This document is a pricing sheet for Jack-and-Bore Services Contract 309A-25, submitted by Underground Utilities, Inc., located in Monroeville, Ohio. The contract appears to be with the Ohio Department of Transportation, covering multiple state districts for underground utility installation services. The vendor contact is Scott Riley, who can be reached at 419-465-2587 or via email at general@uui.net.

The contract provides detailed pricing for steel casing installation across various pipe sizes (12 to 60 inches) and different ground conditions, including dirt, clay, shale, soft rock, and hard rock. Pricing is structured by bore head type, with rates ranging from $266 to $2,247 per linear foot depending on pipe diameter and ground complexity. Additional services include maintenance of traffic ($4,841 lump sum), flagging ($93 per hour), mobilization ($9,785 per district), and site restoration services. The pricing covers labor, equipment, and incidental costs for jack-and-bore operations across 12 Ohio transportation districts, with the vendor offering flexible installation capabilities for different ground and project specifications.

View the file

Other files

File Type Posted
Affirmation_and_Disclosure_ODOT_309A.25_completed.pdf PDF
Signature__4___1___002_.pdf PDF
309A-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendors

309A-25 PRICING: Jack-and-Bore Services 1 / 9 / 25
Vendor Name:Underground Utilities, Inc.
Telephone orders may be followed with fax confirmation sent by the Department.
Identify locations where orders will be placed, the name of an individual responsible for taking the orders, their telephone, and fax numbers.

Vendor Location: 416 W Monroe St. PO Box 428 Monroeville OH 44847

Contact Person: Scott Riley

Telephone Number: 419-465-2587 ext 127

Fax Number: 419-465-4289

Email Address: general@uui.net

1 COMPLETE ALL VENDOR INFORMATION ABOVE

2 FOR EACH ITEM YOU WISH TO BID, PROVIDE A UNIT PRICE.

3 FOR ITEMS THAT YOU DO NOT WISH TO PROVIDE A BID FOR, PLEASE LEAVE BLANK.

4……..AND DO NOT DELETE/REMOVE COLUMNS/ROWS FROM THIS BID SHEET.
BIDDERS MUST SUBMIT ANY QUESTIONS, CLARIFICATIONS, OR INQUIRIES

REGARDING THIS INVITATION TO BID VIA THE FOLLOWING WEBSITE:

http://www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Pages/PurchasePBQ.aspx

JACK & BORE OPERATION

309A-25 PRICING: Jack-and-Bore Services 1 / 9 / 25
VENDOR NAME:Underground Utilities, Inc.
CASING INFORMATION
Casing Details:Casing Meeting 748.06 ASTM A-139 Grade B Non Hydro

PART 1 - PRICING OF STEEL CASING INSTALLED (including incidentals)*

Provide a description of the various type boring heads used to auger, and the conditions in which they would typically be used. i.e. soil, rock, etc.
CONDITIONDESCRIPTION
BORE HEAD TYPE #1DirtClay/Sand/Gravel
BORE HEAD TYPE #2ShaleFlat Face Head or Altered Dirt Head
BORE HEAD TYPE #3Soft RockChristmas Tree Style for Boring Soft Rock
BORE HEAD TYPE #4Hard RockSmall Boring Unit or Rollar Cone Cutting Head for Boring Hard Rock including Limestone, Sandstone, or Hard Shale

HAND-MINED: per Linear Foot See section 6.3 for requirements and compensation for areas that require this method.

A vendor may bid on any or all sizes listed below. When bidding on a specific diameter, provide the sections lengths available and cost per linear foot.
Diameter of CasingSECTION LENGTH(S)$ / Linear Foot$ / Linear Foot$ / Linear Foot$ / Linear Foot
List length(s)BORE HEAD TYPE #1BORE HEAD TYPE #2BORE HEAD TYPE #3BORE HEAD TYPE #4
Nominal Pipe SizeWall Thickness(Linear FT)(Linear FT installed)(Linear FT installed)(Linear FT installed)(Linear FT installed)Nominal Pipe SizeWall Thickness
12 Inch0.50020------------->$266.00$327.00$642.00$745.0012 Inch0.500
14 Inch0.500------------->14 Inch0.500
16 Inch0.50020------------->$286.00$376.00$657.00$760.0016 Inch0.500
18 Inch0.50020------------->$313.00$417.00$684.00$787.0018 Inch0.500
20 Inch0.50020------------->$333.00$440.00$701.00$804.0020 Inch0.500
24 Inch0.50020------------->$391.00$496.00$829.00$932.0024 Inch0.500
26 Inch0.500------------->26 Inch0.500
28 Inch0.500------------->28 Inch0.500
30 Inch0.50020------------->$513.00$636.00$1,135.00$1,279.0030 Inch0.500
32 Inch0.500------------->32 Inch0.500
34 Inch0.500------------->34 Inch0.500
36 Inch0.50020------------->$607.00$718.00$1,222.00$1,388.0036 Inch0.500
40 Inch0.500------------->40 Inch0.500
42 Inch0.50020------------->$757.00$861.00$1,461.00$1,667.0042 Inch0.500
48 Inch0.50020------------->$881.00$992.00$1,713.00$2,022.0048 Inch0.500
54 Inch0.50020------------->$964.00$1,101.00$1,877.00$2,144.0054 Inch0.500
60 Inch0.50020------------->$1,045.00$1,188.00$1,980.00$2,247.0060 Inch0.500
* Part 1 shall include labor and operating equipment, as well as any incidentals, necessary to install the steel casing.
PART 2 - MAINTENANCE OF TRAFFIC
M.O.T.$4,841.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding PCB & End Treatment) to properly setup and maintain the work zone.
PCB (M.O.T.)$165.00Linear Ft.(When requested)A separate charge for temporary portable concrete barrier has been provided.
End Treatment (M.O.T)$2,987.00Each(When requested)A separate charge for an approved portable concrete barrier end treatment for work zones has been provided.
Flagger$93.00$ / hr / flagger(When required)The number of flaggers may vary from project to project.
Flagging charges apply during jack & bore operation, grouting, and seeding & mulching.

They do not apply during mobilization or staging area setup.

PART 3 - MOBILIZATIONPART 4 - STAGING AREA SETUPPART 5 - RESTORATION
3.14.14.24.35.15.2
MOBILIZATIONSTAGING AREA SETUPGROUTSEEDING & MULCHING
EXCAVATIONSITE MODIFICATIONSABANDONED PIPE
CYLump Sum Materials
with BackStopLump Sum Materials
without BackStopLump Sum Equipment
Lump SumCYSQ YD
District 1$9,785.00$108.00$8,034.00$3,811.00$3,811.00$340.00$14.00
District 2$9,785.00$108.00$8,034.00$3,811.00$3,811.00$340.00$14.00
District 3$9,785.00$108.00$8,034.00$3,811.00$3,811.00$340.00$14.00
District 4
District 5
District 6
District 7
District 8
District 9
District 10
District 11
District 12

3.1 MOBILIZATION OF EQUIPMENT TO THE STAGING AREA AND FOR MAINTENANCE OF TRAFFIC. (See Section 6.7)

4.1 EXCAVATION OF MATERIALS FOR STAGING AREA. (See Section 6.3)

4.2 MATERIAL COSTS FOR BRACING OF JACKING EQUIPMENT. (See Section 6.3)

4.3 EQUIPMENT COSTS TO PREPARE THE SITE FOR THE JACKING OPERATION. (See Section 6.3) This item will not apply if the equipment is on site as part of another pay item. Changing an attachment to a piece of equipment is not considered a different piece of equipment for this work.

5.1 GROUT or approved equivalent materials shall include any incidentals to seal outlet end and eliminate any voids during the pour. (See Section 6.3)

5.2 SEEDING & MULCHING (See Section 6.4)

VENDOR FACILITY LOCATION ( If multiple vendor locations to be utilized, provide separate bid sheet for each location )

ADRESS: 416 W Monroe St. CITY: Monroeville ZIP CODE: 44847

REQUEST FOR INFORMATION OF CASING ( OR APPROVED EQUIVALENT ) SUPPLIED BY BIDDER

Each bidder shall furnish types, dimensions, and product specifications for the pipe sizes bid.
The furnished information shall also specify the standard section length(s) of each type being supplied