CTR050386_Contract_Amendment_Summary_Six__6_.pdf
PDF 481 KB Posted
- Attached to
- Master Agreement AZ|CTR050386
- Contract number
- CTR050386
- Issued by
- Arizona
About this file
This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT) for Cactus Transport Inc, specifically Amendment Number Six for On-Call Milling & Asphalt Replacement Services. The contract covers services across five regions within Arizona: Regions 1, 2, 3, 4, and 5.
The amendment reflects a 1% price increase across multiple service line items, including pavement milling for various project sizes and depths, traffic control services, mobilization charges, and hauling services. Key pricing adjustments include increases for asphalt plant activation charges (from $3,000 to $3,030), certified flag person rates, pilot truck services, truck-mounted attenuator charges, and various traffic control equipment and personnel rates. The amendment maintains all other existing contract terms and conditions, with changes limited to the specified price adjustments across the different regional service categories.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1739 W. Jackson Street, MD 100P
Phoenix, AZ 85007 602.712.7211
Contract Amendment Summary CONTRACTOR: Cactus Transport Inc AMENDMENT NO.: Six (6)
DESCRIPTION: On-Call Milling & Asphalt Replacement Services (Region 1, 2, 3, 4, and 5)
Rev. 04/2020
Procurement
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Contract line items were amended to reflect approved price increase.
2. All other terms, conditions and provisions of this contract remain unchanged.
Product Code Name Price 1% Increase New Price CTR050386-1_1 Region 1 - Pavement Milling, 0-2" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 1.50 0.02 1.52 CTR050386-1_11 Region 1 - Asphalt Plant activation charge (Maximum Unit Price) 3,000.00 30.00 3030.00 CTR050386-1_12 Region 1 - (Traffic Control) Certified Flag Person (Maximum Unit Price) 40.00 0.40 40.40 CTR050386-1_13 Region 1 - (Traffic Control) Pilot Truck with Arrow Board & Operator (Maximum Unit Price) 50.00 0.50 50.50 CTR050386-1_14 Region 1 - (Traffic Control) TL3 Truck Mounted Attenuator with driver (Maximum Unit Price) 550.00 5.50 555.50 CTR050386-1_15 Region 1 - (Traffic Control) Trailer Mounted Arrow Panel (Maximum Unit Price) 12.00 0.12 12.12 CTR050386-1_16 Region 1 - (Traffic Control) Variable Message Sign Board (Maximum Unit Price) 30.00 0.30 30.30 CTR050386-1_17 Region 1 - (Traffic Control) Barricade (Type II, Vertical Panel, tubular Marker) (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-1_18 Region 1 - (Traffic Control) Barricade (Type III, High Level) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-1_19 Region 1 - (Traffic Control) Warning Light (Type A) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-1_2 Region 1 - Pavement Milling, 0-2" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 1.21 0.01 1.22 CTR050386-1_20 Region 1 - (Traffic Control) Warning Light (Type B)(Maximum Unit Price) 0.50 0.01 0.51 CTR050386-1_21 Region 1 - (Traffic Control) Warning Light (Type C) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-1_22 Region 1 - (Traffic Control) Portable Sign Stand (High Level Flag Tree) (Maximum Unit Price) 0.50 0.01 0.51 CTR050386-1_23 Region 1 - (Traffic Control) Portable Sign Stand (Spring type) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-1_24 Region 1 - (Traffic Control) Traffic Sign Stand (Rigid) (Maximum Unit Price) 0.30 0.00 0.30 CTR050386-1_25 Region 1 - (Traffic Control) Vertical Panel (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-1_26 Region 1 - (Traffic Control) Traffic Sign Panel (10SF or less) (Maximum Unit Price) 0.55 0.01 0.56 CTR050386-1_27 Region 1 - (Traffic Control) Traffic Sign Panel (10SF or more) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-1_28 Region 1 - (Traffic Control) Traffic cones (28") (Maximum Unit Price) 0.35 0.00 0.35 CTR050386-1_29 Region 1 - (Traffic Control) Off Duty Uniformed Law Enforcement Officer and Vehicle (Maximum Unit Price) 65.26 0.65 65.91 CTR050386-1_3 Region 1 - Pavement Milling, 0-2" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.03 0.01 1.04 CTR050386-1_30 Region 1 - Mill and Fill Mobilization (Maximum Unit Price) 100.00 1.00 101.00 CTR050386-1_31 Region 1 - Hauling Millings Mobilization (Maximum Unit Price) 50.00 0.50 50.50 CTR050386-1_32 Region 1 - Traffic Control Mobilization (Maximum Unit Price) 10.00 0.10 10.10 CTR050386-1_33 Region 1 - Intrajob Mobilization - Mill and Fill Mobilization (Maximum Unit Price) 60.00 0.60 60.60 CTR050386-1_34 Region 1 - Intrajob Mobilization - Hauling Millings Mobilization per SQYD/mile (Maximum Unit Price) 25.00 0.25 25.25 CTR050386-1_35 Region 1 - Intrajob Mobilization - Traffic Control Mobilization (Maximum Unit Price) 5.00 0.05 5.05 CTR050386-1_4 Region 1 - Pavement Milling, 2-1/8-4" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 3.00 0.03 3.03 CTR050386-1_5 Region 1 - Pavement Milling, 2-1/8-4" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 2.00 0.02 2.02 CTR050386-1_6 Region 1 - Pavement Milling, 2-1/2-4" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.44 0.01 1.45 CTR050386-1_36 Region 1 - Hauling in-place Millings (Maximum Unit Price) CY/MILE 1.75 0.02 1.77 CTR050386-1_37 Region 1 - Hauling Asphaltic Concrete (Maximum Unit Price) TON/MILE 1.05 0.01 1.06 CTR050386-2_1 Region 2 -Pavement Milling, 0-2" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 1.50 0.02 1.52 CTR050386-2_10 Region 2 - (Traffic Control) Certified Flag Person (Maximum Unit Price) 40.00 0.40 40.40 CTR050386-2_11 Region 2 - (Traffic Control) Pilot Truck with Arrow Board & Operator (Maximum Unit Price) 50.00 0.50 50.50 CTR050386-2_12 Region 2 - (Traffic Control) TL3 Truck Mounted Attenuator with driver (Maximum Unit Price) 550.00 5.50 555.50 CTR050386-2_13 Region 2 - (Traffic Control) Trailer Mounted Arrow Panel (Maximum Unit Price) 12.00 0.12 12.12 CTR050386-2_14 Region 2 - (Traffic Control) Variable Message Sign Board (Maximum Unit Price) 30.00 0.30 30.30 CTR050386-2_15 Region 2 - (Traffic Control) Barricade (Type II, Vertical Panel, tubular Marker) (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-2_16 Region 2 - (Traffic Control) Warning Light (Type A) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-2_17 Region 2 - (Traffic Control) Warning Light (Type B) (Maximum Unit Price) 0.50 0.01 0.51 CTR050386-2_18 Region 2 - (Traffic Control) Warning Light (Type C) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-2_19 Region 2 - (Traffic Control) Portable Sign Stand (Spring type) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-2_2 Region 2 - Pavement Milling, 0-2" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 1.21 0.01 1.22 CTR050386-2_20 Region 2 - (Traffic Control) Traffic Sign Stand (Rigid) (Maximum Unit Price) 0.30 0.00 0.30 CTR050386-2_21 Region 2 - (Traffic Control) Vertical Panel (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-2_22 Region 2 - (Traffic Control) Traffic Sign Panel (10SF or less) (Maximum Unit Price) 0.55 0.01 0.56 CTR050386-2_23 Region 2 - (Traffic Control) Traffic Sign Panel (10SF or more) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-2_24 Region 2 - (Traffic Control) Traffic cones (28") (Maximum Unit Price) 0.35 0.00 0.35 CTR050386-2_25 Region 2 - (Traffic Control) Off Duty Uniformed Law Enforcement Officer and Vehicle (Maximum Unit Price) 65.26 0.65 65.91 CTR050386-2_26 Region 2 - Mill and Fill Mobilization (Maximum Unit Price) 75.00 0.75 75.75 CTR050386-2_27 Region 2 - Hauling Millings Mobilization (Maximum Unit Price) 50.00 0.50 50.50
CTR050386-2_28 Region 2 - Traffic Control Mobilization (Maximum Unit Price) 10.00 0.10 10.10 CTR050386-2_29 Region 2 - Intrajob Mobilization - Mill and Fill Mobilization (Maximum Unit Price) 25.00 0.25 25.25 CTR050386-2_3 Region 2 - Pavement Milling, 0-2" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.03 0.01 1.04 CTR050386-2_30 Region 2 - Intrajob Mobilization - Hauling Millings Mobilization per SQYD/mile (Maximum Unit Price) 25.00 0.25 25.25 CTR050386-2_31 Region 2 - Intrajob Mobilization - Traffic Control Mobilization (Maximum Unit Price) 5.00 0.05 5.05 CTR050386-2_4 Region 2 - Pavement Milling, 2-1/8-4" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 3.00 0.03 3.03 CTR050386-2_5 Region 2 - Pavement Milling, 2-1/8-4" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 2.00 0.02 2.02 CTR050386-2_6 Region 2 - Pavement Milling, 2-1/2-4" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.44 0.01 1.45 CTR050386-2_9 Region 2 - Asphalt Plant activation charge (Maximum Unit Price) 3,000.00 30.00 3030.00 CTR050386-2_32 Region 2 - Hauling in-place Millings (Maximum Unit Price) CY/MILE 1.75 0.02 1.77 CTR050386-2_33 Region 2 - Hauling Asphaltic Concrete (Maximum Unit Price) TON/MILE 1.05 0.01 1.06 CTR050386-3_1 Region 3 -Pavement Milling, 0-2" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 1.50 0.02 1.52 CTR050386-3_10 Region 3 - Asphalt Plant activation charge (Maximum Unit Price) 3,000.00 30.00 3030.00 CTR050386-3_11 Region 3 - (Traffic Control) Certified Flag Person (Maximum Unit Price) 40.00 0.40 40.40 CTR050386-3_12 Region 3 - (Traffic Control) Pilot Truck with Arrow Board & Operator (Maximum Unit Price) 50.00 0.50 50.50 CTR050386-3_13 Region 3 - (Traffic Control) TL3 Truck Mounted Attenuator with driver (Maximum Unit Price) 550.00 5.50 555.50 CTR050386-3_14 Region 3 - (Traffic Control) Trailer Mounted Arrow Panel (Maximum Unit Price) 12.00 0.12 12.12 CTR050386-3_15 Region 3 - (Traffic Control) Variable Message Sign Board (Maximum Unit Price) 30.00 0.30 30.30 CTR050386-3_16 Region 3 - (Traffic Control) Barricade (Type II, Vertical Panel, tubular Marker) (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-3_17 Region 3 - (Traffic Control) Barricade (Type III, High Level) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-3_18 Region 3 - (Traffic Control) Warning Light (Type A) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-3_19 Region 3 - (Traffic Control) Warning Light (Type B) (Maximum Unit Price) 0.50 0.01 0.51 CTR050386-3_20 Region 3 - (Traffic Control) Warning Light (Type C)(Maximum Unit Price) 0.25 0.00 0.25 CTR050386-3_21 Region 3 - (Traffic Control) Portable Sign Stand (High Level Flag Tree) (Maximum Unit Price) 0.50 0.01 0.51 CTR050386-3_22 Region 3 - (Traffic Control) Portable Sign Stand (Spring type) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-3_23 Region 3 - (Traffic Control) Traffic Sign Stand (Rigid) (Maximum Unit Price) 0.30 0.00 0.30 CTR050386-3_24 Region 3 - (Traffic Control) Vertical Panel (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-3_25 Region 3 - (Traffic Control) Traffic Sign Panel (10SF or less) (Maximum Unit Price) 0.55 0.01 0.56 CTR050386-3_26 Region 3 - (Traffic Control) Traffic Sign Panel (10SF or more) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-3_27 Region 3 - (Traffic Control) Traffic cones (28") (Maximum Unit Price) 0.35 0.00 0.35 CTR050386-3_28 Region 3 - (Traffic Control) Off Duty Uniformed Law Enforcement Officer and Vehicle (Maximum Unit Price) 65.26 0.65 65.91 CTR050386-3_29 Region 3 - Mill and Fill Mobilization (Maximum Unit Price) 100.00 1.00 101.00 CTR050386-3_30 Region 3 - Hauling Millings Mobilization (Maximum Unit Price) 50.00 0.50 50.50 CTR050386-3_31 Region 3 - Traffic Control Mobilization (Maximum Unit Price) 10.00 0.10 10.10 CTR050386-3_32 Region 3 - Intrajob Mobilization - Mill and Fill Mobilization (Maximum Unit Price) 60.00 0.60 60.60 CTR050386-3_33 Region 3 - Intrajob Mobilization - Hauling Millings Mobilization per SQYD/mile (Maximum Unit Price) 25.00 0.25 25.25 CTR050386-3_34 Region 3 - Intrajob Mobilization - Traffic Control Mobilization (Maximum Unit Price) 5.00 0.05 5.05 CTR050386-3_4 Region 3 - Pavement Milling, 2-1/8-4" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 3.00 0.03 3.03 CTR050386-3_6 Region 3 - Pavement Milling, 2-1/2-4" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.44 0.01 1.45 CTR050386-3_35 Region 3 - Hauling in-place Millings (Maximum Unit Price) CY/MILE 1.75 0.02 1.77 CTR050386-3_36 Region 3 - Hauling Asphaltic Concrete (Maximum Unit Price) TON/MILE 1.05 0.01 1.06 CTR050386-4_1 Region 4 - Pavement Milling, 0-2" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 1.50 0.02 1.52 CTR050386-4_10 Region 4 - (Traffic Control) Certified Flag Person (Maximum Unit Price) 40.00 0.40 40.40 CTR050386-4_11 Region 4 - (Traffic Control) Pilot Truck with Arrow Board & Operator (Maximum Unit Price) 55.00 0.55 55.55 CTR050386-4_12 Region 4 - (Traffic Control) TL3 Truck Mounted Attenuator with driver (Maximum Unit Price) 550.00 5.50 555.50 CTR050386-4_13 Region 4 - (Traffic Control) Trailer Mounted Arrow Panel (Maximum Unit Price) 12.00 0.12 12.12 CTR050386-4_14 Region 4 - (Traffic Control) Variable Message Sign Board (Maximum Unit Price) 30.00 0.30 30.30 CTR050386-4_15 Region 4 - (Traffic Control) Barricade (Type II, Vertical Panel, tubular Marker) (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-4_16 Region 4 - (Traffic Control) Barricade (Type III, High Level) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-4_17 Region 4 - (Traffic Control) Warning Light (Type A) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-4_18 Region 4 - (Traffic Control) Warning Light (Type C) (Maximum Unit Price) 0.25 0.00 0.25 CTR050386-4_19 Region 4 - (Traffic Control) Portable Sign Stand (Spring type) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-4_2 Region 4 - Pavement Milling, 0-2" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 1.21 0.01 1.22 CTR050386-4_20 Region 4 - (Traffic Control) Traffic Sign Stand (Rigid) (Maximum Unit Price) 0.30 0.00 0.30
CTR050386-4_21 Region 4 - (Traffic Control) Vertical Panel (Maximum Unit Price) 0.40 0.00 0.40 CTR050386-4_22 Region 4 - (Traffic Control) Traffic Sign Panel (10SF or less) (Maximum Unit Price) 0.55 0.01 0.56 CTR050386-4_23 Region 4 - (Traffic Control) Traffic Sign Panel (10SF or more) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-4_24 Region 4 - (Traffic Control) Traffic cones (28")(Maximum Unit Price) 0.35 0.00 0.35 CTR050386-4_25 Region 4 - (Traffic Control) Off Duty Uniformed Law Enforcement Officer and Vehicle (Maximum Unit Price) 65.26 0.65 65.91 CTR050386-4_26 