About this file

This document is a contract deliverables export CSV file for the Department of Environmental Protection, specifically referencing Contract Number CN203 for professional engineering services. The contract appears to be an indefinite delivery vehicle focused on construction management and related professional services for environmental projects.

The contract involves cost reimbursement plus fixed fee arrangements for multiple task assignments, including preconstruction meetings, monthly reporting, and final project inspections. Pricing is structured with hourly rates for senior construction managers ($52.98-$137.42/hr) and project managers ($59.07-$167.51/hr), along with reimbursable expenses for items such as mileage, lodging, per diem, tolls, and parking fees. The contract includes provisions for performance metrics, with specific requirements for deliverable quality and timely submission. Financial consequences are outlined for unsatisfactory work, including the potential for task assignment or contract termination if deliverables do not meet specified standards. The total contract value appears to be structured in monthly increments, with one example showing a monthly not-to-exceed amount of $33,324.08 for a four-month period.

Text of this file

Agency Name,FLAIR Contract ID,Commodity/Service Type,Major Deliverable,Method of Payment,Major Deliverable Price,Non Price Justification,Performance Metrics,Financial Consequences,Source Documentation Page Reference,Deliverable Number DEPARTMENT OF ENVIRONMENTAL PROTECTION,CN203,Professional engineering services,As indicated in individual task assignments. ,"Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components",0.00,Agreement without a financial exchange or impact,"Prior to submission to the Department, the Consultant shall review all deliverables to ensure the same are accurate and complete at time of submittal and meet or exceed the specified deliverable. ","The Department will not pay for any unsatisfactory deliverables. In the event the Department deems a deliverable unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to the Department within 15 consecutive days. If the Consultant fails to resubmit a satisfactory deliverable within the specified timeframe, the Department, in its sole discretion, may terminate the Task Assignment and/or Agreement for failure to perform. ",As indicated in individual task assignments, DEPARTMENT OF ENVIRONMENTAL PROTECTION,CN203,Professional engineering services,"Task 1: Preconstruction Meeting Report and Form Package. Sr. Construction Manager 40hrs @ $52.98; Project Manager 2hrs @ $59.07; $800 for reimbursable expenses (mileage, lodging, per diem, tolls, parking fees, etc.) The Department shall reimburse the Contractor on a cost reimbursement plus fixed fee basis not to exceed $6,631.82","Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components",0.00,Price cannot be determined until the work has been completed,Timely and complete submittal of Preconstruction Meeting Report and Form Package. Package will include items as provided by the contractor. For Invoice Labor & reimbursable Period: Invoice will represent progress to date. ,"No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory. the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable. at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe. the Department may. in its sole discretion, terminate the Contract for failure to perform. ",T1,T1-1 DEPARTMENT OF ENVIRONMENTAL PROTECTION,CN203,Professional engineering services,"Task 1: Monthly Report and Form Package (include copies of reports and logs generated, documents received from the contractor, forms that may be applicable for the work done during the preceding month, meeting minutes and comments and approvals of any reviewed documents). Total not to exceed $33,324.08 per month. 4 months - 200 hours @ $137.42/hr Sr. Construction Manager, 8 hours @ $167.51/hr Project Manager, and $4,500.00 for reimbursables (mileage, lodging, per diem, tolls, parking fees, reproduction services, fax costs, film processing and delivery costs) per month. Cost Reimbursement plus Fixed Fee: $133296.32 ","Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components",0.00,Price cannot be determined until the work has been completed,Timely and complete submittal of Preconstruction Meeting Report and Form Package. Package will include items as provided by the contractor. For Invoice Labor & reimbursable Period: Invoice will represent progress to date. ,"No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory. the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable. at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe. the Department may. in its sole discretion, terminate the Contract for failure to perform. ",T1 PG5-6,T1-2 DEPARTMENT OF ENVIRONMENTAL PROTECTION,CN203,Professional engineering services,"Task 1: Final Inspection and Project Closeout Package. 1 Month - 200 hours @ $52.98/hr (Senior Construction Manager), 8 hours @ $59.07/hr (Project manager), Overhead 157.8%, Fee 10%, and $4,500 for reimbursables (mileage, lodging, per diem, told, parking fees, reproduction services, fax costs, film processing, and delivery costs). Cost Reimbursement plus Fixed Fee: $33,324.08 ","Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components",0.00,Price cannot be determined until the work has been completed,Timely and complete submittal of Preconstruction Meeting Report and Form Package. Package will include items as provided by the contractor. For Invoice Labor & reimbursable Period: Invoice will represent progress to date ,"No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory. the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable. at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe. the Department may. in its sole discretion, terminate the Contract for failure to perform. ",T1 PG7-8,T1-3

Other files

File Type Posted
CN-370000-CN203.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .