About this file
This document is Amendment 7 to a state contract issued by the Ohio Department of Administrative Services (DAS), General Services Division, Office of Procurement Services. The primary contractor is ABM Electrical Power Solutions LLC, located in Cranberry Township, Pennsylvania, with subcontractors including Capital City Electric, Inc., Claypool Electric, Inc., Siemens Industry Inc., and Mid City Electric Company.
The contract covers switchgear preventive maintenance, testing, inspections, and repair services for eight state-owned buildings across Ohio, including facilities in Columbus, Cleveland, and Reynoldsburg. The amendment adds 8995 E. Main Street to the price schedule, clarifies transformer oil sampling and testing for the Rhodes Tower, and updates administrative details. The contract includes detailed pricing for various electrical equipment maintenance events at each location, with services performed on a periodic basis (typically every 36 months). Time and materials pricing is also established, with labor rates ranging from $165 to $297 per hour depending on the time of service, and a 10% markup on parts and materials. The contract is effective from March 1, 2025, with previous amendments extending and modifying the original agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CSP903721_Contract_Rev.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Index No.: DAS078 Contract No.: CSP903721 Eff. Date: 03/01/25
STATE OF OHIO
DEPARTMENT OF ADMINISTRATIVE SERVICES
GENERAL SERVICES DIVISION
OFFICE OF PROCUREMENT SERVICES
4200 SURFACE ROAD, COLUMBUS, OH 43228-1395
AMENDMENT FOR CHANGE
AMENDMENT NO. 7
TO: Ohio Department of Administrative Services (DAS), Office of Properties and Facilities
FROM: KATHLEEN C. MADDEN, DIRECTOR, DEPARTMENT OF ADMINISTRATIVE SERVICES
SUBJECT: CONTRACT FOR SWITCHGEAR PREVENTIVE MAINTENANCE, TESTING, INSPECTIONS AND REPAIR
SERVICES
Attached are pages 4-20 to this contract. Remove these pages from the existing contract and replace with the attached page s on the effective date.
This amendment is issued to rescind amendment 3, to clarify the Transformer Oil Sample and Testing for Rhodes Tower, to add 8995 E, Main to the Price Schedule, correct an administrative error, and to repaginate several pages.
All other prices, terms and conditions remain unchanged.
This Amendment, the main Requirements Contract and any additional amendments thereto are available from the DAS Web site at the following address:
http://www.ohio.gov/procure
Affected Contractor(s):
0000223690 ABM Electrical Power Solutions LLC 317 Commerce Park Drive Cranberry Township, PA 16066 Chris Tecca Christopher.Tecca@abm.com
Page No.: *4
**AMENDMENT 7
MUTUALLY AGREED TO CHANGES
I. TRANSFORMER OIL SAMPLE AND TESTING FOR RHODES TOWER
a. Oil Sampling Scope of Work: perform Oil Sampling on ten (10) Transformers at Rhodes Tower located at 30 E. Broad Street Columbus, Ohio.
ABM will provide equipment, supervision, and required work force to perform predictive and preventative maintenance services on all equipment as indicated on the attached “Equipment List”. All testing will be performed in accordance with the applicable NETA (InterNational Electrical Testing Association) Maintenance Testing Specifications, unless otherwise noted.
b. The project will be completed during normal business hours during a non-holiday work week.
c. Contractor may invoice for these, or similar services using the Time and Materials price schedule.
d. Oil Sample results to include:
i. Oil Quality Analysis Package Water in Insulating Fluids - ASTM D1533
ii. Interfacial Tension (IFT) - ASTM D971
iii. Acid Number - ASTM D974
iv. Color & Visual Examination - ASTM D1500/1524
v. Dielectric Breakdown - ASTM D1816
vi. Specific Gravity - ASTM D1298
vii. Power Factor @ 25o C - ASTM D924
viii. Dissolved Gas Analysis (DGA) - ASTM D3612-C
* Denotes repagination, per amendment 7.
**Denotes addition of oil testing specifications, per amendment 7.
Page No.: *5
FACILITY LOCATIONS
This Contract covers the following eight (8)* buildings:
Frank J. Lausche State Office Building 615 W. Superior Ave., Cleveland, Ohio 44113
Vern Riffe Center for Government & the Arts 77 S. High St., Columbus, Ohio 43215
James A. Rhodes State Office Tower 30 E. Broad St, Columbus, Ohio 43215.
North High Complex 246 N. High St.
Columbus, Ohio 43215
North High Complex 35 E. Chestnut, Columbus, Ohio 43215
25 S. Front St. Building 25 S. Front St., Columbus, Ohio 43215
4200 Surface Rd. Building 4200 Surface Rd., Columbus, Ohio 43228
8995 E. Main 8995 E. Main St., Reynoldsburg, Ohio 43068
Page No.: *6
PRICE SCHEDULE
RFP Title: Switchgear Preventive Maintenance, Testing, Inspections and Repair Services RFP Number: CSP906420
UNSPSC CATEGORY CODE: 81102402, 39121115, 72151500
FRANK J. LAUSCHE STATE OFFICE BUILDING:
BUILDING (CITY, STATE),
UNIT/PANEL: DESCRIPTION
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
Frank J. Lausche State Office Building (Cleveland OH)
MDPH Main Breaker - 480v 1600A NWH3 1 EVENT A; 1 per 36 months;
MDPH Sub Breakers - 480V 800A NWH3 25 MDPL Main Breaker - 208v/120v 3200A 1
Lausche Event A: TOTAL PRICE:
$ 6,237.00
MDPL Sub Breakers - 208v/120v 800A 19
EVENT B; 1 per 36 months;
EDP (480V 3 Phase 4 Wire Switch Board) PL800A 1
EDP (480V 3 Phase 4 Wire Switch Board) Switch Board Mounted Breakers JL 250A 12 ATS ATS Inspection, Mechanical, Electrical Tests 5 ATS ATS Disconnects 5
Lausche Event B: TOTAL PRICE:
$ 12,705.00
IR Scan of Facility Equipment, Annually:
The above set of listed electrical gear for Frank J.
Lausche Building (MDPH, MDPL, EDP, ATS) (set)
Normal Hours Schedule with Building; Annually; IR Scan of Facility Equipment, MCCT Starters and Disconnects 5 Electrical Panels 127 Disconnect Switches 29 Small Dry Transformers 0 - 200 KVA 13 VFDs 12
MOTORS 12
Fire Pump Controllers 1
Lausche IR Scan - TOTAL PRICE:
$ 13,860.00
Lausche Building: IR scan may be completed during normal working hours. DAS will supply one electrical technician to assist for up to 3 days.
Page No.: *7
PRICE SCHEDULE (Cont’d.)
UNIT/PANEL: DESCRIPTION
8995 E. Main Switchgear Preventive Maintenance, Testing, Inspections and Repair Services
Cost: Time & Materials
*Denotes repagination, per amendment 7.
