CSS N6247324Q3206.pdf

PDF 919 KB Posted

Attached to
Vertical Transportation Equipment (VTE) Services Federal contract opportunity
Solicitation number
N6247324Q3206
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This is a Naval Facilities Engineering Systems Command, Southwest (NAVFAC SW) combined synopsis/solicitation for Vertical Transportation Equipment (VTE) services on Naval Support Activity (NSA) Monterey, California. The solicitation is a 100% small business set-aside for a firm-fixed-price (FFP) and indefinite-delivery/indefinite-quantity (IDIQ) performance-based contract with a 1-year base period and four 1-year option periods. The required services include developing, implementing, and executing preventative maintenance, inspection, testing, and certification programs, as well as scheduled service orders for VTE. Quotes are due by 1:00 PM PST on April 12, 2024, and the government intends to award to the responsible quoter whose quote provides the best value. The North American Industry Classification System (NAICS) code is 811310 for Commercial and Industrial Machinery and Equipment Repair and Maintenance, and the Product Service Code (PSC) is J036 for Maintenance, Repair, and Rebuild of Equipment - Special Industry Machinery.

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Transportation Equipment (VTE) Services, newest first.
File Type Posted
Attachment I.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICITATION FOR

COMMERCIAL SERVICES

I. GENERAL INFORMATION:

This is a Naval Facilities Engineering Systems Command, Southwest (NAVFAC SW) combined synopsis/solicitation (CSS) prepared in accordance with Federal Acquisition Regulation (FAR) Subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” and FAR Subpart 13.5, “Simplified Acquisition Procedures,” as supplemented with additional information as included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued unless otherwise indicated herein.

This notice represents a request for quotation(s) (RFQ). The unique procurement instrument identifier (PIID) associated with this contract action is RFQ Number (No.) N6247324Q3206.

The incorporated provisions and clauses of this solicitation are those in effect through the Federal Acquisition Circular (FAC) 2024-03, effective December 1, 2024, and Defense Federal Acquisition Regulation Supplement (DFARS) Publication Notice (DPN) 20240215, effective February 15, 2024. The provisions and clauses referenced herein may be reviewed and obtained in full-text form at the following addresses:

(1) FAR: https://www.acquisition.gov/browse/index/far

(2) DFARS: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

This solicitation is issued as a 100% total small business set-aside, and is reserved exclusively for small businesses. Any quote(s) received in response to this solicitation from other than small business concerns will not be accepted. Competitive quotes are requested.

The North American Industry Classification System (NAICS) code for this requirement is “811310,” titled “Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance,” which has a small business size standard of $12.5 million. The associated product service code (PSC) for this requirement is “J036,” titled “Maintenance, Repair, and Rebuild of Equipment – Special Industry Machinery.”

The Government anticipates the award of a firm-fixed-price (FFP) single-vendor performance-based contract that consists of both recurring and non-recurring services. FFP and indefinite-delivery/indefinite-quantity (IDIQ) services, on an as needed basis, for one (1) 12-month base period, and four

(4) 12-month option periods, as indicated below:

Base Period May 1, 2024 – April 30, 2025 Option One (1) May 1, 2025 – April 30, 2026 Option Two (2) May 1, 2026 – April 30, 2027 Option Three (3) May 1, 2027 – April 30, 2028 Option Four (4) May 1, 2028 – April 30, 2029

Funding will be provided by issuance of task orders, and allocated during each period of performance for the recurring and non-recurring services.

This commercial service requirement is for all labor, management, supervision, tools, material, and equipment necessary to perform recurring and non-recurring services to vertical transportation equipment (VTE) onboard Naval Support Activity (NSA) Monterey, California, as specified herein and with the applicable solicitation documents. Services will consist of 1) development, implementation, and execution of a preventative maintenance (PM) program; 2) development, implementation, and execution of an inspection, testing, and certification program; and 3) scheduled service orders.

The following FAR clauses and provisions apply to this solicitation:

FAR 52.212-1: Instructions to Offerors – Commercial Products and Commercial Services FAR 52.212-3: (Alternate I): Offeror Representations and Certifications-Commercial Products and Commercial Services FAR 52.212-4: Contract Terms and Conditions-Commercial Products and Commercial Services FAR 52.212-5: Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services

Note: Quoter(s) shall include a completed copy of FAR provision 52.212-3 with quote submission. Additional contract terms and conditions applicable to this procurement are provided in Attachment I.

A site walk is not scheduled at this time, but can be requested.

III. QUOTE SUBMISSION INFORMATION:

All questions and inquiries involving this solicitation must be submitted via email to Ashley N. Thornton, Contract Specialist, at ashley.n.thornton4.civ@us.navy.mil, not later than 1:00 PM PST on April 5, 2024.

The quoter shall submit his/her quote via email to Ashley N. Thornton, Contract Specialist, at ashley.n.thornton4.civ@us.navy.mil, not later than 1:00 PM PST on April 12, 2024. The quote must be valid for 90 days after the submission date.

The quoter shall be registered in the System for Award Management (SAM), at https://sam.gov, prior to quoting.

Failure to have an active registration status in SAM by the time of award will make that quoter ineligible to receive the anticipated contract award, with no exceptions.

All quotes must conform to the solicitation requirements, to include all stated terms, conditions, representations, and certifications.

Quoter(s) shall submit a FFP quote for all ELINs/SubELINs in the pricing schedule. Quote(s) shall include pricing for the base requirement and all options as specified herein. Quotes shall acknowledge any amendments and be dated, signed, and submitted to the Contract Specialist prior to the due date for receipt of quote(s).

In order for the government to make a fair and reasonable price determination, additional market research may be conducted. The government may request the quoter to submit any available pricing data and/or relevant sales or invoice history to further substantiate the price reasonableness of the quote provided.

The government intends to award the anticipated contract to the responsible quoter whose quote conforms to the solicitation; is most advantageous to the government, price and other factors considered; and provides the best value to the government in accordance with FAR 13.106-1(a)(2)(ii) and

FAR 2.101.

Quoter(s) are advised, this is ONLY a request for quotation(s). A contract will be awarded pursuant to the evaluation of the quotations received. Do NOT deliver or perform services until a written notification has been provided by the Contracting Officer indicating a successful and acceptable quote. Performance under the anticipated contract shall NOT commence until the successful quoter is in receipt of the fully-signed Standard Form (SF) 1449, signifying a binding contract.

IV. POINT(S) OF CONTACT:

Ashley N. Thornton Batina N. Wingo Contract Specialist Supervisory Contract Specialist FEAD Monterey FEAD Monterey

NAVFAC SW NAVFAC SW

Phone: (831) 656-3694 Phone: (831) 656-3454 Email: ashley.n.thornton4.civ@us.navy.mil Email: batina.n.wingo.civ@us.navy.mil

V. ADDITIONAL CONTACT INFORMATION:

Contracting Office:

Facilities Engineering and Acquisition Division (FEAD) Monterey Public Works Department (PWD) 511 Gardners Road, Build 426 Monterey, California 93943-5035

Contracting Agency:

Naval Facilities Engineering Systems Command (NAVFAC SW), Southwest 750 Pacific Highway San Diego, CA 92132-5190

ANNEX 0100000: GENERAL INFORMATION

0100000 – General Information Spec Item

Title Description

1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at the Naval Support Activity Monterey (NSAM) and Fleet Numerical and Oceanographic Center (FNOC), Monterey, CA. The type of contract anticipated for this procurement, is a combination firm-fixed price (FFP) and indefinite delivery-indefinite quantity (IDIQ) contract with four option years. The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

Annex 1 General Information - Included Annex 2 Management and Administration - Included Annex 3 Command and Staff – N/A Annex 4 Public Safety – N/A Annex 5 Air Operations – N/A Annex 6 Port Operations – N/A Annex 7 Ordnance – N/A Annex 8 Range Operations – N/A Annex 9 Health Care Support – N/A Annex 10 Supply – N/A Annex 11 Personnel Support – N/A Annex 12 Morale, Welfare and Recreation Support – N/A Annex 13 Galley – N/A Annex 14 Housing – N/A Annex 15 Facilities Support 1502000 – Facility Investment - Included Annex 16 Utilities – N/A Annex 17 Base Support Vehicles and Equipment – N/A Annex 18 Environmental – N/A

1.2 Project Location The work shall be performed at various locations. Vertical Transportation Equipment (VTE) elevator maintenance, repair and inspection assistance shall be performed at the following locations:

(1) Naval Support Activity Monterey (NSAM) and Fleet Numerical and Oceanographic Center (FNOC), Monterey, CA.

See Attachment J-1502000-03 for VTE Equipment Listing.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional elevator services at additional locations in addition to the services and locations identified in the Firm-Fixed Price requirements of this contract. Additional services will be incorporated into the contract in accordance with FAR 52.212-4, CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS

(JUL 2013). Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background

Information

The intent of this solicitation is to obtain facility maintenance management and services for VTE. This commercial item contract is a performance based specification relying on the contractor’s experience and expertise determining the best method of service operations. The Contractor is required to have in place a Quality Management System providing quality measures for all requirements at all sites.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.

1.6 Climate Patterns The Monterey climate near the coast is moist. Rainfall averages nineteen inches a year. The rainy season occurs November through March. Thunderstorms and hail are rare. Heavy wind gusts are frequent during rain storms

1.7 Related

Information

There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer.

Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering

Philosophy

The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's

Knowledge

The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best

Practices

The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on- site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements. Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 4 of Annexes 3 through 18.

1.10 Navy PBSA

Approach

The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3)

ANNEX 0200000: MANAGEMENT AND ADMINISTRATION

TABLE OF CONTENTS

Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and

Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Utilities

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.7 Quality Management System (QMS)

2.6.6 NAVFAC MAXIMO

2.6.6.1 MAXIMO Data

2.6.6.2 MAXIMO Method of Data Entry

2.6.6.3 MAXIMO Access (N/A)

2.6.6.4 MAXIMO Training (N/A)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 Property Management Plan

2.6.9 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 Non-Hazardous Waste Disposal

2.10.2.2 Hazardous Waste Disposal

2.10.2.3 Spill Prevention, Containment, and Clean-up

2.10.2.4 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.5 Noise Control

2.10.2.6 Salvage

2.10.2.7 Asbestos Containing Material (ACM)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Warranty Management

2.13 Recurring Work Procedures

2.13.1 Notification to the Government for Work Above the Recurring Work Limitations

2.13.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.14 Non-recurring Work

2.14.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.14.1.1 Acceptance and Performance

2.14.1.2 Invoicing and Receiving Payment

2.14.2 Unit Priced Labor (UPL)Work (Negotiated)

2.14.2.1 Non-recurring Preparation of Proposals

2.14.2.1.1 Labor Requirements

2.14.2.1.2 Material and Equipment Requirements

2.14.2.2 Issuance of Final Task Order

2.14.3 Non-recurring ELINS

0200000 - Management and Administration Spec Item Title Description 2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes requires Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

Contractor access to some areas may be constrained due to security or operational requirements.

2.2.2 Wage

Determinations

Refer to the incorporated Service Contract Wage Determination, J-0200000-02. Upon exercising each option period, a current Wage Determination will be incorporated into the contract via a contract modification.

2.2.3 Requirements

Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend a Pre-performance Meeting and applicable monthly meetings as determined by the KO or his/her designated representative.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal

Partnering

The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the

KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract

Partnering Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract

Partnering

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

Session Attendees

President/Vice President

* Project Manager

* Quality Manager Site Safety and Health Officer

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

Additional information about NMCI may be obtained at http://www.eds.com/nmci.

2.3.8 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-

03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing

Procedures

Invoicing procedures are identified in Section I – Clauses, DFARS 252.232-7006

2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-1502000- 06.

2.4 Government-

Furnished Property, Materials and Services

In accordance with FAR 52.245, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract as stated below.

A list of Government Furnished Property, Materials, and Services is provided in J-0200000-06.

2.4.1 Government-

Furnished Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO, FSC or PAR. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government.

Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal

Government business. In those cases, where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government.

The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.

Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall submit an electronic copy of all deliverables listed in Section F to the Contracting Officer, Contract Specialist, Facilities Service C and Performance Assessment Representative (PAR). Each deliverable email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel upon request for the duration of the contract.

2.6.5 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO two weeks in advance, affected tenants, and customers in accordance with local procedures and forms. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

2.6.6 NAVFAC MAXIMO MAXIMO is the Computerized Maintenance Management System (CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below:

2.6.6.1 MAXIMO Data Required data fields for work orders are indicated in the Service Provider Information provided in J-0200000-05. Required data for documenting condition assessments is indicated in the

Characteristic Meter Reading Information provided in J- 0200000-06.

Specified data shall be provided for all work performed in 1502000 Facility Investment.

The Service Provider, Asset, Specification, and Characteristic Meter Reading Interfaces are used in multiple processes for loading data into MAXIMO by the Government and the format may be updated periodically.

2.6.6.2 MAXIMO Method

of Data Entry

The Contractor shall provide data for NAVFAC MAXIMO using the method detailed below:

FLAT FILE: The Contractor shall electronically record and report compiled service performance data for exportation of work order, asset, specification, and condition assessment data to NAVFAC MAXIMO.

The Contractor shall submit work order and condition assessment data in a pipe delimited flat-file per Section F. Any failures in processing of the pipe delimited flat-file shall be corrected and resubmitted by the Contractor. In order to demonstrate the ability to properly format the pipe delimited flat-file, the Contractor shall provide a Sample Pipe Delimited Flat-file prior to contract performance per Section F.

2.6.6.3 MAXIMO Access (N/A)

2.6.6.4 MAXIMO Training (N/A)

2.6.7 Quality

Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein.

The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.7.1 Quality

Management (QM) Plan

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System (QMS)

• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work

• Documentation and records management

• Communication with government (customers)

2.6.7.2 Quality Inspection

and Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246- 4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

2.6.7.3 Quality Inspection

and Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.8 Property

Management Plan

The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.

2.6.9 System and

Equipment Replacement

The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site personnel performing work under this contract. The chart shall include names of personnel and their position title in this contract. Personnel to be included are: President/Owner, PM/QM/SSHO, and all Service Technicians that will be performing services under this contract.

Service Technician training/certification shall be included with the submittal of the key personnel information. Contractor shall clearly identify who each key person reports to.

Contractor personnel performing service under this contract shall be well versed in OSHA safety requirements and the Army Corps of Engineers EM385-1-1. Safety training certificates shall be included with the key personnel listing.

2.7.1.1 Project Manager

(PM)

The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within three (3) hours after the Government's regular working hours.

The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The Quality Manager shall be available on-site within three hours after the Government's request.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past, and have completed the OSHA 30-hour construction safety class or equivalent. The SSHO shall maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract.

Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.

2.7.2.1 Employee

Certification and Training

The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes.

Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.

2.7.2.2 Employee

Appearance

The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position.

The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.3 Employee

Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.4 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

2.7.2.5 Removal of

Employees

The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.6 Proof of Legal

Residency

No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is furnished per Section F.

2.8 Security

Requirements

Insert appropriate requirements, e.g., The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, position description/title. Supervisor and company.

2.8.2 Vehicles The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible.

All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.

2.8.3 Passes and

Badges

All employees shall have some type of identification showing their company affiliation, i.e. badge, clothing, etc.

DBIDS Program has been instituted for all new and existing vendors, suppliers, and contractors who require routine access to NSAM main installation. This program provides a standardized background screen, an identification badge and entry procedure that improves security while at the same time speeding up access. Participants in the DBIDS Program will enjoy significant advantages that will make it easier to go through the gate.

The DBIDS badge will be valid for twelve (12) months, as long as the badge holder has valid business on the facility.

Employees not registered in the DBIDS Program must submit written request with employee’s full name 48 hours in advance to access the facility.

The Contractor shall immediately report lost or stolen badges to the Contracting Officer. The Contractor is informed that security requirements frequently change and it is the Contractor’s responsibility to stay abreast of said changes.

The Contractor shall submit and update a list of personnel with DBIDS to the Contracting Officer. The Contractor shall be responsible for collecting badges from personnel no longer needing access to the Naval Support Activity Monterey.

For access to FNMOC, the Contractor shall complete and submit the FNMOC Visit Request & Visitor Clearance Information form to allow for 6-month access to the FNMOC.

The form must be completed and resubmitted again after 6 months for continued

2.8.4 Access to

Installation

All Contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS), or by obtaining passes each day from the Base Pass and Identification Office. There is no charge for DBIDS or one-day passes, issued through the Base Pass and Identification Office.

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards.

Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

2.8.4.1 DBIDS Program DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards.

Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

2.8.4.2 DBIDS Credentials Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:

https://www.cnic.navy.mil/om/dbids.html.

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

2.8.5 Access to

Buildings

The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .