This is an Environmental Management Permit issued by the City of Tallahassee Growth Management Department for the Old St. Augustine Sidewalk Improvements project located at 1457 Old St. Augustine Road in Leon County, Florida. Permit No. TEM240071 was issued on November 24, 2025, and expires on November 24, 2028. The project encompasses sidewalk and boardwalk construction with associated improvements including driveway work, regrading, and culvert extension along Old St. Augustine Road in two separate locations. The permit requires multiple pre-construction activities including a mandatory pre-construction conference (to be scheduled at least 48 hours in advance), submission of a Notice of Intent to Proceed (at least 24 hours before development activity begins), designation of a qualified Stormwater and Erosion & Sediment Control Officer, and approval of all required easements. Environmental Inspector James Payne (850-891-7167) oversees the project. The permit includes requirements for stormwater management, tree protection and removal, landscape compliance, and erosion and sediment control measures.
Special conditions require identification of a staging and stockpile area during the pre-construction conference, implementation of an arboricultural mitigation plan under a certified arborist's direction, and compliance with ADA accessibility standards for sidewalk slopes and ramp design. All tree roots greater than one-half inch in diameter must be clean-cut and hand-pruned with prompt backfilling. The applicant must submit all required right-of-way and temporary construction easements at the pre-construction meeting, including easements between stations 34+80 and 37+00. Final closeout requires submission of as-built drawings, compliance reports certified by the Engineer of Record, post-construction tree surveys, infiltration rate data, executed easement copies, and documentation of all stormwater facility modifications. The project must receive approval of the final environmental inspection prior to certificate of occupancy release.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENVIRONMENTAL
MANAGEMENT PERMIT
PERMIT EXHIBITS: _ A Approved Site Plans
__B__ Special Conditions that Apply to this Permit
_____ Other: ___________________________________________________
REQUIREMENTS: __X__ Pre-Construction Conference _____ Conservation Easements
__X__ Notice of Intent Form _____ Drainage Easements
__X__ Stormwater Control Officer Form __X__ NPDES/CGP
_____ Stormwater Facility Operating Permit _____ State ERP
__X__ Compliance Report & Record Drawings
The application for this permit has been examined and approved as consistent with the City of Tallahassee Land Development
Code. This permit is issued upon the condition that the applicant will procure and comply with all other necessary
Federal, State, and Local permits as well as all conditions listed on the back of this placard. Failure to comply with this condition shall be a violation of the Land Development Code. Failure to conform to the terms and conditions of this permit shall constitute a violation punishable according to law.
Failure to post this permit in a conspicuous place on-site or failure to have the approved plans available on-site may result in the immediate issuance of a stop-work order. Permits may be extended beyond, or expire prior to the above indicated expiration date. The actual expiration date shall be determined in accordance with Ordinance No. 90-0-0044AA.
See Reverse Side for Conditions
Permit #:
Parcel Tax ID#(s):Project Name:
Location:
Permittee Name:
Agent:
Date Issued:
Expiration:
Extended Date:
Extension No.:
Inspector:
Phone #:
Phone #:
PERMIT INCLUDES THE FOLLOWING COMPONENTS:
Stormwater: Tree Protection & Removal: Landscape:MINOR NY
TEM240071
Old St. Augustine Sidewalk Improvements
1457 OLD ST AUGUSTINE RD, APT 3
LEON COUNTY
11/24/2025
11/24/2028
James Payne
(850) 891-7167 0
Erosion & Sediment Control: Y
Cell #:
Email:
Attachment #23
This permit is subject to conditions as set forth in the Tallahassee Land Development Code and includes, without limit , the following:
1. This permit shall be posted in a conspicuous place on-site and remain in place at all times during the development activity. It should be protected from the elements, including rainfall and remain visible.
2. A copy of the approved plans shall be available on the site at all times during the development activity .
3. A notice of intent to proceed shall be filed with the Land Use and Environmental Services Division of the Growth
Management Department at least 24 hours (see special conditions if more than 24 hours is required) prior to initiation of development activity. Notice shall be in writing. Notices received on Fridays will be for activity started on the following Monday or Tuesday if Monday is a legal holiday.
4. A list of the names of the individuals who are in responsible charge of the ongoing work shall be prepared and one or more of the persons listed shall be on-site whenever work is occurring. The list shall be maintained current , protected from the elements, and posted next to the permit and be easily read.
5. Erosion prevention and sediment control measures more extensive than shown on these plan (s) may become necessary for this project during construction.
6. For all projects, unless otherwise indicated as special conditions, the following conditions apply:
a. A pre-construction conference is required prior to start of any development activity. This conference must be scheduled at least 48 hours (2 business days) in advancewith the Environmental Inspector. (See attached
Pre-Construction Meeting Request Submittal Requirements).
b. The Stormwater Officer Form which includes the name and local telephone number of the stormwater management control officer for the development activity shall be submitted prior to scheduling the
Pre-Construction Meeting. This form must be posted next to the permit, maintained current, protected from the elements, and be easily read.
c. A vegetation control inspection and an inspection of the erosion and sediment controls in place are required .
Schedule this inspection at least 24 hours in advance. Inspections are made Monday through Friday, excluding holidays.
7. If prehistoric or historic artifacts, such as pottery or ceramics, stone tools, metal implements, dugout canoes or any other physical remains that could be associated with the Native American Cultures or early colonial or American
Settlement are encountered at any time within the project site area, the permitted project shall cease all activities involving subsurface disturbance in the immediate vicinity of such discoveries. The permittee or designated representative shall contact the Florida Department of State, Division of Historical Resources, review and
Compliance Section, at (850) 245-6333 or (800) 847-7278, as well (as appropriate) Leon County Environmental
Services/the City of Tallahassee Growth Management Department. Project activities should not resume without a written authorization from the Division of Historical Resources. In the event that unmarked human remains are encountered during permitted activities, all work shall stop immediately, and the proposed authorities notified in accordance with Section 872.05, Florida Statutes.
If the property owner feels that this order is unreasonable or unfairly burdens the use of his /her land, he/she may apply to the City of Tallahassee within 30 days of the receipt of this order under Sec. 70.51, Florida Statutes, the Florida Land
Use and Environmental Dispute Resolution Act. The request for relief should be filed with the City Attorney, 300 S.
Adams St., Tallahassee, FL, pursuant to City Commission Policy 414CP, which is available online at talgov.com under the Treasurer-Clerk’s website, or by calling the City Attorney’s Office at (850) 891-8554
CONDITIONS OF THE PERMIT
"EXHIBIT B"
SPECIAL CONDITIONS
OF PERMIT NO. TEM240071
Old St. Augustine Sidewalk Improvements
This Permit is subject to conditions as set forth in the Tallahassee Land Development
Code (TLDC) and includes the following Special Conditions (refer to the reverse side of the
Permit for standard conditions that apply to all permits):
GROWTH MANAGEMENT DEPARTMENT
DIVISION OF LAND USE & ENVIRONMENTAL SERVICES
All other applicable permits must be obtained before commencement of the development.
A staging and stockpile area shall be identified during the preconstruction conference, and a separate environmental management permit may be needed for offsite laydown area.
All tree roots greater than ¾ inch diameter shall be clean-cut and hand pruned and backfilled with soil promptly
The proposed sidewalk and boardwalk shall comply with ADA accessibility requirements for maximum allowable slopes and ramp design. Any segment exceeding 5% longitudinal slope shall be designed and constructed in accordance with ADA ramp standards (maximum 8.33% slope for up to 30 feet, with required level landings and handrails as applicable). The applicant shall ensure that all transitions, including the alternative sidewalk detail over tree roots, provide sufficient horizontal distance to maintain the maximum allowable grade and meet
ADA standards.
It was stated that all R/W and temporary construction easements have been acquired, except for the R/W between Sta. 34+80 and 37+00. However, none of these documents have been provided. Make sure that all required easements are submitted at the pre-construction meeting.
Implement the arboricultural mitigation plan under the direction of a certified arborist on site during mitigation. Describe the mitigation measures performed in the landscaping compliance report at the end of the project for successfully mitigated trees.
Pre-Construction Meeting Request
Submittal Requirements
ALL ENVIRONMENTAL PERMITS REQUIRE A PRE-CONSTRUCTION CONFERENCE.
(This also applies to demolition permits and permit waivers.)
To ensure a smooth start please remember the following:
1. To request for preconstruction conference, you will need to create a new application for EMP-
PreConstruction through the online customer permitting portal and upload the following documents:
a) Notice of Intent to Proceed
b) Stormwater, Erosion & Sediment Control Officer Designation Form. One each required for Site
Contractors AND General/Building Contractor.
c) Copy of Northwest Florida Water Management District Environmental Resource Permit or
Exemption Letter.
d) Copy of NPDES Notice of Intent (if site is larger than 1 acre).
- The department will review all submitted documents and respond with correction comments or approval within 7 days of all documents being received.
- Once the submission has been approved the applicant will be notified via a system email and at that time you will go into the customer permit portal to select a date and time from the available slots.
2. Permit plans and all permit attachments are required to be posted on-site and available at all job sites. The Standard Conditions and any Special Conditions issued with the permit must be included.
Preconstruction conferences will not be scheduled until the required documents are received.
If you have any questions about these requirements, please contact the Environmental Inspector noted on your permit documents.
Submittal Requirement Guidelines For Requesting
The Final Environmental Inspection
Submittal of closeout documents is now an online process. Approximately TWO WEEKS prior to requesting the Final Environmental Inspection please create a new application for
EMP-Closeout through the online customer permitting portal for access to upload the closeout documents listed below.
NOTE: The project must receive approval of the final environmental inspection prior to release of a certificate of occupancy.
• As-builts/Record Drawings - including the following information (as applicable):
• Finished Floor Elevations - All buildings
• Detail of the pond control structure - (structure type, size and invert of all pipe, orifices, and weirs, invert of connection at off-site conveyance system, grates and skimmers)
• Sand filter construction details - (show inverts and sizes of under drain pipe at each cleanout)
• Pond construction details - (Show topography, top of berm/wall and bottom elevations, sand filter location)
• Show entire stormwater conveyance system (size, type and invert of all pipes, channels, roof drain systems, structures, curbing, and spot shot elevations in vehicle use areas)
• Show all sidewalks and vehicle use areas
• Show all traffic control devices (signs, signals, parking striping and pavement markings)
• Post Development site data table - impervious area, urban forest area, green space area, number of parking spaces, etc
• Post construction tree survey (show location, size, species of all urban forest and replant trees, and irrigation systems)
• Delineate conservation and drainage easement boundaries and label with the OR (Official Record) book and Page number
• Compliance Report - Prepared based on the Record Drawings and Certified by the Engineer of Record
• Engineer’s statement that project is consistent with permit as required in LDC 5-62(4)
• Discuss reason and nature of all permit non-compliance or deviations
• Address protected tree removal not authorized by the permit
• Identify any modifications required to bring project into compliance with approved plan
• Provide Arborist or Landscape architect report on tree mitigation if applicable .
• Provide a post construction tree preservation and replant credit schedule
• Report as-built Pond Storage and Treatment volumes
• Retention Ponds - Report the following:
• Design infiltration rate _______
• Actual infiltration rate _______ (Provide certified supporting test data)
• Easements - Provide copies of all executed and recorded conservation, and drainage easements
• Stormwater Management Facility (SWMF) Operating Permit - For Projects that utilize an existing master SWMF, an updated capacity accounting record is required with the compliance report. Projects with new or modified stormwater ponds require a new Operating Permit. Provide the operating permit number in the Compliance Report.
To Whom It May Concern:
The City of Tallahassee pursuant to Chapter 556, Florida Statutes
(2003), the “Underground Facility Damage Prevention and Safety Act,” will continue to locate only the City’s utilities in response to a location request received from Sunshine State One-Call of Florida, Inc.
Specifically, this means that you, the excavator digging in the City’s right-of-way, are responsible for locating and avoiding all private utility laterals in that right-of-way. The City does not locate private lines or any utility lines belonging to any other member-operator, as Chapter
556, F.S. defines those entities. The location of private utility laterals is your responsibility.
Should your excavation efforts result in the cutting or breaking of any private utility lateral, you are responsible for repairing that lateral or reimbursing the private owner for any reasonable repair costs incurred in repairing any cut utility lines caused by your excavation efforts. In instances of clear fault, your failure to promptly address these matters may impact your later ability to secure a permit for future excavation in the City’s right-of-way.
The City of Tallahassee appreciates your efforts to use reasonable care in digging in the City’s right-of-way.
STORMWATER, EROSION & SEDIMENT CONTROL OFFICER
DESIGNATION FORM
Prior to commencement of construction, the property owner (permittee) shall designate an Erosion and
Sediment Control Officer (Control Officer) for the duration of the project. The Control Officer shall be qualified through the Florida Department of Environmental Protection Stormwater Erosion and Sediment Control Inspector
Training Program. The Control Officer shall have adequate authority within the project administration to ensure that erosion and perimeter sediment controls are properly installed and maintained in a manner that will manage stormwater runoff, control erosion, and contain sediment on-site.
The permittee and the control officer shall be thoroughly familiar with the Florida Stormwater Erosion and
Sediment Control Inspector Manual, the Sediment and Erosion Control Standards presented in Section 5-88 of the Tallahassee, Land Development Code, and City Commission Policy 417 - Stormwater, Sediment and Erosion
Controls.
Changes in ownership or control officer must be provided in writing to the City of Tallahassee Environmental
Inspector on a new Designation Form within 24 hours or change. Failure to notify Growth Management Could result in a "Stop Work Order".
Owner hereby designates the following individual as the Erosion and Sediment Control Officer.
Project Name:
Property Owner (Permittee):
Property Owner E-Mail Address:
Property Owner 24-Hour Telphone Number:
Control Officer Name:
FDEP Inspector Number:
E-Mail Address:
24-Hour Telephone Number:
TEM Number:
I acknowledge the requirements within this document and accept the responsiblities required.
Signature of Property Owner: Date:
Signature of Control Officer: Date:
LAND USE AND ENVIRONMENTAL
SERVICES DIVISION
WE INTEND TO START DEVELOPMENT ACTIVITY
ON _________________ AT _______:_______ am/pm
� We understand an Environmental Resource Permit (ERP) must be secured from the Northwest Florida
Water Management District or FDEP, as applicable. This project is covered under ERP or Exemption #
� We understand a NPDES - Construction General Permit (CGP) must be secured for construction site that disturbs one acre or more. Is this project one acre or larger _________(yes/no)? If yes, coverage has been secured and is provided under the CGP, NOI #___________________
� Note; Failure to provide the above permit numbers will delay start of development activity.
� We understand a pre-construction conference with the City Growth Management Inspector is required prior to beginning development activity. This conference must be scheduled at least 48 hours in advance and prior to filing this Notice of Intent to proceed form.
� We understand that perimeter sediment controls and tree protection barricades must be installed as presented on the approved plans and inspected by the City Growth Management Inspector before proceeding with other clearing or development activities. A maximum of a 10-foot-wide strip may be cleared for placement of control measures.
Signature of Owner or Duly Authorized Agent Date
(Provide Owners Affidavit For Agent)
Printed Name and Title of Above Signee
NOTICE OF INTENT TO PROCEED
Date: __________________
Owner Info: _______________________________________________
ATTN: James Payne, Environmental Inspector