CTR073430_Price_List.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Master Agreement AZ|CTR073430
- Contract number
- CTR073430
- Issued by
- Arizona
About this file
This document is a pricing sheet for a Tunnel Fan Maintenance contract (GovTribe ID: 975def4cc9efe607cf0a54bc5a209fa0), specifically the CTR073430 Price List. The document appears to be from Howden Construction, detailing pricing for maintenance services, labor rates, parts, and additional fees related to tunnel fan equipment and maintenance.
The contract includes comprehensive pricing structures across four main categories: (1) Annual Maintenance Service with an estimated 8 units at $24,973.13 per unit totaling $199,785, (2) Labor Rates for various technician types including Field Engineers and Superintendents with base, after-hours, and emergency rates, (3) Parts Pricing for custom tunnel fan components with specific evaluation pricing for items like hydraulic stacks, fan vibrations, actuators, rotors, and dampers, and (4) Additional Fees including $13,800 for mobilization, $8,300 for tool trailer, and $16,405 for expenses. The pricing document provides detailed rate breakdowns for different service scenarios, with an emphasis on custom parts and flexible maintenance options for tunnel fan systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CTR073430_Contract_Amendment_Summary_One__1_.pdf | ||
| CTR073430_Contract_Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-Annual Maintenance Service
| PRICING SHEET |
| BPM006002 Tunnel Fan Maintenance |
OFFEROR:
Annual Maintenance Service Rates
Instructions: For Annual Maintenance Service for Tunnel Fan Maintenance. The Contractor shall provide rates for Annual Maintenance Services that may be applicable to the service being offered. Annual Maintenance service rates shall be listed to include all parts as necessary.
| Annual Maintenamce Service | Annual Estimated Quantity | Annual Service Rate | Extended Price (Quanity X Annual Rate) |
| 8 | 24973.13 | 199785 |
2-Labor Rates
| PRICING SHEET |
| BPM006002 Tunnel Fan Maintenance |
| Labor Rates |
| Instructions: The Contractor shall provide Base, After-hours and Emergency labor rates for each technician type. These rates are outside of the Annual Maintenance. The base hourly rate for each technician type will be used for evaluation purposes. List all technician types for service or repair work as required in the Scope of Work. | |||||||||||
| Base Labor Rate | After-Hours Labor Rate | Emergency Labor Rate | |||||||||
| Technician Type | Annual Estimated Quantity of Hours | Base Labor Hourly Rate | Extended Price (Quanity X Hourly Rate) | Technician Type | Annual Estimated Quantity of Hours | After-Hours Hourly Rate | Extended Price (Quanity X After Hours Hourly Rate) | Technician Type | Annual Estimated Quantity of Hours | Emergency Hourly Rate | Extended Price (Quanity X Emergency Hourly Rate) |
| Field Engineer | 300 | 266.38 | 79914 | Field Engineer | 50 | 396 | 19800 | Field Engineer | 0 | $ | $ |
| Superintendent | 192 | 123.68 | 23746.56 | Superintendent | 40 | 142.57 | 5702.8 | Superintendent | 0 | $ | $ |
| Millwright Foreman | 0 | 106.73 | 0 | Millwright Foreman | 0 | 125.6 | 0 | Millwright Foreman | 0 | $ | $ |
| Millwright | 0 | 102.21 | 0 | Millwright | 0 | 118.81 | 0 | Millwright | 0 | $ | $ |
| Laborer | 0 | 81.84 | 0 | Laborer | 0 | 88.26 | 0 | Laborer | 0 | $ | $ |
| Operator | 0 | 109 | 0 | Operator | 0 | 128.99 | 0 | Operator | 0 | $ | $ |
| $ | $ | $ | $ | $ | $ | ||||||
| $ | $ | $ | $ | $ | $ | ||||||
| $ | $ | $ | $ | $ | $ | ||||||
| $ | $ | $ | $ | $ | $ | ||||||
| $ | $ | $ | $ | $ | $ | ||||||
| $ | $ | $ | $ | $ | $ |
3- Parts Pricing
| PRICING SHEET |
| BPM006002 Tunnel Fan Maintenance |
OFFEROR:
Parts Used in a Repair or Service, Instructions: The Contractor shall provide pricing structures for each classification/manufacture of parts that may be used in a repair or service. For each classification offered, include at a minimum, manufacturer’s name and or classification and the associated pricing structure (% discount off of list etc.) that may be applicable. Additionally, the Contractor shall provide evaluation pricing in the table to the right labeled Evaluation Pricing. Evalaution Pricing:The contractor shall provide pricing for the listed evaluation parts. The pricing provided will be used in evaluation.
| Classification/Manufacturer (Tunnel Fan parts, additional fan blades, filters, oils, etc.) | Pricing Structure (% discount off of List, Etc.) | Evaluation Parts | Quantity (These have been Adjusted to Quote) | Amount Each | Total Cost | Comments |
| We do not have list pricing on any of these parts as they are all custom parts for these specific fans. | Hydraulic Stack | 1 | $7,000 | $ 7,000.00 | There are several components that make up the hydraulic stack - pricing will be based on which specific items within the hydraulic stack that need to be replaced. Pricing can change based on supplier availability of originally installed components at the time the parts need to be replaced. | |
| Fan Vibrations | 4 | $ 2,385.60 | $ 9,542.40 | |||
| Accuator | 1 | $ 38,700.00 | $ 38,700.00 | |||
| Rotor | 1 | $ 123,879.00 | $ 123,879.00 | Receive & Inspect (R&I) - See Quote for details | ||
| Fan Dampner | 1 | $ 133,980.00 | $ 133,980.00 | New Damper | ||
| Hi Temp Bearing Grease | 2 | $ 47.25 | $ 94.50 | |||
| Hydraulic Filters | 8 | $ 397.50 | $ 3,180.00 | |||
| Hydraulic Oil (Hunble #68) or equilivent | 8 | $ 1,845.50 | $ 14,764.00 | |||
| Heaters (Thermocouples) | 1 | $ 72,691.00 | $ 72,691.00 | Motor Refurbishment | ||
| Hydraulic Panels | 1 | $74,300 | $ 74,300.00 | There are several components that make up the hydraulic panels - pricing will be based on which specific items within the panels that need to be replaced. Pricing can change based on supplier availability of originally installed components at the time the parts need to be replaced. | ||
| Blade Pitch Control | 1 | $ 2,500.00 | $ 2,500.00 | There are several components that make up the blade pitch controls - pricing will be based on which specific items within the controls that need to be replaced. Pricing can change based on supplier availability of originally installed components at the time the parts need to be replaced. |
4-Additional Fees
| PRICING SHEET |
| BPM006002 Tunnel Fan Maintenance |
OFFEROR: Howden Construction
Additional Fees
Instructions: For, Additional Fees, The Contractor shall list any additional fees that may applicable to Tunnel Fan maintenance or repair
| Additional Fees | Fee |
| Mobilization | 13800 |
| Tool Trailer (Equipment) | 8300 |
| Expenses | 16405 |
File details come from the government source that posted it. Updated .