** Denotes addition of 8995 E. Main Street to the price schedule, per amendment 7.
Page No.: *8
VERN RIFFE CENTER FOR GOVERNMENT & THE ARTS:
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
Vern Riffe Center for Government & the Arts (Columbus OH)
Generator Parrelling Gear Draw-Out Air Circuit Breaker- 5000A 1
EVENT A; 1 per 36 months;
Generator Parrelling Gear Draw-Out aAir Circuit Breaker - 3200A 3 Generator Parrelling Gear Draw -Out Air Circuit Breaker - 1600A 1 Russell Electric ATS's Inspection, Mechanical, Electrical, Clean 6 EDP -6M Draw Out Air Circuit Breakers 1600A(4), 2000A (1) 5
Vern Riffe Event A: TOTAL PRICE:
$ 10,395.00
Sub Station 6B Fused Load Break Switch 15KV 2
EVENT B; 1 per 36 months;
Sub Station 6B 14400 - 480V Dry Type Transformer 1000 KVA 1 B2 Medium Voltage Switchgear MV Vacuum Circuit Breaker GE Power Vac 7 B2 Medium Voltage Switchgear Time Current Relay 24 Substation B2C Switch Gear Line Up Fused Load Break Switch 15KV 2 Substation B2C Switch Gear Line Up Secondary Substation Transformer 2500KVA GE 1 Substation B2C Switch Gear Line Up Fused Load Break Switch 5KV1 1 Substation B2C Switch Gear Line Up Fused Load Break Switch 5KVA Chiller 1,2,3 3 Substation B2C Switch Gear Line Up Control Power Transformer 1 Sub Station B2B Fused Load Break Switches 15KV 2 Sub Station B2B 14400 - 480V Dry Type Transformer 2500KVA 1
Vern Riffe Event B: TOTAL PRICE:
$ 20,328.00
Sub Station T26 (32nd Floor) Low Voltage Switchgear Lineup - 480V AKD-8 1
EVENT C; 1 per 36 months;
Sub Station T26 (32nd Floor) Draw Out Air Circuit Breaker - 3200A - Tie Breaker 1 Sub Station T26 (32nd Floor) Draw Out Air Circuit Breaker - 1600A 6 Sub Station T26 (32nd Floor) Draw Out Air Circuit Breaker - 4000A Main 2 Sub Station B2B Draw Out Air Circuit Breaker 4000A Main 1 Sub Station B2B Low Voltage Switchgear Line up 480V 1 Sub Station B2B Draw Out Air Circuit Breaker 1600A 4 Dry Type Transformers 200 - 500KVA Inspection, Mechanical, Electrical, Clean 5
Vern Riffe Event C: TOTAL PRICE:
$ 8,316.00
Page No.: *9
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
Vern Riffe Center for
------ (CONTINUED)------
Substation 6A Low Voltage Switchgear Lineup - 480V AKD-8 1
EVENT D; 1 per 36 months;
Substation 6A Draw Out Air Circuit Breaker - 3200A - Tie Breaker 1 Substation 6A Draw Out Air Circuit Breaker - 2000A 2 Substation 6A Draw Out Air Circuit Breaker - 4000A Main 2 Substation 6A Draw Out Air Circuit Breaker - 1600A 7 Sub Station 6B Low Voltage Switchgear Lineup - 480V AKD-8 1 Sub Station 6B Draw Out Air Circuit Breaker 3200A Main 1 Sub Station 4 Low Voltage Switchgear Line up 480V 1 Sub Station 4 Draw Out Air Circuit Breaker - 3200A - Main 1 Sub Station 4 Draw Out Air Circuit Breaker - 1200A 3 Sub Station 4 Draw Out Air Circuit Breaker - 800A 1
Vern Riffe Event D: TOTAL PRICE:
$ 10,164.00
Sub Station T26 (32nd Floor) Fused Load Break Switch 15KV 4
EVENT E; 1 per 36 months;
Sub Station T26 (32nd Floor) 14400 - 480V Dry Type Transformer 2000 KVA 2 Substation 6A Fused Load Break Switches 15KV 4 Substation 6A 14400 - 480V Dry Type Transformer 2000 KVA 2 Sub Station 4 Fused Load Break Switches 15KV 2 Sub Station 4 14400 - 480 V Dry Type Transformer 2000 KVA 1 Spare Draw Out Air Circuit Breakers-Test, Clean, adjust 2000A 2 Spare Draw Out Air Circuit Breakers-Test, Clean, adjust 4000A 1 Spare Draw Out Air Circuit Breakers-Test, Clean, adjust 3200A 1 Spare Draw Out Air Circuit Breakers-Test, Clean, adjust 1600A 2
Vern Riffe Event E: TOTAL PRICE:
$ 17,787.00
Page No.: *10
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
Vern Riffe Center for
The above set of listed electrical gear for Riffe Center Building (Gen. Parall. Gear, Sub. St. T26, Sub. St.
6A, Sub. St. 6B, Sub. St. 4, B2 Med. Volt.
Switchgear, Sub. St. B2C Switchgear Line Up, Sub.
St. B2B, Dry Type Transform. 200-500KVA, Russell Elec. ATS’s, EDP-6M, Spare Draw Out Air Circuit Breakers) (set)
Normal Hours schedule with Building; Annually;
Fused Disconnects 300 Electrical Panels 200 Small Dry Type Transformers 0 - 200KVA 100 Motor Control Centers 10 Russell Electric ATS's 6 Inspection, Mechanical, Electrical, Clean 6 VFDs 50 Motors 0 - 200 KVA 100 800A 480V Pringle Switches 2
Vern Riffe IR Scan: TOTAL PRICE:
$ 32,670.00
Vern Riffe Tower: IR scan may be completed during normal working hours. DAS will supply one electrical technician to assist for up to 4 days. All Events at Saturday 6PM to Sunday 6AM windows.
Page No.: *11
JAMES A. RHODES STATE OFFICE TOWER:
BUILDING (Location), EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
James A. Rhodes State Office Tower (Columbus OH)
B-2 Gear, Main AEP feed 15 KV Vacuum Breakers, ITE 15HK 7 1 6PM-6AM Sat/Sun EVENT A;
1 per 36 months;
B-2 Gear, Main AEP feed Protection Relays Type IAC 24 B-2 Gear, Main AEP feed Protection Relays Type ICR 2 B-2 Gear, Main AEP feed Transformer 500 KVA 13.2KV to 480 V 1
Rhodes Event A: TOTAL PRICE:
$ 8,316.00
Sub Station #1 13.2 KV HV Switch 1
1 6PM-6AM
Sat/Sun EVENT B;
1 per 36 months;
Sub Station #1 13.2 KV to 480 V Transformer Liquid 1 Sub Station #1 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #1 Sub Breakers 480 V 0 - 2000 Amp (incl 1 spare) 12 Sub Station #1 Tie Circuit Breaker 480V 2001 - 4000 Amp 1 Sub Station #1 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #1 13.2 KV to 480 V Transformer Liquid 1 Sub Station #1 13.2 KV HV Switch 1
Rhodes Event B: TOTAL PRICE:
Sub Station #2 13.2 KV HV Switch 1
Sat/Sun Event C;
Sub Station #2 13.2 KV to 480 V Transformer Liquid 1 Sub Station #2 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #2 Sub Breakers 480 V 0 - 2000 Amp 10 Sub Station #2 Tie Circuit Breaker 480V 2001 - 4000 Amp 1 Sub Station #2 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #2 13.2 KV to 480 V Transformer Liquid 1 Sub Station #2 13.2 KV HV Switch 1
Rhodes Event C: TOTAL PRICE:
Sub Station #3 13.2 KV HV Switch 1
Sat/Sun Event D; 1 per 36 months;
Sub Station #3 13.2 KV to 480 V Transformer Liquid 1 Sub Station #3 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #3 Sub Breakers 480 V 0 - 2000 Amp 7 Sub Station #3 Tie Circuit Breaker 480V 2001 - 4000 Amp 1 Sub Station #3 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #3 13.2 KV to 480 V Transformer Liquid 1 Sub Station #3 13.2 KV HV Switch 1
Rhodes Event D: TOTAL PRICE:
Page No.: *12
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
James A. Rhodes State Office
Sub Station #4 13.2 KV HV Switch 1
Sat/Sun Event E;
Sub Station #4 13.2 KV to 480 V Transformer Liquid 1 Sub Station #4 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #4 Sub Breakers 480 V 0 - 2000 Amp 6 Sub Station #4 Tie Circuit Breaker 480V 2001 - 4000 Amp 1 Sub Station #4 Main 480V Circuit Breaker 2001 - 4000 Amp 1 Sub Station #4 13.2 KV to 480 V Transformer Liquid 1 Sub Station #4 13.2 KV HV Switch 1 Sub Station #4 K 4000 Main 480V Circuit breaker 4000 amp (spare) 1 Sub Station #4 K 3000 Main 240V Circuit breaker 3000 amp (spare) 1
Rhodes Event E: TOTAL PRICE:
Sub Station #5 13.2 KV HV Switch 1
Sat/Sun Event F (Sub Station #5) ;
Sub Station #5 13.2 KV to 208/120 V Transformer Liquid 1 Sub Station #5 Main 240V Circuit Breaker 2001 - 3000 Amp 1 Sub Station #5 Sub Breakers 240 V 0 - 2000 Amp 5 Sub Station #5 Tie Circuit Breaker 240V 2001 - 3000 Amp 1 Sub Station #5 Main 240V Circuit Breaker 2001 - 3000 Amp 1 Sub Station #5 13.2 KV to 208/120V Transformer Liquid 1 Sub Station #5 13.2 KV HV Switch 1
Rhodes Sub Station #5 only: TOTAL PRICE:
Page No.: *13
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
James A. Rhodes State Office
ATS (800A-2000A) Incl Fire Pump ATS Inspection and Testing ATS
1 6PM-6AM
Sat/Sun Event F; 1 per 36 months;
Rhodes “ATS (800A-2000A) Incl Fire Pump ATS” only: TOTAL PRICE:
$ 5,532.15
The above set of listed electrical gear for James A.
Rhodes Building (B-2 Gear main feed, Sub. St. 1, Sub. St. 2, Sub. St. 3, Sub. St. 4, Sub. St. 5, ATS Incl. Fire Pump ATS)
(set)
Normal Hours Schedule with
Building
MCC#1 Starters and Disconnects 3 MCC#2 Starters and Disconnects 17 MCC#3 Starters and Disconnects 10 MCC #4 Starters and Disconnects 10 MCC #5 Starters and Disconnects 8 MCC #6 Starters and Disconnects 12 MCC#7 Starters and Disconnects 10 Fused Disconnects 65 Elevator Control Cabinets and Transfmr 22 Electrical Panels 200 Small Dry Transformers 0 - 200 KVA 100 Motors 0 - 200 KVA 100 Fire Pump Controllers 2 VFDs 70
Rhodes IR Scan: TOTAL PRICE:
$ 41,580.00
Rhodes Tower: IR scan may be completed during normal working hours. DAS will supply one electrical technician to assist for up to 4 days. Spares are included with the substations.
Eff. Date: 01/01/25 Page No.: **14
NORTH HIGH COMPLEX:
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
N.H. Complex: 246 N. High St. (Columbus OH) SQD Main Switch Gear 15KV Primary Switch F201/F203 2 1 6PM Sat to 6AM
Sunday Event A; * 1 per 36 months;
SQD Main Switch Gear 1200 Amp Main Breakers 2 SQD Main Switch Gear Common Metering Section 2
N.H. Complex: 246 N. High St. “SQD Main Switch Gear” only: TOTAL PRICE:
$ 4,158.00
Sub Station 1 SQD 13,200V Square D 15KV HVL Switch 1
1 6PM Sat to 6AM Sunday Event A; * 1 per 36 months;
Sub Station 1 SQD 13,200V 1500 KVA Dry type transformer 13.2 KVY-480v/277v 1 Sub Station 1 SQD 13,200V 1 QED Switch Board 2500 Amp, Containing power pact RJ2500circuit breaker equipped with Micro Logic
6.0 trip unit
Sub Station 1 SQD 13,200V 2 QED Switch Board 1600 Amp, containing Power Pact RJ 1600circuit breaker equipped with 6.0 Micro Logic trip unit
Sub Station 1 SQD 13,200V (4) SQD LJ 600 Micrologic 3.3, (1) PJ1200 micrologic
6.0 5
Sub Station 1 SQD 13,200V (1) Square D 100A, (1) Square D 150A 2
N.H. Complex: 246 N. High St. “Sub Station 1 SQD 13,200V” only: TOTAL PRICE:
$ 6,006.00
SQD HV SWITCHES (2) 13.2KV HV
1 6PM Sat to 6AM Sunday Event A; * 1 per 36 months;
N.H. Complex: 246 N. High St. “SQD HV SWITCHES” only: TOTAL PRICE:
Automatic Transfer Switches 600A Kohlor ATS Inspect, Mechanical, Testing, Clean 1 1 6PM Sat to 6AM
Sunday Event A; * 1 per 36 months; Automatic Transfer Switches Fire Pump Controller & ATS (Firetrol) 1
N.H. Complex: 246 N. High St. “Automatic Transfer Switches” only: TOTAL PRICE:
The above set of listed electrical gear for 246 N. High St. Building (SQD Main Switch Gear, Sub St. 1, SQD HV SWITCHES, Auto. Transfer Switches)
(set)
Normal Hours Schedule with
Building IR Scan of Facility Equipment, Dry type transformers 0-200 KVA 17 Electrical Panels 85 Fused Disconnects (Including elevator rooms) 64 VFD's 13 Elevator Room Dry Type Transformers 8
N.H. Complex: 246 N. High St. NETA MTS IR Scan: TOTAL PRICE:
$ 5,000.00
N.H. Complex: 246 N. High St.: IR scan may be completed during normal working hours. DAS will supply one electrical technician to assist for up to 4 days covering 246 N. High St. and 35 E. Chestnut St., combined.
* There will be one 6PM Sat to 6AM Sunday Event A covering 246 N. High St. and 35 E. Chestnut St., combined.
** Denotes repagination, per amendment 7.
Page No.: **15
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
N.H. Complex: 35 E. Chestnut St. (Columbus OH) SQD Switchboard MSB (480/277V) 400 Amp meter section (AEP utility owned) N/A SQD Switchboard MSB (480/277V)
1600 Amp Main #1 molded case circuit breaker (PSB) 1 1 6PM Sat to 6AM
Sunday Event A; *
SQD Switchboard MSB (480/277V)
600 Amp Main #2 molded case circuit breaker
(BTSB) 1
SQD Switchboard MSB (480/277V) 1600 Amp Main #3 molded case circuit breaker (#3) 1
N.H. Complex: 35 E. Chestnut St. “SQD Switchboard MSB (480/277V)” only:
TOTAL PRICE:
$ 4,175.00
PSB Switchboard SQD MJ600A 1 1 6PM Sat to 6AM
Sunday Event A; * 1 per 36 months; PSB Switchboard PJ800A 3 Micrologic 6.0 1
N.H. Complex: 35 E. Chestnut St. “PSB Switchboard” only: TOTAL PRICE:
Automatic Transfer Switch Kohler 600A Inspect, Mechanical, Testing, Clean 1
1 6PM Sat to 6AM Sunday Event A; * 1 per 36 months;
N.H. Complex: 35 E. Chestnut St. “Automatic Transfer Switch” only: TOTAL PRICE:
The above set of listed electrical gear for 35 E.
Chestnut St. Building (SQD Switchboard MSB, PSB Switchboard, Auto. Transfer Switch) (set)
Normal Hours Schedule with
Building
Fire Pump Breaker-1200Amp 1 IR Scan for dry type transformers 0-200 KVA 17 IR Scan for electrical panels 64 Fused disconnects (Including elevator rooms) 34 Small dry type transformers 6
MCC1 6
MCC2 7
EMCC1 6
VFD's 27 Motors 9
N.H. Complex: 35 E. Chestnut St. IR Scan: TOTAL PRICE:
$ 5,000.00
N.H. Complex: 35 E. Chestnut St.: IR scan may be completed during normal working hours. DAS will supply one electrical technician to assist for up to 4 days covering 246 N. High St. and 35 E. Chestnut St., combined.
