ContractDeliverablesExport (1).csv

CSV file 1 KB Posted

Attached to
Master Agreement FL|CN806|1e3ed82de988f9bc8255dce9d4b129d8
Contract number
CN806
Issued by
Florida

About this file

This document is a contract deliverables export from the Florida Department of Environmental Protection (DEP), with a FLAIR Contract ID of GC153. The contract appears to be a statewide service agreement for environmental rehabilitation and petroleum contamination site response actions.

The contract is structured as a cost reimbursement plus fixed fee arrangement, with deliverables established on a work assignment basis. Financial consequences for unsatisfactory performance are clearly defined, including the potential for work assignment termination or required corrective action plans if deliverables do not meet specified standards. The contract allows the Department to withhold payment for unsatisfactory work and requires the contractor to re-perform services at no additional cost within 30 days of notification. The major deliverable pricing is listed as $0.00, suggesting the actual costs will be determined through individual work assignments.

Text of this file

Agency Name,FLAIR Contract ID,Commodity/Service Type,Major Deliverable,Method of Payment,Major Deliverable Price,Non Price Justification,Performance Metrics,Financial Consequences,Source Documentation Page Reference,Deliverable Number DEPARTMENT OF ENVIRONMENTAL PROTECTION,GC153,Environmental rehabilitation,Petroleum contamination site response action services statewide. Deliverables established on a work assignment basis. ,"Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components",0.00,Rate Agreement,Established on a work assignment basis ,"Financial Consequences for Unsatisfactory Performance. No payment will be made for unsatisfactory deliverables. Department shall notify Contractor of all unsatisfactory deliverables. Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, Department may, in its sole discretion, either: 1) terminate the Work Assignment for failure to perform, or 2) Department Contract Manager, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to Department. CAPs must be able to be implemented and performed in no more than sixty (60) days following submittal. ",,

Other files

File Type Posted
CN-370000-CN806.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .