CTR069178_Contract_Amendment_Summary_One__1_.pdf

PDF 223 KB Posted

Attached to
Master Agreement AZ|CTR069178
Contract number
CTR069178
Issued by
Arizona

About this file

This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT) Procurement division, amending a contract with Granite Construction for On-Call Pipelining and Drainage Repair Services. The amendment is designated as Amendment Number One (1) and follows the Uniform Terms and Conditions, Section 5 on Contract Changes.

The amendment specifically removes Section 16.4.5 related to Contractor's Pollution Liability from the Special Terms and Conditions, which previously outlined detailed insurance requirements for pollution-related incidents. The removed section included comprehensive coverage specifications such as per occurrence and aggregate liability limits ($1,000,000 and $2,000,000 respectively), provisions for pollution losses, environmental damage coverage, defense costs, and endorsements involving the State of Arizona. All other terms, conditions, and provisions of the original contract remain unchanged, indicating this is a targeted modification of the insurance provisions for the on-call pipelining and drainage repair services contract.

View the file

Other files

File Type Posted
2023 Q4 Usage Report.xlsx XLSX spreadsheet
2024 Q1 Usage Report.xlsx XLSX spreadsheet
2024-10-01_COI.pdf PDF
2025 Q2 Usage Report.xlsx XLSX spreadsheet
CTR069178_Contract_Documents.pdf PDF
2024 Q2 Usage Reports.xlsx XLSX spreadsheet
2024 Q3 Usage Report.xlsx XLSX spreadsheet
2024 Q4 Usage Report.xlsx XLSX spreadsheet
CTR069178_Contract_Amendment_Summary_3.pdf PDF
CTR069178_Contract_Amendment_Summary_Two__2_.pdf PDF
2025 Q1 Usage Report.xlsx XLSX spreadsheet
CTR069178_Contract_Amendment_Summary_4.pdf PDF
Ordering_Guidelines_for_Contracts_with_Not_to_Exceed_Pricing.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson Street, MD 100P

Phoenix, AZ 85007 602.712.7211

Contract Amendment Summary CONTRACTOR: Granite Construction AMENDMENT NO.: One (1) DESCRIPTION: On-Call Pipelining and Drainage Repair Services

Rev. 04/2020

Procurement

Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:

1. The following has been removed from the Special Terms and Conditions, Section 16 Insurance

Requirements:

16.4.5 Contractor’s Pollution Liability

For losses caused by pollution conditions that arise from the operations of the Contractor as described in the Scope of Services section of this Contract.

• Per Occurrence $1,000,000

• General Aggregate $2,000,000

a. Coverage must be identified specific to the operations as described in the Scope of

Services in this Contract.

b. Must include coverage for pollution losses arising out of completed operations.

c. Pollution coverage must apply to all locations utilized for the acceptance, storage, or disposal of any hazardous materials.

d. The policy is to be written on an “occurrence” basis with no sunset clause. In the event that the Pollution Liability insurance required by this Contract is written on a claims-made basis, Contractor warrants that any retroactive date under the policy shall precede the effective date of this Contract. That either continuous coverage will be maintained, or an extended discovery period will be exercised, for a period of ten

(10) years beginning at the time this Contract is terminated.

e. Pollution coverage must apply to all phases of the work described in the Scope of Services in this Contract.

f. The policy shall include coverage for bodily injury, sickness, disease, mental anguish, or shock sustained by any person, including death and medical monitoring costs.

g. The policy shall include coverage for property damage, and physical damage to, or destruction of, tangible property including the resulting loss of use thereof, clean-up costs, and the loss of use of tangible property that has not been physically damaged or destroyed including diminution in value.

h. For losses that arise from the facility, coverage shall apply to sudden and non-sudden pollution conditions including the discharge, dispersal, release or escape of smoke, vapors, soot, fumes, acids, alkalis, toxic chemicals, liquids or gases, waste materials or other irritants, contaminants or pollutants, into or upon land, atmosphere, or any watercourse or body of water which results in cleanup costs, bodily injury or property damage.

i. The policy shall include coverage for environmental damage including physical damage to soil, surface water, ground water, plant, or animal life, caused by pollution conditions and giving rise to cleanup costs.

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson Street, MD 100P

Phoenix, AZ 85007 602.712.7211

Contract Amendment Summary CONTRACTOR: Granite Construction AMENDMENT NO.: One (1) DESCRIPTION: On-Call Pipelining and Drainage Repair Services

Rev. 04/2020

Procurement

j. The policy shall include defense including costs, charges and expenses incurred in the investigation, adjustment or defense of claims for such compensatory damages.

k. The policy shall include coverage for asbestos and lead, mold, with no exclusions.

l. The policy shall include Non-Owned Disposal Site coverage.

m. The policy shall be endorsed, as required by this written agreement, to include the

State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees as additional insureds with respect to liability arising out of the activities performed by or on behalf of the Contractor.

n. The policy shall contain a waiver of subrogation endorsement, as required by this written agreement, in favor of the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees for losses arising from work performed by the Contractor.

2. All other terms, conditions and provisions of this contract remain unchanged.

javascript:void('0') javascript:void('0')

File details come from the government source that posted it. Updated .