CTR079534_Pricing.xlsx

XLSX spreadsheet 220 KB Posted

Attached to
Master Agreement AZ|CTR079534
Contract number
CTR079534
Issued by
Arizona

About this file

This document is a pricing sheet for an On-Call Transit Consulting Services contract, identified by the code BPM007068. The contract appears to be a state or local government indefinite delivery vehicle for professional consulting services in transit-related projects. The document includes detailed pricing information for various professional roles within a consulting organization, with multiple rate structures and staff categorizations.

The contract provides not-to-exceed, fully burdened hourly rates for 12 different professional roles ranging from Administrative Support at $114 per hour to Consultant at $443.91 per hour. There are two distinct pricing tables: one with higher rates and another with alternative/lower rates. The pricing is designed to be flexible, allowing for project-specific quotes that can be negotiated based on the specific staff levels and expertise required. The contract emphasizes that while the rates are set, the actual project awards will typically be fixed-price or not-to-exceed, with the potential for reimbursement of direct costs and travel at actual rates according to state accounting principles. The document includes a comprehensive list of staff members, their roles, and corresponding rates, suggesting a detailed organizational structure ready to support transit consulting projects.

View the file

Other files

File Type Posted
CTR079534_Contract_Documents.pdf PDF
CTR079534__Contract_Summary_Document.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 BPM007068 On Call Transit Consulting Services Pricing Sheet Attachment 12 A pricing sheet will be completed for individual tasks assigned/requested under the on-call.

Contract RoleSUM of No of Estimated HoursUnit PriceExtended Price
CONSULTANT1$443.91$443.91
PRINCIPAL1$373.17$373.17
MARKETING & MEETING SPECIALISTS1$343.37$343.37
OPERATIONS MANAGER1$313.56$313.56
PROJECT MANAGER1$289.08$289.08
DEVELOPER1$260.37$260.37
PLANNER1$231.63$231.63
GIS/TECHNICAL1$198.81$198.81
ANALYST1$165.36$165.36
GRAPHICS / ART / MULTIMEDIA1$144.00$144.00
TECHNICAL WRITERS1$126.30$126.30
ADMINISTRATIVE / FINANCIAL SUPPORT1$114.00$114.00
PURCHASING / PROCUREMENT OFFICER1$0.00$0.00
GRANT WRITERS1$0.00
Total$3,003.56

Rates quoted shall be not-to-exceed, fully burdened rates, and shall reflect the highest rate for any level of position for the role. The hours reflected in this table is based on an estimate only and does not represent any guarantee of work or projects. Pricing per hour will be used as not-to-exceed rates by the contractor in completing a specific project budget / quote. Project budgets shall be quoted with competitve rates relevant to the level of staff being recommended for perform on a project. For example, if two levels of an "analyst" are required for a particular work project, it would be expected that two different prices would be quoted on that project budget, and the highest could not exceed the awarded rate for that role. Though it is possible to award a time-and-materials contract in special circumstances permissible under federal funding, the contractor should not expect such an award for a project. Instead, the contractor's budget / quote will be normally be awarded as a not-to-exceed price established for the project, or as a fixed price by deliverable or task; except that other direct costs and travel must be reimbursed at actual per State Accounting Principles. The method of award will be identified in the task assignment / request for project quote document that explains a specific scope of work. All project-level quote shall be subject to negotiation.

Alt_additionalcats BPM007068 On Call Transit Consulting Services Pricing Sheet Attachment 12 A pricing sheet will be completed for individual tasks assigned/requested under the on-call.

Contract RoleSUM of No of Estimated HoursUnit PriceExtended Price
GIS/TECHNICAL1$35.00$35.00
ADMINISTRATIVE / FINANCIAL SUPPORT1$40.00$40.00
PLANNER1$55.00$55.00
PROJECT MANAGER1$60.00$60.00
SENIOR PLANNER1$65.00$65.00
OPERATIONS MANAGER1$67.00$67.00
SENIOR GIS/TECHNICAL1$70.00$70.00
MARKETING & MEETING SPECIALISTS1$75.00$75.00
COMMUNICATIONS COORDINATOR1$75.00$75.00
TECHNICAL WRITERS1$80.00$80.00
ANALYST1$87.00$87.00
SENIOR PROJECT MANAGER1$90.00$90.003.0 multiplierbase rate
DEVELOPER1$95.00$95.00mclaren rate for consultant?
CONSULTANT1$104.00$104.00eric rouse for consultant
PRINCIPAL1$124.39$124.39
GRAPHICS / ART / MULTIMEDIA1$0.00
PURCHASING / PROCUREMENT OFFICER1$0.00
GRANT WRITERS1$0.00
Total$1,122.39

Rates quoted shall be not-to-exceed, fully burdened rates, and shall reflect the highest rate for any level of position for the role. The hours reflected in this table is based on an estimate only and does not represent any guarantee of work or projects. Pricing per hour will be used as not-to-exceed rates by the contractor in completing a specific project budget / quote. Project budgets shall be quoted with competitve rates relevant to the level of staff being recommended for perform on a project. For example, if two levels of an "analyst" are required for a particular work project, it would be expected that two different prices would be quoted on that project budget, and the highest could not exceed the awarded rate for that role. Though it is possible to award a time-and-materials contract in special circumstances permissible under federal funding, the contractor should not expect such an award for a project. Instead, the contractor's budget / quote will be normally be awarded as a not-to-exceed price established for the project, or as a fixed price by deliverable or task; except that other direct costs and travel must be reimbursed at actual per State Accounting Principles. The method of award will be identified in the task assignment / request for project quote document that explains a specific scope of work. All project-level quote shall be subject to negotiation.

