CT Sim Bid Set DWGs - Stamped.pdf
PDF 22 MB Posted
- Attached to
- Z2DA--642-CSI-802 Site Prep for CT Sim Federal contract opportunity
- Solicitation number
- 36C24422B0002
About this file
This document provides details for a federal contract solicitation for site preparation work for a CT simulator project. The Department of Veterans Affairs Medical Center in Philadelphia is soliciting bids for demolition and removal of existing structures to prepare the site for a new CT simulator. The project scope includes all labor, materials, tools, equipment, permits, testing and reports required. The estimated value of the construction project is between $250,000 and $500,000. The period of performance is approximately 100 calendar days after issuance of the notice to proceed. This solicitation is set aside solely for service-disabled veteran small businesses. The relevant NAICS code is 236220 for commercial and institutional building construction, and the small business size standard is $36.5 million. A pre-proposal conference and site visit will be held within two weeks of solicitation issuance. The solicitation documents will be posted on FBO.gov on or around November 2, 2021. Questions should be directed to the named contracting specialist and reference the solicitation and project numbers. This procurement is subject to availability of funds.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24422B0002 0002.docx | DOCX document | |
| 36C24422B0002 0001.docx | DOCX document | |
| CT Sim Bid Set Spec V2.pdf | ||
| 36C24422B0002_1.docx | DOCX document | |
| CT Sim BID SET Spec V1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC PHILADELPHIA
NORTH
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
TITLE SHEET
GI100
-C
S I-
G I1
.p d f
00 - GENERAL
GI100 TITLE SHEET
GI200 SYMBOLS, ABBREVIATIONS & NOTES
GI300 GENERAL NOTES
GC200 EXISTING CONDITIONS PLAN
GC201 LIFE SAFETY PLAN
GC300 PHASING PLANS - ICRA
GC400 LEAD SHIELDING PLANS
06 - ARCHITECTURAL
AD100 DEMOLITION PLAN
AE100 FLOOR PLANS
08 - EQUIPMENT
QH100 EQUIPMENT PLANS - ARCHITECTURAL - SIEMENS
QH101 EQUIPMENT PLANS - STRUCTURE - SIEMENS
QH102 EQUIPMENT PLANS - ELECTRICAL - SIEMENS (1 OF 2)
QH103 EQUIPMENT PLANS - ELECTRICAL - SIEMENS (2 OF 2)
Department of Veterans Affairs
SITE PREP TO REPLACE CT SIMULATOR
CORPORAL MICHAEL J. CRESCENZ VA MEDICAL CENTER
3900 WOODLAND AVE, PHILADELPHIA, PA 19104
LOCATION MAP DRAWING LIST
APPLICABLE CODES PROJECT CONTACT DIRECTORY
Approved by Medical Center Director Approved by Director of Facility Management Service
Approved by Medical DirectorApproved by Project COR
Approved by Project CO
Approved by Infection Control
Approved by Radiation Oncology
Approved by Safety Officer
CONTRACTING OFFICER REPRESENTATIVE (COR)
ARCHITECT
MEP/FP/STRUCTURAL ENGINEER
ANJU ELIAS
Corporal Michael J. Crescenz VAMC 3900 Woodland Ave, Philadelphia, PA 19104 PHONE: (W) 215-823-5800 x 207517 Anju.Elias@va.gov
CB DESIGN GROUP, INC
11720 Beltsville Drive, Suite 350 Calverton, MD 20705
PHONE: (443) 388-7351
kjones@cbdg-ae.com
HF LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
PHONE: (814) 269-9300
RMickle@hflenz.com
CONTRACTING OFFICER (CO)
EVERETT SHAVER
Contracting Officer, Construction-East (VISN 4 Eastern Market) Department of Veterans Affairs / Service Area Office East / Network Contracting Office 4 1111 East End Blvd, Wilkes-Barre, PA 18711 PHONE: (W) 302-994-2511 x 7526 everett.shaver@va.gov
MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1)
LIFE SAFETY CODE NFPA 101 - 2018
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS
VA DESIGN MANUALS:
FIRE PROTECTION, EIGHTH EDITION - JUNE
INTERIOR DESIGN MANUAL, NOVEMBER 2020
VA BARRIER FREE DESIGN STANDARD (PG-18-13),
REV 11/1/18
NATIONAL ELECTRIC CODE - LATEST VERSION
PROJECT #642-CSI-802
09 - STRUCTURAL
S001 STRUCTURAL NOTES & ABBREVIATIONS
SF101 STRUCTURAL SUB-BASEMENT FRAMING PLAN & DETAILS
10 - MECHANICAL
M001 MECHANICAL NOTES, SYMBOLS, & ABBREVIATIONS
MD101 MECHANICAL DUCTWORK SUB-BASEMENT PLAN - DEMOLITION
MD102 MECHANICAL PIPING SUB-BASEMENT PLAN - DEMOLITION
MH201 MECHANICAL DUCTWORK SUB-BASEMENT PLAN -NEW WORK
MH202 MECHANICAL PIPING SUB-BASEMENT PLAN - NEW WORK
M501 MECHANICAL DETAILS (1 OF 2)
M502 MECHANICAL DETAILS (2 OF 2)
M601 MECHANICAL SCHEDULES AND CONTROLS
11 - PLUMBING
P201 PLUMBING SUB-BASEMENT PLAN -NEW WORK
12 - FIRE PROTECTION
F201 FIRE PROTECTION SUB-BASEMENT PLAN - NEW WORK
14 - ELECTRICAL
E001 ELECTRICAL NOTES, SYMBOLS, & ABBREVIATIONS
ED101 ELECTRICAL SUB-BASEMENT PLAN - DEMOLITION
EL201 ELECTRICAL SUB-BASEMENT PLAN - LIGHTING
EP301 ELECTRICAL SUB-BASEMENT PLAN - POWER & SIGNAL
EP302 ELECTRICAL SUB-BASEMENT PLAN - IMAGING EQUIPMENT PLAN
EP401 ELECTRICAL RISER DIAGRAM
E501 ELECTRICAL DETAILS (1 OF 2)
E502 ELECTRICAL DETAILS (2 OF 2)
E601 ELECTRICAL SCHEDULES
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATIOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT
INDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
NORTH ARROW
FEC
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
1 3/16"
D2
XX-XX
XXxxx
XXxxx
CL
XXxxx x'-x" VERTICAL HEIGHT INDICATOR
REVISION
REVISION CLOUD
NORTH
BREAK LINE
X
DEMOLITION KEYNOTE
NEW ROOM NAME AND NUMBERCORRIDOR
C2
XX
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
WALL MOUNTED FIRE EXTINGUISHERFE
XX
SHEET WHERE
DRAWN
ELEVATION NUMBER
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB VAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VENT THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN
MAY NOT BE USED ON THIS PROJECT.
CERTAIN COMMON ABBREVIATIONS
MAY NOT BE SHOWN.
L
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
SYMBOLS, ABBREVIATIONS & NOTES
GI200
-C
S I-
G I2
.p d f
SYMBOLS OF MATERIALS DRAWING KEY ARCHITECTURAL ABBREVIATIONS
G1 Items and conditions noted, detailed, or otherwise identified on drawings are applicable and binding to similar conditions on all drawings. For conditions not noted or not detailed, provide materials of equal quality and performance to other similar conditions on the job.