* There will be one 6PM Sat to 6AM Sunday Event A covering 246 N. High St. and 35 E. Chestnut St., combined.
** Denotes repagination, per amendment 7.
Page No.: *16
25 SOUTH FRONT STREET BUILDING:
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
25 S. Front St. Building (Columbus OH) Main Switchgear SQD Bolt Lock
4000 Amp Bolted Pressure Contact Switch with Powerlogic monitoring and ground fault relay 1
One 6AM to 6PM Sat. Event A;
1 per 36 months;
Main Switchgear SQD Bolt Lock SQD Bolted Pressure Contact 2000A (1), 1200A (2) 3 Main Switchgear SQD Bolt Lock SQD Fused Disconnects (100A-400A) 17 Main Switchgear SQD Bolt Lock ATS (150A, 250A) Cummins ONAN 2
25 S. Front Street Event A: TOTAL PRICE:
$ *6,237.00
The above set of listed electrical gear for 25 S. Front St. Building (Main Switchgear SQD Bolt Lock) (set)
Normal Hours Schedule with Building
Starters and Disconnects IR Scan-MCC 1 28 Fused Disconnects 63 Electrical Panels 61 Small Dry Transformers 0 - 200 KVA 22 Motors 0 - 200 HP 50
25 S. Front Street NETA MTS IR Scan: TOTAL PRICE:
$ *12,210.00
25 South Front Street Building: IR scan may be completed during normal working hours.
DAS will supply one electrical technician to assist for up to 2 days.
**Denotes correction of transposed Event A & IR Scan costs, per amendment 7.
Page No.: *17
4200 SURFACE ROAD BUILDING:
EQUIPMENT
QUANTITY
EVENT;
FREQUENCY; and
PRICE;
4200 Surface Rd. Building (Columbus OH) Sub Station #1 & 2 ATS 13.2 KV HV Switch Outdoor 2
One Saturday Event A;
1 per 36 months;
Sub Station #1 & 2 ATS GE 13.2 KV to 480V, 2500KVA Dry Transformer 1 Sub Station #1 & 2 ATS GE Main 480V Molded Case Wave Pro Main Circuit
Breaker 3200 Amp 1 Sub Station #1 & 2 ATS GE 480V Molded Case Wave Pro Sub Breakers 600
Amp (2), 2000 Amp (1) 3 Sub Station #1 & 2 ATS ATS Units Inspection Mechanical, Electrical Testing, Cleaning Kohlor GLS and ASCO 7000 2 Sub Station #1 & 2 ATS Dry Transformer 225 KVA (megger test) 480V
208/120V 1
4200 Surface Road Event A: TOTAL PRICE:
$ 6,237.00
The above set of listed electrical gear for 4200 Surface Rd. Building (Sub St. #1 & 2 ATS) (set)
Normal Hours Schedule with
Building
Boiler Rm Motor Starters and Disconnects 2 Electrical Panels 59 Small Dry Transformers 0 - 200 KVA 20 Large Dry Transformers 200 KVA 1 Motors 0 - 200 KVA 2
4200 Surface Road NETA MTS IR Scan: TOTAL PRICE:
$ 6,270.00
4200 Surface Road Building: IR scan may be completed during normal working hours.
DAS will supply one electrical technician to assist for up to 2 days.
Page No.: *18
TIME AND MATERIALS PRICING:
If the need arises for repair, replacement, modification, or third-party testing or analysis of any of the components, and the Agency approves the Contractor to complete these repairs, replacements, or modifications, the Contractor may bill the Agency Time and Materials Pricing at the following rates, pricing, and markup. No additional charges will be allowed under this Contract for Time and Materials Pricing. *
RATE CATEGORY
PRICE
Labor Hourly Rate (Regular Business Hours) M-F between 8:00AM– 5:00PM
$ 165.00 / HR
Labor Hourly Rate (Non Business Hours) M-F 5:00PM – 7:00AM, and Weekends
$ 231.00 / HR
Labor Hourly Rate (State Holidays)
$ 297.00 / HR
Labor Hourly Rate (Emergency Service)
$ 231.00 / HR
Parts, Materials, third-party testing, or analysis will be at Contractor’s cost, as invoiced by its supplier (Invoice Cost) plus the Mark-Up Percentage provided.
The Contractor must include its invoice for any parts, materials, testing, or analysis billed to the Agency. *
10% above cost
Engineer Labor Rate – for performing Arc Flash Study, testing & analysis, and maintenance only. $ 175.00 / HR
NOTES:
Guarantees: All on site cleaning, maintenance & testing of electrical shall be guaranteed for their professional quality & standards.
All costs must be in U.S. Dollars;
The State will not be responsible for any costs not identified;
There will be no additional reimbursement for travel or other related expenses;
Index No. DAS078 Eff Date: 03/01/25 Page *19
CONTRACTOR INDEX
CONTRACTOR AND TERMS: CONTRACT NO.: CSP903721-1
0000223690 ABM Electrical Power Solutions LLC TERMS: 2%10, Net 30 Days 317 Commerce Park Drive Cranberry Township, PA 16066 DELIVERY: As Specified
CONTRACTOR’S CONTACT:
Chris Tecca Office: (724) 900-8716
E-mail: Christopher.Tecca@abm.com Fax: (724) 772-6003
Cell: (216) 317-2444
SUBCONTRACTOR:
Capital City Electric, Inc.
Claypool Electric, Inc.
Siemens Industry Inc.
Mid City Electric Company mailto:Christopher.Tecca@abm.com
Index No. DAS078 Eff Date: 03/01/25
SUMMARY OF AMENDMENTS
Amendment Number
Effective
Date
Description
7 03/01/25
This amendment is issued to rescind amendment 3, to clarify the Transformer Oil Sample and Testing for Rhodes Tower, to add 8995 E, Main to the Price Schedule, correct an administrative error, and to repaginate several pages. All other prices, terms and conditions remain unchanged.
6 12/23/24 This amendment is issued to correct an administrative error.
5 12/12/24
This amendment is issued to add sub-contractors; Claypool Electric, Inc., Siemens Industry Inc., and Mid City Electric Company effective with all orders issued on or after 10/01/24. All other prices, terms and conditions remain unchanged.
4 10/01/24
This amendment is issued to notify that as a result of mutual agreement between the State of Ohio and the Contractor, this contract is renewed for an additional 24 months, effective 10/01/24 through 09/30/26. Additionally, this amendment is issued to add sub-contractor Capital City Electric, Inc, and to update the Price Schedule, effective with all orders issued on or after 10/01/24. All other prices, terms and conditions remain unchanged.
3 06/10/24
This amendment is issued to advise of the addition of Transformer Oil Sample and Testing for Rhodes Tower, addition of 8995 E. Main location, addition of Engineer Labor Rate, change in column formats, and change in Time and Material Pricing changes, effective for orders issued on or after 06/10/24, as indicated herein. All other prices, terms and conditions remain unchanged.
2 10/01/23
This amendment is issued to renew the subject contract an additional twelve
(12) months, effective 10/01/23 through 09/30/24, as a result of mutual agreement between the State of Ohio and the Contractor.
Additionally, this amendment is issued to include updated language regarding the Prohibition of the Expenditure of Public Funds for Offshore Services, and advise of change in Contractor’s Contact Person, as indicated herein.
All other prices, terms and conditions remain unchanged.
1 02/22/22 This amendment is issued to notify of the removal of Oliver Ocasek Government Office Building effective 03/02/22 at 11:59:59 p.m.
All other prices, terms and conditions remain unchanged.
HIRE DEI
| CONTRACTOR INDEX |
| SUMMARY OF AMENDMENTS |
File details come from the government source that posted it. Updated .