Updated Section B.2.pdf
PDF 236 KB Posted
- Attached to
- 6515--Ceiling Mounted Patient Lift System - NWI VAHCS Federal contract opportunity
- Solicitation number
- 36C26323Q0747
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26323Q0747 A0002.pdf | ||
| 36C26323Q0747 A0002_1.docx | DOCX document | |
| 36C26323Q0747 A0001.pdf | ||
| 36C26323Q0747 A0001_1.docx | DOCX document | |
| 36C26323Q0747.pdf | ||
| D.2 - Installation Checklist for Ceiling Lifts.pdf | ||
| 36C26323Q0747_1.docx | DOCX document | |
| D.1 - Building 25 Room Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26323Q0747
B.2 Statement of Work - Amendment A0002
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Imaging Bldg. 25 Phase 2 Overhead Lift Systems
Bldg. 25 Imaging Nuc Med/Ultrasound – Omaha VA
1. General:
1.1. The Contractor will provide all labor and materials to provide and install patient lifts in the quantity and locations required by the contract documents.
1.2. The Contractor shall provide independent third-party certification that each lift installation is structurally sound and suitable for the intended installation method. This certification shall include structural design drawings for each installation location signed and sealed by a Professional Structural Engineer not employed by the Contractor except as an independent consultant, registered with a current Professional Engineer license in at least one of the 50 states of the United States
1.3. Quality Assurance
1.3.1. Inspection of equipment after installation is required prior to use for patient movement. Inspection shall be in accordance with manufacturer’s installation checklist and the facilities installation checklist (Patient Safety Alert AL14-07).
1.3.2. Documentation shall include detailed descriptions of items in the “After Installation Checklist” for Ceiling Mounted Patient Lifts from Patient Safety Alert 14 - 07.
1.4. Submittals
1.4.1. Certificates of Compliance
1.4.1.1. Manufacturer's Literature and Data:
1.4.1.2. Lifting Capacity
1.4.1.3. Lifting Speed
1.4.2.
1.4.2.1. Horizontal Displacement Speeds
1.4.2.2. Horizontal Axis Motor
1.4.2.3. Vertical Axis Motor
1.4.2.4. Emergency Brake
1.4.2.5. Emergency Lowering Device
1.4.2.6. Emergency Stopping Device
1.4.2.7. Electronic Soft-Start and Soft-Stop Motor Control
1.4.2.8. Current Limiter for Circuit Protection
1.4.2.9. Low Battery Disconnect System
1.4.2.10. Strap Length
1.4.2.11. All equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed.
1.4.3. Individual Room layouts showing location of lift system installation shall be approved by NWIHCS representatives from SPHM Facility Champion and Engineering before proceeding with installation of lifts.
1.4.4. Manufacturer’s Checklist for after installation inspection.
After Installation Checklist for Ceiling Mounted Patient Lifts
1.5. Contractor shall be responsible for all facility alterations and repairs necessary for a complete and usable installation. If facility modifications are required, the contractor will obtain the Chief Engineer’s approval before starting any modification.
1.6. The Contractor shall ensure the equipment; materials and installation adhere to the publications listed below to the extent referenced. The publications are listed in the text by the basic designation only.
International Organization for Standardization (IOS):
10535-2021 Hoist for the Transfer of Disabled Persons-Requirements and Test Methods https://www.iso.org/standard/72711.html
Underwriters Laboratories (UL):
60601-1 Medical Electrical Equipment: General Requirements for Safety https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=11166
94-2006 UL Standards for Safety Test for Flammability of Plastic Materials for Parts in Devices and Appliances-Fifth Edition https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=25730
Patient Safety Alert 14-07: Ceiling Mounted Patient Lift Installations – see attachment Installation Checklist for Ceiling Lifts
National Fire Protection Agency (NFPA)
NFPA 99. https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=99
2. Products: Brand name or equal to LIKO Ceiling Mtd Patient Lift BARIATRIC Traverse Rail System 1000lb capacity & LIKO Ceiling Mounted Patient Lift, Traverse Rail System 550lb capacity https://www.iso.org/standard/72711.html https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=11166 https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=25730 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=99 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=99
2.1. Provide anchor supports as specified by manufacturer for the specific required ceiling condition and required load.
2.2. Lift unit shall be constructed of a steel frame system (2205lbs / 1000kg tested) driven by a gear reduced high torque motor