Sheet1_work (2)

BPM007068 On Call Transit Consulting Services Pricing Sheet
Attachment 12ExistingRevisedColumn1
Contract Role (Charging)Contract Role (Charging)Contract Role (Charging)firstlastrate147.97
A pricing sheet will be completed for individual tasks assigned/requested under the on-call.consultantconsultantconsultantericrouse147.97124.39
3.0multiplierprincipalprincipalprincipalpeterbrakenhoff124.39104
Marketing and Meeting SpecialistOperations ManagerOperations Managerjayharper108.91
Contract RoleSUM of No of Estimated HoursUnit PriceExtended Pricefully burdened Unit Price (To submit)Marketing and Meeting SpecialistConsultantOperations Managerscottmiller104.5297PDC On-Call Rates
CONSULTANTConsultant1$147.97$147.97$443.91Operations ManagerOperations Managerericsitiko103.21
PRINCIPALPrincipal1$124.39$124.39$373.17Project ManagerConsultantmatthewtaunton96.36
MARKETING & MEETING SPECIALISTS1$116.00$116.00$348.00Project ManagerProject Managermicahellabianca94.57
OPERATIONS MANAGEROperations Manager1$104.54$104.54$313.62Project ManagerProject managermichaelgorton91.8578
PROJECT MANAGER1$96.36$96.36$289.08Developer??86.79
DEVELOPER - Don't have anyone in org chart at this rate (currently)1$86.79$86.79$260.37PlannerOperations Managertonycohen77.2168
PLANNER1$77.21$77.21$231.63PlannerMeeting Specialistkristiross72.12
GIS/TECHNICAL1$66.27$66.27$198.81GIS / TechnicalMeeting Specialistmichaelbook66.27
ANALYST1$55.12$55.12$165.36GIS / TechnicalGraphics??oliverkuehne65.4256
GRAPHICS / ART / MULTIMEDIA1$48.20$48.20$144.60GIS / TechnicalGIS / Technical or something else?joshmatthews62.5
TECHNICAL WRITERS1$42.10$42.10$126.30AnalystAnalystdavidtotten55.12
ADMINISTRATIVE / FINANCIAL SUPPORT1$38.00$38.00$114.00AnalystGIS / Technicalcavannoone52.3643
PURCHASING / PROCUREMENT OFFICER1$0.00$0.00AnalystAnalystRebeccasantiago50.99
GRANT WRITERS1$0.00Technical WritersPlannerCherieSigna42.138
TotalJackieBrown41.31
Technical WritersPlannerblanachavez40.18
Graphicskristiquaglieri39.58
Administrative / Financial SupportAdministrative/Financial SupportAudreyPhillips38
Administrative / Financial SupportGIS / Technicaladititparihar35.12
Administrative / Financial SupportTechnical Writerarrianajones34.97
Administrative / Financial SupportPlanneralikazemeini31.38
$86.79
Rates quoted shall be not-to-exceed, fully burdened rates, and shall reflect the highest rate for any level of position for the role. The hours reflected in this table is based on an estimate only and does not represent any guarantee of work or projects. Pricing per hour will be used as not-to-exceed rates by the contractor in completing a specific project budget / quote. Project budgets shall be quoted with competitve rates relevant to the level of staff being recommended for perform on a project. For example, if two levels of an "analyst" are required for a particular work project, it would be expected that two different prices would be quoted on that project budget, and the highest could not exceed the awarded rate for that role. Though it is possible to award a time-and-materials contract in special circumstances permissible under federal funding, the contractor should not expect such an award for a project. Instead, the contractor's budget / quote will be normally be awarded as a not-to-exceed price established for the project, or as a fixed price by deliverable or task; except that other direct costs and travel must be reimbursed at actual per State Accounting Principles. The method of award will be identified in the task assignment / request for project quote document that explains a specific scope of work. All project-level quote shall be subject to negotiation.

Rates

OHw/ profit
firstlastrateColumn1161%10%
ericrouse147.97
scottmiller104.52104273.04300.34
ericsitiko103.21269.62296.58
matthewtaunton96.3697251.72276.89
micahellabianca94.57247.05271.75
michaelgorton91.85239.94263.93
tonycohen77.2178201.70221.87
kristiross72.12188.40207.24
michaelbook66.2768173.12190.43
oliverkuehne65.42170.90187.99
joshmatthews62.5163.27179.60
davidtotten55.1256143.99158.39
cavannoone52.36136.78150.46
santiago50.99133.20146.52
CherieSigna42.143109.98120.98
blanachavez40.18104.96115.46
AudreyPhillips383899.27109.19
adititparihar35.1291.74100.92
arrianajones34.9791.35100.49
alikazemeini31.3881.9790.17

image1.png image2.png

File details come from the government source that posted it. Updated .