CTR064441_Contract_Amendment_Summary_Two__2_.pdf

PDF 423 KB Posted

Attached to
Master Agreement AZ|CTR064441
Contract number
CTR064441
Issued by
Arizona

About this file

This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT) Procurement division, located in Phoenix, Arizona. The amendment involves Empire Southwest as the contractor and pertains to an existing contract for Engines, Pumps, and Control Panels.

The amendment specifically adds two new line items to the contract: CTR064441-33 for Parts Used in a Repair or Preventative Maintenance (referenced in section 5.7 of the scope of work), and CTR064441-34 for Shop Supplies not to exceed 5% of labor costs (per section 4.1.3). All other terms, conditions, and provisions of the original contract remain unchanged. This is the second amendment to the contract, as indicated by "Amendment No.: Two (2)" on the document.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson Street, MD 100P

Phoenix, AZ 85007

Contract Amendment Summary CONTRACTOR: Empire Southwest AMENDMENT NO.: Two (2)

DESCRIPTION: Engines Pumps and Control Panels

Rev. 04/2020

Procurement

Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:

1. The Following line items have been hereby added to the contract.

CTR064441-33 Parts Used in a Repair or Preventative maintenance -Per section 5.7 of the scope of work.

CTR064441-34 Shop supplies NTE 5% of labor cost- Per section 4.1.3.

2. All other terms, conditions and provisions of this contract remain unchanged.

javascript:void('0') javascript:void('0')

File details come from the government source that posted it. Updated .