Contract Information - Loading Dock Equipment Installation Maintenance and Repair.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
LOADING DOCK EQUIPMENT, INSTALLATION, MAINTENANCE, AND REPAIR
Contract number
UWMSN-2026-5700-LOADING DOCK EQUIPMENT, INSTALL
Issued by
Wisconsin

About this file

This document is a contract award for loading dock equipment, installation, maintenance, and repair services established by the University of Wisconsin-Madison. The contract is available for use by all UW campuses, Wisconsin state agencies, and municipalities. The awarded contractor is Paul Reilly Company under contract number UWMSN-2026-5700-LOADING DOCK EQUIPMENT, INSTALL, with a primary contact of DJ Hicks at 608-893-2496 or dhicks@paulreilly.com.

The contract encompasses two lots of services and equipment. Lot 1 covers service and maintenance, including planned maintenance visits or inspections at $150.00 per visit, with hourly rates for additional services and repairs at $155.00 for regular hours, $232.50 for overtime, and $310.00 for Sunday and holiday work, with travel time added at 50 miles. Lot 2 provides installed dock equipment from Advance Lifts, including recessed dock lifts ranging from $17,500.00 to $42,500.00 depending on model, and a Serco mechanical dock leveler at $7,800.00, all with installation included. The contract term runs from May 1, 2026 through April 30, 2030, with automatic renewal extensions extending through April 30, 2032 unless amended, cancelled, or rebid.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Information

LOADING DOCK EQUIPMENT, INSTALLATION, MAINTENANCE, AND REPAIR

Purpose/Scope: The University of Wisconsin-Madison requests bids to establish a contract for the purchase of LOADING DOCK EQUIPMENT, INSTALLATION, MAINTENANCE, AND REPAIR. All University of Wisconsin-Madison departments must be eligible to purchase from this contract.

Contract Term: May 1, 2026 through April 30, 2030, with automatic renewal extensions to April 30, 2032, unless amended, cancelled or rebid.

Paul Reilly Company

Contract # UWMSN-2026-5700-LOADING DOCK EQUIPMENT, INSTALL

Contract Available To: UW Campuses, WI State Agencies and Municipalities

F.O.B.: V - Service/Maintenance, I - Installed

Contact for Ordering: DJ Hicks, 608-893-2496, dhicks@paulreilly.com

Award: Service/Maintenance, Equipment

Notes: Travel time will be added at 50 Miles

Pricing/Bid Information: See below

Paul Reilly Company
Lot 1: Service/Maintenance
Item Name, Description, EtcQuantityUnit of MeasurementUnit Price
Price per Planned Maintenance Visit/Inspection1Each$ 150.00
Hourly Rate for additional Services/Repairs, Regular1Hour$ 155.00
Hourly Rate for additional Services/Repairs, Overtime1Hour$ 232.50
Hourly Rate for additional Services/Repairs, Sunday/Holiday1Hour$ 310.00
Lot 1 Total$ 847.50
Lot 2: Equipment
Item Name, Description, EtcQuantityUnit of MeasurementUnit Price
Advance Lifts Model # T2-50608 Recessed Dock Lift (FOB INSTALLED)1Each$ 17,500.00
Advance Lifts Model # T2-60608 Recessed Dock Lift (FOB INSTALLED)1Each$ 17,500.00
Advance Lifts Model # T3-60810 Recessed Dock Lift (FOB INSTALLED)1Each$ 22,500.00
Advance Lifts Model # 3100 Recessed Dock Lift (FOB INSTALLED)1Each$ 26,500.00
Advance Lifts Model # 3480 Recessed Dock Lift (FOB INSTALLED)1Each$ 34,500.00
Advance Lifts Model # 3660 Recessed Dock Lift (FOB INSTALLED)1Each$ 42,500.00
Serco Model # WL800 Mechanical Dock Leveler (FOB INSTALLED)1Each$ 7,800.00
Lot 2 Total$ 168,800.00

File details come from the government source that posted it. Updated .