3200

A5107

M4811

SCHEDULING

RESTROOM

SPECT/

CT

1944 CONTROL

ROOM

1944.A

THERAPY

ADMIN.

CORRIDOR

C1-19

HOT

LAB

STORAGE

RESTROOM

1932.A

HOT

WAITING

ROOM

CORRIDOR

C1-20

UPTAKE

ROOM

UPTAKE

ROOM

CORRIDOR

C1-21

CORRIDOR

C1-17

F.E.C.

F.E.C.

A-912F7

F8

M8830

M1801

F0275

A5080

F2010

CS150

F1

X9500

A5080

A5145

CG-2

M0506

CR-1 CR-1 CR-1CR-1

CR-1 CR-1

CG-1CG-1 CG-1

A5108

2"

A1203

A1203

A1203

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:xxxxxxCOPYRIGHT

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

C U s e rs

\n g ri m it \D o c u m e n ts

\R

-2 n g ri m it .r v t

/1 /2

:5

:5

A

M

Q-103

EQUIPMENT - FLOOR PLAN - NUC

MED

NRG KK11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE, 68105

1/4" = 1'-0"E1

EQUIPMENT - FLOOR PLAN - PET / SPECT, STRESS, SPECT /

CT AND UPTAKE

Revisions: Date:

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

B B1

B2

A-907

E6

A-909F8

F6

E3

E1

E8

A-906 D1

A-909 D3

A-909

D1

E1

E3

A-909

F3

F1

RADIATION

SAFETY

OFFICE

ULTRASOUND

CORRIDOR

C1-16

STORAGE

STORAGE

ULTRASOUND

ULTRASOUND-VASCULAR

ULTRASOUND

ULTRASOUND

ULTRASOUND-VASCULAR

RESTROOM

DRESSING

1951.A

RESTROOM

DRESSING

1953.A

VASCULAR

LAB

RESTROOM

DRESSING

1952.A

RESTROOM

DRESSING

1954.A

F0240

A1015

F0205

F0275

F2000

E0078 F3200

M1801

F0110

F0275

A5145

X2100

M8940M8810

M4655

M7435

F0205

E0948

A5108

E0930

A1014

F3200

E0945

X3930

F0355

M3072

A5077

CE030

CS150

F2000

A5180

A5145

A5075

P3000

A1080

A1030

A5090

M8810

F0205

M7435

M4655

X2100

M8940

E0948

E0945

M1801

X3930 F3200

A1014

F0355

A5145

F2000 M3072

A5082

CE030

CT030

E0930

A5077

A1015

F0275

F3200

M1801

A1030

A5075

A5145

P9050

A5090

A5200

A5107

A5082

M1801

CG-1

CG-1

CG-1

CORRIDOR

C1-17

MECHANICAL

CR-1

CR-1

CR-1

CR-1 CR-1 CR-1

CR-1

CR-1

CR-1CR-1

CR-1

MECHANICAL

MECHANICAL

STORAGE

P9050

A5145

A1066

P3000

A5080

F2010

A5082

F2010 C03P0

A5026

TYP.

A5026

C03F0

CS150

C03P0

A5108

A5180

A5145

DESK,

66 x 24

DESK,

66 x 24

CR-1

CR-1

CR-1

D6

D8

C D E FC1 D1

5'

C2 D1.5 E1

A-906 C4

C6

A-906

A1

A6

A-912

E6

A-905F5

F3

F1

A-912

A-402

F1

A-902

D3

E1

C1

A-905F8 A-910

B1

B3B7

B5

A-910 C3

C1

C7

C5

WOMEN'S

LOCKER

MEN'S

LOCKER

RESTROOM

SHOWER

1916.A

RESTROOM

SHOWER

1914.A

CHIEF

TECH

SUPERVISORS

OI&T

OI&T

RECEPTION

1902QA

TECHS

CONFERENCE

1904.A

P3000

A5075

A5200

A5205 A5170

P5040

A5145

A5026

A5090

A5145

F2000

A1015

F0275F0420

F3200

M0512

F2000

M0507

F3200

A1020

A5212

F0420

A5220

F0275

A1015

M1801

F3200

F0420

A1080

A1030

A1080

F2000

A1030

F2000

F3200

A1012

A5170

P5040

A5205

A5082 A1090

P3000

F3200

F2000

M1801

A1015

F0275

F0765

F0220

CG-1

CG-1

CG-1

F0230

M1801

A1015

CORRIDOR

C1-22

CORRIDOR

C1-23

CORRIDOR

C1-23

CORRIDOR

C1-17

CORRIDOR

C1-21

CR-1

CR-1 CR-1 CR-1 CR-1 CR-1

CR-1

CR-1

CR-1

CORRIDOR

C1-21

ZERO

ENTRY

SHOW

SHOWER

DRAIN

C06M0

F.E.C.

A5026

A5030

A5027

A5026

A5024

A-902

D6

A4

DESK,

66 x 24

DESK,

66 x 24DESK, 66 x 24

A5145

A5145

A5145

A-802

A-910

A-910 D3

D1

D5

D7

E7 E3

E5

E1

F3065

F3200

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:xxxxxxCOPYRIGHT

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

C U s e rs

\n g ri m it \D o c u m e n ts

\R

-2 n g ri m it .r v t

/1 /2

:5

:0

A

M

Q-104

EQUIPMENT - FLOOR PLAN -

ULTRASOUND / ADMIN.

NRG KK11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE, 68105

1/4" = 1'-0"E1

EQUIPMENT - FLOOR PLAN - ULTRASOUND

1/4" = 1'-0"E5

EQUIPMENT - FLOOR PLAN - ADMINISTRATION

Revisions: Date:

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

A B C D F H

5'

7'

K

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W16X31

W16X31

W16X31

W18X65

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W18X65

W X

W14X22

W16X31

W16X31

W16X31

W16X31

W16X31

W12X35

W12X35

W12X35

W12X35

W12X35

W12X35

W12X35

W16X31

W16X31

W16X31

W18X65

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W18X50

W18X50

W18X65

W X

W14X22

W18X40

W18X40

W18X50

W18X97 W16X36 W16X36 W16X36 W18X97

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

3.3

4.1

5.1

5.9

A.1B.1C.1D.1

W12X14

W X

W X

W X

W12X22

W X

W X

W X

7' - 0" 6' - 8" 4' - 7 1/2"

W12X16

W12X26

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W16X31

W16X31

W16X31

W16X31

W16X31

W16X31

W12X35

W12X35

W18X50

W16X31W X

W X

W X

HSS6X6X5/16

P5000 UNISTRUT BEAMS TO HANG

PATIENT LIFT SYSTEM (TYP.)

T Y

P

T Y

P

T Y

P

P5000 UNISTRUT BEAMS TO HANG

PATIENT LIFT SYSTEM (TYP.)

S-201

S-201

SIM.

S-201

SIM.

P5000 UNISTRUT BEAMS TO HANG

PATIENT LIFT SYSTEM (TYP.)

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:xxxxxxCOPYRIGHT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

InfraStructure, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

I:

\p ro je c ts

\N E

\1

P

\0

\D w g s\ B u ild in g

S tr u c tu ra l.

rv t

/3

/2

:4

:5

P M

S-102

ROOF FRAMING PLAN - AREA B

NRG BJN11/04/20

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE, 68105

1/8" = 1'-0"

LOW ROOF FRAMING PLAN - AREA B

TRUE

KEY PLAN

B

A

C D

BEARING

1 1/2" MIN.

1/8 1

BOTH SIDES

(TYP.)

MANUFACTURER'S PENDANT

HANGER

P5000 UNISTRUT SECTION SPANNING

BETWEEN EXISTING BEAMS. ALIGN

OVER LIFT TRACK LOCATIONS

LIFT TRACK BY MANUFACTURER

P1000 LONGITUDINAL BRACE

(ONE PER TRACK) w/ P1843

HINGE CONNECTOR EACH END.

45 DEGREE MAXIMUM ANGLE

P1000 LATERAL BRACE AT EACH PENDANT HANGER w/

P1843 HINGE CONNECTOR EACH END. 45 DEGREE

MAXIMUM ANGLE. ATTACH TO CENTER OF UNDERSIDE OF

CONCRETE-FILLED METAL DECK FLUTE w/ 1/2"Ø x 3 1/2"

LONG HILTI KWIK HUS EZ ANCHOR

VERIFY

8' - 0"

FIRST FLOOR

234' - 6"

/2

TAB PL - 3/8x5x6"

1/4

EXIST. BEAMNEW BEAM

NOTE: NEW BEAM SHALL BE LOCATED WITH ITS TOP FLANGE FLUSH WITH THE

CENTER OF THE UNDERSIDE OF AN EXISTING METAL DECK FLUTE. NO

CONNECTION BETWEEN THE NEW BEAM AND THE DECK IS REQUIRED

1/4 5 1/2

FIRST FLOOR

234' - 6"

COVER PL - 1/2x8" CONT. ALONG EXISTING

BOTTOM BEAM FLANGE. PLATE MAY BE AS

MUCH AS 2'-0" SHORTER THAN EXISTING BEAM

LENGTH (HELD BACK 1'-0" EACH END).