2.3. The Lift system shall have the following features.
1. Lifting capacity: minimum 550lbs for non-bariatric and minimum 1000 lbs for bariatric
2. Electronic soft-start and soft-stop motor control
3. Emergency lowering device
4. Emergency stopping device
5. Current limiter for circuit protection in case of overload.
6. Safety device that stops the motor to lift when batteries are low.
7. Lifting speed: minimum 2.3in/s (6 cm/s), 1.6in/s (3.5cm) in full capacity
8. Horizontal displacement speed: 5.9in/s (150mm/s) +/- .4 inches
10. Emergency brake (in case of mechanical failure)
11. Strap length up to 90in (2.3m) tested for minimum 2998lbs (1360kg)
12. Cab: VO plastic–fire retardant
2.4. Lift Batteries
Provide rechargeable batteries with minimum 100 transfers with a load of 200lbs (74kg) and up to 60 transfers with its maximum load of 550lbs (200kg).
2.5. Chargers
2.5.1. Charger Input: 100-240 Vac, 50/60 Hz.
2.5.2. In rail charging
2.6. Straps and Slings
2.6.1. The straps shall ensure the patient’s safety by preventing the patient from falling out of the sling.
2.6.2. The sling shall be made from a material that is pliable, breathable, and easy to use. The sling shall cradle the body of the patient.
3. Execution
3.1. Installation
3.1.1. Contractor will install overhead mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings. If the distance in between the suspended ceiling and anchors is more than 18” consult with manufacturer to determine if lateral braces will be required.
3.2. Instructions and Personnel Training
3.2.1. Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system equipment.
3.3. Tests
3.3.1. Contractor will conduct performance test, in the presence of the Resident Engineer, Biomedical Engineering representative and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design and specification requirements.
3.4. Inspections
3.4.1. Refer to manufacturer’s specific model and specifications to verify all location information, including minimum clearances for operation are compliant.
3.4.2. Manufacturer information, including model and serial number(s).
3.4.3. Confirm receipt of operator and maintenance manuals.
3.4.4. Verification of proper connections of structural system to the building’s structure including seismic bracing if applicable.
3.4.5. Verification of proper structural component sizing and physical installation to make sure that proper structural system and size is in place and properly installed to support the lift.
3.4.6. Verification of proper interface of lift unit at ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.
3.4.7. Inspection of lift motor casing for cracks and alignment.
3.4.8. Full extension and inspection of lift strap for loose threads or frays.
3.4.9. Inspection of spreader bar and clips for cracks and for loose or missing r ings or cotter pins.
3.4.10. Verification that all rail end stops are in place and tightened.
3.4.11. Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.
3.4.12. Inspection and activation of emergency up/down motor case control buttons if applicable.
3.4.13. Confirm any and all motor case indicator lights are functioning (e.g., red service warning light, charging state light).
3.4.14. If included in installation, verify rail turntable function, exchanger function, and gate alignment.
3.4.15. Confirm track is clean and clear of all debris (suggest wiping entire length of interior track channel with a soft cloth). Note: Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.
Phenol or chlorine solutions may damage some motor case surfaces.
3.4.16. Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.
3.4.17. Verification of load testing and deflection testing at lift listed maximum for each lift unit at its maximum rated lift capacity. Conduct this test per manufacturer’s instructions and in accordance with Patient Safety Alert 14-07 to 100% of maximum rated lift capacity.
3.4.18. Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.
3.4.19. Verification of function of emergency brake at maximum rated lift capacity.
3.4.20. Verification of emergency lowering feature at maximum rated lift capacity.
3.4.21. Inspection of units by Contracting Officer’s Technical Representative (COTR:
Maintenance & Repairs, Facilities Engineering Services, Biomedical Engineering, or Safety) prior to release of lift(s) to clinical use.
3.4.22. Training of clinicians and other staff who move and handle patients on the use of patient handling equipment is accomplished by the manufacturer or their designated representative. Training is documented
3.5. Any additional charges claimed will be approved by the CO via the COTR before service is completed.
4. Security:
4.1. The contractor shall not connect any storage device into a VHA owned equipment that is connected to the network without prior written approval and after having the device scanned by a VA approved computer with appropriate virus detection software.
4.2. VHA BESS personnel will ensure no patient data is removed from the facility by the vendor by maintaining a physical presence during all work.