G2 Sections shown are intended to show the specific construction where indexed as well as establish the general construction details for sections throughout the project which do not have specific sections drawn. The most similar section shall be adapted to any section not detailed. Any specific questions concerning construction not adequately covered by the above should be directed to the Architect during the bid period.
G3 All construction is to be assumed new and furnished and installed by the Contractor, unless noted otherwise.
G4 Refer to mechanical and electrical drawings for notes pertaining to their particular trades. Coordinate the work of all trades and report to the Architect any perceived discrepancies. Contractor shall be responsible for establishing sequences of construction and means and methods for how to perform the Work required in the Contract Documents. All Contractors shall carefully review all existing conditions and determine the most feasible sequence for performing the new Work so as to avoid conflicts in the field.
G5 Any areas or spaces not clearly defined or indicated by notes shall be of same material and finish as areas of similar use or function elsewhere in the building.
G6 Wall and ceiling finishes shall include projections, beam enclosures, recesses, bulkheads, pilasters and other similar items.
G7 All appurtenances built into or through walls, including doors, windows, ducts, frames, louvers, grilles, mechanical work, etc., shall fit snugly and be thoroughly sealed around perimeters. Install fire sealant around all penetrations through floors, fire rated walls and smoke partitions.
Work at exterior walls shall be flashed or otherwise waterproof sealed.
G8 Field check rough and/or finished dimensions for accurate fitting of cabinets, counters, storefront, doors, frames, fixtures, millwork and all other installations prior to shop or factory fabrication. Provide and install necessary filler strips, scribe strips, bases, closures, finishes and trim to complete such installations. Dimensions of such installations shall be considered "nominal". Contractors shall account for all manufacturer's required tolerances, clearances and shim space to ensure proper installation of the new Work.
G9 See equipment plans and floor plans for casework, cabinets, millwork and other built-in items. Coordinate with MEP drawings for sinks, outlets, and other items to be built into such items.
G10 If a discrepancy appears to exist between drawings of different scales, consult Architect for clarification.
G11 If a discrepancy appears to exist between drawings and/or specifications, the more stringent (typically the more costly) requirement shall apply. Items described on drawings, but not specified, shall be provided. Contractor shall be responsible to submit an RFI to seek clarification of any perceived discrepancy during bid phase.
G12 Written information on drawings takes precedent over drawing lines.
G13 In the absence of a written dimension, or in case of doubt as to the proper measurement, consult Architect. DO NOT SCALE DRAWINGS.
Assumptions made, or actions taken, based on scaled dimensions shall be at the Contractor's risk and any resulting corrections shall be performed by Contractor at no additional cost to the Government.
G14 Each Contractor or Sub-Contractor shall be responsible for coordinating with the Work of other trades shown throughout the complete set of Contract Documents. Changes resulting from a Contractor or Sub-Contractor's failure to obtain and review a complete set of Contract Documents shall be corrected at no additional cost to the Government.
G15 At all changes in floor finishes, provide and install an appropriate transition strip as shown on the drawings.
G16 Consult HVAC and Electrical drawings for locations and descriptions of access panels, louver openings, ventilators, grilles, valve cabinets, fire dampers or other appurtenances affecting walls, ceilings or floors and provide necessary lintels, support or anchoring.
G17 Electric switches, outlets, thermostats, controls, clocks, speakers, or other wall-mounted accessories shall be installed in locations which are unobstructed by cabinets, counters, racks, marker and tackboards, fixtures, shelving or other furnishing or equipment designated for spaces shown on drawings. Items for wall-mounting are not to be installed on, through, or into, any equipment other than walls, unless specifically noted otherwise.
G18 Electrical outlets, clocks, P.A. speakers, pull stations, exit signs, or other devices shown diagrammatically on the architectural drawings serve to alert Contractors of the presence of such devices. Consult the electrical drawings for further information and advise Architect of any perceived discrepancy between architectural and electrical drawings regarding location or type of devices shown prior to preparing submittals.
G19 Electric switches, thermostats or other electronic controls in the same vicinity shall be mounted at the same height from floor (unless noted otherwise) in a uniform, orderly fashion.
G20 SUBMITTAL REVIEW - The Contract Documents provide sizes, dimensions, product requirements, etc. Contractor shall verify that submittals are coordinated with the requirements of the Contract Documents prior to submission. A/E review of submittals is NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. All deviations from what is shown on the Contract Documents shall be clouded on the submittal or otherwise clearly brought to the attention of the reviewer. Failure to clearly bring any deviation(s) to the attention of the reviewer shall be understood by all parties that what is shown in the submittal complies with the Contract Documents regardless of whether or not the reviewer discovers the deviation. Changes resulting from the Contractor's failure to clearly identify deviations in submittals shall be the Contractor's sole responsibility and shall be corrected by the Contractor at no additional cost to the Government.
G21 Contractors shall carefully review existing field conditions and coordinate all quantities, dimensions, and tolerances required to perform the work shown on the Contract Documents. Contractor is responsible for determining information that pertains solely to fabrication processes, installation techniques (means and methods), and sequencing of the Work to meet the requirements of the project schedule. Each subcontractor shall coordinate with other trades prior to beginning their portion of the Work.
G22 Public exits shall remain clear at all times while the building is occupied. No storage shall be permitted in the exit access.
G23 Patch all holes in floors, walls and ceilings within the project limits after demolition and new work is complete.
G24 Unless specific dimensions are provided, MEP drawings are considered "diagrammatic". It is the sole responsibility of the Contractor(s) to field coordinate locations, sequences, etc for unobstructed installation of items that are shown on MEP drawings in diagrammatic form.
Coordinate above-ceiling work of MEP trades so that each trade locates their work as tight to the structure / deck above as is feasible. Each successive trade shall locate their work as tight to the trade before.
G25 The Drawings and Specifications are complimentary and NEITHER shall take precedent over the other. What is required by either the Drawings or Specifications shall be interpreted as being required as part of the Scope of Work for this project. Items specified, but not indicated on the drawings, shall be provided. Items shown on the drawings, but not specified, shall be provided. It is the sole responsibility of the Contractor to seek clarification prior to submitting a bid amount if there should appear to be a discrepancy between drawings and/or the specifications. Otherwise, the most stringent (typically the most expensive) requirement shall apply at the discretion of the COR.
G26 Contractor to verify with FMS and remove all dead and decommissioned MEP work encountered.
G27 All mechanical, electrical, plumbing, med air/gas/vac shutdowns require a minimum two weekreview time and can take as long as four weeks. Present shutdown requests to the project COR in a timely and detailed manner.
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING SHARPS CONTAINERS, FROM AREAS
TO BE RENOVATED, PRIOR TO THE START OF THE PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF IMMEDIATELY IF UNEXPECTED MEDICAL
WASTE IS ENCOUNTERED.
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT LIMITED TO ELECTRONIC OR E-CIGARETTES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND VENDORS EFFECTIVE OCTOBER 1, 2019.
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS TO BE DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 99.97% CAPTURE OF 0.3 MICRONS
(EFFECTIVE FOR POLLEN AND MOLD SPORES).
1. VA DESIGN MANUAL (PG-18-10)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. NFPA 101: LIFE SAFETY CODE - LATEST VERSION
10. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
11. NFPA 70: NATIONAL ELECTRICAL CODE
12. ASHRAE 62.1: VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
13. ASHRAE 90.1: ENERGY STANDARD FOR BUILDINGS
14. VA NATIONAL CAD STANDARD APPLICATION GUIDE
15. NFPA NATIONAL FIRE CODES (EXCEPT NFPA 5000 & 900)
16. VA MASTER SPECIFICATIONS
17. NEC NATIONAL ELECTRICAL CODE - LATEST VERSION
18. VA SUSTAINABLE DESIGN MANUAL
19. INTERNATIONAL BUILDING CODE (IBC) - LATEST VERSION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
GENERAL NOTES
GI300
-C
S I-
G I3
.p d f
GENERAL NOTESCODES AND REFERENCES
SMOKING POLICY
ENVIRONMENTAL CONTROL NOTES
MEDICAL WASTE NOTES
(APPLY TO ALL SHEETS IN THE ENTIRE SET OF DRAWINGS)
UP
ENGINEERS
OFFICE
B3B111
TOILET
B3B112
STORAGE
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
STAIR 10
LOUNGE
MALE LOCKER
ROOM
B3B105
PHYSICIAN
WORKROOM
B3B137
SUPPLY
B3B138a
RECORD
REVIEW
ELEVATOR ELEVATOR
FEMALE
LOCKER ROOM
B3B104
FEMALE
LOCKER ROOM
B3B106
LOUNGE
B3B108
MALE LOCKER
ROOM
B3B107CORRIDOR
CB3-14
CORRIDOR
CB3-13
ELEVATOR PIT
WAITING
B3A132
SEC. AND FILES
B3A123
CHIEF
B3A120
OFFICE
B3A119
OFFICE
B3A118
OFFICE
B3A117
ONCOLOGY
B3A115
SERVICE
B3A136
STRETCHER
WAITING
B3A131
COMPUTER
B3A130
ULTRA SOUND
B3A129
STORAGE
B3A133
E.C
B3A134STAIR 9
ELEVATOR
EQUIPMENT
ROOM
B3B110
ELEVATOR
RESEARCH/REGIONAL
OFFICE/MEDICAL/GENERAL
STORAGE
B3B109
STORAGE OFFICE
B3A136a
STORAGE
B3B102
RESIDENT
B3A114
DRESS
B3A113a
DRESS
B3A113
MOLD ROOM
B3A112
TOILET
B3A111
TOILET
B3A110
EXAM
B3A106
EXAM
B3A107
EXAM
B3A108
MULTI-VIEW
B3A109
IV ROOM/DARK
ROOM
B3A126
TOILET
B3A125
CLEAN UTILITY
B3A121
LAB
B3A117
SOILED
UTILITY
B3A122
DRESS
B3A124
CT SIMULATOR
B3A128
RADIOACTIVE
MATERIALS
B3A127a
CHILLER ROOM
B3A127a
EQUIPMENT
B3A127b
FILE ROOM
B3A127
MEDICAL
STORAGE
B3A127c
RADIOACTIVE
MATERIALS
B3A127b
CONTROL ROOM
B3A128a
CORRIDOR
CB3-7
CORRIDOR
CB3-4
CONTROL ROOM
B3A104
MEGAVOLT
B3A103
CORRIDOR
CB3-3
CORRIDOR
CB3-2
CORRIDOR
CB3-9
ELEVATOR
LOBBY
CB3-11
ELEVATOR
LOBBY
CB3-12
CORRIDOR
CB3-15
EQUIPMENT
ROOM
B3A104a
B
C
D
E
F
G
4 8 11 13
14 15 16 17 18 19
7 9 10 12
NA
AD100
F6
LINEAR
ACCELERATOR
B3A105
NORTH
SUB-BASEMENT FLOOR KEY PLAN
AREA OF WORK
BUILDING 2
BUILDING 1
SCOPE OF WORK
LEGEND
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
EXISTING CONDITIONS PLAN
GC200
-C
S I-
G C
.p d f
1/8" = 1'-0"A15 EXISTING SUB-BASEMENT PLAN
NORTH
SUB-BASEMENT KEY PLAN
AREA OF WORK
BUILDING 2
BUILDING 1
EXISTING TRAVEL DISTANCE TO EXIT
EXIT A - 182'
EXIT B - 135'
EXISTING TRAVEL DISTANCE TO EXIT
EXIT A - 195'
EXIT B - 143'
EXIT B
EXIT A
143'
195'
SMOKE PARTITION
1-HOUR PARTITION
2-HOUR PARTITION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
LIFE SAFETY PLAN
GC201
-C
S I-
G C
.p d f
1/8" = 1'-0"1 FIRE PROTECTION PLAN
EXISTING PATHS OF EGRESS WITHIN THE BUILDING HAVE NOT BEEN MODIFIED FOR THIS PROJECT.
GENERAL NOTES:
1. OCCUPANCY CLASSIFICATION FOR THE FLOOR IS HEALTHCARE
2. TOTAL PROJECT AREA OF RENOVATION: 507 SF
3. CURRENT USE AND OCCUPANCY TYPE REMAINS UNCHANGED FOR THIS PROJECT
4. THE FLOOR IS FULLY SPRINKLERED.
WALL RATING LEGEND:
B
C
"1'
8"
CT SIMULATOR
B3A128
CONTROL ROOM
B3A128A
B
C
REMOVE ICRA BARRIER AND DOORS IN
THEIR ENTIRETY.
PATCH AND REPAIR ALL FINISHES TO
MATCH EXISTING CONDITIONS.
CT SIMULATOR
B3A128
CONTROL ROOM
B3A128A
INFECTION CONTROL RISK ASSESSMENT (ICRA) POLICY
PRECAUTIONS DURING CONSTRUCTION (ALL PHASES)
1. UTILIZE 6-MIL FIRE-RATED POLY PLASTIC SHEET WITH EXPANDABLE POLES TO ISOLATE AREA DURING
CONSTRUCTION OF ICRA PARTITION WITH SECURITY DOOR.
2. EXECUTE WORK BY METHODS TO MINIMIZE CREATING DUST FROM CONSTRUCTION OPERATIONS.
3. ANY CEILING TILES DISPLACED FOR VISUAL INSPECTION MUST BE REMOVED CAREFULLY AND IMMEDIATELY REPLACED. INSTALL NEW CEILING TILE IN ITS PLACE IF IT IS DAMAGED IN THE PROCESS.
4. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
5. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING GYP. BOARD FOR BARRIERS.
6. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
8. REMOVE CONSTRUCTION WASTE IN SEALED CONTAINERS DAILY AFTER 4:30 PM.
9. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF ABOVE FLOOR PENETRATION TO DISCHARGE AIR WITH THE VA COR.
PATCH FLOOR PENETRATION AFTER CONSTRUCTION AS REQUIRED TO MATCH EXISTING.
10. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
11. COORDINATE ALL INFECTION CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS WITH THE VA INFECTION
CONTROL OFFICER AND VA COR.
12. PROVIDE DIGITALLY RECORDING MONOMETER OUTSIDE OF PERIMETER WALL.
13. UTILIZE ONLY HEPA RATED VACUUMS.
14. PROVIDE DUST STICKY MATS AT EACH ENTRANCE / EXIT. CHANGE STICKY MATS EVERY 4 HOURS.
4"
SEAL W/ FIRE CAULK, CONT.
EXISTING STRUCTURAL DECK
EXISTING WALL FRAMING
2 LAYERS 5/8" TYPE X GYP BOARD
2ND LAYER OF GYP BOARD TO
OVERLAP EXISTING FINISHED WALL
EXISTING SPACE NEW WORK SIDE
SEAL W/ FIRE CAULK, CONT.
NEW ACOUSTIC CEILING TILE
EXISTING FINISHED WALL
EXISTING ACOUSTIC CEILING TILE
NOTE:
CRITICAL BARRIERS ARE THE EXTENSION OF EXISTING WALLS UP TO
THE EXISTING DECK ABOVE. THE PERIMETER WALLS OF EACH PHASE
MUST EXTEND UP TO THE EXISTING DECK, ABOVE. IF THEY DO NOT,
THE CONTRACTOR IS TO EXTEND THE WALLS UP TO THE EXISTING
DECK. CONTRACTOR MUST ENSURE THAT ALL PENETRATIONS HAVE
BEEN FIRE STOPPED.
NORTH
SUB-BASEMENT FLOOR KEY PLAN
AREA OF WORK
BUILDING 2
BUILDING 1
GENERAL INFECTION CONTROL NOTES
INFECTIOUS CONTROL PROCEDURES (ICRA)
NOTE:
CONTRACTOR MUST PROTECT DEMOLITION AND CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE
FOLLOWING PROVISIONS:
TYPE OF CONSTRUCTION ACTIVITY: CLASS IV, TYPE D.
DURING CONSTRUCTION OF PROJECT:
01. CONTRACTOR SHALL FOLLOW VA/ ICRA REGULATIONS IN PERFORMING ALL WORK.
02. CONTRACTOR SHALL COORDINATE WITH THE VA FOR OFF-HOURS ACCESS TO THE FLOORS ABOVE AND BELOW THE WORK NEEDED FOR MEP TIE-INS. TEMPORARY ICRA BARRIERS ARE TO BE INSTALLED
AROUND ALL WORK AREAS PRIOR TO CONSTRUCTION.
03. CONTRACTOR SHALL FOLLOW ALL FIRE SAFETY CODES DURING CONSTRUCTION.
04. CONTRACTOR SHALL PROVIDE THE VA TWO (2) WEEKS (14 CALENDAR DAYS) NOTICE PRIOR TO ANY SYSTEM
SHUTDOWN WORK VIA A SHUTDOWN REQUEST FORM, (FORM TO BE PROVIDED BY THE VA).
05. BEFORE COMMENCEMENT OF CONSTRUCTION, COORDINATE THE ICRA PROCEDURE WITH THE COR AND THE FACILITY INFECTION CONTROL DEPARTMENT. CONTRACTOR MUST ACQUIRE AN ICRA PERMIT FROM INFECTION CONTROL DEPARTMENT PRIOR TO THE START OF CRITICAL BARRIER AND ICRA BARRIER
CONSTRUCTION.
06. COORDINATE WITH THE VA COR FOR ANY PHASING PLAN REQUIREMENTS TO SCHEDULE SHUTDOWNS, TEMPORARY RELOCATION OR CLOSED DOWN AREAS THAT MAY BE AFFECTED DUE TO THE RENOVATION OF
THE SCHEDULED PROJECT.
07. ALL CRITICAL BARRIER AND ICRA BARRIER WORK TO BE COMPLETED ON SECOND SHIFT FROM 4:30PM - 11PM MONDAY - FRIDAY OR ON SATURDAYS AND SUNDAYS. (WHEN AVAILABLE, PER RADIATION THERAPY
SCHEDULE.) ALL WEEKEND WORK MUST BE APPROVED BY THE COR.
08. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM, PRIOR TO ANY PHASE WORK COMMENCEMENT. HVAC SYSTEM ISOLATION MATERIALS TO BE REMOVED IN THEIR ENTIRETY, PRIOR TO TURNING THE SPACE OVER TO THE VA FACILITY AFTER EACH
PHASE'S COMPLETION OF WORK.
09. COMPLETE ALL CRITICAL BARRIERS TO 1-HOUR FIRE-RATING I.E. GYP BOARD, PLYWOOD, PLASTIC , TO SEAL AREA FROM NON-WORK AREA, BEFORE CONSTRUCTION BEGINS. CRITICAL BARRIERS ARE THE EXTENSION OF EXISTING WALLS TO THE UNDERSIDE OF THE DECK ABOVE AND ARE TO BE SEALED WITH FIRE SEALANT AT THE DECK/ TOP OF WALL INTERSECTION AND AROUND ALL GAPS FROM WALL PENETRATIONS OF EXISTING ITEMS (PIPES, CONDUIT, DUCTWORK, ETC.) THAT THE CRITICAL BARRIERS MUST BE BUILT
AROUND.
10. WHEN CONSTRUCTING ICRA ANTE-ROOMS, REMOVE AND SECURELY STORE ALL INTERFERING WALL APPURTENANCES, INCLUDING BUT NOT LIMITED TO HANDRAILS AND ELECTRICAL DEVICES. ALL ITEMS TO
BE SECURELY STORED FOR REINSTALLATION BY THE CONTRACTOR.
11. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS, CONTRACTORS SHALL MAINTAIN 0.001" NEGATIVE PRESSURE. PROVIDE DIGITALLY RECORDING GAUGE MOUNTED ON THE OUTSIDE OF THE PERIMETER WALL OF THE PROJECTS WORKSPACE. CONTRACTOR TO
CHECK GAUGE DAILY.
12. SEAL ALL HOLES, PIPES, CONDUITS, AND PENETRATIONS IN THE WALLS ABOVE THE CEILING.
13. CONSTRUCT ANTE-ROOM AND PROVIDE WALK-OFF STICKY MATS. REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN HEPA VACUUM CLEAN THEMSELVES BEFORE LEAVING WORK SITE OR THEY SHALL WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK
SITE.
14. ALL PERSONNEL EXITING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE
CHANGED EACH TIME WORKERS EXIT THE WORK AREA.
15. REPORT TOTAL WEIGHT OF CONSTRUCTION WASTE DISPOSED OF TO THE COR AND CONTRACTING
OFFICER ON THE LAST DAY OF EACH MONTH.
16. COVER TRANSPORT RECEPTACLES OR CART. TAPE COVERING SECURELY UNLESS UTILIZING A SOLID LID.
17. CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF SMOKE COMPARTMENTS WITHIN AREA OF
CONSTRUCTION DURING THE ENTIRE PROJECT.