3/16 2@12

8" SOLID WELD

AT ENDSEXIST. W16X31 BEAM

3/4x5 1/2x11" SPLICE PLATE (IF NEEDED). SPLICE IN

COVER PLATE MAY OCCUR AT ONE OR TWO LOCATIONS

ALONG LENGTH OF PLATE AT CONTRACTOR'S OPTION1/4

NOTE: ALL COVER PLATES SHALL BE WELDED TO BOTTOMS OF INDICATED BEAMS AFTER

FIRST FLOOR INTERIOR WALLS HAVE BEEN DEMOLISHED AS INDICATED ON ARCHITECTURAL

DRAWINGS, AND BEFORE NEW INTERIOR WALLS HAVE BEEN INSTALLED

/2

/2

E M

B E

D

/2

H O

L E

D E

P T

H

/4

1/2"Ø HILTI KWIK BOLT 3 w/ 2 1/2" EMBED.

DO NOT USE MANUFACTURER'S

STANDARD 3 1/2" EMBED. ANCHORS

EXIST. SLAB ON METAL DECK

CT SCAN BASE

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:xxxxxxCOPYRIGHT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

InfraStructure, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

I:

\p ro je c ts

\N E

\1

P

\0

\D w g s\ B u ild in g

S tr u c tu ra l.

rv t

/3

/2

:4

:5

P M

S-201

STRUCTURAL DETAILS AND NOTES

NRG BJN11/04/20

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE, 68105

1" = 1'-0"

SECTION AT PATIENT LIFT SUPPORT

1" = 1'-0"

SECTION AT NEW BEAM

1 1/2" = 1'-0"

SECTION AT COVER PLATED BEAM

3" = 1'-0"

ANCHORAGE OF CT SCAN EQUIP. TO SLAB

G

GG

E,G

E,G

J

J

J

J

J

J

E ,G

G

G

G G

G G

G G G

G

G

G

G

J

J

J

E ,G

C D E F G HC1 D1

C2 D1.5

+44"

+44"

+44" +44"

NUC-MED

PET/SPECT

COMPONENTS

1901.A

HOLDING

BAY

CONTROL

ROOM

SPECT/ CT

NUC-MED

PET/SPECT

NUC-MED

DRESSING

RESTROOM

1903.A

NUC-MED

DRESSING

COMPONENTS

CARDIAC

STRESS

STORAGE

CORRIDOR

C1-18

RESTROOM

1905.A

ALCOVE

C1-18B

COLLIMATOR

STORAGE

1909.A

CORRIDOR

C1-17

+44"

1BNA-8

1BNA-2

1BNA-4

1BL-10

1BL-9

1BL-13

1BL-11

1BNA-10

1BL-15

1BNA-20 1BNA-16

1BNA-18

1BL-8

1BNA-21

1BL-18

+44" E

1BNA-19

1BNA-12

E

E

E

+44"

E

1BNA-11

1BNB-17

1BL-7

1BL-17

1BNB-5

4 1BNB-4

UPS

POWER

DISTRIBUTION UNIT

UPS

POWER

DISTRIBUTION

UNIT

7 8

EE

ICE MAKER

E

1BL-6

E

E

1BNA-13

1BNA-6

'XFMR TCT1909'

'XFMR TNM1901'

1BL-19

(PARTIAL CIRCUIT SHOWN)

SSIU

1901.A-A

SSIU

1901.A-B

SSIU

1911-A

SSIU

1911-B

EPO

EPO EPO

EPO

EPO

EPO

E E

E

E

EP4-25,27,29

EP4-26,28,30

EP4-14,16,18

EP4-20,22,24

C D E F G H J KC1 D1

C2 D1.5

3.3

+44"

+44"

+44"

+44"+44"

+44"

+44"

+44"

+44"

+86"

+44"

UPTAKE

ROOM

UPTAKE

ROOM

HOT LAB

HOT

WAITING

ROOM

RESTROOM

CORRIDOR

C1-21

CONTROL

ROOM

1944.A

SPECT/ CT

COMPONENTS

1944B

THERAPY

ADMIN.

