Construction Services - West Hollywood Recovery Center - Log Cabin Renovation and Expansion Project.pdf
PDF 154 KB Posted
- Attached to
- Construction Services - West Hollywood Recovery Center - Log Cabin Renovation and Expansion Project
- Solicitation number
- FFS 0001
- Issued by
- Los Angeles County, California
About this file
This is a bid invitation document from the City of West Hollywood's Public Works Department for construction services related to the West Hollywood Recovery Center Log Cabin Renovation and Expansion Project. The project is divided into two phases: Phase One includes construction of a new single-story building containing two meeting rooms and storage, a new restroom building, a new office structure, parking lot reconfiguration, electronic vehicle charging stations, photovoltaic panels, and associated site work; Phase Two comprises renovation of the existing historic Log Cabin. The existing Log Cabin must remain operational during Phase One construction, with operations transitioning to the completed Phase One facilities before Phase Two begins. The invitation number is FFS 0001, with a bid due date of August 31, 2026 at 1:00 PM PDT. A mandatory onsite pre-bid meeting is scheduled for August 11, 2026 at 10:00 AM PDT at 621 N Robertson Boulevard, West Hollywood, California, with an online Q&A deadline of August 14, 2026 at 10:00 AM PDT. The project is anticipated to commence in October 2026.
This lump sum construction project carries an estimated bid value of $15,000,000 and requires a Class B contractor license. Bidders must provide a bid bond of 10 percent, payment bond of 100 percent, and performance bond of 100 percent. The bid valid liquidated damages are set at $3,000 per calendar day. Responses must be submitted electronically through the PlanetBids Vendor Portal. The project has been canceled as of the document posting date of July 31, 2026. Contact for additional information is Erin Hamant at 323-848-6859 or ehamant@weho.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Deputy Building Inspection Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of West Hollywood
Opportunity Detail
Bid Bond
Pre-Bid Meeting Information
Online Q&A
Contact Information
Construction Services - West Hollywood Recovery Center - Log Cabin Renovatio
Title Construction Services - West Hollywood Recovery Center - Log Cabin Renovation and Expansion Project Invitation # FFS 0001
Posting Date 07/31/2026 2:44 PM (PDT) Project Stage Canceled Bid Due Date 08/31/2026 1:00 PM (PDT)
Response Format Electronic
Type Bid Response Types Line Items
General Attachment (required) Type of Award Lump Sum
Categories 90900 - Building Construction Services, New (Incl. Maintenance And Repair Services) 90922 - Building Construction, Non-Residential (Office Bldg., Etc.)
91200 - Construction Services, General (Incl. Maintenance And Repair Services) 91400 - Construction Services, Trade (New Construction)
License Requirements Class B
Department Public Works
Address 8300 Santa Monica Blvd West Hollywood, California 90069
County Los Angeles
Bid Valid Liquidated Damages $3000 per calendar day Estimated Bid Value 15,000,000 Engineer's Estimate Start/Delivery Date October 2026
Project Duration
Bid Bond 10.00% Payment Bond 100.00%
Performance Bond 100.00%
Pre-Bid Meeting Yes Meeting Type Onsite
Date & Time 08/11/2026 10:00 AM (PDT) Address 621 N Robertson Boulevard, West Hollywood, California
Attendance Required Yes
Online Q&A Yes Q&A Deadline 08/14/2026 10:00 AM (PDT)
Contact Info Erin Hamant 323-848-6859 ehamant@weho.org
Bids to Owner's Agent
8/2/26, 12:57 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/22761/bo/bo-detail/144650#bidInformation 1/2
Description
Search & Bid on Thousands of Contracts
Scope of Services As set forth in the Project Bid Documents, the proposed work is split into two phases of construction for the West Hollywood Recovery Center - Log Cabin Renovation & Expansion Project.
Phase One consists of a new, single-story building (two meeting rooms and storage), new restroom building, new office structure, and reconfiguration of the parking lot, electronic vehicle charging stations, photovoltaic panels, and other site work.
Phase Two includes renovation of the existing, historic Log Cabin. The existing Log Cabin will need to stay in operation during the Phase One construction. After the completion of Phase One (fully operational), the operations in the Log Cabin will move into Phase One and Phase Two construction can begin.
Other Details Notes
Special Notices Local Programs & Policies www.vendorline.com
8/2/26, 12:57 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/22761/bo/bo-detail/144650#bidInformation 2/2 https://vendor.planetbids.com/
File details come from the government source that posted it. Updated .