5. Definitions/Acronyms
5.1. NWIHCS - Nebraska Western Iowa Health Care System. Consists of 3 main campuses: Omaha 4101 Woolworth Ave, Omaha NE 68105 (ph 402.995.3040); Grand Island 2201 N Broadwell Ave, Grand Island NE 68803 (308-382-3660 ext 2491); and Lincoln 600 South 70th, Lincoln NE 68510 (ph 402.489.3802 ext 6437) and associated CBOCS (Bellevue, Norfolk, Holdrege, North Platte Nebraska and Shenandoah IA CBOCs
5.2. Contracting Officer, VA Network 23 Contracting Office (NCO 23), 4801 Veterans Drive, Bldg11, Rm 201, Saint Cloud, MN 56303
5.3. fPOC – Facility Point of Contact
5.4. IAW – In Accordance With
5.5. FSE – Field Service Engineer. A person who is authorized by the contractor
5.6. ESR – Vendor Engineering Service Report. A documentation of the services rendered for each incidence of work performance under the terms and conditions of the contract.
5.7. Acceptance Signature – Signature of VA Omaha employee who indicates FSE demonstrated service conclusion/status and user has accepted work as complete/pending as stated in ESR.
5.8. Authorization Signature – COTR’s signature; indicates COTR accepts work status as stated in ESR.
5.9. OSHA – Occupational Safety and Health Administration.
5.10. BESS — Biomedical Equipment Support Specialist. VA employee responsible vendor coordination of maintenance for VA owned medical equipment.
6. Hours of Coverage:
6.1. Installation: Dates and hours of installation shall be determined by NWIHCS representative in consideration of room use and occupancy. Expect that some, if not all, lift systems will require non-business hours (Mon-Fri; 0730-1530) installation to minimize negative impact to patient care or access to care.
6.2. Federal holidays observed by VA Omaha are:
New Years Day Labor Day
Martin Luther King Day Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day Juneteenth and any other day specifically designated by the President of the United States.
7. Reporting Requirements:
7.1. Upon arrival at VA Omaha the contractor shall be required to log in with Biomed in room B556 in Omaha. This log in is mandatory as well as wearing the contractor badge issued upon log in.
7.2. When service is completed, the FSE shall document services rendered on a legible ESR(s) and submit to the BESS who set-up the service. The ESR can be submitted when logging out with Biomed, via an internet web site or e-mail. ESRs should be submitted not later than 5 business days after service is complete.
7.3. In those cases when the Biomed office is closed, contractor personnel will log in and/or out via the VA police and after-hours service shall be prearranged with the BESS.
8. Test Equipment:
9.1. Test weights/equipment calibration shall be traceable to National Institutes of Standard Technology standards.
9. Identification, Parking, Smoking, and VA Regulations:
9.1. Contractor’s FSE(s) shall obtain a VA issued photo identification badge.
9.2. It is the responsibility of the contractor to park in the appropriate designated parking areas. Information on parking is available from VA Police Service. VA will not invalidate or make reimbursement for parking violations of the contractor under any conditions.
9.3. Smoking is prohibited inside all VA buildings and only allowed in designated areas outside.
9.4. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search.
9.4. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state or municipal court.
10. Contractor Qualifications:
10.1. Contractor must have full time staff that is “fully qualified” FSE and a “fully qualified” FSE who will serve as the backup for the equipment identified in this solicitation.
10.2. “Fully qualified” is based upon training and on experience in the field. For training, the FSE(s) has successfully completed a formalized training program for the equipment identified in this solicitation as required by the manufacturer.
10.3. Contractor must provide, upon request, evidence of appropriate training of any FSE(s) providing services under terms of the contract. Subcontracting of any ensuing award of this solicitation will not be allowed without written permission of the Contracting Officer.
11. Delivery and Installation Storage of goods:
11.1. Delivery and installation of lifts shall be within 60 days of contract award.
12. Installation Locations: Omaha VA, 4101 Woolworth Ave, Building 25
Lift Systems Quantity Type of Equipment
US Room 1951 Bariatric 1 1000 lb transverse system
US Rooms 1952,1953,1954 1 per room listed
550 lb transverse system
Nuclear Medicine Rooms 1901,1909,1944 1 per room listed
550 lb transverse system
See attached Building 25 Room Drawings. Only yellow highlighted rooms are included in the procurement. Rooms 1941/1945 are NOT included even though drawing shows lifts.
| 2. Products: Brand name or equal to LIKO Ceiling Mtd Patient Lift BARIATRIC Traverse Rail System 1000lb capacity & LIKO Ceiling Mounted Patient Lift, Traverse Rail System 550lb capacity |
| 3. Execution |
| 4. Security: |
| 5. Definitions/Acronyms |
| 6. Hours of Coverage: |
| 7. Reporting Requirements: |
| 8. Test Equipment: |
| 9. Identification, Parking, Smoking, and VA Regulations: |
| 10. Contractor Qualifications: |
| 11. Delivery and Installation Storage of goods: |