BARGE CRANE SERVICE

This work item describes the requirements for the Contractor to provide a barge crane to remove equipment from and to the Coast Guard Barge and Tender.

Project Manager:

Mr. James Tepen Industrial Detachment Supervisor* Office (314) 771-6044 x 2103

Cell (314) 565-8893 Fax (314) 771-6269 *Visits for possible estimates must be scheduled with the Industrial Detachment Supervisor Dockside Location: CG Schlimme Industrial Facility

100 Arsenal Street Building 17 St. Louis, MO 63118 Location Work Hours:

0700 – 1500 (All work outside of these hours requires advanced approval from the Project Manager)

Vessel: USCGC MUSKINGUM (WLR 75402)

Homeport: Sallisaw, OK.

POC: MKC Austin Brummett or Cutter Representative* (918) 775-4471

*Schedule visits for possible estimates with POC and project manager listed below.

Remove Equipment: 18 Apr 2023 (8:00 am – 1:00 pm) Reinstall Equipment: 31 May 2023 (8:00 am – 1:00 pm)

NOTE

Crane must be capable of mooring outboard of the USCG cutter, hoisting 10000 lbs and lowering it onto the USCG pier. Approximately 80’ lift and 70’ outreach

1. SCOPE

1.1 This work item describes the requirements for the Contractor to remove and reinstall the following equipment:

· 1ea Appleton Crane, KB20-10-50 Boom

12000lbs

2. REQUIREMENTS

2.1 General. The Contractor shall provide a barge crane with sufficient lifting capacity for the above listed equipment for a minimum period of five (5) hours on the dates specified above. Positioning of the Barge crane shall be outboard of the Coast Guard Barge and the Appleton Crane boom shall be hoisted approximately 80’ to the main pier, approximately 70’ outreach. Prior to equipment removal and following equipment reinstallation contractor shall move various tools to and from main pier to floating pier and Coast Barge.

2.2 Equipment Removal. The Contractor shall lift equipment from the Coast Guard Barge to the main pier (approx. 80 feet above floating pier & 70 feet from centerline of the contracted floating crane) using lifting slings and straps provided by the Coast Guard. All equipment will be unfastened, unwired, and readied for removal by Coast Guard personnel.

NOTE

Crane will be required to hold the load over the main pier for an unspecified period while positioning the boom on stands.

SAFETY CAUTION!

A Coast Guard Deck Supervisor (Yellow Hard Hat) will direct all lifting and/or movement of the crane.

2.3 Equipment Reinstall. The Contractor shall lift equipment from the main pier to the Coast Guard Barge for reinstallation by Coast Guard personnel using lifting slings and straps provided by the Coast Guard.

NOTE

Crane will be required to hold the load over the Coast Guard Barge for an unspecified period while positioning the boom and securing it in place.

SAFETY CAUTION!

A Coast Guard Deck Supervisor (Yellow Hard Hat) will direct all lifting and/or movement of the crane.

3. Quality Assurance

3.1 Certification. Contractor shall provided proof of Certified Weight Test of crane and weight handling equipment within the last twelve (12) months. Proof must be faxed to the project manager no later than one (1) week prior to start of project.

4. Notes

4.1 All persons conducting business with or at the ISC Industrial Coast Guard

Facility and onboard Coast Guard Cutters while moored at this facility are required to meet all applicable safety requirements including weather conditions set forth by the Coast Guard Industrial Facility and the Army Corps of Engineers.