CR Roadway Surfacing FY20.doc
DOC document 28 KB Posted
- Solicitation number
- 140F0420Q0187
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Barnes Lake Road.pdf | ||
| Biscoe Road System.pdf | ||
| Sol_140F0420Q0187.pdf | ||
| CR Gravel FY20 SOW.docx | DOCX document | |
| Aggregate Specs (1).doc | DOC document | |
| Nall Tract Road.pdf | ||
| Holder Tract Road.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEQ CHAPTER \h \r 1ROADWAY SURFACING MATERIAL
1. Station: _Cache River NWR
Date:_6/10/2020 Contacts: Jonathan Windley, Cache River NWR_ Telephone No.:_870-919-6931
2. Material Description (i.e., gravel, aggregate, etc.): Class 7 Gravel
3. Specification Section/Paragraph/No. (Reference applicable State
Department Standard and Specification, if known):
_ Table 303-1 Aggregate Base Course Grading and crushing requirements page 186 of Standard Specifications for Highway Construction Arkansas State Highway and Transportation Department. __________
4. Total Tons/Yards Required: Approximately 5,000 ton. Tons will adjusted based on available funding amount as specified in contract._____
5. Check one or more: ____ Stock Piled (spot dumped)
__X___ Tail Gate Spread Thickness: __6”__
6. Maximum/Minimum Amount to be delivered daily: _15 loads minimum per day.__
(Insert number of truck loads per day)
7. Attach a delivery and/or local site map. (See Attached)
8. Are there State certified scales in the area? __X__ Yes ____ No
NOTE: If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.
9. Required commencement date for delivery: August 1, 2020
10. Last date for delivery: _July 31, 2021__
11. Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.) that may affect delivery: __None______
The following shall be attached to the acquisition request:
(A) A completed Roadway Surfacing Material Form
(B) Applicable Map
(C) List of suggested vendors with names, addresses and phone numbers
Then forward the acquisition package to:
(1) Appropriate Regional Office Supervisor
Contracting and General Services
File details come from the government source that posted it. Updated .