18. COORDINATE A DISCHARGE PLAN FOR EACH PHASE WITH THE VA PRIOR TO COMMENCING WORK ON THE
NEXT PHASE.
19. HEPA FILTER UNIT DISCHARGE DUCT MUST LEAVE THE ICRA CONTAINMENT AREA TO BE DISCHARGED TO THE OUTSIDE. THE DUCT SHALL BE SHEET METAL WHEN CROSSING THE ICRA BARRIER TO THE POINT OF DISCHARGE. A PLAN SHALL BE SUBMITTED AND REVIEWED WITH THE VA COR FOR OCCUPIED AREAS THAT THE DISCHARGE DUCT MUST TRAVERSE. FLEX DUCT IS PERMITTED INSIDE THE ICRA BARRIER AND OTHER LOCATIONS AS APPROVED BY THE VA. CONNECTIONS TO THE OUTSIDE DISCHARGE POINT (I.E. WINDOW) SHALL BE MADE WITH SHEET METAL AND SHALL BE SECURE. CONNECTIONS SHALL NOT BE MADE WITH
DUCT TAPE.
20. ANY MEP WORK OUTSIDE THE ICRA BARRIER MAY NOT REQUIRE FULL BARRIER WALL PROTECTION. LESS STRINGENT MEASURES SUCH AS PLASTIC SHEETING SHALL BE PERMITTED, AS APPROVED BY VA COR FOR AREAS WITH SHORT TERM WORK. THE WORK IN THESE AREAS IS EXPECTED TO BE COMPLETE OR DONE IN
SECTIONS THAT COMPLETE WORK AND RESTORE THE SPACE IN A ONE DAY WORK SHIFT.
21. CONTRACTOR SHALL COORDINATE FINAL ICRA WALLS WITH VA COR AND PROTECT EXISTING WALL
MOUNTED EQUIPMENT IDENTIFIED TO REMAIN.
22. RELOCATE EXISTING "EXIT" SIGNS TO LOCATIONS AS SHOWN ON ELECTRICAL DRAWINGS TO PROVIDE
CLEAR EGRESS PATH DIRECTIONS DURING CONSTRUCTION.
23. CONTRACTOR SHALL PROTECT ALL EXISTING FINISHES THAT ARE TO REMAIN.
UPON COMPLETION OF EACH PHASE
1. DO NOT REMOVE ICRA/ANTE ROOM BARRIERS FROM WORK AREA UNTIL THE PHASE WORK IS INSPECTED
AND APPROVED, IN WRITING, BY VA COR.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. UTILIZE POLYURETHANE PLASTIC SHEETING DURING INSTALLATION AND DEMOLITION OF
ICRA BARRIERS TO CONTAIN DUST AND DEBRIS.
3. CONTRACTOR'S FINAL CLEANUP THROUGHOUT PHASE WORK AREA SHALL UTILIZE HEPA FILTERED VACUUMS. PHASE WORK AREA SHALL NOT BE TURNED OVER TO THE VA FOR USE UNTIL IT IS THOROUGHLY CLEANED BY THE VA'S ENVIRONMENTAL SERVICES (EMS). PROVIDE THE VA COR WITH ONE (1) WEEK
NOTIFICATION PRIOR TO THE EMS CLEANING TO ALLOW FOR SCHEDULING OF EMS.
EXISTING ROOF OR FLOOR.
6 MIL FIRE RETARDANT POLY.
EXTEND TO TO UNDERSIDE OF
STRUCTURE ABOVE.
TAPEAND SEAL AT ALL EDGES AND
AROUND ALL PENETRATIONS.
EXISTING CONC. FLOOR.
INFECTION CONTROL KEYNOTES
PRECAUTIONS DURING CONSTRUCTION (ALL PHASES)
01 INFECTION CONTROL BARRIER PAINTED TO MATCH EXISTING CORRIDOR WALLS.
02 REMOVE EXISTING SPRINKLER IN HALLWAY IN PREPARATION FOR NEW ANTEROOM. SPRINKLER TO BE
REINSTALLED AFTER ICRA REMOVAL. PROVIDE A TEMPORARY LIGHT FIXTURE IN ANTEROOM.
03 CONTRACTOR TO REMOVE AND PROTECT ROOM SIGNAGE PRIOR TO CONSTRUCTION. SIGNAGE TO BE
REINSTALLED AT THE END OF CONSTRUCTION.
04 PROVIDE 45 MIN RATED DOOR ASSEMBLY WITH CLOSER AND A VA COMPATIBLE 7-PIN INTERCHANGEABLE CORE STOREROOM FUNCTION CYLINDRICAL LOCK WITH PUSHBUTTON CODE LOCK FOR ACCESS. BASIS OF DESIGN IS STANLEY 9K SERIES LOCK. PROVIDE SIGN ON OCCUPIED SIDE OF DOOR THAT STATES
"CONSTRUCTION AREA. AUTHORIZED PERSONNEL ONLY."
SECTION
PLAN
7/
8"
3 5/8" METAL STUDS @ 16" OC, TYP
5/8" GWB, BOTH SIDES, SEE ROOM FINISH
SCHEDULE FOR FINISHES
CONTINUOUS METAL STUD TOP TRACK
CONTINUOUS METAL STUD BOTTOM
TRACK
LINE OF FINISHED FLOOR, SEE ROOM
FINISH SCHEDULE FOR FLOOR & BASE
TYPE
LINE OF EXISTING SOFFIT/WALL.
CONTINUE STUD WALL AND GWB TO
BOTTOM OF DECK WHERE REQUIRED.
CONTRACTOR TO VERIFY EXISTING CONDITIONS.
CONTINUOUS METAL HORIZONTAL
BRIDGING CHANNEL @ MID HEIGHT, TYP
FIRE-RATED SEALANT, BOTH SIDES
3 5/8" METAL STUDS @ 16" OC, 25-GAGE,
TYPICAL
5/8" TYPE "X" GWB, BOTH SIDES, STAGGER
JOINTS ON OPPOSITE SIDES OF ROOM SEE
ROOM FINISH SCHEDULE FOR FINISHES
EXISTING FINISHED CEILING
SYSTEM
PRIOR TO DEMOLISHING IN AN AREA,
DISCONNECT AND REMOVE EXISTING HVAC,
DUCTS, ELECTRICAL AND PLUMBING LINES.
SEE MEP DRAWINGS.
1-HR RATED PARTITION - U465
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
PHASING PLANS - ICRA
GC300
-C
S I-
G C
.p d f
1/4" = 1'-0"G9 PLAN - ICRA CONSTRUCTION
1/4" = 1'-0"B9 PLAN - ICRA DEMOLITION
3/4" = 1'-0"H12 CRITICAL BARRIER - (TYP. ABOVE CEILING WALL INFILL DETAIL)
3/4" = 1'-0"A15 6 MIL POLY ICRA BARRIER
1 1/2" = 1'-0"G15 ICRA BARRIER DETAIL w/ GWB CEILING
NORTH
NORTH
WORK SHOULD BE COMPLETED 100 DAYS FROM NTP. CONSTRUCTION CAN BE SCHEDULED FOR 1ST
SHIFT, 2ND SHIFT AND WEEKENDS TO MEET THE TIMELINE.
(SEE G15 THIS SHEET).
CT SIMULATOR
B3A128
CONTROL ROOM
B3A128a
CORRIDOR
CB3-7
1/8" Pb EQUIVALENT TO 14'-0" A.F.F.
1/8" Pb EQUIVALENT TO 14'-0" A.F.F.
1/ 8"
P b
E Q
U
IV
A
LE
N T
TO
4' -0
A
.F .F
1/ 8"
P b
E Q
U
IV
A
LE
N T
TO
4' -0
A
.F .F
L3
L3L2
L1
L1
L1 MIN. 1/8" Pb
EQUIVALENT CEILING
NORTH
SUB-BASEMENT FLOOR KEY PLAN
AREA OF WORK
BUILDING 2
BUILDING 1
LEAD SHIELDING KEYNOTES
L1. LEAD-LINED WALL WITH EQUIVALENT THICKNESS OF 1/8" FROM
FLOOR TO 14'-0" A.F.F.
L2. LEAD-LINED WINDOW AND FRAME WITH EQUIVALENT THICKNESS OF
1/8".
L3. LEAD-SHIELDED DOOR AND FRAME WITH EQUIVALENT THICKNESS
OF 1/8".
1. REFER TO SHIELDING DESIGN EVALUATION (DATED 2/2/21) AND
SHIELDING INTEGRITY SURVEY (DATED 2/12/21) PROVIDED BY WEST
PHYSICS. CONTRACTOR MUST MAINTAIN OR EXCEED ALL MINIMUM
REQUIRED LEAD SHIELDING THICKNESSES AND EQUIVALENCIES AS
IDENTIFIED WITHIN THE RADIATION SHIELDING DESIGN
EVALUATION.
2. SHIELDING CONTRACTOR SHALL PROVIDE AND SUBMIT SHOP
DRAWINGS REVIEWED AND SEALED BY A PROFESSIONAL ENGINEER
FOR APPROVAL BY PROJECT COR.
3. SUPPLY AND INSTALLATION OF ALL SHIELDING MATERIALS
INCLUDING BUT NOT LIMITED TO LEAD LINED GWB, STEEL
RESTRAINTS, AND STEEL SUPPORT COMPONENTS SHALL BE THE
SOLE RESPONSIBILITY OF SHIELDING VENDOR/INSTALLER.
4. WHERE Pb SHIELDING EQUIVALENT THICKNESS IS CALLED OUT AT 1/8" OR LESS. IT IS ASSUMED THAT Pb LINED GYPSUM WALL BOARD
WILL BE USED AS THE SHIELDING MATERIAL. LEAD SHIELDING IN
CEILING SHALL BE LEAD-LINED PLYWOOD.
5. ALL SHOP DRAWINGS AND SHIELDING SUBMISSIONS SHALL BE
REVIEWED BY THE VA FOR APPROVAL.
6. ANY SUPPORT STRUCTURE OR FRAMING UTILIZED TO SUPPORT
LEAD SHIELDING SHALL NOT INTERRUPT EXISTING FIREPROOFING.
ALL FIREPROOFING THAT IS DISTURBED SHALL BE REPLACED IN
ACCORDANCE WITH ALL APPLICABLE CODES.
7. THERE SHALL BE NO HOLES, GAPS OR INCONSISTENCIES IN THE
SHIELDING MATERIAL OR ITS EQUIVALENCY. ALL SEAMS BETWEEN
NEW AND EXISTING SHIELDING MATERIALS SHALL BE COVERED
WITH A MIN 2" LEAD STRIP THE ENTIRE LENGTH OF SEAM.
8. SECURE ALL STRUCTURAL METAL STUDS TO SHIELDING RESTRAINT
STEEL AND / OR STRUCTURE ABOVE.
9. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY BREACHES IN
SHIELDING WHETHER NEW OR EXISTING.
10. LEAD SHIELDING SHOULD BE TESTED AND APPROVED BY VA
RADIATION SAFETY OFFICER.
11. EXTEND LEAD WALLS TO THE CEILING LEAD.
LEAD SHIELDING GENERAL NOTES
FOLD LEAD SHIELDING OVER
CABINET ATTACHMENT AS
SHOWN AND AFFIX WITH
ADHESIVE
5/8" GWB WITH 1/8"
LEAD SHIELDING
CABINET /
ACCESSORY
METAL STRAPPING
AS REQUIRED
LEAD SHIELDING
PROTECTION CAP
INFILL WITH
CONCRETE
EXISTING RACEWAY,
VERIFY SIZE IN FIELD
LINE OF EXISTING
CONCRETE FLOOR
4x LARGEST
DIMENSION OF
DUCT
NOTE: ALL PENETRATIONS
AT LEAD WALLS TO BE
SHIELDED
LEAD SHIELDING EQUAL TO LEAD
SHIELDING REQUIRED FOR WALL. WRAP
AROUND ALL SIDES OF DUCT WITH 2"
LAPS AS REQUIRED
LA
R
G E
S T
D
IM
E N
S
IO
N O
F D
U C
T
SHIELDED ROOM
SIDE
4x LARGEST
DIMENSION OF
DUCT
LEAD-LINED GWB
2"
LEAD SHIELDING EQUAL TO LEAD
SHIELDING REQUIRED FOR WALL. WRAP
AROUND ALL SIDES OF DUCT WITH 2"
LAPS AS REQUIRED
2" MIN.
4"
4"
EXISTING WALL WITH LEAD SHIELDING
TO REMAIN
PROVIDE AND INSTALL 1/8" LEAD 4"x4" "FLASHING"
AT BASE OF WALL. PROVIDE 4" MIN OVERLAP UNDER
NEW FLOOR LEAD AND BEHIND EXISTING LEAD GWB
FLOOR AND BASE AS SCHEDULED: SEE FINISH SCHEDULE.
NEW 1/4" SUB-FLOOR, FIELD VERIFY THICKNESS TO MATCH
EXISTING CONDITIONS. FULLY ADHERE OVER LEAD SHIELDING
WHERE MECHANICAL FASTENERS ARE REQUIRED,
COUNTERSINK AND PROVIDE SUPPLEMENTAL LEAD
PROTECTION AT ALL PENETRATIONS
SHIELDED ROOM
SIDE
NEW 1/8" THICK
LEAD WITH 2" WIDE
OVERLAP LEAD
SHIELDING IN WALL
5/8" GWB WITH 1/8"
LEAD SHIELDING
5/8" GWB WITH 1/8"
LEAD SHIELDING
2"
2"
SHIELDED ROOM
SIDE
EXISTING LEAD-LINED GWB PARTITION
NEW LEAD SHIELDING WITH 2"
WIDE OVERLAP. LEAD SHIELDING
EQUAL TO THICKNESS IN WALL.
EXISTING IN-WALL MOUNTED
DEVICE REMOVED FROM WALL,
OPENING VARIES. REFER TO DEMO
DRAWINGS
NEW 5/8"GWB W/ LEAD SHIELDING.
LEAD SHIELDING EQUAL TO
THICKNESS OF LEAD IN WALL.
NEW LEAD SHIELDING WITH 2"
WIDE OVERLAP. LEAD SHIELDING
EQUAL TO THICKNESS IN WALL.
2" O
P E
N
IN
G V
A R
IE
S
2"2" V
A R
IE
S
2"
2" VARIES 2"
OPENING
ELEVATION SECTION
SHIELDED
ROOM SIDE
ELEVATION SECTION
SHIELDED
ROOM SIDE
LEAD-LINED GWB
NEW LEAD SHIELDING WITH 2" WIDE
OVERLAP. NEW LEAD SHIELDING
EQUAL TO THICKNESS IN WALL
NEW IN-WALL MOUNTED DEVICE,
AS REQUIRED BY ARCH/MEP/EQUIP
DRAWINGS
NEW LEAD SHIELDING AROUND ALL
SIDES OF BOX/OPENING. LEAD
SHIELDING EQUAL TO THICKNESS
OF LEAD IN WALL
NEW LEAD SHIELDING WITH 2" WIDE
OVERLAP. NEW LEAD SHIELDING
EQUAL TO THICKNESS IN WALL
2"
V A
R
IE
S
O P
E N
IN
G
2"
PIPE
4x P
IP
E
D
IA
P
IP
E
LEAD SHIELDING EQUAL TO
THICKNESS IN WALL. WRAP
AROUND CIRCUMFERENCE
OF PIPE.
PIPE OR CONDUIT
LEAD-LINED GWB
SHIELDED ROOM
SIDE
4x PIPE DIAMETER
1/8" THICK LEAD WRAP
AROUND CIRCUMFERENCE OF
PIPE. OVERLAP NEW LEAD 2".
8" MIN.
1/8" THICK LEAD WRAP AROUND
CIRCUMFERENCE OF PIPE. OVERLAP NEW
LEAD 2" OVER EXISTING LEAD ON FLOOR.
PIPE, SIZE VARIES
O F
P
IP
E
4x D
IA
GALVANIZED IRON SLEEVE
C O
N
S
LA
V
A R
IE
S
CLAMP
O F
P
IP
E
4x D
IA
EXISTING FLOOR ABOVE
PLYWOOD W/ 1/8" LEAD SHIELDING
INSTALLED AS HIGH AS POSSIBLE.
COORDINATE WITH ALL OTHER TRADES.
NEW 1/16" LEAD SHIELDING
W/ 2" WIDE OVERLAP
EXISTING STRUCTURE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
LEAD SHIELDING PLANS
GC400
-C
S I-
G C
.p d f
1/4" = 1'-0"G5 EXISTING LEAD SHIELDING PLAN
3" = 1'-0"D14 LEAD DETAIL - CABINET / ACCESSORY WALL ATTACHMENT - PLAN DETAIL
3" = 1'-0"A8 LEAD DETAIL - CABLE RACEWAY
3" = 1'-0"G9 LEAD DETAIL - DUCT SECTION
3" = 1'-0"A14 LEAD DETAIL - FLOOR / WALL
3" = 1'-0"D11 LEAD DETAIL - GWB CORNER
3" = 1'-0"D5 LEAD DETAIL - INFILL OPENING
3" = 1'-0"A5 LEAD DETAIL - NEW DEVICE
3" = 1'-0"A11 LEAD DETAIL - PIPE
3" = 1'-0"D8 LEAD DETAIL - PIPE FLOOR
1 1/2" = 1'-0"F15 LEAD DETAIL - CEILING DETAIL
2X2 ACOUSTIC CEILING TILE SYSTEM.
GYPSUM BOARD CEILING
REMOVE 2X4 LIGHT FIXTURE
NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR. SUFFIX "L.P." AND "H.P."
INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-FINISHED ALUMINUM TRANSITION STRIP. REFER TO SPECIFICATIONS.
REMOVE DIFFUSER
RCP LEGEND
TRACK LIGHT - SEE ELEC
RECESSED
DOWNLIGHT - SEE ELEC
1'X4' RECESSED LIGHT
FIXTURE - SEE ELEC
2'X4' RECESSED LIGHT
FIXTURE - SEE ELEC
1'X4' LIGHT
FIXTURE - SEE ELEC
SPRINKLER
SUPPLY DIFFUSER, REGISTER,
OR GRILL - SEE MECH
RETURN DIFFUSER, REGISTER,
OR GRILL - SEE MECH
REMOVE AIR RETURN
REMOVE 2X2 ACT
RCP NOTES
GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR
OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING TO ALL
OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.
1. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ITEMS NOT SHOWN ON
CEILING PLAN. GRILLES, SPEAKERS, SPRINKLERS, HEAT & SMOKE DETECTORS, TO BE CENTERED
IN TILES UNLESS NOTED OTHERWISE.
B
C
AD100
H15
H9
H11
H13
CT SIMULATOR
B3A128
AD100
F15
F12
F11
F8
CONTROL ROOM
B3A128a
B3A128A
B3A128
C B
-7
EQ02 EQ03
EQ04
EQ16
EQ15
EQ01
EQ12
EQ10
B3636
EQ05
EQ14
B3642
EQ06
C3624
CT025
EQ11
EQ05
CT024
EQ04EQ03
EQ02
EXISTING WALL
WIRE SHELF
EQ16 EQ15
EQ14
EQ06
B3636
EQ05
EQ01
EQ09
EQ10
EQ-11
3'
0" 2'
0"
2'
0"
7'
0" EQ12
EQ07
EQ08
FURR DOWN
3' - 0"
3'
2"
3'
4"
EQ02
WALL MTD SHELF (6 SHELVES)
EQ11
EQ05
C3624
REMOVE BASE CABINET
B3642
ADJ.
ADJ.
EXISTING METAL
BLINDS
ADJUSTABLE SHELVES
WITH BRACKETS
CHASE
REMOVE EXISTING WALL PROTECTION
ADJUSTABLE
SHELVES WITH
BRACKETS
B
C
10' - 0"
CT SIMULATOR
B3A128
CONTROL ROOM
B3A128A
GENERAL DEMOLITION NOTES (ALL PHASES)
1. SCOPE OF DEMOLITION WORK IS NOT LIMITED TO WORK SHOWN ON DEMOLITION
DRAWINGS. CONTRACTOR TO COORDINATE DEMOLITION WITH NEW WORK AND PATCH
EXISTING TO RECEIVE NEW FINISHES.
2. REFER TO MECHANICAL, ELECTRICAL & PLUMBING DRAWINGS FOR DEMOLITION WORK.
WHERE SUCH WORK OCCURS, ARCHITECTURAL ITEMS OR FINISHES SHALL BE REMOVED
ONLY TO THE EXTENT REQUIRED & PATCHED TO MATCH EXISTING ADJACENT
CONSTRUCTION AND FINISHES.
3. REMOVE ALL INTERIOR DOORS, FRAMES AND HARDWARE INDICATED AS DASHED LINES.
4. REMOVE EXISTING CEILING IN ALL AREAS TO RECEIVE A NEW CEILING AND REPLACE ANY
OBSERVED ABOVE-CEILING ICRA VIOLATIONS TO THE COR.
5. REMOVE EXISTING FLOOR FINISH, BASE AND ADHESIVE IN ALL AREAS WHICH ARE TO
RECEIVE NEW FLOOR FINISHES. SEE FINISHES PLAN.
6. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF
DEMOLITION WORK.
7. REMOVE PARTITIONS SHOWN DASHED.
8. VERIFY EXISTING FIRE PROTECTION ON ALL STRUCTURAL ELEMENTS IN AREA OF WORK
PRIOR TO INSTALLING NEW WORK. PATCH AND REPAIR AS NECESSARY TO MAINTAIN
REQUIRED RATING.
9. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH ALL EXISTING SURFACES
AFFECTED BY CONSTRUCTION AND MATCH EXISTING FINISHES.
NORTH
SUB-BASEMENT FLOOR KEY PLAN
AREA OF WORK
BUILDING 2
BUILDING 1
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
CONSULTANT:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones
Consultant:
HF LENZ
1407 SCALP AVENUE
JOHNSTOWN, PA 15904
814-2269-9300
POC: ROBERT MICKLE A R C H I T E C T S E N G I N E E R S
H.F. LENZ COMPANY
1407 Scalp Avenue Johnstown, PA 15904
Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants Corporal Michael J. Crescenz VAMC
3900 Woodland Ave, Philadelphia, PA 19104
09-20-2021
642-CSI-802
DRKBJ
SITE PREP TO REPLACE CT
SIMULATOR
BID SET
DEMOLITION PLAN
AD100
-C
S I-
A D
.p d f
1/4" = 1'-0"F6 EXISTING PLAN
1/4" = 1'-0"H15 EXISTING CT SIMULATOR - NORTH
1/4" = 1'-0"H13 CT SIMULATOR - EAST
1/4" = 1'-0"H11 CT SIMULATOR - SOUTH
1/4" = 1'-0"H9 CT SIMULATOR - WEST
1/4" = 1'-0"F15 CONTROL ROOM - NORTH
1/4" = 1'-0"F12 CONTROL ROOM - EAST
1/4" = 1'-0"F11 CONTROL ROOM - SOUTH
1/4" = 1'-0"F8 CONTROL ROOM - WEST
1/4" = 1'-0"A6 EXISTING REFLECTED CEILING PLAN - DEMO
EXISTING EQUIPMENT
ITEM DESCRIPTION Comments
B3636 BASE CABINET 36"W x 36" H REMOVE
B3642 BASE CABINET 36"W x 42" H REMOVE
C3624 WALL CABINET 36"W x 24" H REMOVE
CT024 25" DEEP COUNTERTOP REMOVE
CT025 25" DEEP COUNTERTOP w/ SINK REMOVE
EQ01 CT SIMULATOR SALVAGE TO SIEMENS
EQ02 POWER DISTRIBUTION UNIT SALVAGE TO SIEMENS
EQ03 SUPPLY CART SALVAGE / REINSTALL
EQ04 BLANKET WARMER SALVAGE / REINSTALL
EQ05 MEDICAL SHARPS DISPOSAL REMOVE
EQ06 HAMPER SALVAGE / REINSTALL
EQ07 PAPER TOWEL DISPENSER REMOVE
EQ08 SOAP DISPENSER REMOVE
EQ09 CAMERA SALVAGE / REINSTALL
EQ10 WIPES REMOVE
EQ11 WALL-MOUNTED SHELF SALVAGE / REINSTALL
EQ12 WATER BATH SALVAGE / REINSTALL
EQ14 UTILITY WIRE SHELF SALVAGE / REINSTALL
EQ15 ROLLING CART SALVAGE / REINSTALL
EQ16 ROLLING CART SALVAGE / REINSTALL
WALL CABINETS TO REMAIN
SUB-BASEMENT FLOOR KEY PLAN
AREA OF WORK
BUILDING 2
BUILDING 1
B B
C C
EQ17
B3A128
B3A128A
C B
-7
CT SIMULATOR
ORIENTATION POINT
C3624
CT025
C3624
B3636
B3636
B3636
C3624C3624
B3636
CT024
CT030
7'
0"
7' - 0"
EQ03
EQ06
EQ05
EQ05
EQ11
EQ04
EQ15
EQ16
EQ14
EQ08 EQ19
EQ18
EQ12
EQ10
AE100
H11
H9
H15
H13
AE100
F15
F8 F12
F11
CT024
CT SIMULATOR
B3A128
CONTROL ROOM
B3A128A
CORRIDOR
CB3-7
EXTENT OF NEW FINISHES IN CORRIDOR CB3-7
VERTICAL TRANSITION STRIP
8' - 6"
WORKSTATION PROVIDED BY SIEMENS.
COORDINATE WITH MANUFACTURER.
EQ17
EQ03 EQ16
EQ04
EQ15
EQ14
P-1 C3624C3624
CT024
EQ06B3636B3636
EQ04
EQ16
EQ05
EQ14
P-1 P-1
EXISTING LEAD-SHIELDED
WINDOW TO REMAIN
EQ19
EQ08
EQ12
B3636
C3624 P-1
EQ12
EQ05
EQ11
C3624 C3624
EQ19
B3636
CT025
B3636 EQ03
P-4
CT030
CT024
EXISTING WALL CABINETS
NEW BLINDS
P-2
CT024
EXISTING WALL CABINETS
P-1
CT024
EXISTING WALL CABINETS
P-1
WP-1
3'
0"
CT030
P-2
B B
C C
10' - 0"
A.F.F.
2' x 2' AT-1
10' - 0"
7' - 0"
7'
0"
2' - 0"
8"
CT SIMULATOR
ORIENTATION POINT
CORRIDOR
CB3-7
CT SIMULATOR
B3A128
CONTROL ROOM
B3A128A
2x2 CEILING SYSTEM. SEE FINISH
SCHEDULE
2x4 CEILING SYSTEM. SEE FINISH
SCHEDULE
GYPSUM BOARD CEILING
NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR. SUFFIX "L.P." AND "H.P."
INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-FINISHED ALUMINUM TRANSITION STRIP. REFER TO SPECIFICATIONS.
TRACK LIGHT - SEE ELEC
RECESSED
DOWNLIGHT - SEE ELEC
1'X4' RECESSED LIGHT
FIXTURE - SEE ELEC
2'X4' RECESSED LIGHT
FIXTURE - SEE ELEC
1'X4' LIGHT
FIXTURE - SEE ELEC
SPRINKLER - SEE PLUMB
SUPPLY DIFFUSER, REGISTER,
OR GRILL - SEE MECH
RETURN DIFFUSER, REGISTER,
OR GRILL - SEE MECH
RCP LEGEND
1-HR RATED SHAFTLINER CEILING
ASSEMBLY
2x2 CEILING SYSTEM
TO BE DEMOLISHED
2x4 CEILING SYSTEM
TO BE DEMOLISHED
GYPSUM BOARD CEILING
TO BE DEMOLISHED
RCP NOTES
GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR
OTHERWISE IDENTIFIED ON ONE…
This is the start of the file's text. The full file is on GovTribe.