CTR072298_Amendment_2_-_Adds_Key_Personnel_and_Subcontractors.pdf
PDF 175 KB Posted
- Attached to
- Master Agreement AZ|CTR072298
- Contract number
- CTR072298
- Issued by
- Arizona
About this file
This document is a Contract Amendment (Amendment No. 2) for Contract No. CTR072298 issued by the Arizona Department of Environmental Quality (ADEQ) Procurement in Phoenix, Arizona. The contract is with Geosyntec Consultants, Inc. and pertains to ASRAC (Assessment and Remediation of Hazardous Substances).
The amendment adds 15 new Key Personnel to the contract, with varying professional levels (PL I through PL V), and introduces nine new Subcontractors including AWP Safety, Advantage Geophysics, Inc., BC2 Environmental, Ground Penetrating Radar Systems, Mike's Drilling LLC, Newterra Corporation, Quail Construction LLC, Varitec Solutions, and Wolfgangs Cooling, Heating & Plumbing. The amendment was executed on October 14, 2025, by Ana Machiche, Procurement Officer, and represents a unilateral acknowledgement of the contractor's approved change request. All other contract requirements, specifications, terms, and conditions remain unchanged.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 03-05-2025
CONTRACT
AMENDMENT
CONTRACT NO.: CTR072298
AMENDMENT NO.: 2
TITLE: ASRAC Assessment and Remediation of Hazardous Substances CONTRACTOR: Geosyntec Consultants, Inc.
ADEQ PROCUREMENT
1110 W. Washington Street Phoenix, AZ 85007 602-771-4140
THE PURPOSE OF THIS AMENDMENT IS TO:
In accordance with the Uniform Terms and Conditions, 5.1 Amendments and Special Terms and Conditions, 3.7 Subcontract, this contract is hereby amended as follows:
1. Add the following Key Personnel to this contract:
• Alicia Fischer – PL III
• Braden Surrett – PL I
• Branden Selleh – PL II
• Caelan Conrad – PL II
• Dilan Evans– PL I
• Jennifer Isbell – PL II
• Matthew Bigler – PL II
• Morgan Greenwald– PL IV
• Nate Lamb– PL II
• Ryan Ayala – PL III
• Sai Muddana – PL I
• Scott Wolfskill – PL V
• Stephanie Bone – PL III
• Summer Broeckx-Smith – PL IV
• Symone Stocking – PL I
• Theany Su – PL III
2. Add the following Subcontractors:
• AWP Safety
• Advantage Geophysics, Inc.
• BC2 Environmental
• Ground Penetrating Radar Systems
• Mike’s Drilling LLC
• Newterra Corporation, Inc.
• Quail Construction LLC
• Varitec Solutions
• Wolfgangs Cooling, Heating & Plumbing
3. All other Requirements, Specifications, Terms and Conditions remain unchanged.
THE ABOVE REFERENCED AMENDMENT IS A
UNILATERAL ACKNOWLEDGEMENT OF
CONTRACTOR’S APPROVED CHANGED
REQUEST.
ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY
The above referenced Amendment is hereby executed this 14th day of October 2025 at Phoenix, Arizona.
Ana Machiche Procurement Officer
Available online at Arizona Procurement Portal (APP) eProcurement System https://app.az.gov https://app.az.gov/
File details come from the government source that posted it. Updated .