This document is a Contract Deliverables Export from the Florida Department of Transportation (FDOT), specifically for a contract with the FLAIR Contract ID BE926. The contract pertains to a specific project at the Treasure Coast Operation Center and involves procurement and replacement activities.

The contract covers the replacement of above-ground fuel storage tanks, including associated piping and electrical connectors. The total contract value is $155,910.00, structured as a fixed price lump sum agreement. The contract includes specific performance metrics and financial consequences, with penalties of $676.00per day for late completion or failure to meet contract requirements. The scope of work requires the contractor to provide all necessary labor, materials, and equipment to complete the tank replacement project, with strict adherence to established contract specifications and procedures.

Text of this file

Agency Name,FLAIR Contract ID,Commodity/Service Type,Major Deliverable,Method of Payment,Major Deliverable Price,Non Price Justification,Performance Metrics,Financial Consequences,Source Documentation Page Reference,Deliverable Number DEPARTMENT OF TRANSPORTATION,BE926,Tanks and cylinders and their accessories,"Replacement of above ground fuel storage tanks, associated piping and electrical connectors. The work specified under this Contract shall consist of providing all labor, materials, equipment, and incidentals necessary to perform the replacement of the existing above ground fuel storage tanks at the Florida Department of Transportation, Treasure Coast Operation Center.",Fixed Price - Lump Sum,155910.00,,"a. Work not completed within allowed timeframe: Work must be completed within timeframe established in this Contract.b. Work not completed correctly or according to requirements: Re-perform the work until correct. Work must be completed according to requirements established in this Contract, procedures, specifications, and other Contract documents.",a. $676.00 per day for each calendar day late.b. $676.00 per day for each calendar day late due to exceeding allowed timeframe in reperforming the work.,NOT COLLECTED,

Other files

File Type Posted
CN-550000-C9048-00020000.pdf PDF
ContractBudgetExport.csv CSV file
ContractDeliverablesExport (2).csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .