Crane_Project_Requirements_FRA-665-3.pdfCrane_Project_Requirements_FRA-665-3.pdf
PDF 377 KB Posted
- Attached to
- D06 - Crane Services Darydale OH - RFQ-2141
- Solicitation number
- SRC0000042327
- Issued by
- Franklin County, Ohio
About this file
This is a Crane Project Requirements document for the State of Ohio, specifically for crane services needed in Darydale, Ohio under RFQ-2141. The project requires crane and operator rental with a working radius sufficient to set reinforced concrete pipe (72" diameter) sections weighing approximately 15,000 lbs each into a 30-foot-wide trench extending 25 feet from the centerline of the road in each direction. The crane must have an approximate 65-foot working radius (center to center) with its rotation center positioned 25 feet west of the trench cut line, adjustable as needed. The project is located at approximately 6821 London Groveport Rd, Grove City, OH 43123, with the crane required to arrive from the west. Services must be ready to commence by 9:00 AM on or around October 23, 2026, with an estimated job duration of at least 12 hours, though actual time may vary. Contractors should contact Sam Morrison at 740-833-8023 to confirm the exact date and coordinate logistics.
The scope of work includes mobilization and demobilization of the crane, trucks, and personnel, as well as fuel and support equipment. The crane must be capable of lifting culvert sections over a communication utility line, necessitating careful coordination and clearance management. Pricing terms, specific funding sources, set-asides, and contract renewal options are not detailed in this requirements document. Prospective bidders should note the specific operational constraints and coordination requirements with project management prior to submitting proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Crane and operator rental. Crane must have a working radius sufficient to set concrete pipe to the middle of a 30' wide trench, that extends 25' from the centerline of the road in each direction. Setting reinforced concrete pipe (72”) with each sections weighing approximately 15,000 lbs. and an approximately 65' working radius center to center. This radius assumes the cranes rotation center is 25 feet west of the trench cut line, adjust as needed.
Mobilization & Demobilization of crane, trucks and personnel, fuel, support equipment. Ready to set pipe by 9am on or around October 23, 2026. Please estimate at least 12 hours, job time can vary. Please work with Sam Morrison for exact date, phone number 740-833-8023
Crane must lift culvert sections over a communication utility line.
The project address is approximately 6821 London Groveport Rd, Grove City, OH 43123.
Crane must arrive from the west.
File details come from the government source that posted it. Updated .