Copy of Pricing Schedule Bear Legare.xls
XLS spreadsheet 51 KB Posted
- Attached to
- USCGC LEGARE-BEAR DOCKSIDE REPAIR
- Solicitation number
- 70Z080-21-Q-P4557700
About this file
This document contains pricing schedules and a statement of work for dockside repair services for two Coast Guard cutters, the USCGC Legare and the USCGC Bear. The contractor will provide all labor and materials to complete cleaning, inspection, repair, renewal, and preservation services for items such as seawater heat exchangers, lube oil heat exchangers, HVAC ducts, piping systems, tanks, pumps, windows, decking and other vessel components as specified. Pricing is provided for definite line items for each cutter as well as optional items, with total pricing of definite and optional items and composite labor rates included. The related solicitation is for these dockside repair services to be provided under solicitation number 70Z080-21-Q-P4557700 for the Department of Homeland Security Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Legare-Bear-Amendment 1.pdf | ||
| LEGARE (WMEC 270B) DS FQ3 CMD 21R0.pdf | ||
| BEAR (WMEC 270A) DS FQ2 SRH 21R0.pdf | ||
| RFQ Bear Leagare Dockside.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGARE
| PRICING SCHEDULE FOR: | |||||
| USCGC LEGARE (WMEC-270B) DOCKSIDE AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Seawater Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $ - 0 | |
| D-002 | Lube Oil Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $ - 0 | |
| D-003 | 28 Volt DC Helo Power Supply, Load Test | JOB | 1 | $ - 0 | |
| D-004 | Windspeed Transmitter (Anemometer), Renew | JOB | 1 | $ - 0 | |
| D-005 | Flow Meter (Aviation Fuel), Calibrate | JOB | 1 | $ - 0 | |
| D-006 | Vent Ducts (Engine And Motor Room All), Commercial Cleaning | JOB | 1 | $ - 0 | |
| D-007 | Vent Ducts (Galley and Pantry Room All), Commercial Cleaning | JOB | 1 | $ - 0 | |
| D-008 | Vent Ducts (Laundry Exhaust), Commercial Cleaning | JOB | 1 | $ - 0 | |
| D-009 | Chill Water System, Clean And Flush | JOB | 1 | $ - 0 | |
| D-010 | Potable Water Pneumatic Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-011 | Potable Water System Valve, Renew | JOB | 1 | $ - 0 | |
| D-012 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | 1 | $ - 0 | |
| D-013 | Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | JOB | 1 | $ - 0 | |
| D-014 | Commissary Hoist, Inspect and Service | JOB | 1 | $ - 0 | |
| D-015 | Helo Talon Grids, Inspect and Test | JOB | 1 | $ - 0 | |
| D-016 | Sewage Discharge and Transfer Pumps, Renew | JOB | 1 | $ - 0 | |
| D-017 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-018 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-019 | Sewage Piping, Clean And Flush | JOB | 1 | $ - 0 | |
| D-020 | Decks, Helicopter Operating Areas, Preserve | JOB | 1 | $ - 0 | |
| D-021 | 400 Hz Power Supply, Load Test | JOB | 1 | $ - 0 | |
| D-022 | Auxiliary Salt Water Piping, Renew | JOB | 1 | $ - 0 | |
| D-023 | Counter Measure Washdown Piping and Nozzles, Renew | JOB | 1 | $ - 0 | |
| D-024 | Sounding Tubes, Renew | JOB | 1 | $ - 0 | |
| D-025 | Weather Deck Stanchions, Renew | JOB | 1 | $ - 0 | |
| D-026 | Sewage Piping, Renew | JOB | 1 | $ - 0 | |
| D-027 | Vent Ducts, Renew | JOB | 1 | $ - 0 | |
| D-028 | Bridge Windows, Renew | JOB | 1 | $ - 0 | |
| D-029 | Watertight Hatches (External DC Deck and Below), Renew | JOB | 1 | $ - 0 | |
| D-030 | Helicopter Tie-Down Fittings (Raised), Renew | JOB | 1 | $ - 0 | |
| O-031 | Tanks (Grey Water Holding), Preserve “Partial” | JOB | 1 | $ - 0 | |
| O-032 | Tanks (Sewage Holding), Preserve “Partial” | JOB | 1 | $ - 0 | |
| D-033 | Flexible Couplings, Renew | JOB | 1 | $ - 0 | |
| D-034 | Gun Control Booth Electrical Matting and Deck Plating, Renew | JOB | 1 | $ - 0 | |
| D-00C | Travel and Perdiem | JOB | 1 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 | ||||
| Composite Labor Rate for Growth Work: |
&C(10/28/2020) Draft-1 - Page &P of &N
BEAR
| PRICING SCHEDULE FOR: | |||||
| USCGC BEAR (WMEC-270A) DOCKSIDE AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Seawater Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $ - 0 | |
| D-002 | Lube Oil Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $ - 0 | |
| D-003 | 28 Volt DC Helo Power Supply, Load Test | JOB | 1 | $ - 0 | |
| D-004 | 400 Hz Power Supply, Load Test | JOB | 1 | $ - 0 | |
| D-005 | Windspeed Transmitters (Anemometer), Renew | JOB | 1 | $ - 0 | |
| D-006 | Flow Meter (Aviation Fuel), Calibrate | JOB | 1 | $ - 0 | |
| D-007 | Chill Water System, Clean And Flush | JOB | 1 | $ - 0 | |
| D-008 | Potable Water Pneumatic Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-009 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | 1 | $ - 0 | |
| D-010 | Helo Talon Grids, Inspect and Test | JOB | 1 | $ - 0 | |
| D-011 | Sewage Discharge Pumps, Renew | JOB | 1 | $ - 0 | |
| D-012 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-013 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-014 | Sewage Piping, Clean And Flush | JOB | 1 | $ - 0 | |
| D-015 | Decks, Helicopter Operating Areas, Preserve | JOB | 1 | $ - 0 | |
| D-016 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $ - 0 | |
| D-017 | Countermeasure Wash Down System, Repair | JOB | 1 | $ - 0 | |
| D-018 | Heated Bridge Windows, Renew | JOB | 1 | $ - 0 | |
| D-019 | Anchor Tripper Bar, Restore | JOB | 1 | $ - 0 | |
| D-020 | Helo Tie-Down Fittings, Renew | JOB | 1 | $ - 0 | |
| O-021 | Tanks (Grey Water Holding), Preserve “Partial” | JOB | 1 | $ - 0 | |
| O-022 | Tanks (Sewage Holding), Preserve “Partial” | JOB | 1 | $ - 0 | |
| D-023 | Steering System Relief Valves, Inspect and Test | JOB | 1 | $ - 0 | |
| D-00C | Travel and Perdiem | JOB | 1 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 | ||||
| Composite Labor Rate for Growth Work: |
&C(12/3/2020) Rev-0 - Page &P of &N
OVERALL
| PRICING SCHEDULE FOR: | ||
| USCGC LEGARE AND USCGC BEAR FY 21 DS | ||
| ITEM | DESCRIPTION | EXTENDED PRICE |
| D-000 | USCGC LEGARE Overall Total | $0 |
| USCGC LEGARE Definite Items | $0 | |
| USCGC LEGARE Optional Items | $0 | |
| D-100 | USCGC BEAR Overall Total | $0 |
| USCGC BEAR Definite Items | $0 | |
| USCGC BEAR Optional Items | $0 | |
| TOTAL PRICE OF DEFINITE ITEMS | $0 | |
| TOTAL PRICE OF OPTIONAL ITEMS | $0 | |
| TOTAL PRICE OF DEFINITE AND OPTIONAL ITEMS | $0 |
File details come from the government source that posted it. Updated .