Region 4 - Mill and Fill Mobilization (Maximum Unit Price) 125.00 1.25 126.25 CTR050386-4_27 Region 4 - Hauling Millings Mobilization per (Maximum Unit Price) 40.00 0.40 40.40 CTR050386-4_28 Region 4 - Traffic Control Mobilization (Maximum Unit Price) 10.00 0.10 10.10 CTR050386-4_29 Region 4 - Intrajob Mobilization - Mill and Fill Mobilization (Maximum Unit Price) 60.00 0.60 60.60 CTR050386-4_3 Region 4 - Pavement Milling, 0-2" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.03 0.01 1.04 CTR050386-4_30 Region 4 - Intrajob Mobilization - Hauling Millings Mobilization per SQYD/mile (Maximum Unit Price) 25.00 0.25 25.25 CTR050386-4_31 Region 4 - Intrajob Mobilization - Traffic Control Mobilization (Maximum Unit Price) 5.00 0.05 5.05 CTR050386-4_4 Region 4 - Pavement Milling, 2-1/8-4" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 3.00 0.03 3.03 CTR050386-4_5 Region 4 - Pavement Milling, 2-1/8-4" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 2.00 0.02 2.02 CTR050386-4_6 Region 4 - Pavement Milling, 2-1/2-4" in depth, Large Projects 10,000+ SY (Maximum Unit Price) 1.44 0.01 1.45 CTR050386-4_9 Region 4 - Asphalt Plant activation charge (Maximum Unit Price) 3000.00 30.00 3030.00 CTR050386-4_32 Region 4 - Hauling in-place Millings (Maximum Unit Price) CY/MILE 7.75 0.08 7.83 CTR050386-4_33 Region 4 - Hauling Asphaltic Concrete (Maximum Unit Price) TON/MILE 1.02 0.01 1.03 CTR050386-5_1 Region 5 -Pavement Milling, 0-2" in depth, Small Projects 0-5000 SY (Maximum Unit Price) 1.50 0.02 1.52 CTR050386-5_10 Region 5 - (Traffic Control) Variable Message Sign Board (Maximum Unit Price) 30.00 0.30 30.30 CTR050386-5_11 Region 5 - (Traffic Control) Portable Sign Stand (Spring type) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-5_12 Region 5 - (Traffic Control) Traffic Sign Panel (10SF or more) (Maximum Unit Price) 0.70 0.01 0.71 CTR050386-5_13 Region 5 - (Traffic Control) Traffic cones (28") (Maximum Unit Price) 0.35 0.00 0.35 CTR050386-5_14 Region 5 - (Traffic Control) Off Duty Uniformed Law Enforcement Officer and Vehicle (Maximum Unit Price) 65.26 0.65 65.91 CTR050386-5_15 Region 5 - Mill and Fill Mobilization (Maximum Unit Price) 100.00 1.00 101.00 CTR050386-5_16 Region 5 - Traffic Control Mobilization (Maximum Unit Price) 10.00 0.10 10.10 CTR050386-5_17 Region 5 - Intrajob Mobilization - Mill and Fill Mobilization (Maximum Unit Price) 60.00 0.60 60.60 CTR050386-5_18 Region 5 - Intrajob Mobilization - Traffic Control Mobilization (Maximum Unit Price) 5.00 0.05 5.05 CTR050386-5_2 Region 5 - Pavement Milling, 2-1/8-4" in depth, Medium Projects 5001-9999 SY (Maximum Unit Price) 2.00 0.02 2.02 CTR050386-5_5 Region 5 - Asphalt Plant activation charge (Maximum Unit Price) 3000.00 30.00 3030.00 CTR050386-5_6 Region 5 - (Traffic Control) Certified Flag Person (Maximum Unit Price) 40.00 0.40 40.40 CTR050386-5_7 Region 5 - (Traffic Control) Pilot Truck with Arrow Board & Operator (Maximum Unit Price) 50.00 0.50 50.50 CTR050386-5_8 Region 5 - (Traffic Control) TL3 Truck Mounted Attenuator with driver (Maximum Unit Price) 550.00 5.50 555.50 CTR050386-5_9 Region 5 - (Traffic Control) Trailer Mounted Arrow Panel (Maximum Unit Price) 12.00 0.12 12.12 CTR050386-5_19 Region 5 - Hauling in-place Millings (Maximum Unit Price) CY/MILE 1.75 0.02 1.77 CTR050386-5_20 Region 5 - Hauling Asphaltic Concrete (Maximum Unit Price) TON/MILE 1.05 0.01 1.06 CTR050386-5_21 Region 5 - Hauling Millings Mobilization per (Maximum Unit Price) 50.00 0.50 50.50
File details come from the government source that posted it. Updated .