STORAGE

RESTROOM

1932.A

SCHEDULING

CORRIDOR

C1-21

CORRIDOR

C1-19

CORRIDOR

C1-20

1BNB-18

1BNB-19

1BL-5

1BNB-22

1BNB-23

1BNB-24

1BL-3

1BL-2

1BNB-27

1BNB-28

1BNB-29

1BNB-30

+44"+44"

1BNB-31

1BNB-32

E

E

1BNB-20

+44"

1BNB-21

1BL-4

1BNB-2

POWER

DISTRIBUTION

UNIT

UPS

7 8

E +44"

WARMING

CABINET

1BL-1

E

1BNB-6

E

E

1BL-19

(PARTIAL CIRCUIT SHOWN)

1BL-24

CUH

E

E

EPO

EPO

EPO

1BNB-1

SSIU

1944.B-A

SSIU

1944.B-B

1CL-6,8,10

1CL-12,14,16

APPLY TO ALL 'EP10X' AND 'EP40X' SERIES SHEETS

A. REFER TO ELECTRICAL SCHEDULES ON SHEET 'E-702' & 'E-703' FOR CIRCUTING INFORMATION.

B. REFER TO ELECTRICAL LARGE-SCALE POWER PLANS ON SHEET 'EP40X' FOR CIRCUITING AND

ADDITIONAL INFORMATION.

GENERAL POWER NOTES

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com FEI#: 192044

NORTH

B

A

C D

FIRST FLOOR KEY PLAN

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

11/04/2020

C

U se rs \g h o lm e s \D o cu m e n ts

\1

C e n tr a l- R g h o lm e s2 W

D D

J.

rv t

/2

/2

:2

:2

P

M

EP403

LARGE SCALE POWER PLANS -

AREA B - NUC MED

11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE 68105

GTHEMN

KEYNOTES

1 PROVIDE 200A, 480V, 3Ø, 4-WIRE MAIN FUSIBLE DISCONNECT, UL LISTED WITH MAGNETIC CONTACTOR SHUNT TRIP. PROVIDE THREE #3/0 CONDUCTORS, ONE #3/0 NEUTRAL, AND ONE #3/0

GROUND.

2 PROVIDE RED MUSHROOM HEAD EMERGENCY SHUT-OFF PUSHBUTTON WITH CLEAR PROTECTIVE

COVER. PROVIDE “EMERGENCY OFF” ENGRAVED NAME PLATE. CONNECT PUSHBUTTON TO

OPERATE SHUNT TRIP AT MAIN CIRCUIT BREAKER TO SHUT OFF EQUIPMENT. COORDINATE

CONNECTIONS WITH EQUIPMENT MANUFACTURER.

3 ROOM DESIGN BASIS OF DESIGN IS BASED OFF GE DISCOVERY EQUIPMENT. COORDINATE FINAL

LAYOUT OF ROOM WITH OWNER SELECTED EQUIPMENT.

4 PROVIDE CONNECTION TO PATIENT LIFT CHARGING STATION. VERIFY EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH MANUFACTURER.

5 PROVIDE CONNECTION FROM MAIN DISCONNECT TO POWER DISTRIBUTION UNIT VIA THREE #1/0

CONDUCTORS AND ONE #1/0 GROUND.

6 PROVIDE 12” WIDE X 3 1/2” DEEP MULTI-COMPARTMENT FLUSH FLOOR DUCT WITH SCREW-ON

COVER FROM POWER DISTRIBUTION UNIT TO ROUTE BELOW EQUIPMENT AND TO CONTROL ROOM.

COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT SUPPLIER. COORDINATE SAW CUTTING

FLOOR AS REQUIRED TO INSTALL FLOOR DUCT.

7 PROVIDE 10” WIDE X 3 1/2" DEEP MULTI-COMPARTMENT SURFACE VERTICAL WALL DUCT WITH

SCREW-ON COVER FROM FLOOR DUCT TO HORIZONTAL WALL DUCT. COORDINATE EXACT

REQUIREMENTS WITH EQUIPMENT SUPPLIER. COORDINATE SAW CUTTING FLOOR AS REQUIRED TO

INSTALL FLOOR DUCT.

8 PROVIDE 4 3/4” WIDE X 3 1/2" DEEP MULTI-COMPARTMENT SURFACE HORIZONTAL WALL DUCT WITH

SCREW-ON COVER FROM HORIZONTAL WALL DUCT ALONG CONTROL ROOM WALL. COORDINATE

EXACT REQUIREMENTS WITH EQUIPMENT SUPPLIER. COORDINATE SAW CUTTING FLOOR AS

REQUIRED TO INSTALL FLOOR DUCT.

9 COORDINATE EXACT LOCATION WITH TELEVISION PRIOR TO ROUGH-IN.

10 CONNECT TO CORRESPONDING OUTDOOR UNIT. CONDUITS SHALL FOLLOW CONDENSER LINE SET

ROUTING. COORDINATE WITH MECHANICAL CONTRACTOR.

SCALE: 1/4" = 1'-0"

1 POWER - AREA B PLAN - PET/SPECT AND STRESS

SCALE: 1/4" = 1'-0"

2 POWER - AREA B PLAN - SPECT/CT AND UPTAKE

Revisions: Date:

VHAOMAMazurJ Highlight

G G

G

G

G

G

G

G G

G G

G G

G G

G G

J J

J J

J J

C D E F G H J

K

C1 D1

5'

C2 D1.5

4.1

CUH

+44"+44"

RECEPTION

RESTROOM

/ SHOWER

1916.A

RESTROOM

/ SHOWER

1914.AWOMEN'S

LOCKER

MEN'S

LOCKER

1916 SUPERVISORS

MAIN

WAITING

CONFERENCE

1904.A

CHIEF

TECH

QA TECHS

OI&T

OI&T

CORRIDOR

C1-23

EXISTING PANEL '1BL'

EXISTING PANEL '1BNB'

EXISTING PANEL '1AE'

1BNB-15

1BNB-16

1BNB-12

1BNB-11

1BNB-13

1BNB-7

1BNB-8

1BNB-9

1BNB-10

1BNB-36

1BNB-14

+60"

1BNB-33

1BNB-35

1BNB-34

1BNB-37

1BNB-26

1BNB-25

B B1

B2

4.1

3.3

1BNA-15

1BNA-23

1BNA-14

1BNA-32

+44"

+44"

+44"

1BNA-5

1BNA-26

ULTRASOUND

RESTROOM

DRESSING

1953.A

RESTROOM

DRESSING

1951.A

ULTRASOUND

ULTRASOUND

RESTROOM

DRESSING

1954.A

RESTROOM

DRESSING

1952.A

ULTRASOUND

STORAGE

RADIATION

SAFETY

OFFICE

VASCULAR

LAB

ULTRASOUND-VASCULAR

STORAGE

STORAGE

ULTRASOUND-VASCULAR

CORRIDOR

C1-16

+44"

+44"

+44" +44"

+44"

1BNA-30

+44"

+44"

+44"

+44"

+44"

1BNA-34

+44"

+44"

+44" +44"

+44"

1BNA-36

+44"

+44"

+44"

+44"

+44"

1BNA-22

+44"

+44"

1BNA-24

+44"

+44"

+44"

1BNA-3

1BNA-25

+44"

1BNA-7

1BNA-9

1BNA-17

1BNA-28

1BNA-35

1BNA-37

1BNA-38

3 3

+44"+44"

+44"+44"

APPLY TO ALL 'EP10X' AND 'EP40X' SERIES SHEETS

A. REFER TO ELECTRICAL SCHEDULES ON SHEET 'E-702' & 'E-703' FOR CIRCUTING INFORMATION.

B. REFER TO ELECTRICAL LARGE-SCALE POWER PLANS ON SHEET 'EP40X' FOR CIRCUITING AND

ADDITIONAL INFORMATION.

GENERAL POWER NOTES

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com FEI#: 192044

NORTH

B

A

C D

FIRST FLOOR KEY PLAN

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

636-18-117

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

InfraStructur, LLC

6910 Pacific Street, Suite 310

Omaha, NE 68106

Phone:(402) 554-0234

FARRIS ENGINEERING

12700 W Dodge Rd.

Omaha NE 68154

Phone:(402) 330-5900

11/04/2020

C

U se rs \g h o lm e s \D o cu m e n ts

\1

C e n tr a l- R g h o lm e s2 W

D D

J.

rv t

/2

/2

:2

:2

P

M

EP404

LARGE SCALE POWER PLANS -

AREA B - ULTRASOUND / ADMIN

11/04/2020

RENOVATE BUILDING 25

FOR SPECIALTY CARE

CD-1 CONSTRUCTION

DOCUMENTS

Omaha, NE 68105

GTHEMN

KEYNOTES

1 PROVIDE WIREMOLD RFB4 SERIES POKE THRU AND FPBTCXX COVER ASSEMBLY. COORDINATE

COLOR OF COVER AND EXACT LOCATION WITH ARCHITECT PRIOR TO ORDERING AND

INSTALLATION. MOUNT DEVICES INDICATED ON POWER PLAN IN FLOOR BOX. PROVIDE FLOOR BOX

ACCESSORIES AS REQUIRED TO MOUNT DEVICES.

2 COORDINATE EXACT LOCATION WITH TELEVISION PRIOR TO ROUGH-IN.

3 PROVIDE CONNECTION TO PATIENT LIFT CHARGING STATION. VERIFY EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH MANUFACTURER.

SCALE: 1/4" = 1'-0"

1 POWER - AREA B PLAN - ADMINISTRATION

SCALE: 1/4" = 1'-0"

2 POWER - AREA B PLAN - ULTRASOUND

Revisions: Date:

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

VHAOMAMazurJ Highlight

Sheets
G-001 - TITLE SHEET
LS101 - LIFE SAFETY PLAN - AREA A
LS102 - LIFE SAFETY PLAN - AREA B
GI-001 - OVERALL PHASING PLAN
GI-101 - PHASING PLAN - FIRST FLOOR - PHASE 1
GI-102 - PHASING PLAN - FIRST FLOOR - PHASE 2
GI-103 - PHASING PLAN - FIRST FLOOR - PHASE 3
AG001 - ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES
AD101 - FIRST FLOOR - DEMOLITION PLAN AREA A
AD102 - FIRST FLOOR - DEMOLITION PLAN AREA B
CD-101 - DEMO CEILING PLAN AREA A
CD-102 - DEMO CEILING PLAN AREA B
A-100 - FLOOR PLAN - OVERALL AREA A & AREA B
A-101 - FIRST FLOOR - FLOOR PLAN - AREA - A
A-102 - FIRST FLOOR - FLOOR PLAN - AREA - B
AC101 - FIRST FLOOR - REFLECTED CEILING PLAN AREA A
AC102 - FIRST FLOOR - REFLECTED CEILING PLAN AREA B
A-201 - EXTERIOR ELEVATIONS
A-301 - LARGE SCALE PLANS - AREA A - BLOOD DRAW / ELIGIBILITY
A-302 - LARGE SCALE PLANS - AREA A - COMP. & PEN.
A-303 - LARGE SCALE PLANS - AREA B - NUC MED
A-304 - LARGE SCALE PLANS - AREA B - ULTRASOUND
A-305 - LARGE SCALE PLANS - AREA B - ADMIN.
A-306 - LARGE SCALE PLANS - AREA B - WAITING ROOM
A-401 - WALL SECTIONS
A-402 - WALL SECTIONS
A-701 - DOOR & WINDOW SCHEDULES & DETAILS
A-702 - DOOR & FRAME TYPES AND DETAILS
A-703 - ROOM FINISH SCHEDULE
A-801 - INTERIOR DETAILS - WALL TYPES
A-802 - INTERIOR DETAILS
A-803 - SIGNAGE SCHEDULE & DETAILS
A-901 - CASEWORK DETAILS
A-902 - CASEWORK SECTIONS
A-903 - INTERIOR ELEVATIONS
A-904 - INTERIOR ELEVATIONS
A-905 - INTERIOR ELEVATIONS
A-906 - INTERIOR ELEVATIONS
A-907 - INTERIOR ELEVATIONS
A-908 - INTERIOR ELEVATIONS - RESTROOMS AREA A
A-909 - INTERIOR ELEVATIONS - RESTROOMS AREA B
A-910 - INTERIOR ELEVATIONS - RESTROOMS AREA B
A-911 - INTERIOR ELEVATIONS - COORIDORS AREA B
A-912 - INTERIOR ELEVATIONS - COORIDORS AREA B
A-913 - INTERIOR ELEVATIONS - COORIDORS AREA A
A-914 - INTERIOR ELEVATIONS - COORIDORS AREA A
AI101 - FIRST FLOOR - INTERIOR FLOOR FINISH PLAN AREA A
AI102 - FIRST FLOOR - INTERIOR FLOOR FINISH PLAN AREA B
Q-101 - EQUIPMENT - FLOOR PLAN - COMP. & PEN.
Q-102 - EQUIPMENT - FLOOR PLAN - BLOOD DRAW / ELIGIBILITY
Q-103 - EQUIPMENT - FLOOR PLAN - NUC MED